P102 PLUMBING SET BID DOCUMENTS.pdf

PDF 477 KB Posted

Attached to
Bid-Build (BB) Install Alternate Connections for Steam and Chilled Water at Lake Nona
Solicitation number
36C24825Q1212
Issued by

About this file

This document is a mechanical engineering drawing (P102) for the U.S. Department of Veterans Affairs (VA) depicting an alternate connection plan for steam and chilled water in Building 7's Boiler Plant, located in Orlando, Florida. The technical schematic details multiple piping connections, including natural gas (3" line), fuel oil supply and return (2" lines), and domestic cold water (4" soft water supply), with specifications for temporary and permanent connections. Key contractor requirements include connecting to existing natural gas and fuel oil systems, extending pipes through trenches and foundation walls, installing ground-mounted piping support systems, and terminating water supply lines with specific valve and coupler configurations. The drawing is part of a bid document set dated 10-26-2023 for project number 675-22-17, prepared by Toland Mizell Molnar as the consulting architectural/engineering firm.

View the file

Other files

File Type Posted
Wage Determination 1.6.26.pdf PDF
AS101 - ARCHITECTURAL SITE PLAN.pdf PDF
Limitation of Subcontracting Certificate.pdf PDF
RFQ 36C24825Q1212.pdf PDF
23-0015 C-050 DEMO.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6 5

DD

SL

E-CH-6

(FUTURE)

CF

E-ET-3

(FUTURE)

EA

MC

MD

MB

MA

ME

E7 E8 E9 E10 E11 E12 E13 E15

(E) 6" G

(E) 6" G

CONTRACTOR SHALL CONNECT TO EXISTING

NATURAL GAS LINE AND EXTEND TO EXTERIOR

FOR TEMPORARY CONNECTION (PRIMARY

FUEL SOURCE)

CONTRACTOR SHALL CONNECT TO EXISTING FUEL OIL

SYSTEM IN TRENCH. PROVIDE SHUTOFF VALVES IN

TRENCH AND ROUTE THROUGH TRENCH TO WEST SIDE

OF BUILDING. EXTEND THROUGH FOUNDATION WALL.

SEE ARCHITECTURAL FOR WALL PENETRATION

(SECONDARY FUEL SOURCE)

EXTERIOR ENCLOSURE,

SEE ARCHITECTURE.

BASEMENT

MEZZANINE

26' - 7 3/4" 26' - 7 3/4"

P103 3" G

2" FOS

2" FOR

(E) 2" FOR

(E) 2" FOS

(E) 1 1/2" FOR

(E) 1 1/2" FOS

(E) 1 1/2" FOR

(E) 1 1/2" FOS (E) 1 1/2" FOR (E) 1 1/2" FOS

3" G

PIPES IN TRENCH

(TYP.)

BOILER

PLANT

4" CW

4" CW

4" CW

2 1/2"

S-CW

2 1/2"

S-CW

2 1/2"

S-CW

2 1/2"

S-CW

4" CW

2 1/2"

S-CW

6" CW

4" CW

6" CW

1 1/4"

CW

4" CW

6" CW

4" CW

1 1/4"

CW

6" S-CW

6" S-CW

3" S-CW

2 1/2"

S-CW

6" S-CW

6" S-CW

6" S-CW

6" S-CW

6" S-CW

6" S-CW

6" S-CW

4" S-CW

4" CW

2 1/2"

S-CW

2 1/2"

S-CW

2 1/2"

S-CW

2 1/2" DOMESTIC COLD WATER

TEMPORARY CONNECTION

2" FUEL OIL RETURN

TEMPORARY CONNECTION

15' - 11 1/4"

CONNECT NEW 4" DOMESTIC COLD WATER-SOFT WATER

INTO EXISTING 6" AS REQUIRED

EXISTING 6" SOFT

COLD WATER

GROUND MOUNTED PIPING

SUPPORT SYSTEM (TYP.)

SEE STRUCTURAL DOCUMENT

15' - 11 1/4"

4" DOMESTIC COLD WATER-SOFT WATER

SUPPLY TERMINATE WITH CAM & GROOVE

COUPLER x FLANGE EQUAL TO DIXON

G400-DLT-AL AND CAP END , INSTALL FLANGED

OS&Y GATE VALVE.

TEMPORARY CONNECTION

4" S-CW

4" S-CW

4" S-CW

2 1/2" DOMESTIC COLD WATER -SOFT WATER

TEMPORARY CONNECTION

3" NATURAL GAS

TEMPORARY CONNECTION

2" FUEL OIL SUPPLY

TEMPORARY CONNECTION

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E)

(E)

(E)

(E)

(E) (E)

(E)

(E)

(E)

(E)

(E)

(E)

3' - 2 1/4"

4" FLANGED

OS&Y GATE VALVE

POC

POC

POC

POC

POC

N

C

D

PP

G2

H

W

E

G1

H

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

JLH SJ/SM

INSTALL ALTERNATE CONNECTIONS FOR

STEAM AND CHILLED WATER

675-22-17

ORLANDO, FL

10-26-2023REVISIONS: SHEET 0F 032 SHEETS

KEY PLAN - NOT TO SCALE

TRUE

NORTH

PLAN

NORTH

BUILDING 7

BOILER PLANT CONNECTION

P102

1/8" = 1'-0"P102

1 CENTRAL ENERGY PLANT BOILER ROOM

david Text Box david Contractor david Contractor david Contractor david Contractor david Contractor david Contractor david Contractor david Contractor david Rectangle david Callout

RELOCATED FUEL

TANK OVERFLOW

ALARM