P09 Project Drawings 589A5-25-129.pdf

PDF 6 MB Posted

Attached to
Z2DA--589A5-25-129 Replace Pharmacy IV Room Floor & Sink l EKH
Solicitation number
36C25525R0034
Issued by

About this file

This file contains architectural drawings for a VA construction project to replace pharmacy IV room flooring and sink at the Colmery-O'Neil VA Medical Center in Topeka, Kansas (Project No. 589A5-25-129). The drawings show floor plans, site plans and HEPA filter locations for Building 1's basement pharmacy area.

The scope includes replacing 563 total square feet of flooring in the pharmacy IV preparation areas and combining separate eye-wash station and sink into a single unit. The affected spaces include the main pharmacy (2,294 SF), IV room (99 SF), ante vestibule (253 SF), IV room-chemo (108 SF), and HD/storage receiving area (103 SF). The drawings provide detailed floor plans showing the project location within the building, mechanical systems including HEPA filter specifications, and campus-wide site plans indicating Building 1's location within the medical center complex.

View the file

Other files

File Type Posted
Site Visit Sign-in 0001.pdf PDF
S02 36C25525R0034 0001.pdf PDF
P09 Specifications 589A5-25-129.pdf PDF
36C25525R0034.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHED

SH

ED

SHED

CARPORT

st

S

TR

E E

T

ROAD A

R

O A

D

R O

A D

O

ROAD J

ROAD A

ROAD A

R O

A D

A

R O

A D

A

R O

A D

B

R O

A D

C

R O

A D

L

ROAD E

RO

AD

F

R O

A D

D

ROAD K

R O

A D

H

R O

A D

G

GAGE BLVD.

BUILDING

BU

IL

D

IN

G

SHED

SOLAR ENERGY FIELD

GAGE BLVD.

st

S

TR

E E

T

BLDG_NO

BLDG

2 5

T101 T102

11A

2 2

24 25

29A

29B

28A

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:NO DESCRIPTION DATE

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

N

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

BLDG 1 REPLACE PHARMACY

IV ROOM FLOOR & SINK

COLMERY-O'NEIL VA MEDICAL CENTER

TOPEKA, KANSAS

PROJECT No. 589A5-25-129

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

TOPEKA VA MEDICAL CENTER CAMPUS MAP

SCALE: NTS

No. NAME DESCRIPTION

1 GI-100 COVER SHEET

2 GS-100 PROJECT SITE PLAN

3 CS-100 FLOOR PLAN & DETAILS

4 CS-101 HEPA FILTER LOCATIONS

DRAWING INDEX

nTs Colmery-O'Neil VA Medical Center, Topeka

1 RES

1 4

GI-100

589A5-25-129

11/29/2024

RAF

COVER SHEET BLDG 1 BSMT

REPLACE PHARMACY IV

ROOM FLOOR & SINK

C:\Users\VHALEASmithRE\OneDrive - Department of Veterans Affairs\Desktop\B001\589A5-25-129 Pharmacy Floor\24- nnn GI-100 cover.dwg, 12/3/2024 9:08:20 AM, AutoCAD PDF (General Documentation).pc3

AutoCAD SHX Text A/C

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

TR

AutoCAD SHX Text

TR

AutoCAD SHX Text

SV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

FC

AutoCAD SHX Text

CO

AutoCAD SHX Text

SHED

AutoCAD SHX Text

CO

AutoCAD SHX Text

SV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

PIV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

FC

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

ER

AutoCAD SHX Text

TR

AutoCAD SHX Text

UGM

AutoCAD SHX Text

CO

AutoCAD SHX Text

SV

AutoCAD SHX Text

TR

SHED

CARPORT

st

S

TR

E E

T

ROAD A

R O

A D

R O

A D

O

ROAD J

ROAD A

ROAD A

R O

A D

A

R O

A D

A

R O

A D

B

R O

A D

C

R O

A D

L

ROAD E

RO

AD

F

R O

A D

D

ROAD K

R O

A D

H

R O

A D

G

GAGE BLVD.

BUILDING

BU

IL

D

IN

G

SHED

SOLAR ENERGY FIELD

GAGE BLVD.

st

S

TR

E E

T

BLDG_NO

BLDG

2 5

T101 T102

11A

2 2

24 25

29A

29B

28A

NO DESCRIPTION DATE

D ep ar tm en t o f Ve te ra ns A ffa irs on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS: FACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

Colmery-O'Neil VA Medical Center, Topeka

NO DESCRIPTION DATE

00 80' 160'

N1 SCALE: 1" = 80'-0"

OVERALL SITE PLAN

PROJECT LOCATION

1" = 80'-0" Colmery-O'Neil VA Medical Center, Topeka

RES

2 4

GS-100

589A5-25-129

RAF

PROJECT SITE PLAN

BUILDING LOCATIONS

11/29/2024BLDG 1 BSMT

REPLACE PHARMACY IV

ROOM FLOOR & SINK

C:\Users\VHALEASmithRE\OneDrive - Department of Veterans Affairs\Desktop\B001\589A5-25-129 Pharmacy Floor\24- nnn GI-100 cover.dwg, 12/3/2024 9:09:18 AM, AutoCAD PDF (General Documentation).pc3

AutoCAD SHX Text A/C

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

GV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

TR

AutoCAD SHX Text

TR

AutoCAD SHX Text

SV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

FC

AutoCAD SHX Text

CO

AutoCAD SHX Text

SHED

AutoCAD SHX Text

CO

AutoCAD SHX Text

SV

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

PIV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

SV

AutoCAD SHX Text

FC

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

ER

AutoCAD SHX Text

TR

AutoCAD SHX Text

UGM

AutoCAD SHX Text

CO

AutoCAD SHX Text

SV

AutoCAD SHX Text

TR

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

DN

UPUP

UP

B23

B23G

B23A B23B

B23E B23D B23C

C0-3A

A9E

A9C A9D

B5

C3

A17

A12

A30

A21

A21E

A21A

A13A A13B

A1

A10F

A3B

A3

A3A

A13

A20E

A20

A17F

C7

C7B

C4EC3EC3F

A19A

C7A

C7G

C7C

C7D

A19

C5

C7H

C7I

C6A19B

C1A18

A18A C2

A17A

A5

B1E

A7A8A9

A10E

A10

A4

A7E

A9A

A11

A14

A15

B4

B3

B13E

B22M

B14A

B14

A2

A2A

A2B

A2C A2D

A19DC0-1

C8A

C20

C23

C24 C25

C28

C27

C26

C22 C21

C18C19

C17

C8

C9

C12

C14

C8B

C10 C11

C13

C15 C14A

C14B C14C

C16 C16A

C0-4

A16D

B2 B2B

B2A

B15B16 B17

B1

A16

A16C

A16A

A16E A16B

B22E

B1B

C0-2

C1A

B21

A19C

B1C

B6C

A16G

A9B

B43M B42

B42A B39

B38

C0-5B

C0-5A

C0-3

A10H

C114C

C11A

CB-8

B6D

A0-E3

A0-E1

A0-E2

A0-E4

B42B

B41

B40

B6P

B6 B8A

B7

B13CB13

B12

B9

B10

B11

B11A

B6M

B7M

B8 C0-3E

C0-3C

C0-3B B8C

B13B

B13A

A10G

A10B

A10A

A10C A10D

B20

B23F

B23G

A2P

PHARMACY

PHA

2294 SF

A10

OFFICE

PHA

158 SF

A9B

AIR

EXCHANGE

PHA

45 SF

H.A.C.

PHA

51 SF

A10G

IV ROOM

PHA

99 SF

A10B

ANTE VESTIBULE

PHA

253 SF

A10A

IV ROOM-CHEMO

PHA

108 SF

A10C

HD / STOR

RECEIVING

PHA

103 SF

A10D

A10H on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS:

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

D ep ar tm en t o f Ve te ra ns A ffa irsFACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

NO DESCRIPTION DATE

CS100

Colmery-O'Neil VA Medical Center, Topeka

3/8" = 1'-0"2 PHARMACY / PROJECT PLAN

0 100% SUBMITTAL 01/21/2014

ST REVISION 7/19/2019

RES REVISION 03/08/2021

RES P.Cache REVISION 04/11/2022

C

G

F NE

D

A B

FLOOR PLAN & DETAILS

AS NOTED

RES P.Cache II REVISION 05/15/2024

1/32" = 1'-0"1 BASEMENT - OVERALL PLAN

PROJECT LOCATION

1 RES

3 4

589A5-25-129

11/29/2024

RAF

BLDG 1 BSMT

REPLACE PHARMACY IV

ROOM FLOOR & SINK

SEPARATE EYE-WASH STATION

& SINK TO BE REMOVED, AND REPLACED

WITH SINGLE, COMBINED SINK /

EYE-WASH STATION.

EXISTING EYE-WASH STATION

TO REMAIN.

563 TOTAL SF OF FLOORING

TO BE REPLACED.

C:\Users\VHALEASmithRE\OneDrive - Department of Veterans Affairs\Desktop\B001\589A5-25-129 Pharmacy Floor\B001_FBsmt_20241129.dwg, 12/3/2024 9:07:02 AM, AutoCAD PDF (General Documentation).pc3 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

F

E

D

C

B

A

97 8654321

ARCHITECTS/ENGINEERS:

Dwight D. Eisenhower VA Medical Center, Leavenworth Colmery-O'Neil VA Medical Center, Topeka

Drawing Title:

Scale:

Approved:

Building Number:

Location:

Project Title:

Checked By: Drawing No.

Project No.

Drawn By:

Date:

Dwg. Of

Building Key Plan:

D ep ar tm en t o f Ve te ra ns A ffa irsFACILITIES MANAGEMENT

FLOOR PLAN DRAWINGS VA EASTERN KANSAS HEALTH CARE SYSTEM

NO DESCRIPTION DATE

CS101

Colmery-O'Neil VA Medical Center, Topeka

3/8" = 1'-0"2 PHARMACY / PROJECT PLAN

0 100% SUBMITTAL 01/21/2014

ST REVISION 7/19/2019

RES REVISION 03/08/2021

RES P.Cache REVISION 04/11/2022

C

G

F NE

D

A B

HEPA FILTER LOCATIONS

& DETAILS

AS NOTED

RES P.Cache II REVISION 05/15/2024

1 RES

4 4

589A5-25-129

11/29/2024

RAF

BLDG 1 BSMT

REPLACE PHARMACY IV

ROOM FLOOR & SINK

C:\Users\VHALEASmithRE\OneDrive - Department of Veterans Affairs\Desktop\B001\589A5-25-129 Pharmacy Floor\B001_FBsmt_20241129.dwg, 12/3/2024 8:58:40 AM, AutoCAD PDF (General Documentation).pc3

Sheets and Views
24- nnn GI-100 cover-1 1-GI-100 COVER SHEET
24- nnn GI-100 cover.pdf
Sheets and Views
24- nnn GI-100 cover-2 1-GS-100 SITE PLAN
B001_FBsmt_20241129.pdf
Sheets and Views
B001_FBsmt_20241129-Pharmacy Floor
25-129_CS-100 Floor.pdf
Sheets and Views
B001_FBsmt_20241129-Pharmacy Floor
25-129_CS-101 HEPA Filters.pdf
Sheets and Views
B001_FBsmt_20241129-RCP

File details come from the government source that posted it. Updated .