P1068_Interior Finishes.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
P1068 - SOF Renovate Operations Building
Solicitation number
N4008524R2670
Issued by

About this file

This document is a Notice of Intent and Brand Name or Equal Justification related to a federal contract opportunity for the renovation of Operations Building 355. The key details are:

The Department of the Navy Naval Facilities Engineering Command is preparing a solicitation for a firm fixed price construction contract for the P1068 - SOF Renovate Operations Building project located in Dam Neck, Oceana, Virginia Beach, VA. The plans and specifications indicate the use of brand name or equal descriptions for approximately 26 items across various design disciplines. A justification and approval is being prepared for the use of these brand name or equal descriptions in accordance with federal regulations. The justification allows for the use of alternate manufacturers during construction, provided the standard of quality, characteristics, and performance requirements are met or exceeded. The document provides a complete list of the items and associated manufacturers that have brand name or equal descriptions. Questions, comments, or additional information should be directed to the contract specialist by July 31, 2024. This is not a request for proposal.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

INTERIOR FINISHES
REFERENCE SHEET AF601 DATED 4/25/2024
CODEMATERIALDESCRIPTION
ACT1ACOUSTICAL CEILING TILEARMSTRONG; ULTIMA; STYLE: #1941; SIZE: 24" X 24"; COLOR: "WHITE"; SUSPENSION SYSTEM: 15-16" PRELUDE; GRID COLOR: "BLIZZARD WHITE"
CPT1CARPET TILEPATCRAFT; ORGANIC INTERRUPTION; STYLE: #GY541; SIZE: 18" X 36"; COLOR: "LAGOON" #00430; INSTALLATION: BASKETWEAVE
CPT2CARPET TILEPATCRAFT; ORGANIC INTERRUPTION; STYLE: #GY541; SIZE: 18" X 36"; COLOR: "RIVER ROCK" #00450; INSTALLATION: ASHLAR
CG1CORNER GUARDC/S GROUP; ACROVYN CORNER GUARDS; VA SERIES; MODEL VA-200N; COLOR: "DRIFTWOOD" #262
GR1GROUTMAPEI; COLOR: "PEWTER" #02
LVT1LUXURY VINYL TILEPATCRAFT; TIMBER GROVE II; STYLE: #1421V; SIZE: 5.96" X 48"; COLOR: JUNIPER" #00559
PL1PLASTIC LAMINATEWILSONART; GLOSS LINE FINISH WITH AEON; COLOR: "PHANTOM CHARCOAL" #8214
PRC1PORCELAIN TILE(FLOOR)CROSSVILLE; SERIES: GOTHAM; COLOR: "CLOCK TOWER" #AV323; SIZE: 12" X 24"
PRC2PORCELAIN TILE(WALL)CROSSVILLE; SERIES: GOTHAM; COLOR: "LAMP POST" #AV321; SIZE: 12" X 24"
PRC3PORCELAIN TILE(ACCENT)CROSSVILLE; SERIES: GOTHAM; COLOR: "PAVEMENT" #AV326; SIZE: 12" X 24"
PT1PAINT(GENERAL)SHERWIN WILLIAMS: COLOR: #SW7653 "SILVERPOINT"; SHEEN: EGGSHELL
PT2PAINT(CEILING)SHERWIN WILLIAMS: COLOR: #SW7005 "PURE WHITE"; SHEEN: FLAT
PT3PAINT(TRIM AND DOOR)SHERWIN WILLIAMS: COLOR: #SW7653 "SILVERPOINT"; SHEEN: SEMIGLOSS
PT4PAINT(ACCENT)SHERWIN WILLIAMS: COLOR: #SW7068 "GRIZZLE GRAY"; SHEEN: EGGSHELL
PT5PAINT(ACCENT)SHERWIN WILLIAMS: COLOR: #SW6517 "REGATTA"; SHEEN: EGGSHELL
RAF1RAISED ACCESS FLOORTATE; CONCORE PANEL; SERIES: CONCORE 1000; SIZE: 2'X2'; STATIC CONTROL CARPET FINISH: STATIC SMART; SERIES: MC SERIES; COLLECTION: DISCOVERY; COLOR: "LIVINGSTONE"
RB1RUBBER BASENOT USED
RB2RUBBER BASETARKETT/JOHNSONITE; PERCEPTIONS WALL BASE; PROFILE: RECESS; STYLE: WITH TOE; SIZE: 4 1/4"H; COLOR: "CHARCOAL" #20
RFT1RESILIENT FLOOR TILETARKETT; JOHNSONITE SOLID COLOR RUBBER TILE; STYLE: HAMMERED; SIZE: 24" X 24"; COLOR: "NAVY" #18
RSW1ROLLER WINDOW SHADEMECHOSHADE; MANUAL DUAL ROLLER SHADES; FABRIC COLLECTION: EUROTWILL; SERIES: 6000; COLOR: #6010 "NICKEL", FABRIC #2 COLLECTION: CLASSIC BLACKOUT; SERIES: 0700; COLOR: "DARK GRAY" #0711
SC1SEALED CONCRETEMANUFACTURERS STANDARD; COLOR: "CLEAR"
SF1STATIC-CONTROL RESILIENT FLOORINGFLEXCO; DELANE ESD; SIZE: 12"X12"; COLOR: "GRAY/DARK GRAY" #42
SSM1SOLID SURFACECORIAN; COLOR: "SILVER LINEAR"
SSM2SOLID SURFACECORIAN; COLOR: "ARROWROOT"
TP1TOILET PARTITIONSCRANTON; STYLE: HINNY HIDERS PARTITIONS; FINISH: "CHARCOAL GRAY"; TEXTURE: HAMMERED
ABOVE INFORMATION IS PROVIDED BASED ON THE 100% FINAL SUBMITTAL DATED 4/25/2024

Q-1068 SOF Renovate Operations Building 355

File details come from the government source that posted it. Updated .