Statement of Work: Boiler Plant Domestic Hot Water Heater Bundle Repair
This Statement of Work (SOW) defines a one-time service requirement for the Department of Veterans Affairs' Rocky Mountain Regional VA Medical Center (RMRVAMC) located in Aurora, Colorado. The primary objectives include replacement of one set of tube bundles on three Aquaplex domestic hot water heaters (Model 150L5A-ISD, Serial No. 1214139097), replacement of three sets of control valves (MVF461H50-30 and MVF461H32-12), and installation of three secondary steam isolation systems. The scope of work encompasses proper disposal of spent components, plumbing verification, installation of new parts according to specifications, verification of safe operating parameters, system start-up and training for VA employees, operational testing, and completion of a detailed report. The contractor must furnish all labor, materials, supplies, tools, equipment, and qualified personnel with demonstrated experience in removing, rebuilding, and replacing Aquaplex tube bundles and control valves. All replacement parts must be new standard parts manufactured by the original equipment maker or equivalent, with costs included in the contract price. The contractor is responsible for providing all tools, test equipment, service manuals, diagnostic software, and technical documentation necessary for performance.
Work must be performed Monday through Friday from 7:30 a.m. to 4:00 p.m. at the RMRVAMC facility, with the requirement completed within 90 days of award. Any operational disruptions must be coordinated at least two weeks in advance and approved by the Contracting Officer or Point of Contact. Contractor personnel must check in and out with the POC located in Building L. Payment is made in arrears upon satisfactory completion and submission of properly prepared invoices through the Tungsten system, referencing the contract number, purchase order number, manifest numbers, dates of performance, and detailed descriptions of services rendered. The contractor must maintain personal liability and property damage insurance, is responsible for any injury or property damage caused by contractor negligence, and must remove all debris upon completion. Contractor employees handling federal records must complete VHA-provided records management training, and all subcontractor requirements must be incorporated through written acknowledgment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR 52 225 2 Buy American Certificate.docx | DOCX document | |
| 36C25926Q0413.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS – Eastern Colorado Healthcare
Boiler Plant Domestic Hot Water Heater Bundle Repair
STATEMENT OF WORK
1. Background
The Rocky Mountain Regional VA Medical Center (RMRVAMC) has three (3) Aquaplex domestic hot water heaters that provide efficient and reliable hot water heating for various applications throughout the facility. The purpose of this service contract is to have a contractor furnish all labor, materials, supplies, tools, equipment, and qualified personnel to replace Aquaplex tube bundles or equivalent tube bundles along with control valves sized for current load in the Boiler Plant while adding three secondary steam isolations. Equipment is located in the Boiler Plant at the Rocky Mountain Regional VA Medical Center, 1700 N Wheeling Street, Aurora, CO 80045.
2. Objective:
• Replacement of one (1) set of tube bundles
• Replacement of three (3) sets of control valves on Aquaplex domestic hot water heaters
• Add three (3) secondary steam isolation to Aquaplex domestic hot water heater
3. Scope:
• Proper disposal of all spent tube bundles and control valves
• Check plumbing for proper isolation of each domestic water heater
• Installation of the new tube bundles, properly and according to specifications
• Installation of the new control valves, properly and according to specifications
• Verify and check all operating parameters are within safe levels
• Provide start-up and training of the system to VA employees
• Test and ensure full operation is restored
• Complete detailed report for review and training of the units
4. Site Specific Equipment Information:
Aquaplex Hot Water Heater
• Model: 150L5A-ISD
• Serial No. 1214139097
Control Valves
• MVF461H50-30/ BPZ:MVF461H50-30
• MVF461H32-12/ BPZ:MVF461H32-12
5. Contractor Qualifications and Responsibilities:
• Contractors shall be qualified and skilled employees with previous work experience in removal, rebuilding and replacing Aquaplex tube bundles or equivalent tube bundles.
• Contractors shall be qualified and skilled employees with previous work experience in removal, rebuilding and replacing control valves and secondary steam isolation
• Contractors must demonstrate having performed labor, start-up and commissioning of these units
• The contractor shall furnish all spare and replacement parts needed to service the equipment. The price of all parts used to perform all scheduled preventive, and unscheduled maintenance shall be included in the coverage. The Government will not pay for any parts provided (during either scheduled or unscheduled maintenance), by the contractor. Only new standard parts (manufactured by the maker of the equipment, or equal) shall be furnished to maintain the equipment.
• The contractor shall provide tools, (test) equipment, service manuals or service diagnostic software. The contractor shall obtain, have on file, and make available to its FSE's all operational and technical documentation (such as operational and service manuals, schematics, and parts list) necessary to meet the performance requirements and repair of the medical equipment. A reference list of applicable.
• Contractor shall take all precautions necessary to protect people and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees’ fault or negligence. Contractors shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government.
• The Government reserves the right to accept or reject Contractor’s employees for the rendering of services. Complaints concerning Contract Personnel’s performance or conduct will be dealt with by the Contractor and POC with the final decision being made by the Contracting Officer.
6. Report Requirements:
• Furnish report within one week of each facility inspection in “Microsoft Word” format by email to the FMS POC.
7. Resources:
• The Government will not furnish any resources for the fulfillment of the services required under this contract. The contractor must provide all tools, equipment, materials, transportation, professional expertise, personnel, and supervision for maintenance services required under this contract. The contractor shall remove all debris and trash from facility upon completion of work.
8. Hours of Work and Scheduling A. Scheduling
• The work will be performed Monday through Friday from 7:30am to 4:00pm. The majority of the work will have minimal impact on the operation of the VA Medical Center.
• Any potential disruption to ongoing medical center operations shall be coordinated 2 weeks in advance and shall be subject to review and approval by the CO/POC.
• Any other disruption of operations in any building shall be scheduled at least one week in advance with the CO/POC. Work shall be scheduled to allow continuous operation of all facilities to the greatest extent possible.
Federal Holidays:
New Year’s Day Martin Luther King Jr’s Day Presidents Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
If the holiday falls on a Sunday, the following Monday will be observed as a national holiday.
When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.
B. Contractor Check-In
• All Contractor personnel working onsite at the VA facility shall check in and out with the POC located in Building L (ENC). Access to work areas, and performance monitoring, will be provided by the POC. In all cases, the CO/POC shall be notified of any changes which may affect the response time of vital equipment.
9. Period of Performance
• This requirement is for a one-time service request to be completed within 90 days of award.
10. Place of Performance
All work will be performed at Rocky Mountain Regional VA Medical Center at 1700 N. Wheeling Street, Aurora, Colorado, 80045
11. Invoicing and Payment:
• Payment of services rendered under this contract shall be made in arrears upon satisfactory completion of each service and receipt of a properly prepared invoice and submitted by the Contractor to the payment address specified by Contracting. Invoices shall reference the Contract Number and Purchase Order Number, Manifest Number(s), provide a complete and accurate description of services/ supplies delivered/ rendered, including dates of performance, amounts, unit prices, extended totals and any other data relevant for payment purposes.
• Payments also must be submitted through Tungsten to be paid
12. Records Management Language
A. This clause applies to all contractors whose employees create, work with, or otherwise handle Federal records, as defined below:
“Federal Record” as defined in 44 U.S.C. 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the information value of data in them.
The term Federal Record:
1. Includes (Agency) records.
2. Does not include personal materials.
3. Applies to records created, received, or maintained by Contractors to the (Agency) contract.
4. May include deliverables and documentation as associated with deliverables.
13. TRAINING: All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
14. FLOWDOWN OF REQUIREMENTS TO SUBCONTRACTORS:
1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this contract, and require written subcontractor acknowledgement of same.
2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
| Boiler Plant Domestic Hot Water Heater Bundle Repair |
| STATEMENT OF WORK |