ACAD_Rehab_Ext_Masonry_Historic_Rockefeller_Bldg_-_30_Jun_14_-_representative_photos.pdf
PDF 7 MB Posted
- Solicitation number
- P15PS00500
About this file
Color photos.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ACAD_-_Rockefeller_Hall_POI_ _NPS_responses__.docx | DOCX document | |
| Rockefeller_Hall_Pre_Bid_Conference_Attendance_6-30-15.docx | DOCX document | |
| ACAD_201824_RHX_Contrct_Price_Schedule.xls | XLS spreadsheet | |
| ACAD_201824_RHX_Submittal_List_06232015.pdf | ||
| ACAD_Proposal_Package_06152015.pdf | ||
| Standard_Form_1442_ACAD_Masonry_Rehab_06112015.pdf | ||
| ACAD_201824_RHX_Drawings.pdf | ||
| ACAD_Wage_Determination_06112015.txt | TXT text file | |
| Clause_Matrix_ACAD_Masonry_06042015.docx | DOCX document | |
| Standard_Form_1442_ACAD_Masonry_Rehab_06112015.pdf | ||
| ACAD_201824_Specifications_(2).pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACAD Rehab Rockefeller Building: cons t ruc t ion de ta i l s 06/30/14 [Refer to Conditions Assessment w/ Recommendations for Treatment]
KEY: image # / page #
1/01 NORTH EAST VIEW of WEST ELEVATION 2/01 SOUTH EAST VIEW of WEST [Ref.] ELEVATION
3/01 S. ELEV. of N. WING [west end] 4/01 NORTH ELEVATION of SOUTH WING [west end of wing]
5/01 WEST ELEVATION of NORTH WING 6/01 NORTHEAST VIEW of WEST ELEVATION
1 / 42
CGilley Text Box PHOTOS ON PAGES 1-42 ARE REPRESENTATIVE OF WORK BUT NOT EXHAUSTIVE AND DO NOT REPRESENT ENTIRE SCOPE. DRAWINGS AND SPECIFCATIONS GOVERN.
1/02 NORTH ELEVATION of NORTH WING
2/02 SOUTH ELEVATION of SOUTH WING
3/02 NORTH ELEVATION of S. WING [east side] 4/02 S. ELEVATION of N. WING [east side]
2 / 42
1/03 EAST ELEVATION [ with Terrace over Garage]
2/03 EAST ELEVATION of SOUTH WING 3/03 EAST ELEVATION of NORTH WING
3 / 42
1/04 Chimney @ flat roof section 2/04 Chimney (south chimney w/ single clay pot)
3/04 Sloping concrete wash (n. chimney) 4/04 Crack in clay pot (n. chimney w/ two pots)
Cracks previously documented Parging applied in [2012]
4 / 42
1/05 Copper counter flashing @ chimney 2/05 EPDM base flashing/ patching
@ chimney counter-flashing
3/05 Flat roof section @ location of chimneys [both ends of main building]
4/05 EPDM flat roof (replacing copper) adhered to sloping clay tile roof of main block
Bottom row of clay tiles replaced w/ copper clips during installation of the EPDM flat roof
Flat roof [adhered EPDM]
Ridge tiles @ flat roof edge
Tabs adhered to clay ridge tiles and EPDM membrane
Copper counter-flashing strip @ top of upturned EPDM [sloping roof surface]
Copper holding clips @ bottom row of roof tiles above flashing re-installed during installation EPDM
Sealant @ juncture of EPDM & clay tile roof
Replaced roof tiles w/ copper holding clips
5 / 42
1/06 Top of chimney in Attic (evidence of water penetration on brick / corrosion of painted steel roof framing)
2/06 Chimney in Attic (@ north wing)
Formed sheet metal catch pan @ circumference of chimney
“Nailcrete” (nail-able concrete roof deck)
Painted steel roof framing member
Efflorescence & evidence of previous roof leaks (and/or current penetration of water from the chimney intersection to the flat roof)
6 / 42
1/07 Biological growth on west side of central block
2/07 Biological growth differential on west 3/07 Biological growth on w. elevation, looking north elevation roof between sloping section of main roof to roof section below flat roof section [@ chimney locations (2)]
Flat roof beyond
Demarcation between main roof w/ heavy biological growth & sloping roof on either side of the flat roofs
7 / 42
1/08 Vent pipes on west side (leaching of copper 2/08 [See 1/08] reduces biological growth in path of run-off)
3/08 Vent pipes on the e. side of the roof (more 4/08 [See 3/08] exposed to direct sunlight -reducing the amount of biological growth compared to the west sides)
Replacement tiles w/ copper tabs
8 / 42
1/09 Half round copper gutter w/ transition to 2/09 Restricted downspout rectangular down spout @ ground drain
3/09 Downspouts from roof to interior drains thru Terrace & Garage below/ Copper counter-flashing @ masonry wall over EPDM base flashing and membrane (below concrete paving)
9 / 42
1/10 Roof drain @ Terrace connected to drain pipe 2/10 [See 1/10] thru Garage (to underground location)
3/10 & 4/10 Copper counter-flashing over base flashing of EPDM membrane below Terrace concrete pavers (set over stone ballast). Various sealant applications along juncture bet/ counter-flashing & masonry.
5/10 Underside of Terrace / garage concrete ceiling w/ roof drain 6/10 Round downspout to from Terrace to below Garage concrete floor drain @ Terrace
Detached sealant between counter-flashing & masonry
Corrosion of steel drain pipe @ concrete Garage ceiling
10 / 42
1/11 Tapered hip/ridge tiles [12 in. exposure] 2/11 Underside of typ. ridge tile
3/11 Tapered clay ridge tiles
4/11 Red-tinted mortar @ ridge tile
11 / 42
1/12 Hip tiles
2/12 North pavilion [north-west corner]
3/12 Ridge at flat roof [central block, w. side]
Partly dislodged starter hip tile
Missing hip tile
Partly detached hip tile
Dislodged hip tile
12 / 42
1/13 Central block [north end of west side]
2/13 Main roof
Partially exposed metal flashing below ridge tiles
Fractured tile
Displaced tile out-of-plane w/ field
Partly detached tiles
Asphaltic droppings on field tiles
Asphaltic drips on field tiles
13 / 42
1/14 Hip tiles 2/14 Tiles at hip-to-edge of flat roof
3/14 Hip roof [s. end of central core] 4/14 Cement under hip tile
Special hip starter tile
Hip tiles missing (2) w/ wood stringer
Hip tiles missing (2) w/ wood stringer & mortared setting bed
Concrete setting bed (tiles missing)
Copper flashing cap under ridge tiles
14 / 42
1/15 Roof tiles 2/15 Roof tiles
3/15 [See 4/15] 4/15 Dimensions of clay roof tiles: 8 in. wide x 8 in. exposure
(minor spotted areas of biological growth)
5/15 Tile starter course @ eaves 6/15 Asphaltic material on exposed tile surface
Example of cracked / broken roof tile exposed to weather
Example of metal tile clip deformed from tile movement
15 / 42
1/16 Clay tiles @ main field of roof surface
2/16 Patched tile / debris collected bottom of gutter
Displaced tile w/ retaining clip missing
Deformed tile retaining clip (from ice/snow load)
Cracked tile over starter course open to weather
16 / 42
1/17 Valley between s/ wing roof & sloping section adjacent to flat roof
2/17 Valley w/ uneven mitering of tiles. 3/17 Valley below flat roof edge [Flashing condition @ valley
Unknown]
Replaced roof tiles
EPDM flashing of flat roof to copper flashing of last tile course above
Metal flashing under ridge tiles
Roof tile clips for replaced tiles
Ridge tiles used for edge of flat roof (end of tile open to weather)
Metal flashing under ridge tiles
Poor fitment of tiles @ valley (risk of ice lodging in open area & damage to tiles)
Displaced roof tile
17 / 42
1/18 Clay gable end cap 2/18
3/18 Gable @ w elevation (n. side) 4/18 Gable @ w/ elevation (s. side)
Cracked rake tiles @ gable end
(s. gable, w/ side )
18 / 42
1/19 Center bay of west elevation @ cntral block
2/19 Missing rake tile @ gable end
Continuous copper flashing strip @ transition from main roof to bay roof
Missing rake tile w/ lower tile cracked w/ detached piece unsupported by nailing section
19 / 42
1/20 Missing rake tile @ gable end
2/20 Bottom of gable end roof (n. side)
Missing rake tile [see above]
Displaced starter course / copper clip @ tile above [unknown end of gutter condition]
20 / 42
1/21 Bottom of gable end roof (s. side)
2/21 Bottom of gable end roof (n. side)
Exposed copper flashing where rake tile is missing
Area potentially open to weather
Missing starter course tile / unknown condition regarding open to weather
Displaced starter course tile
21 / 42
1/22 Dividing insert in gutter (approx. in center 2/22 Debris trapped where gutter section slopes of section(s)) towards center-dividing insert
3/22 Gutter width approx. 6 in.
Gutter divider
Debris collected due to negative slope towards gutter divider
22 / 42
1/23 Gutter / roof section between gable & central bay roof [east elevation]
2/23 Top edge of bay roof w/ copper flashing strip @ roof transition
Holes in roof transition flashing (erosion from water dripping from the tiles above)
Missing starter course tiles
Displaced starter course tiles
23 / 42
1/24 Potentially open joints @ mitered Corner of wood trim
2/24 Wood trim @ top of masonry wall 3/24 Gap between back of gutter & wood trim
Gap @ miter joint of upper pecky cypress top board
Gap @ back of gutter
24 / 42
1/25 Separation of joint sealant between mortar & wood
2/25 Separation of sealant between wood framing elements
Detached sealant @ pecky cypress joints & between cypress framing – masonry j i
Detached sealant @ pecky cypress joints & between cypress framing – masonry j i
25 / 42
1/26 Sealant in passages of pecky cypress in wood framing elements
2/26 Sealant joint failure at wood-to-brick joint 3/26 [See 2/26]
Detachment / failure of sealant joint
Sealant detached from partial application to passages of pecky cypress
Notch cut into pecky cypress to receive flashing @ window heads
26 / 42
1/27 Window sill & pecky cypress w/ deep passages (w/ the potential to allow water to penetrate the wall cavity &/or interior wall surfaces)
2/27 Roof canopy bracket [over n. entrance of w. elevation]
Detached sealant between cypress framing
– masonry mortar joint
Cracked / displaced starter course tile
Biological growth on door canopy bracket [facing west]
Debris / biological growth collected between sidewall flashing & bottom of adjacent tile
27 / 42
1/28 Thru hole from pecky cypress @ wood bracket 2/28 Bracket @ cross gable
(looking upwards through the bracket)
3/28 Looking down @ pecky cypress vertical member 4/28 Top of bracket deteriorated & open w/ numerous possible paths of water ingress/
Through passage in pecky cypress @ bracket
Possible open passage(s) in pecky cypress @ bracket & framing
Approx. location of open passage in pecky cypress @ bracket (from view in 1/28)
28 / 42
1/29 Pecky cypress window frame
2/29 Pecky cypress window frame
Detached sealant between cypress framing
– masonry mortar joint
Sealant applied between mortar joint & wood framing element
Detached sealant between cypress framing
– masonry mortar joint
Sealant campaign using grey sealant post white sealant application
29 / 42
1/30 Detached sealant example
2/30 Detached sealant bead & bond breaker tape
3/30 Test area where mortar was removed from joint masonry to determine configuration & dimension of typ. joint
Detached sealant between cypress framing – masonry mortar joint
Sample of removed sealant joint material & backer tape
Mortar joint width approx. ½ in.
Outer wall width:
approx. 4 in.
30 / 42
1/31 Pecky cypress window frame
2/31 Pecky cypress window frame
Detached sealant between cypress framing – masonry mortar joint
Detached sealant between cypress framing
– masonry mortar joint
Sealant campaign using grey sealant post white sealant application
31 / 42
1/32 Pecky cypress window frame
2/32 Pecky cypress window frame
Sealant campaign using grey sealant post white sealant application
Detached sealant between cypress framing
– masonry mortar joint
Detached sealant between cypress framing
– masonry mortar joint
Split in sill window frame element
Detached sealant between cypress framing
– masonry mortar joint
32 / 42
1/33 Pecky cypress window sill
2/33 Pecky cypress window sill
3/33 Pecky cypress window sill
Split in sill window frame element (wood peg is a an original decorative element)
Sealant campaign using grey sealant post white sealant application
Sealant application using grey sealant post white sealant application
Detached sealant between cypress framing
– masonry mortar joint
33 / 42
1/34 Detached sealant @ wood frame w/ inconsistent application over flashing strip
2/34 Copper flashing strip on horizontal wood members
Flashing reglet cut into vertical wood frame member to receive end of flashing
Sealant detached from wood frame
34 / 42
1/35 Brick panels @ 2nd story [w/ mortar joints / sealant joints]
2/35 Window sill @ 2nd story (typ.)
Mortar joint
Sealant joint
Protruding wood pegs are an original design feature [replacement pegs shall match dimension of original]
Sealant joint
35 / 42
1 / 36 cracking in wood window frame [n. elevation of the s. wing, e. side]
2/36 Structural cracking (break) in vertical wood frame members
Crack / break (@ 3 locations in vertical wood framing)
Horiz. crack / break [depth undetermined]
Vert. crack / break [depth undetermined]
36 / 42
1/37 thru 3/37 Details of intentionally out-of-plane &/or angled bricks in panels below
4/37 Brick patern as character-defining features
Bricks out of plane / angled
37 / 42
1/38 Wood (pecky cypress) lintel @ ground floor 2/38 [See 1/38] windows / vents w/ inconsistent sealant application @ flashing
3/38 Wood lintels in lower window openings
38 / 42
1/39 Brick piers & wood lintels @ garage doors
2/39 Brick piers & wood lintels @ garage doors
3/39 Brick piers & wood lintels @ garage doors
Weep holes (not installed consistently @ all brick piers)
Splitting / checking @ end of lintel
Copper flashing @ lintel bearing surface
Flashing between wood & masonry elements
Copper flashing @ header bearing surface
Flashing between top of lintel & masonry
39 / 42
1/40 Ext. light @ e. elevation of s. wing
2/40 Electrical conduit entrance
@ e. elevation of s. wing
3/40 Electrical conduit entrance
@ e. elevation of s. wing
Unsealed passage of electrical conduit as possible source of water entry
Possible source of water entry (staining in area as observed by staff)
Possible source of water entry
40 / 42
1/41 Disintegration of factory-applied 2/41 Post base cap in place coating @ post cap
3/41 Biological growth @ open joint of aluminum 4/41 Corrosion @ post base accelerated by post set in stone wall cap missing base cap & joint open to water penetration
41 / 42
1/42 Wood window frame & 2/42 Out-lined areas of saturated water from overflow sill saturated w/ water of gutters in front and/or behind/
3/42 [ See 4/42 ] 4/42 Out-lined areas of saturated water from overflow of gutters in front &/or behind
Fully saturated brick panel
See 2/27
42 / 42
| ACAD Rehab Rockefeller Building - Narrative - 30Jun |
| ACAD Rehab Rockefeller Bldg - Construction Details + Notes - 30Jun |
| ACAD Rehab Rockefeller Bldg - Conditions Assessment & Treatment Recomm - 30Jun |
File details come from the government source that posted it. Updated .