P09 Final SOW 3-28-22 (5 pages).pdf
PDF 142 KB Posted
- Solicitation number
- 36C26322Q0411
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S05 Request For Information (2 pages).docx | DOCX document | |
| 36C26322Q0411 0001.docx | DOCX document | |
| P07 Wage Determination 2-25-22 Polk Cnty (7 pages).pdf | ||
| 36C26322Q0411.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FUEL ISLAND UPGRADE AND DIESEL TANK REMOVAL SOW
PN 636A6-22-116
VA Central Iowa Health Care System Des Moines, IA 50310
SCOPE: Remove approximately 2400 gallons of E85 fuel from the E85 underground storage tank and dispose of the E85 fuel. Convert/modify the E85 Fuel underground storage tank (UST), all related components to a Diesel fuel UST and related components. Remove the old diesel dispenser/pump, 500-gallon UST, piping, and related components located near the chiller plant. It is highly recommended all interested contractors visit the site to gather information. Only authorized UST tank contractors by the IDNR are eligible to compete for this project the work under this contract is subject to the Iowa Department of Natural Resources (DNR) rules for Risk-
Based Corrective Action (RBCA) for Underground Storage Tanks (USTs) found in 567
IAC Chapter 135. The selected vendor will be expected to provide services that ensure compliance will all applicable environmental laws and regulations and fuel monitoring devices. The period of performance is 120 days from notice to proceed, to include materials and parts lead time. The contractor will provide all, supervision, labor, equipment, parts, and materials needed to complete the Fuel Island Upgrade and
Diesel Tank Removal Project.
Contractor work performed:
Work performed must be completed by currently licensed (by the IADNR) UST professionals: including Certified Groundwater Professionals Program, Compliance
Inspectors, Cathodic Protection Testers, Installation Inspectors, Tank Installers, Tank
Removers, and Tank Testers. Removal, installation, and testing must be per IADNR
UST requirements.
PHASE 1: Conversion of E85 to Diesel, and installation of a new
Unleaded dispenser for a 1500-gallon gasoline UST per IADNR UST removal and installation requirements.
1. Remove approximately 2400 gallons of E85 fuel and dispose of in accordance with
VA, local, state, and federal (under the Fuel Exemption rule) requirements. Copies of all documents will be given to the COR upon completion of the project.
2. Convert the E85 UST, fuel and water monitoring devices and Veeter-Root system to accommodate diesel fuel. The fuel dispenser/pump is currently designed to allow GSA operations. The fuel dispenser/pump will need to be removed and replaced with a new
Diesel Fuel dispenser, hose, nozzle, and related components. This must be performed by an IDNR authorized/certified remover, installer, and tester.
3. Complete start-up testing for returning to service a temporary closed UST according to local state and federal requirements. Start-up testing includes annual leak detection functionality testing for lines & tank leak detection; and three years overfill prevention, VA Central Iowa Health Care System Des Moines, IA 50310 spill containment and secondary containment sump testing (required to meet current federal requirements).
4. Verify proper operation of the new diesel UST, fuel dispenser/pump, fuel/water monitoring system. Verify no alarms are present and fuel receipts are printed. This must be performed by an IDNR authorized/certified tester.
5. Provide all required documentation to the IDNR for the new diesel UST and related components. This will be coordinated through the general contractor and the COR.
6. Replace the Unleaded fuel dispenser/pump along with related components and verify proper operation. This must be performed by an IADNR authorized/certified remover, installer, and tester.
7. Replace the failed Unleaded spill containment (identified from the February 1, 2022, inspection) with a new double walled spill containment.
Locate All utilities a min. of 50 feet from the area being excavated included but not limited to: Water, electric, drains, sewer, steam pipes, data, etc.
• The work area will consist of the area in which the UST, piping and components are located, and the area needed to maneuver vehicles safely. The area outside the fence/barrier will be kept free of mud and debris and will not impede vehicle and pedestrian traffic. Construction/caution tape will be wrapped around the outside of the fence and work area.
• Break Out appx. 4’x4’ area around Diesel spill containment.
• Remove & dispose of existing spill containment.
• Provide & Install (1) at grade double wall spill containment.
• Provide & install new nipple, top seal adaptor & cap. Install existing overfill prevention valve and ensure the valve is set at the required 95%.
• Haul off old concrete and backfill existing excavated material.
• Provide & install new concrete around the spill bucket with dowels into existing concrete.
• Remove barricades and clean the area.
VA Central Iowa Health Care System Des Moines, IA 50310
PHASE 2: Removal of 500-gallon Diesel tank UST and associated components:
Permanent removal per IADNR UST closure requirements.
1. Locate utilities a min. of 50 feet from the UST tank, to include where the underground piping/conduit runs from the tank to the where it enters the chiller plant. SEE above…
2. Once the E85 UST has been converted to the new diesel fuel tank and is in operation and functioning properly, then the old 500-gallon diesel UST and all associated components (e.g., fuel pump/dispenser, piping, electrical and fuel/water monitoring system will need removed out of the ground. The 500-gallon diesel UST is approximately 50 feet to the west wall of the chiller plant building this includes all conduit with electrical wiring, fuel piping/vent piping. This must be performed by an
IADNR authorized/certified remover, installer, and tester.
3. Layout work over underground storage tank and barricade area off.
4. During removal of the old diesel UST and related components a minimum of 6-foot barrier fence will be installed around the work area for pedestrian safety.
5. The work area will consist of the area in which the UST, piping and components are located, and the area needed to maneuver vehicles safely. The area outside the fence/barrier will be kept free of mud and debris and will not impede vehicle and pedestrian traffic. Construction/caution tape will be wrapped around the outside of the fence and work area.
6. Excavate and expose (1) UST: 500-gallon Fiber-Reinforced Plastic (FRP) UST.
Monitor excavation with LEL during work activity.
7. Remove and dispose of remaining liquids in UST. The fuel monitoring system communications has been cut so there is no way to know the exact amount of diesel fuel remaining in the UST other than a dipstick the VA uses.
8. Remove tank shell and product lines going to island from excavation area and haul-off to approved waste facility. Remove dispenser and island and haul-off to approved waste facility. This must be performed by an IADNR authorized/certified remover, installer, and tester.
9. The fuel pump/dispenser, piping and UST will be disposed of by the contractor in accordance with IDNR, local, state, and federal requirements at no additional costs to the Government.
10. Provide currently licensed and certified Groundwater Professional (GWP) for required soil and water testing per the IADNR UST closure requirements. Soil samples will be taken and tested for soil contamination and test results will be presented to the
VA Central Iowa Health Care System Des Moines, IA 50310
COR immediately after the results have been determined. The results will be provided to the IDNR for determining the need for well monitoring installation.
11. The area in which the UST was removed will remain open and not backfilled until the soil samples are returned and the IDNR has determined whether well monitors will need to be installed. The amount of well monitoring devices and location of installation will be determined by the IDNR and a certified groundwater professional.
12. If well monitors are required by the IDNR they will be installed in accordance with
IDNR requirements, and all documentation filed with the IDNR before and after installation with copies sent to the COR.
13. If well monitors are not needed the area in which the UST was removed will be back filled and packed. The area where the old conduit, fuel and vent pipes were removed will be backfilled.
14. Backfill and compact excavation to rough grade with fill material.
15. Provide GWP closure reports to customer and Iowa DNR within 45 days of removal of the UST. This includes a copy of the closure report to the Iowa UST Fund for reimbursement of removal costs up to $15,000 to the customer. The reimbursed funds will be provided as a credit to the United States Treasury Department.
16. Remove Barricades and clean area.
Any waste generated from this project that meets the EPAs requirements of hazardous waste must be handled and transported in accordance with all federal and state regulations. VACIHCS is considered the generator and must sign any hazardous waste shipment manifests if required.
VHA Supplemental Contract Requirements for Combatting COVID-19
1. Contractor employees who work in or travel to VHA locations must comply with the following:
a. Documentation requirements:
1) If fully vaccinated, contractors shall show proof of vaccination.
i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the
COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, VA Central Iowa Health Care System Des Moines, IA 50310 published on September 3, 2020), or a copy of medical records documenting the vaccination.
2) If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.
3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.
4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.
a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.