Sol_P15PS01074.pdf
PDF 468 KB Posted
- Solicitation number
- P15PS01074
About this file
P15PS01074
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_0005_Questions_and_Answers_05.11.2015.docx | DOCX document | |
| Sol_P15PS01074_Amd_000003.pdf | ||
| Sol_P15PS01074_Amd_000002.pdf | ||
| Attachment_0004_Questions_and_Answers.docx | DOCX document | |
| Sol_P15PS01074_Amd_000001.pdf | ||
| Attachment_0002-_SOW_and_Specs.pdf | ||
| Attachment_0001_DB_wage_rates.PDF | ||
| Attachment_0003-_Plans_Flamingo_VC_Roof_(1).pdf | ||
| Synopsis_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040207749
NPS, SER - South MABO
40001 SR 9336
Homestead FL 33034
PSS
Celinda Hicks
Everglades National Park- Contracting
40001 SR 9336
Homestead, FL 33034
Celinda Hicks 305-242-7742
1x 04/28/2015
P15PS01074
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Replace Visitor Center Roof in Flamingo, Everglades National Park
Location: Everglades National Park- Flamingo
P15PS01074
Estimated Range is between $150,000 and $370,000
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 90 calendar days and complete it within ________________ ________________ calendar days after receiving
05/18/2015
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
NPS, SER - South MABO
40001 SR 9336
Homestead FL 33034
PSS
Celinda Hicks
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 37
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
P15PS01074
Suggested COR: TMANZIN1
Delivery: 09/01/2015
Delivery Location Code: 0009060297
NPS, Everglades NP
40001 State Road 9336
Homestead FL 33034-6733 US
FOB: Destination
Period of Performance: 05/25/2015 to 08/31/2015
00010 Replace Flamingo VC Roof
Period of Performance: 05/01/2015 to 09/01/2015
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Part I------The Schedule Part I------The Schedule SECTION A - Solicitation/Contract Form
PERFORMANCE/PAYMENT BONDS
SECTION B - Price Schedule SECTION C - Description/Specifications SECTION D - Packaging and Marking SECTION E - Inspection and Acceptance E.1 FAR 52.246-12 Inspection of Construction (AUG 1996) SECTION F - Deliveries or Performance
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APRIL
F.1 52.242-14 SUSPENSION OF WORK
Section G – Contract Administration Data G. 1 Contracting Officer:
G.2 Contract Officer Representative:
G.3 TECHNICAL DIRECTION
G.4 CORRESPONDENCE
SECTION H - Special Contract Requirements H.2 CONTRACTOR PERFORMANCE INFORMATION (DIAPR) 2010-14, Amendment 1
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)
DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Copy of the Vendor ’s Commercial Invoice SECTION I - Contract Clauses
I.1 52.252-02 CLAUSES INCORPORATED BY REFERENCE
Liability Insurance—Department of the Interior (JUL 1996) 52.204-8 Annual Representations and Certifications (Jan 2014) 52.204-12 Data Universal Numbering System Number Maintenance (Dec 2012) ) 52.219-14 Limitations on Subcontracting. (NOV 2011)
52.222.8 Payrolls and Basic Records. (JUN 2010)
52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-11 Subcontracts (Labor Standards). (JUL 2005) 52.222-15 Certification of Eligibility. (FEB 1988) 52.228-5 Insurance - Work on a Government Installation. (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995) 52.228-15 Performance and Payment Bonds - Construction. (OCT 2010) 52.236-26 Preconstruction Conference. (FEB 1995) 52.236-27 Site Visit (Construction) (Feb 1995) 52.243-5 Changes and Changed Conditions. (APR 1984) 52.246-21 Warranty of Construction (MAR 1994) 52.249-2 Termination for Convienience 52.249-10 Termination for Default (Fixed Price Construction) SECTION K - Representations, Certifications, and Other Statements of Bidders SECTION L - Instructions, Conditions, and Notices to Offerors/Bidders
L.1 I4252.233-02 SERVICE OF PROTEST- DEPARTMENT OF INTERIOR
(DEVIATION) JULY 1996
L.2 52.204-06 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER JULY
L.3 52.215-01 INSTRUCTIONS TO OFFERORS--COMPETITIVE JANUARY 2004 ... 31
L.4 52.216-01 TYPE OF CONTRACT APRIL 1984
SECTION M - Evaluation Factors for Award
SECTION A - Solicitation/Contract Form
NOTICE TO PROSPECTIVE OFFEROR’S
SUBMISSION OF DOCUMENTS: Your offer must include the following Sections and Forms:
SF-1442, SOLICITATION, OFFER AND AWARD. PLEASE NOTE: The SF-1442 must be signed, and dated, and Blocks 14 through 20c must be completed.
SF-1442, ITEM 17, Offeror is cautioned to review acceptance time stated in Item 13d prior to completing this item. Proposals offering less than specified time will cause proposal to be rejected.
*Please see Section L, instructions to Offeror for proposal submission requirements.
SECTION B, Price Schedule along with cost proposal *see section L
SECTION K, Representations, Certifications and other statements of offerors
The proposal due date: May 18, 2015 at 3 P.M. Eastern Time.
Email Proposal to: Celinda_hicks@nps.gov, please include solicitation number and title in email subject.
*If you select to mail proposals, MAIL PROPOSAL TO:
Celinda Hicks Contracting Officer South Administrative Service Unit - South MABO Everglades National Park/NPS
40001 SR 9336
Homestead, FL 33034
Note:
PERFORMANCE/PAYMENT BONDS – Successful offeror will be required to furnish bonds on Standard Forms 25 and 25A based on contract amounts within the following ranges: 100 percent performance bond, 100 percent payment bond.
All questions regarding this solicitation must be submitted in writing to the Contracting Officer. Questions must be submitted by May 12, 2015 at 4:00 P.M. Eastern Time.
Questions submitted after this time may NOT be considered.
mailto:Celinda_hicks@nps.gov
SECTION B - Price Schedule
CONTRACT
LINE ITEM
NUMBER
CONTRACT LINE ITEM (CLI) TITLE
QUANTITY
UNIT OF
MEASURE
TOTAL
PRICE
1 Replace VC Roof at Flamingo
AU
SECTION C - Description/Specifications
SEE ATTACHMENTS
SECTION D - Packaging and Marking
D.1 PAYMENT OF POSTAGE AND FEES
All postage and fees related to submitting information forms, reports, etc., to the CO or the COR shall be paid by the contractor.
Marking
All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the Solicitation Number of the Solicitation for which the information is being submitted.
SECTION E - Inspection and Acceptance
E.1 FAR 52.246-12 Inspection of Construction (AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements.
The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting
Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not—
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may—
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction.
However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately.
Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of clause)
SECTION F - Deliveries or Performance
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
APRIL 1984
The Contractor shall be required to (a) commence work under this contract within ten
(10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days. The time stated for completion shall include final cleanup of the premises.
F.1 52.242-14 SUSPENSION OF WORK APRIL 1984
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed--
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
Section G – Contract Administration Data
G. 1 Contracting Officer:
Celinda Hicks
Contracting Officer South Administrative Service Unit - South MABO Everglades National Park/NPS
40001 SR 9336
Homestead, FL 33034 305-242-7742 celinda_hicks @nps.gov
G.2 Contract Officer Representative:
Jose A. Baerga Architect Everglades & Dry Tortugas National Parks 40001 State Road 9336 Homestead, Florida 33034 305-242- 7779 Jose_Baerga@nps.gov
G.3 TECHNICAL DIRECTION
The performance of the work required herein shall be subject to the technical direction and surveillance of the COR or his designee. As used herein, "technical direction" is direction to the Contractor which requires pursuit of certain lines of inquiry, filing in details or otherwise serving to accomplish the contract specifications. The technical direction, to be valid:
(a) Must be issued in writing consistent with the general scope of the work set forth in the contract;
(b) May not constitute a new assignment of work changes to the expressed terms, conditions, or specifications incorporated into this contract;
(c) Shall not constitute a basis for extension of the contract delivery schedule.
Nothing contained in this part authorizes the Contractor to incur costs in excess of the contract price or other limitation of funds set forth in the contract due to extra work performed in response to informal directions, suggestions, or instructions (oral or written) given by representatives of the CO, unless prior to commencing such work, the Contractor: 1) directly notifies the CO; 2) requests a formal contract modification; and 3) receives written authorization to proceed from the CO.
G.4 CORRESPONDENCE
Any correspondence initiated by the Contractor shall include the solicitation Number and shall be addressed to the CO at the address provided in the clause entitled "Contractor Administration".
G.5 CONTRACT PAYMENTS
The Contractor shall submit invoices in two copies monthly to the Contracting Officer for the percentage of work completed. Contractor and COR at the site must agree on the percentage of work completed at the end of each month. The COR must sign this invoice or it will be returned to the Contractor and will delay payment. A correctly signed invoice is reviewed by mailto:william_w_leady@nps.gov the COR and returns the payment request to the CO who approves and processes for payment.
Payments are authorized by Clause 52.235-5, which requires that the Contractor certify with each payment request that he has paid or will pay with the proceeds of the payment his employees and subcontractors.
G.6 JOB SITE ADMINISTRATION
The Government will designate a Project Inspector (PI) who will be available at the site to inspect the work as it progresses. The PI will prepare an Inspector's Daily Log, detailing ground and weather conditions, work being performed, materials delivered, and notes of any problems or difficulties. At the end of every day of work on this contract, the Contractor's Superintendent, as defined below, shall contact the PI, review the daily log, and sign as the Contractor's Representative. Unless the Contractor's Superintendent makes notations to the contrary on a daily log, then the log shall be presumed to be accurate. The PI is not authorized to make technical decisions or give technical directions; the Contractor or the Contractor's Superintendent must contact the COR regarding such decisions and directions.
The Contractor shall have a competent superintendent (hereinafter referred to as the "Contractor's Superintendent") who is (i) deemed acceptable to the Government; (ii) authorized to act on the Contractor's behalf; and (iii) to be present on the job site at all times when contract work is being performed.
G.7 PAYROLL RECORDS
The Prime Contractor is responsible for furnishing the Contracting Officer with one (copy of the Weekly Payroll Form WH-347 or equivalent) to include payroll records for his/her subcontractors. Payroll records shall be submitted within seven (7) days after the close of the payroll period and numbered in consecutive order. The Prime Contractor shall review all subcontractors' payroll and ensure that all employees are paid in accordance with the Wage Determination, which is a part of this contract.
The Prime Contractor shall ensure that compliance is met. The Contractor is subject to the Wage and Hour Dept., U.S. Department of Labor, and may be subject to liquidated damage for non-compliance
G.8 SUBCONTRACTING
The Prime Contractor shall complete a Standard Form (SF1413) for each subcontractor and submit the form to the Contracting Officer at the Pre-Construction meeting. No subcontractor shall be allowed on the site without an executed SF 1413. The Prime shall be held responsible for ensuring that his/hers subcontractor's DO NOT subcontract any portion of this work. The Prime Contractor is responsible to ensure that all subcontractors carry sufficient insurance in accordance with this contract
SECTION H - Special Contract Requirements
H.1 EXECUTIVE ORDER 13513 PROHIBITION ON TEXT MESSAGING AND USING
ELECTRONIC EQUIPMENT SUPPLIED BY THE GOVERNMENT WHILE DRIVING as prescribed in Federal Leadership on Reducing Text Messaging While Driving
Prohibition on Text Messaging and Using Electronic Equipment Supplied by the Government while Driving (Oct, 2009)
This Executive Order introduces a Federal Government-wide Prohibition on the use of text messaging while driving on official business or while using Government –supplied equipment.
Additional guidance enforcing the ban will be issued at a later date. In the meantime, please adopt and enforce policies that immediately ban text messaging while driving company-owned or –rented vehicles, government-owned or leased vehicles, or while driving privately owned vehicles when on official government business or when performing any work for or on the behalf of the government.
(End of order)
H.2 CONTRACTOR PERFORMANCE INFORMATION (DIAPR) 2010-14, Amendment 1
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)
(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
(b) The past performance evaluation process is a totally paperless process using CPARS.
CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.csd.disa.mil/. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.
(e) Within 60 days after the end of a performance period, the Contracting Officer will http://www.cpars.csd.disa.mil/ complete an interim or final past performance evaluation and the report will be accessible at http://www.cpars.csd.disa.mil/. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
Your response is due within 30 calendar days after receipt of the CPAR.
(f) The following guidelines apply concerning your use of the past performance evaluation:
(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.
(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.
(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30-day review period.
(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
H.3 SAFETY
The Contractor is responsible for establishing and maintaining compliance with all applicable laws, regulations, rules, and standards, including without limitation, those regulations, rules, and standards, promulgated for the administration and enforcement of the following laws: the Occupational Safety and Health Act (OSHA) or Federally approved State equivalent(s) thereof; the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) as amended by Superfund Amendments and Reauthorization Act (SARA);
Emergency Planning and Community Right-to-Know Act (EPCRA); Clean Air Act (CAA);
Clean Water Act (CWA) and Toxic Substances Control Act (TSCA); and Solid Waste Disposal Act (SWDA), as amended by Resource Conservation and Recovery Act (RCRA).
H.4 PROGRESS MEETINGS
(a) The Contractor shall be available to meet with the CO or his/her representative at the job site during construction to discuss work progress.
(b) Meetings will be scheduled by the CO with timely notification to the Contractor.
(c) At the progress meetings, the Contractor shall give oral reports of the progress on the project to the CO. If the work is behind schedule, the Contractor shall be prepared to (i) discuss the work and any causes of work delay(s);
(ii) present a plan to bring the work back into conformance with the schedule; or, if necessary (iii) to propose a revised work schedule.
H.5 PAYROLLS
The Contractor must furnish copies of his weekly payrolls to the CO. Payroll submission is required weekly, seven (7) days after close of payroll period.
H.6 OPERATION OF FACILITY DURING CONSTRUCTION
Construction activities must not interrupt the function and day-to-day operations of the facility during construction. The contractor must coordinate with the Project Inspector for any temporary measures. All temporary measures employed shall be at the Contractor's expense and shall be removed upon completion of the contract. Normal work hours are from 7:30 a.m. through 4:00 p.m., Monday through Friday.
H.7 1489.236-79 CONDUCT OF OPERATIONS (JANUARY 1988)
At all times the Contractor shall conduct his organization in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and with such appropriate regulations as the Superintendent may prescribe. Work on Saturdays, Sundays, Federal Holidays or at night may be performed only with the prior consent of the Contracting Officer
No signs or advertisement (except those specified herein) shall be displayed on the construction site or within the park except with approval of the Contracting Officer.
H.8 SAMPLES AND CERTIFICATES
When required by the specifications or the contracting Officer, samples, certificates, and test data shall be submitted after award of the contract, prepaid, in time for proper action by the contracting Officer or his/her designated representative. Certificates and test data shall be submitted in triplicate to show compliance of materials and construction specified in the contract performance requirements. Samples shall be submitted in duplicate by the contractor, except as otherwise specified, to show compliance with the contract requirements. Materials or equipment for which samples, certifications or test data are required shall both be used in the work until approved in writing by the Contracting Officer.
H.9 EXCAVATION AND UTILITY CLEARANCES
The Chief of Maintenance shall ensure that the Contractor is provided with necessary excavation and utility clearances. The Contractor shall request such clearances and staking in writing to the Contracting Officer no less than ten (10) calendar days prior to the date which he/she anticipates commencement of work. The Contractor will not proceed with excavation of any kind until such clearances have been issued. Clearances will be valid from the date of issue or completion of, or otherwise directed by the issuing authority.
H.10 DISPOSAL
Debris, rubbish, and non-usable material resulting from under this contract shall be disposed in a manner that meets federal, state and local laws.
H.11 CONTRACTOR EMPLOYEES
(a) The Contractor shall provide the Contracting Officer with the name(s) of responsible the responsible supervisor authorized to act for the Contractor.
(b) The Contractor shall furnish sufficient personnel to perform, supervise and manage all work.
(c) Contractor employees shall conduct themselves in a proper, efficient, courteous and business-like manner.
(d) The Contractor shall remove from the site any individual whose continued employment is deemed by the contracting Officer to be contrary to public interest or inconsistent with the National Park Service.
H.12 PERMITS
The contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required to perform work under this contract. The Contractor shall comply with federal, state and local laws. Evidence of such permits and licenses shall be provided to the Contracting Officer before work commences, or as requested.
H.13 COMPLETION OF WORK
The time stated for completion of the project includes all materiel procurement, payroll records, corrections of all discrepancies (Punch List Items), and final clean up on premises as stated in the clause "Commencement, Prosecution and Completion of Work", FAR 52.211-10 (APR 1984) Section F.
H.14 MATERIAL APPROVAL SUBMITTALS
The submittals contemplated by the clause herein entitles "Materials and Workmanship", FAR 52.236-5 (APR 1984), Section I, shall be submitted to the Contracting Officer through the COR in five (5) copies. The Denver Service Center Form (DSC-1) entitled "Transmittal USDI, National Park Service", shall be used. Contractor shall re-submit any disapproved submittals within seven (7) calendar days of disapproval.
H.15 ARCHEOLOGICAL FINDINGS
Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed and only by the Government. Should Contractor's operations uncover or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery; notify Contracting Officer immediately of the findings; and continue operation in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for the contractor, he will be compensated by an equitable adjustment under the General Provision of the Contract.
DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Internet Payment Platform (IPP) APRIL 2013
Beginning May 1, 2011, payment requests for all new awards must be submitted electronically through the U. S. Department of the Treasury's Internet Payment Platform System (IPP). Payment terms for existing contracts and orders awarded prior to May 1 remain the same. The Contractor must use IPP for contracts and orders awarded May 1 and later, and must use the non-IPP invoicing process for those contracts and orders awarded prior to May 1.
Copy of the Vendor ’s Commercial Invoice
Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury’s Invoice Processing Platform System (IPP).
“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
https://www.ipp.gov/
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
The contractor must submit to the CO and the COR the payroll for the general contractor and any applicable sub-contractors and an updated schedule.
The contractor must us the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instruction via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date.
Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment the Contractor must submit a waiver request in writing to the Contracting Office with its proposal or quotation.
SECTION I - Contract Clauses
I.1 52.252-02 CLAUSES INCORPORATED BY REFERENCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.arnet/far.gov
Clause Title Date
1452.203-70 Restriction on Endorsements July 1996
1452.210-70 Brand Name or Equal--Department of the Interior July 1996
1452.215-70 Examination of Records by the Department of the Interior April 1984
1452.224-01 Privacy Act Notification (July 1996) Deviation July 1996
1452.236-70 Prohibition Against Use of Lead-based Paint July 1996
52.202-01 Definitions November 2013
52.203-03 Gratuities April 1984
52.203-05 Covenant Against Contingent Fees April 1984 mailto:ippgroup@bos.frb.org
52.203-06 Restrictions on Subcontractor Sales to the Government September 2006
52.203-07 Anti-Kickback Procedures October 2010
52.203-08 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
January 1997
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity January 1997
52.203-12 Limitation on Payments to Influence Certain Federal Transactions
October 2010
52.203-13 Contractor Code of Business Ethics and Conduct April 2010
52.204-01 Approval of Contract December 1989
52.204-04 Printed or Copied Double-Sided on Recycled Paper May 2011
52.209-06 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
August 2013
52.211-16 Variation Quantity April 1984
52.211-18 Variation in Estimated Quantity April 1984
52.215-01 Instructions to Offerors – Competitive Acquisition January 2004
52.215-02 Audit and Records--Negotiation Oct 2010
52.215-08 Order of Precedence--Uniform Contract Format October 1997
52.215-10 Price Reduction for Defective Cost or Pricing Data August 2011
52.215-11 Price Reduction for Defective Cost or Pricing Data--Modifications
August 2011
52.215-12 Subcontractor Certified Cost or Pricing Data October 2010
52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications October 2010
52.219-04 Notice of Price Evaluation Preference for HUBZone Small Business Concerns
January 2011
52.219-08 Utilization of Small Business Concerns July 2013
52.219-14 Limitations On Subcontracting November 2011
52.222-01 Notice to the Government of Labor Disputes February 1977
52.222-03 Convict Labor June 2003
52.222-09 Apprentices and Trainees July 2005
52.222-10 Compliance with Copeland Act Requirements February 1988
52.222-11 Subcontracts (Labor Standards) July 2005
52.222-12 Contract Termination-Debarment February 1988
52.222-26 Equal Opportunity March 2007
52.222.35 Equal Opportunity for Veterans September 2010
52.222.36 Affirmative Action for Workers and Disabilities October 2010
52.222-50 Combating Trafficking in Persons February 2009
52.223-3 Hazardous Material Identification and Material Safety Data January 1997
52.223-5 Pollution Prevention and Right-to-Know Information May 2011
52.223-6 Drug-Free Workplace May 2001
52.223-15 Energy Efficiency in Energy-Consuming Products December 2007
52.232-23 Assignment of Claims January 1986
52.232-27 Prompt Payment for Construction Contracts October 2008
52.232-39 Unenforceability of Unauthorized Obligations June 2013
52.233-1 Disputes July 2002
52.233-3 Protest After Award August 1996
52.233-4 Applicable Law for Breach of Contract Claim October 2004
52.236-8 Other Contracts April 1984
52.236-27 Site Visit (Construction) February 1995
52.249-2 Termination for Convenience of the Government (Fixed Price) April 2012
52.249-10 Termination for Default (Fixed Price Construction) April 1984
Liability Insurance—Department of the Interior (JUL 1996)
The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$250,000.00 each person* $500,000.00 each occurrence* $100,000.00 property damage*
Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
*These amounts to be set by the Contracting Officer.
(End of clause)
52.204-8 Annual Representations and Certifications (Jan 2014)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238160.
(2) The small business size standard is $15.0M.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
https://acquisition.gov/far/current/html/52_200_206.html#wp1137850 https://acquisition.gov/far/current/html/52_200_206.html#wp1137850
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence
Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation. This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, 2010, or 2012.
(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vii) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
https://acquisition.gov/far/current/html/52_200_206.html#wp1137583 https://acquisition.gov/far/current/html/FARTOCP13.html#wp271421 https://acquisition.gov/far/current/html/FARTOCP13.html#wp271421 https://acquisition.gov/far/current/html/52_200_206.html#wp1137684 https://acquisition.gov/far/current/html/52_200_206.html#wp1137777 https://acquisition.gov/far/current/html/52_200_206.html#wp1137850 https://acquisition.gov/far/current/html/52_200_206.html#wp1149919 https://acquisition.gov/far/current/html/52_207_211.html#wp1144766 https://acquisition.gov/far/current/html/52_207_211.html#wp1144909 https://acquisition.gov/far/current/html/52_214.html#wp1129381 https://acquisition.gov/far/current/html/52_215.html#wp1144523 https://acquisition.gov/far/current/html/52_217_221.html#wp1135900
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xiii) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements.
This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.
(xvi) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xvii) 52.225-4, Buy American Act—Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $79,507, the provision with its Alternate II applies.
(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.
(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xix) 52.225-20, Prohibition on Conducting Restricted Business
Operations in Sudan—Certification. This provision applies to all solicitations.
(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations.
(xxi) 52.226-2, Historically Black College or University and Minority Institution https://acquisition.gov/far/current/html/52_217_221.html#wp1135943 https://acquisition.gov/far/current/html/52_222.html#wp1147663 https://acquisition.gov/far/current/html/52_222.html#wp1147711 https://acquisition.gov/far/current/html/52_222.html#wp1147704 https://acquisition.gov/far/current/html/52_222.html#wp1147711 https://acquisition.gov/far/current/html/52_222.html#wp1148142 https://acquisition.gov/far/current/html/52_223_226.html#wp1168785 https://acquisition.gov/far/current/html/52_223_226.html#wp1168786 https://acquisition.gov/far/current/html/52_223_226.html#wp1168826 https://acquisition.gov/far/current/html/52_223_226.html#wp1169013 https://acquisition.gov/far/current/html/52_223_226.html#wp1168995 https://acquisition.gov/far/current/html/52_223_226.html#wp1169071 https://acquisition.gov/far/current/html/52_223_226.html#wp1169038 https://acquisition.gov/far/current/html/52_223_226.html#wp1169193 https://acquisition.gov/far/current/html/52_223_226.html#wp1169151 https://acquisition.gov/far/current/html/52_223_226.html#wp1181379 https://acquisition.gov/far/current/html/52_223_226.html#wp1188714 https://acquisition.gov/far/current/html/52_223_226.html#wp1169667
Representation. This provision applies to—
(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and
(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.
(2) The following certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
(i) 52.219-22, Small Disadvantaged Business Status.
(A) Basic.
(B) Alternate I.
(ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iii) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification.
(iv) 52.222-52, Exemption from Application of the Service Contract Act to Contracts for Certain Services–Certification.
(v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA–Designated Products (Alternate I only).
(vi) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.