Amendment_0001_-_Q&A.pdf
PDF 35 KB Posted
- Attached to
- ACAD Duck Pier Replacement Federal contract opportunity
- Solicitation number
- P17PS00107
About this file
Amendment 0001 - Q & A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_Amendment_0003_(Final).pdf | ||
| Sol_P17PS00107_Amd_000003.pdf | ||
| General_Decision_Number.pdf | ||
| Pre-Bid_Sign_in_Sheet.pdf | ||
| P17PS00107_-_Amendment_0002.pdf | ||
| Q_&_A_Amendment_0002.pdf | ||
| Wage_Decision_(Heavy)_ME170008_(01-16-2017).pdf | ||
| Wage_Decision_(Heavy_Dredging)_ME170004_(01-16-2017).pdf | ||
| Wage_Decision_(Heavy_Dredging)_ME170001_(01-16-2017).pdf | ||
| P17PS00107_-_Amendment_0001.pdf | ||
| ACAD_163552B_DHP_SPECS.pdf | ||
| 1_Experience_Questionnaire.docx | DOCX document | |
| 7_SF_24_BidBond.pdf | ||
| 4_ProposedEquals.doc | DOC document | |
| ACAD_163552B_DHP_DRAWINGS.pdf | ||
| P17PS00107.pdf | ||
| 5_HazMat.doc | DOC document | |
| 3_Key_Personnel_Qualifications.docx | DOCX document | |
| 8_GeneralReferences.doc | DOC document | |
| 2_Subcontractor_Reference.doc | DOC document | |
| 6_Past_Performance_Questionnaire.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Solicitation: P17PS00107
Q1. Are there any union requirements for this project and what is the estimated project value?
A1. There are no specific union requirements placed on this contract; however it is the offeror’s responsibility to ensure all union rules/guidelines for specific trades within the local area are followed as/if applicable. The order of magnitude for this project is between $500,000 to
$1,000,000 IAW FAR 36.204
Q2. What is the dollar range (rough order of magnitude) for this project?
A2. See answer to Question 1.