P14 Attachment 2 - OneLines - Main Elec Eq Testing.docx

DOCX document 8 MB Posted

Attached to
J061--Maintenance, Inspection, and Testing of the Electrical Power Distribution System
Solicitation number
36C24221Q0258
Issued by

About this file

This combined synopsis and solicitation requests quotes for maintenance, inspection, and testing of the electrical power distribution system at the New York Harbor Healthcare Center in Manhattan. Required services include preventative maintenance, supervision and scheduling, inspection and testing of transformers, switches, circuit breakers, and generators. Quotes are due by December 21, 2020. The award will be a firm-fixed-price contract to a small business. The solicitation is issued as a 100% small business set-aside and is subject to Service Contract Act wage determinations. The Department of Veterans Affairs Veterans Health Administration VISN 2 is the contracting agency.

View the file

Other files

File Type Posted
Questions and Answers.docx DOCX document
36C24221Q0258 0001_2.docx DOCX document
36C24221Q0258 0001.docx DOCX document
P09 Revised SOW - Main Elec Eq Testing.doc DOC document
P09 SOW - Main Elec Eq Testing.doc DOC document
36C24221Q0258.docx DOCX document
Bronx-NY-BK WD 4-20-2020.docx DOCX document
P12 Attachment 1 - Electrical Inventory Equipment.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10

A A Attachment 2

B B

C C

D (

6/14/2009 12:39:03 PM

)D

E E

F F

Project Number 630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 001

STAMP

ARCHITECT/ENGINEER OF RECORD

CONSULTANT

)PRELIMINARY-NOT FOR CONSTRUCTION

Date:

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-001 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management File Path )U.S. Department of Veterans Affairs

VA FORM 08 - 6231

1 2 3 4 5 6

7 8 9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 002

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-002 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM -003

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-003 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 004

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-004 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

A A

B B

PRELIMINARY-NOT FOR CONSTRUCTION

ARCHITECT/ENGINEER OF RECORD

STAMP

Office of Construction and Facilities Management

U.S. Department

Drawing Title

ONE-LINE DIAGRAM - 005

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Phase

DOCUMENTS FOR REVIEW

Project Title

ELECTRICAL SYSTEM STUDY

Location 423 EAST 23 STREET, NEW YORK, NEW YORK 10010 Issue Date Checked Drawn

Project Number 630-18-111 Building Number

Drawing Number

1-005

File Path )Revisions:

Date:

of Veterans Affairs

07/30/2020

X.X.X.

D.J.S.

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 006

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-006 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM -007

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-007 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 008

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-008 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM -009

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-009 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 10

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-010 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM -011

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-011 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 012

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-012 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 013

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-013 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 014

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-014 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

Construction and Facilities Management

U.S. Department

Drawing Title

ONE-LINE DIAGRAM - 7

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Phase

DOCUMENTS FOR REVIEW

Issue Date Checked Drawn

Project Number

1-015

File Path )Revisions:

Date:

of Veterans Affairs

07/30/2020

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 016

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-016 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 017

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-017 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

Construction and Facilities Management

U.S. Department

Drawing Title

ONE-LINE DIAGRAM - 018

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Phase

DOCUMENTS FOR REVIEW

Issue Date Checked Drawn

Project Number

1-018

File Path )Revisions:

Date:

of Veterans Affairs

07/30/2020

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 019

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-019 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 020

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-020 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

Construction and Facilities Management

U.S. Department

Drawing Title

ONE-LINE DIAGRAM - 021

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Phase

DOCUMENTS FOR REVIEW

Issue Date Checked Drawn

Project Number

1-021

File Path )Revisions:

Date:

of Veterans Affairs

07/30/2020

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

Construction and Facilities Management

U.S. Department

Drawing Title

ONE-LINE DIAGRAM -022

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Phase

DOCUMENTS FOR REVIEW

Issue Date Checked Drawn

Project Number

1-022

File Path )Revisions:

Date:

of Veterans Affairs

07/30/2020

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM -023

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-023 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 024

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-024 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 025

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-025 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10

1 2 3 4 5

6 7 8

9 10

630-18-111 Project Title

ELECTRICAL SYSTEM STUDY

Phase

DOCUMENTS FOR REVIEW

Drawing Title

ONE-LINE DIAGRAM - 026

STAMP

ARCHITECT/ENGINEER OF RECORD

Revisions:

Drawn D.J.S.

Checked X.X.X.

Issue Date 07/30/2020 Drawing Number 1-026 Location

423 EAST 23 STREET, NEW YORK, NEW YORK 10010

Approved:

NEW YORK HARBOR HEALTH CARE SYSTEM

Building Number Office of Construction and Facilities Management

1 2 3 4 5

6 7 8

9 10 image6.png image96.png image97.png image98.png image99.png image100.png image101.png image102.png image103.png image104.png image105.png image7.png image106.png image107.png image108.png image109.png image110.png image111.png image112.png image113.png image114.png image115.png image8.png image116.png image117.png image118.png image119.png image120.png image121.png image122.png image123.png image124.png image125.png image9.png image126.png image127.png image128.png image129.png image130.png image131.png image132.png image133.png image134.png image135.png image10.png image136.png image137.png image138.png image139.png image140.png image141.png image142.png image143.png image144.png image145.png image11.png image146.png image147.png image148.png image149.png image150.png image151.png image152.png image153.png image154.png image155.png image12.png image156.png image157.png image158.png image159.png image160.png image161.png image162.png image163.png image164.png image165.png image13.png image166.png image167.png image168.png image169.png image170.png image171.png image172.png image173.png image174.png image175.png image14.png image176.png image177.png image178.png image179.png image180.png image181.png image182.png image183.png image184.png image185.png image15.png image186.png image187.png image188.png image189.png image190.png image191.png image192.png image193.png image194.png image195.png image16.png image196.png image197.png image198.png image199.png image200.png image201.png image202.png image203.png image204.png image205.png image17.png image206.png image207.png image208.png image209.png image210.png image211.png image212.png image213.png image214.png image215.png image18.png image216.png image217.png image218.png image219.png image220.png image221.png image222.png image223.png image224.png image225.png image19.png image226.png image227.png image228.png image229.png image230.png image231.png image232.png image233.png image234.png image235.png image20.png image236.png image237.png image238.png image239.png image240.png image241.png image242.png image243.png image244.png image245.png image21.png image246.png image247.png image248.png image249.png image250.png image251.png image252.png image253.png image254.png image255.png image22.png image256.png image257.png image258.png image259.png image260.png image261.png image262.png image263.png image264.png image265.png image23.png image266.png image267.png image268.png image269.png image270.png image271.png image272.png image273.png image274.png image275.png image24.png image276.png image277.png image278.png image279.png image280.png image281.png image282.png image283.png image284.png image285.png image25.png image286.png image287.png image288.png image289.png image290.png image291.png image292.png image293.png image294.png image295.png image26.png image296.png image297.png image298.png image299.png image300.png image301.png image302.png image303.png image304.png image305.png image27.png image306.png image307.png image308.png image309.png image310.png image311.png image312.png image28.png image29.png image30.png image31.png image32.png image33.png image34.png image35.png image36.png image37.png image38.png image39.png image40.png image41.png image42.png image43.png image44.png image45.png image1.png image46.png image47.png image48.png image49.png image50.png image51.png image52.png image53.png image54.png image55.png image2.png image56.png image57.png image58.png image59.png image60.png image61.png image62.png image63.png image64.png image65.png image3.png image66.png image67.png image68.png image69.png image70.png image71.png image72.png image73.png image74.png image75.png image4.png image76.png image77.png image78.png image79.png image80.png image81.png image82.png image83.png image84.png image85.png image5.png image86.png image87.png image88.png image89.png image90.png image91.png image92.png image93.png image94.png image95.png