P09 Revised SOW - Main Elec Eq Testing.doc

DOC document 68 KB Posted

Attached to
J061--Maintenance, Inspection, and Testing of the Electrical Power Distribution System
Solicitation number
36C24221Q0258
Issued by

About this file

This document includes a statement of work and a combined synopsis/solicitation for maintenance, inspection, and testing of the electrical power distribution system at the New York Harbor VA Medical Center. The statement of work outlines the qualifications required of electrical contractors to perform the work, including experience requirements and safety certifications. It also provides an inventory of electrical equipment to be maintained and tested according to NETA standards. The combined synopsis/solicitation seeks pricing for inspection and testing of various transformers, switches, circuit breakers, and generators. Quotes are due by December 21, 2020. The award will be a firm-fixed-price contract issued as a 100% small business set-aside to the responsible offeror providing the best value based on technical approach, past performance, and fair and reasonable pricing. The work is to be performed for the Department of Veterans Affairs Veterans Health Administration.

View the file

Other files

File Type Posted
Questions and Answers.docx DOCX document
36C24221Q0258 0001_2.docx DOCX document
36C24221Q0258 0001.docx DOCX document
P09 SOW - Main Elec Eq Testing.doc DOC document
36C24221Q0258.docx DOCX document
Bronx-NY-BK WD 4-20-2020.docx DOCX document
P14 Attachment 2 - OneLines - Main Elec Eq Testing.docx DOCX document
P12 Attachment 1 - Electrical Inventory Equipment.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

NEW YORK HARBOR VA MEDICAL CENTER

STATEMENT OF WORK

FOR

Maintenance, Inspection, and Testing of the Electrical Power Distribution System 1.

Introduction:

A. This Statement of Work (SOW) describes the requirements for the maintenance, inspection, testing, and/or calibration of the Electrical Power Distribution System and all of its components at the New York Harbor VA Medical Center located at 423 East 23rd St, New York NY 10010. These work items are referenced as “Maintenance and Testing” in this document, hereafter.

B. This SOW describes the requirements for the Qualified Electrical Contract Professionals – known as “Contractors” in this document, hereafter. Contractors who are contracted by VA Medical Center to perform maintenance and testing of the Electrical Power Distribution System, and all of its components shall meet all requirements stated in Section 2 of this SOW.

C. This SOW describes the requirements to establish maintenance and testing reports.

2.

Qualifications of Contractors:

A. Contractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor’s business.

B. Contractors shall be certified by the InterNational Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training.

C. Contractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances.

D. Contractors shall have safety trainings – either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S – Electrical, and the NFPA 70E – Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor’ Employer shall certify that he/she has met this requirement in writing, and submit it to the VA Contracting Officer prior to work.

E. Contractors shall have ready access to the latest versions of the following references:

1) NFPA 70, National Electrical Code.

2) NFPA 70B, Recommended Practice for Electrical Equipment Maintenance.

3) NFPA 70E, Standard for Electrical Safety for the Workplace.

4) NFPA 110, Standard for Emergency and Standby Power System.

5) OSHA Standard 29 CFR 1910, Subparts I & S.

6) InterNational Electrical Testing Association, Inc. (NETA) – Maintenance and Testing Specifications.

7) Operating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.

8) VHA Directive 1028, Electrical Power Distribution System

E.

Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.

3.

Summary of Work:

A. The Contractor shall provide a proposed schedule with their bid proposal. The schedule shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during the work period. The proposed schedule shall be reviewed by the VAMC Engineering Service; any requirements for adjusting the schedule (e.g. to minimize disruption to the VAMC) shall be incorporated by the Contractor.

B. Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer and Chief of Engineering Service for immediate actions.

C. Work items, definitions, and references shall comply with the latest edition of the NETA – Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System. Attached is a list of electrical equipment that shall be maintained and tested:

1. Switchgear and Switchboard Assemblies.

2. Transformers, Dry Type

3. Switches

4. Circuit Breakers

5. Protective Relays D. Contractor shall provide a sample checklist of inspections and tests to be performed on each type of equipment with their bid proposal based upon NETA standards at a minimum.

E. Attachments. Government Furnished.

1. Inventory of Electrical Power Distribution System equipment to be maintained, inspected, and tested under this Scope of Work. All associated protective relays for the equipment shall be included in this scope of work.

2. One-line and other informational drawings of the Electrical Power Distribution System. These drawings are not certified as-built drawings.

F. Infra-Red Scanning/Thermographic Survey shall be performed on electrical equipment.

1. Use an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System. Objective of this work is to detect any loose, broken, or corroded connections in the system. Problem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers’ specifications.

2. Note that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions must be taken before, during and after scanning the system.

G. System Function Tests. Provide function test for all equipment listed in this Scope of Work.

4. Summary of Work:

A.

A complete written report of the work performed shall be provided to the VA within 7 days of completion. Information shown in the report shall be as following:

1) Company’s name, addresses, telephone, & FAX numbers.

2) Name and signature of contractors who perform the maintenance and testing.

3) VA Work Contract Number, name and number of VA Contracting Officer.

4) Date and Time of work.

5) Copies of contractors’ valid licenses, professional and training certificates.

6) Descriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera.

7) Location, Type, Name, and nameplate information of electrical equipment to be maintained and tested.

8) Descriptions of work items.

9) Test data. For each equipment, this shall include results from visual and mechanical inspection and electrical test values.

10) Reference materials such as equipment manufacturer’s specifications, coordination study, etc.

11) Remarks on conditions of electrical equipment. List all deficiencies, if any.

12) Recommended corrective actions, if any.

13) Photo documentation of equipment including enclosure, interior components, and close-ups of any deficiencies.

B. Submit four (4) hard copies of the complete written report to VA Contracting Officer within seven (7) calendar days of visit.

C.

Submit four (4) hard copies of the complete written report, and two (2) CD-ROM or DVD of the electronic version of the report in Microsoft Word format and PDF to the COR (1 copy) and Chief of Engineering Service (1 copy) within seven (7) calendar days of visit. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.

END

File details come from the government source that posted it. Updated .