REPLACE THE FLAMINGO VISITOR CENTER ROOF at Everglades National Park
Solicitation number
P15PS01074
Issued by

About this file

plans

View the file

Other files

File Type Posted
Attachment_0005_Questions_and_Answers_05.11.2015.docx DOCX document
Sol_P15PS01074_Amd_000003.pdf PDF
Sol_P15PS01074_Amd_000002.pdf PDF
Attachment_0004_Questions_and_Answers.docx DOCX document
Sol_P15PS01074_Amd_000001.pdf PDF
Attachment_0002-_SOW_and_Specs.pdf PDF
Attachment_0001_DB_wage_rates.PDF PDF
Sol_P15PS01074.pdf PDF
Synopsis_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING NOTES:

1. CONTRACTOR STAGING AREA WILL BE AVAILABLE THROUGH

THE DURATION O F THE PROJECT BUT MUST BE KEPT CLEAN

AND DEBRIS SECURED FROM FLYING.

2. ACCESS ROAD TO STAGING AREA SHALL NOT BE BLOCKED

DURING DELIVERIES OR PICKUP TIMES.

3. CONTRACTOR SHALL PROVIDE THEIR OWN SECURED ACCESS

TO ALL ROOF AREAS.

4. MAINTAIN AREAS AROUND THE BUILDINGS CLEAN FROM

ROOFING DEBRIS.

5. CONTRACTOR SHALL AT ALL TIMES CONDUCT HIS OPERATIONS

TO ENSURE THE LEAST INCONVENIENCE TO THE PUBLIC AND

STAFF.

6. HEAVY TRAFFIC SHALL NOT BE ROUTED TO ROADWAYS CLOSE

TO SEAWALLS. CONTRACTOR SHALL COORDINATE WITH

CONTRACTING OFFICER REPRESENTATIVE FOR ACCESS OF

ALL TRAFFIC TO AND FROM STAGING AND LAY DOWN AREA.

1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

2. REMOVE EXISTING MEMBRANE ROOF SYSTEM, INSULATION, FLASHING,

ACCESSORIES AND DISPOSE PROPERLY.

3. REMOVE WOOD NAILERS AND EDGE WOOD TRIMS AND DISPOSE PROPERLY.

4. REMOVE EXISTING EQUIPMENT STANDS.

5. REMOVE EXISTING LIGHTNING PROTECTION SYSTEM AERIALS AND BASES.

6. CONTRACTOR SHALL ENSURE ROOF DEBRIS IS PROPERLY REMOVED AND

DISPOSED OF APPROPRIATELY. CONTRACTOR SHALL TAKE EVERY MEASURE

NECESSARY TO AVOID FLYING DEBRIS OFF THE ROOF INTO THE GROUND AND

BAY. CONTRACTOR SHALL IMMEDIATELY REMOVE SUCH DEBRIS WHEN IT

OCCURS.

7. CONTRACTOR SHALL PROVIDE THEIR OWN ACCESS TO THE ROOF AND WILL

COORDINATE LOCATION WITH CONTRACTING OFFICER REPRESENTATIVE.

8. CONTRACTOR MUST SECURE ALL ASSIGNED LAYDOWN AREAS WITH A MINIMUM

OF ORANGE SAFETY FENCING. ALL FEATURES INCLUDING NEARBY TREES SHALL

ALSO BE PROTECTED.

BREEZEWAY ROOF EQUIPMENT STAND SETUP 2

VC ROOF

ROOF LAYOUT

VC ROOF

BREEZEWAY ROOF STAGING AREA

RESTAURANT SIDE

STAGING AREA

RESTAURANT SIDE

ANTENNA

VC ROOF

PARAPET DETAIL

VC ROOF

ROOF MOUNTED CONDENSING UNIT SETUP 1

VC ROOF

CABLE GEAR

VC ROOF

ELEVATED ROOF

VC ROOF

SERVICE ENTRANCE

VC ROOF

PLUMBING VENT

VC ROOF

ANTENNA CABLE GEAR

VC ROOF

ROOF ACCESS LADER LOCATION

VC ROOF

ROOF MOUNTED CONDENSING UNIT SETUP 2

GENERAL NOTES:

2. INSTALL NEW FULLY ADHERED POLYISOCIANURATE ROOF INSULATION. MINIMUM

THICKNESS AT LOWEST POINT IS 3". SLOPE UP TO MEET MINIMUM 1:48 (

" PER 12")

SLOPE.

3. INSTALL NEW FULLY ADHERED 3-PLY SBS MODIFIED BITUMINOUS BUR SYSTEM

WITH CAP SHEET.

4. EXISTING EQUIPMENT STANDS TO BE REPLACED, SEE SHEET A-3.3.

5. PAINT PARAPET AND AREAS AFFECTED BY THIS WORK TO MATCH EXISTING

HISTORICAL COLOR SCHEME.

6. REFER TO SHEET A1.1 FOR ADDITIONAL DETAIL ON EACH ROOF AREA.

7. INSTALL NEW LIGHTNING PROTECTION SYSTEM, SEE SHEET A-3.4 FOR PLAN AND

DETAILS.

2. INSTALL NEW FULLY ADHERED POLYISOCIANURATE ROOF

INSULATION. MINIMUM THICKNESS AT LOWEST POINT IS 3". SLOPE UP

TO MEET MINIMUM 1:48 (

" PER 12") SLOPE.

3. INSTALL NEW FULLY ADHERED 3-PLY SBS MODIFIED BITUMINOUS BUR

SYSTEM WITH CAP SHEET.

4. INSTALL NEW PARAPET DETAIL AS INDICATED. FLASHING AS

INDICATED TYPICAL ON ALL EQUIPMENT STANDS ON ROOF. NEW

EXTRUDED ALUMINUM EQUIPMENT STANDS SHALL BE FABRICATED

AND INSTALLED IN ACCORDANCE WITH STRUCTURAL REQUIREMENTS

OF THE 2010 FLORIDA BUILDING CODE. ALL EXISTING EQUIPMENT

SHALL BE RE-INSTALLED ON NEW STANDS AND TESTED PRIOR TO

ACCEPTANCE.

5. FLASH ALL ROOF PENETRATIONS FOLLOWING CORRESPONDING

DETAIL ON SHEETS A3.1- A3.2.

6. LOCATE MEMBRANE LAYER VENTS AS RECOMMENDED BY SBS

MODIFIED BITUMINOUS ROOF SYSTEM MANUFACTURER, SEE DETAIL 5

ON SHEET A3.1.

7. INSTALL NEW LIGHTNING PROTECTION SYSTEM, SEE SHEET A-3.3 FOR

PLAN AND DETAILS.

KEY PLAN

Level 1

8' - 0"

Level 1

8' - 0"

Level 2

20' - 6"

Level 2

20' - 6"

Roof Plan

30' - 6"

MSL

0' - 0"

Level 1

8' - 0"

Level 2

20' - 6"

DRAWING NOTES:

1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

2. ELEVATIONS ARE PROVIDED FOR ILLUSTRATION PURPOSES.

3. INSTALL NEW FULLY ADHERED 3-PLY SBS MODIFIED

BITUMINOUS BUR SYSTEM WITH CAP SHEET.

4. INSTALL NEW PARAPET DETAIL AS INDICATED.

5. BID INCLUDES ALL WORK ASSOCIATED TO THE REPLACEMENT

OF EXISTING TPO ROOFING FOR NEW SBS MODIFIED

BITUMINOUS BUR SYSTEM WITH ALL ACCESSORIES OVER THE

VISITORS CENTER SIDE AND INTERCONNECTING BREEZEWAY

UP TO BUT NOT INCLUDING RESTAURANT SIDE. INSTALLATION

OF NEW ROOF ACCESS LADDER ON THE RESTAURANT SIDE

SHALL BE PART OF THIS PROJECT.

FASTENERS STAGGERED APPROX.

6" O.C. ON ROOF FLANGE

FASTENERS APPROX. 12" O.C.

(6" O.C. AT CORNERS)

CONTINUOUS GALVANIZED

ANCHOR CLEAT

4" CONCEALED JOINT

SPLICE PLATES

10" ALUMINUM FASCIA

TYPICAL

1. INSTALL CONTINUOUS ANCHOR CLEAT OVER THE TURNED DOWN CAP SHEET, NAILING PER INSTRUCTIONS.

2. SET PREFABRICATED CORNER SECTIONS.

3. INSTALL FASCIA LENGTHS WITH CONCEALED JOINT-SPLICE PLATES AT ALL JOINTS.

4. PRIME PERFORATED TOP PLATE THEN CAREFULLY SEAL THE FLASHING PLY TO THE CAP SHEET.

PERFORATED TOP PLATE

-PRIME BEORE SETTING FLASHING

CAP SHEET

NOTE:

MULTI-PLY MODIFIED

BITUMEN ROOF MEMBRANE

3" MINIMUM THICKNESS OF

POLYISOCYANURATE INSULATION

AT LOWEST END

NEW WOOD

BLOCKING

PAINT ALL EXPOSED WOOD EDGES

NEW STRUCTURAL FRAME

CAULK

DRAW BAND WITH BUTYL TAPE

WATERTIGHT UMBRELLA OVERLAPPING

JACK BY RADIUS OF 3" TO 4"

1/4" MINIMUM

1/4" MINIMUM CLEARANCE TO PIPE

ROOF DECK

CLEARANCE

TO UMBRELLA

BASE FLASHING

COVERBORAD INSULATION

MULTI-PLY MODIFIED

BITUMEN ROOF MEMBRANE SYSTEM

M

I

N

ROLL LEAD FLASHING 1" DOWN

INTO PIPE

PLUMBING VENT STACK

2. MINIMUM 18" CLEARANCE FROM PIPES,

M

I

N

SHEET METAL PLATE OVER ROOF SLAB

ROOF INSULATION

CAP SHEET

BASE FLASHING

WALLS AND CURBS.

NOTE:

PRIMED LEAD FLASHING, MINIMUM 2

1/2 TO 4 LBS. SET PRIMED FLANGE IN

ROOFCEMENT ON MOP, COLD MB,

SA-MB AND BUR. SET PRIMED FLANGE

IN HEAT SOFTENED MEMBRANE ON

TORCH APP AND HW SBS

1. SHEET LEAD MINIMUM OF 2-1/2 POUNDS PER

SQUARE FOOT.

MULTI-PLY MODIFIED

BITUMEN ROOF MEMBRANE

GENERAL NOTES:

1. DETAILS SHALL CONFORM TO NRCA 2005 OR LATER

VERSION FOR SBS MODIFIED BITUMINOUS

ROOFING.

2. ALL MATERIALS SHALL NEW OFF STOCK ITEMS.

3. GRAVEL STOP VARIES IN PROFILE. PROFILE GAUGE

SHALL FOLLOW NRCA MINIMUM FOR BOTH

ALUMINUM FASCIA AND CLEATS.

1. DETAILS SHALL CONFORM TO NRCA 2005 OR LATER

VERSION FOR SBS MODIFIED BITUMINOUS

ROOFING.

2. ALL MATERIALS SHALL NEW OFF STOCK ITEMS.

3. INSTALL NEW ALUMINUM TRANSITION LADDER.

INSTALLATION OF THIS LADDER WILL BE

AUTHORIZED ONCE INTERNAL NPS

COMPLIANCE DOCUMENTATION HAS BEEN

COMPLETED.

2. INSTALL NEW ALUMINUM ROOF ACCESS LADDER WITH CAGE. INSTALLATION OF THIS LADDER WILL BE AUTHORIZED

ONCE INTERNAL NPS COMPLIANCE DOCUMENTATION HAS BEEN COMPLETED.

3. NEW EXTRUDED ALUMINUM EQUIPMENT STANDS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH

STRUCTURAL REQUIREMENTS OF THE 2010 FLORIDA BUILDING CODE. ALL EXISTING EQUIPMENT SHALL BE

RE-INSTALLED ON NEW STANDS AND TESTED PRIOR TO ACCEPTANCE.

1. SEE SPECIFICATION 264113 LIGHTNING PROTECTION.

2. THE PLANS ARE SCHEMATIC - THE INSTALLATION

SHALL COMPLY WITH NFPA 780 AND NFPA 70.

3. INSTALL ALL AIR TERMINALS, ROOF CONDUCTORS, AND

VERTICAL CONDUCTORS DOWN TO APPROXIMATE

GRADE, AND TIE TO NEW COPPER GROUNDING ROD TO

PROVIDE A NEW COMPLETE FULLY CERTIFIED SYSTEM.

4. AIR TERMINALS SHALL BE GLUED DOWN SYSTEM ONLY

AND SHALL BE LISTED BY UNDERWRITERS LABORATORY.

5. COMPLETED SYSTEM SHALL BEAR U.L. MASTER LABEL

AND SHALLBE SECURED BY SYSTEM INSTALLER IN

ACCORDANCE WITH UL96A.

6. CONTRACTOR SHALL VERIFY COMPATIBILITY OF

ADHESIVE ON MEMBRANE ROOF APPLICATION PRIOR

TO INSTALLATION.