P09 - Final Drawings.pdf
PDF 5 MB Posted
- Attached to
- Z2DA--CORRECT ELECTRICAL DEFICIENCIES PN:589A4-23-104 Federal contract opportunity
- Solicitation number
- 36C25524R0106
About this file
This document appears to be a set of construction drawings and specifications related to a federal contract opportunity to correct electrical deficiencies at the Harry S Truman VA Medical Center in Columbia, Missouri. The project scope includes replacing multiple automatic transfer switches (ATS), distribution switchboards, transformers, and supporting electrical infrastructure. Key details include:
The solicitation number is 36C25524R0106 and the project number is 589A4-23-104. The procuring agency is the Department of Veterans Affairs Veterans Health Administration. The project involves fully sprinklered 100% construction documents to correct electrical deficiencies at the facility. New equipment includes four ATS units, four distribution switchboards, and five 1500 kVA pad-mounted transformers. The drawings provide one-line diagrams, floor plans, and details for the electrical demolition and new work. Deduct alternates are included for potential reductions in scope.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25524R0106 0002.docx | DOCX document | |
| 261219.pdf | ||
| PRE-BID site walk through sign in list.pdf | ||
| 36C25524R0106 0001.docx | DOCX document | |
| Revised 01 33 23 1Aug24.pdf | ||
| ATTENDANCE ROSTER PRE-BID Meeting.xlsx | XLSX spreadsheet | |
| 36C25524R0106.docx | DOCX document | |
| P09 - Final Specifications - Revised 03JUL24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 23133
A u to d e s k D o c s /2
.0
V A
C o lu m b ia
M
O
C o rr e c t E le c tr ic a l D e fi c ie n c ie s /5
A
-2
-1
.E
.R
.r v t
/1
/2
:1
:4
P
M
G00
COVER SHEET
Introba
6 S Old Orchard Ave Suit 285
Saint Louis, MO 63119
800.404.7677
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S TRUMAN
VAMC
800 Hospital Drive, Columbia, MO 65201
589A4-23-104
05/17/2024 AEA AEA
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S
TRUMAN VAMC
PROJECT NAME:
800 Hospital Drive, Columbia, MO 65201
SITE ADDRESS:
VA PROJECT NUMBER:
589A4-23-104
VICINITY MAP: SITE MAP:
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 23133
A u to d e s k D o c s /2
.0
V A
C o lu m b ia
M
O
C o rr e c t E le c tr ic a l D e fi c ie n c ie s /5
A
-2
-1
.E
.R
.r v t
/1
/2
:1
:4
P
M
G01
SHEET INDEX
Introba
6 S Old Orchard Ave Suit 285
Saint Louis, MO 63119
800.404.7677
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S TRUMAN
VAMC
800 Hospital Drive, Columbia, MO 65201
589A4-23-104
05/17/2024 AEA AEA
SHEET INDEX
Sheet Number Sheet Name
G00 COVER SHEET
G01 SHEET INDEX
E00 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED10 B1 EQUIPMENT ATS ONE-LINE DIAGRAM DEMOLITION
ED11 B1 CRITICAL ATS ONE-LINE DIAGRAM DEMOLITION
ED12 B1 LIFE SAFETY ATS ONE-LINE DIAGRAM DEMOLITION
ED13 ACA & CHILLER HOUSE ATS ONE-LINE DIAGRAM DEMOLITION
ED14 TRANSFORMER ONE-LINE DIAGRAM DEMOLITION
ED50 ENLARGED ELECTRICAL DEMOLITION PLANS - BASEMENT
ED51 ENLARGED ELECTRICAL DEMOLITION PLANS - BASEMENT
E10 B1 EQUIPMENT ATS ONE-LINE DIAGRAM NEW WORK
E11 B1 CRITICAL ATS ONE-LINE DIAGRAM NEW WORK
E12 B1 LIFE SAFETY ATS ONE-LINE DIAGRAM NEW WORK
E13 ACA & CHILLER ATS ONE-LINE DIAGRAM NEW WORK
E14 TRANSFORMER ONE-LINE DIAGRAM NEW WORK
E15 BRANCH CIRCUIT CORRECTION ONE-LINE DIAGRAMS
E30 PARTIAL PIPE BASEMENT PLAN - MAIN HOSPITAL
E31 PARTIAL PIPE BASEMENT PLAN - OR SUITE
E32 PARTIAL BASEMENT PLAN - MAIN HOSPITAL
E33 PARTIAL BASEMENT PLAN - ACA BUILDING
E34 PARTIAL BASEMENT PLAN - OR SUITE AND WAREHOUSE
E35 PARTIAL FIRST FLOOR PLAN - MAIN HOSPITAL
E36 PARTIAL FIRST FLOOR PLAN - ACA BUILDING
E37 PARTIAL FIRST FLOOR PLAN - OR SUITE
E38 PARTIAL SECOND FLOOR PLAN - MAIN HOSPITAL
E39 PARTIAL SECOND FLOOR PLAN - ACA BUILDING
E40 OVERALL THIRD FLOOR PLAN - MAIN HOSPITAL
E41 OVERALL THIRD FLOOR PLAN - ACA BUILDING
E42 OVERALL FOURTH FLOOR PLAN - MAIN HOSPITAL
E43 OVERALL FIFTH FLOOR PLAN - MAIN HOSPITAL
E44 OVERALL SIXTH FLOOR PLAN - MAIN HOSPITAL
E45 OVERALL PENTHOUSE FLOOR PLAN - MAIN HOSPITAL
E46 OVERALL CHILLER HOUSE - FIRST FLOOR PLAN
E47 PARKING GARAGE ELECTRICAL PLAN
E50 ENLARGED ELECTRICAL PLANS-BASEMENT
E51 ENLARGED ELECTRICAL PLANS-BASEMENT
E52 ENLARGED ELECTRICAL PLANS-BASEMENT
E53 ENLARGED ELECTRICAL PLANS-BASEMENT
E54 ENLARGED ELECTRICAL PLANS-FIRST FLOOR
E55 ENLARGED ELECTRICAL PLANS-FIRST FLOOR
E56 ENLARGED ELECTRICAL PLANS-FIRST FLOOR
E57 ENLARGED ELECTRICAL PLANS-SECOND FLOOR
E58 ENLARGED ELECTRICAL PLANS-SECOND FLOOR
E59 ENLARGED ELECTRICAL PLANS-SECOND FLOOR
E60 ENLARGED ELECTRICAL PLANS-THIRD FLOOR
E61 ENLARGED ELECTRICAL PLANS-FOURTH FLOOR
E62 ENLARGED ELECTRICAL PLANS-FIFTH FLOOR
E63 ENLARGED ELECTRICAL PLANS-SIXTH FLOOR
E70 ELECTRICAL DETAILS
E71 ELECTRICAL SCHEDULES
E72 ELECTRICAL SCHEDULES
E73 ELECTRICAL SCHEDULES
E74 ELECTRICAL SCHEDULES
E75 ELECTRICAL SCHEDULES
Grand total: 54
ELECTRICAL ABBREVIATIONS
ABBREVIATION DESCRIPTION
REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.
MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)
AMPERE
AMPERE FRAME
ABOVE FINISHED FLOOR
ALUMINUM
AMPERE TRIP
CONDUIT
CIRCUIT BREAKER
CORRELATED COLOR TEMPERATURE
COPPER
DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)
DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)
EXISTING
ELECTRICALLY OPERATED
ENERGY REDUCING MAINTENANCE SWITCH
FUSE
FULL LOAD AMPS
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT ALARM
GROUND FAULT PROTECTION
HORSEPOWER
KILOAMPERE INTERRUPTING CAPACITY
KILOVOLT AMPERE
KILOWATT
MAXIMUM
MINIMUM CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MINIMUM
MAIN LUGS ONLY
MANUALLY OPERATED
NORMALLY CLOSED
NON-FUSED
NOT IN CONTRACT
NORMALLY OPEN
POLES
PARTIAL
RELOCATE
SHORT CIRCUIT CURRENT RATING
SURGE PROTECTIVE DEVICE
SHUNT TRIP
TYPICAL
UNLESS NOTED OTHERWISE
VOICE
WALL PHONE
WIRE
WEATHER RESISTANT
TRANSFORMER
ZONE SELECTIVE INTERLOCKING
A
AF
AFF
AL
AT
C
CB
CCT
CU
D
D
E
EO
ERMS
F
FLA
G, GFCI
GFA
GFP
HP
KAIC
KVA
KW
MAX
MCA
MCB
MIN
MLO
MO
NC
NF
NIC
NO
P
PART
R
SCCR
SPD
ST
TYP
UNO
V
W
W
WR
XFMR
ZSI
A. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE
STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS.
B. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL
COST TO THE OWNER.
C. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS
ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND
PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.
D. PROVIDE AN INSULATED CONTINUOUS COPPER CONDUCTOR, NOT SMALLER THAN #10, TO BOND ALL
NORMAL AND ESSENTIAL ELECTRICAL SYSTEM PANELBOARDS TOGETHER THAT SERVE THE SAME
INDIVIDUAL PATIENT VICINITY AS DEFINED IN NEC 517.14.
E. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN
CABLING.
F. NEW TRANSFORMER GROUNDING CONDUCTORS SHALL BE ROUTED WITHIN METALLIC CONDUIT TO THE GROUNDING ELECTRODE SYSTEM AND SHALL CONNECT TO THE METALLIC CONDUIT WITH GROUNDING
BUSHINGS ON BOTH ENDS.
G. NEW PANELBOARD INSTALLATION SHALL INCLUDE EXTERNAL WIREWAYS ABOVE TEH PANEL. ALL HOMERUN CONDUITS AT PANEL/WIREWAY TERMINATION SHALL BE MARKER-LABELED INDICATING BRANCH CIRCUIT
NUMBERS CONTAINED WITHIN EACH CONDUIT.
H. PROVIDE CIRCUIT BREAKER LOCK ACCESSORIES ON ALL SOURCE CIRCUIT BREAKERS SERVING
TRANSFORMERS TO ACCOMMODATE LOCK-OUT OF TRANSFORMER PRIMARY SOURCES.
I. EXISTING MOTOR CONTROL CENTERS: TRACE EXISTING BRANCH CIRCUITS TO VERIFY EQUIPMENT SERVED.
PROVIDE NEW PERMANENT LABELING OF MOTOR CONTROL CENTER AND EACH INDIVIDUAL UNIT/BUCKET.
LABEL SHALL IDENTIFY EQUIPMENT SERVED AND DESCRIPTION OF EQUIPMENT LOCATION. PAINT OVER EXISTING MARKER-APPLIED LABELING AFTER CIRCUIT DESCRIPTIONS ARE VERIFIED. PROVIDE MIMIC-BUS
LABELING OF THE EXISTING MCC WITH RAISED PHENOLIC PLASTIC.
J. NEW TRANSFORMERS SHALL BE SUSPENDED FROM STRUCTURE ABOVE AND ANCHORED THROUGH
VIBRATION ISOLATORS. GROUND TRANSFORMER SECONDARY NEURTAL CONDUCTORS PER
REQUIREMENTS.
(GENERAL NOTES SHALL APPLY TO ALL SHEETS)
ELECTRICAL GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 23133
A u to d e s k D o c s /2
.0
V A
C o lu m b ia
M
O
C o rr e c t E le c tr ic a l D e fi c ie n c ie s /5
A
-2
-1
.E
.R
.r v t
/1
/2
:3
:1
A
M
E00
ELECTRICAL SYMBOLS AND
ABBREVIATIONSIntroba
6 S Old Orchard Ave Suit 285
Saint Louis, MO 63119
800.404.7677
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S TRUMAN
VAMC
800 Hospital Drive, Columbia, MO 65201
589A4-23-104
05/17/2024 AEA CTB
ELECTRICAL EQUIPMENT
SYMBOLS
PLAN SYMBOL NAME
AUTOMATIC TRANSFER SWITCH
DISTRIBUTION PANEL
ENCLOSED CIRCUIT BREAKER -
SURFACE
ENCLOSED DISCONNECT
SWITCH - FUSED
ENCLOSED DISCONNECT
SWITCH - NON-FUSED
GENERATOR
PANELBOARD - RECESSED
PANELBOARD - SURFACE
SWITCHBOARD
TRANSFORMER - DRY TYPE
TRANSFORMER - OIL FILLED
VARIABLE FREQUENCY DRIVE
ONE LINE SYMBOL
PLAN SYMBOL NAME
CONTINUATION
ENCLOSED CIRCUIT BREAKER
GROUND BAR
GROUNDING ELECTRODE
PANEL BOARD
SURGE PROTECTIVE DEVICE
SWITCHBOARD/SWITCHGEAR
TRANSFORMER
L
E N
L
E N
SPD
STEAM
GENERATOR
D P B
IC
U V Q
M C C P J V Q
M C C P J V Q
L P J V Q
T B D D .0 V Q
ATS-EQ2
1600A-3P
480V-3ɸ-3W
BYPASS
ISOLATION
ATS-EQ
1600A-3P
480V-3~-3W
BYPASS ISOLATION
NA 110A NA NA 23A
(1)#4/0 G. 3-1/2"C.
(5)SETS OF (3)#500,
FOR CONT.
SEE SHEET
ED11
EQ2
PULLBOX
150AF
100AT
3P
100AT
3P
100AF
600AT
3P
600AF
600AT
3P
600AF
300AT
3P
400AF
45AT
3P
60AF
800AT
3P
800AF
C H
C H
C H
MCCB-BB7.6-480VQ
TB-H14-120VQ
SQUARE D
EE112T3HCU
150° RISE
3.8% Z
XFMR
TB-D08.9-120VQ
DPB-H14-480VQ, GE SPECTRA SERIES,
1600A 480V-3ɸ-3W 65KAIC
(3)#1,(1)#4G,1"C.
400AF
400AT
400AP
600AF
250AP
M C C M V Q
LPB-H14-120VQ
SQUARE D NQ442L2C
25KAIC
225A MCB
TO DPB-Ja14-277VN, 3-B
TO CIRCUIT BREAKER IN PARALLELING SWITCHGEAR EGB-F14-277CG
480∆-208Y/120V
EX MCCB-G14-480VQR
800A, 480V, 3∅, 3W
GE EVOLUTION SERIES E900
CAT# 0859X0928M01
EX MCCB-G14-480VQF
800A, 480V, 3∅, 3W
GE EVOLUTION SERIES E900
CAT# 0859X0928M02
(2)SETS OF (3)#350
(1)#1/0 G. 3"C.
(5)SETS OF (3)#500
(1)#1/0 G. 3"C.(5)SETS OF (3)#500
(1)#4/0 G. 3"C.
TO CIRCUIT BREAKER IN PARALLELING SWITCHGEAR EGB-F14-277CG
250AT
LSILSI
400AF
250AT
250AP
LSI
400AF
300AT
300AP
LSI
150AF
100AT
100AP
LSI
400AF
400AT
400AP
LSI
400AF
400AT
400AP
LSI
400AF
200AT
200AP
LSI
600AF
600AT
600AP
LSI
600AF
600AT
600AP
LSI
NA 80A NA
120A 77A
DPB-DD8.9-277VQ, 1600A, 480Y/277V, 3∅, 4W, 25KAIC
(5)SETS OF (3)#500,
(1)#4/0 G. 3-1/2"C.
TO DPB-Ja14-277VN, 6-C
MAIN HOSPITAL
(5)SETS OF (3)#500
(1)#1/0 G. 3"C.
NORMAL SWITCHGEAR
MAIN HOSPITAL
NORMAL SWITCHGEAR
G013
D020
D022 D022
D022
D022
D022 D022
6 6 6 6 6 6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 23133
A u to d e s k D o c s /2
.0
V A
C o lu m b ia
M
O
C o rr e c t E le c tr ic a l D e fi c ie n c ie s /5
A
-2
-1
.E
.R
.r v t
/1
/2
:4
:4
P
M
ED10
B1 EQUIPMENT ATS ONE-LINE
DIAGRAM DEMOLITIONIntroba
6 S Old Orchard Ave Suit 285
Saint Louis, MO 63119
800.404.7677
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S TRUMAN
VAMC
800 Hospital Drive, Columbia, MO 65201
589A4-23-104
05/17/2024
SHEET NOTES:
1. DISCONNECT AND REMOVE EXISTING ATS. PULL BACK AND PREPARE
SUPPLY AND LOAD FEEDERS FOR RECONNECTION TO NEW ATS.
2. INTERCEPT EXISTING FEEDER FROM PARALLELING SWITCHGEAR EGB-
F14-277VG. PREPARE EXISTING CONDUITS FOR EXTENSION TO NEW
ATS-EQ1AND ATS-EQ3 LOCATIONS AND REMOVE CABLES. REFER TO
NEW WORK PLAN FOR MORE INFORMATION.
3. DEMOLISH NORMAL POWER FEEDER FROM ATS TO NORMAL
SWITCHGEAR.
4. REMOVE ATS-EQ2 PULLBOX. CUT AND PULL BACK CABLES WITH
ENOUGH LENGTH TO TERMINATE ON NEW DISTRIBUTION
SWITCHBOARD DPB-G13-480VQ. TRIM CONDUITS AS NEEDED. REFER
TO NEW WORK PLAN FOR MORE INFORMATION.
5. REMOVE EXISTING FEEDER AND AUTOMATIC TRANSFER SWITCH ATS-
EQ TO EXISTING DISTRIBUTION SWITCHBOARD DPB-H14-480VQ.
PREPARE EXISTING FEEDER FOR EXTENSION/RECONNECTION TO NEW
DEVICE. REFER TO NEW WORK PLAN FOR MORE INFORMATION.
6. DISCONNECT AND RELOCATE EXISTING LOADS TO NEW DISTRIBUTION
SWITCHBOARD DPB-G14-277VQ AND DPB-G13-277VQ TO MAKE ROOM
FOR MODIFICATIONS TO EXISTING SWITCHBOARD. REFER TO NEW
WORK PLAN FOR MORE INFORMATION.
NO SCALEED10
ATS DEMO B1 EQUIPMENT1
1. ATS-EQ2 SYSTEM:
a. RELOCATE TRANSFORMER TB-G13-120VN AND PANELBOARD LPB-
G13-120VN.
b. PREPARE ATS EQ2 SYSTEM REPLACEMENT AS MUCH AS POSSIBLE.
c. INTERCEPT TWO SETS OF THE FIVE SETS OF LOAD SIDE FEEDER
CONDUITS IN PIPE BASEMENT BELOW ATS-EQ2 PULLBOX. PULL
CABLES OUT WITH ENOUGH CABLE LENGTH FOR FINAL
TERMINATIONS BACK INTO NEW SWITCHBOARD DPB-G13-277VQ.
d. PROVIDE TEMPORARY CABLES FROM CRITICAL POWER CAM LOCK
BOX TO LOCATION OF CABLE INTERCEPT BELOW BASEMENT AND
SPLICE CABLES.
e. SET CAMLOCK BOX CIRCUIT BREAKER TO MAX 800AMPS SETTING.
f. DISCONNECT THE OTHER 3 SETS OF CABLES AT SWITCHBOARD
DPB-DD8.9-277VQ FROM ATS-EQ2 AND MAKE SAFE.
g. CONFIRM ALL CABLES IN ATS-EQ2 PULL BOX ARE NO LONGER
ENERGIZED AND SAFE TO WORK ON AND SWITCHBOARD DPB-
DD8.9-277VQ IS ENERGIZED FROM ATS-C4.
h. REMOVE ATS-EQ2 PULL BOX.
i. REPLACE ATS-EQ2 AND INSTALL NEW SWITCHBOARD DPB-
B13-277VQ, CAMLOCK BOX DPB-G13-277VQ, CABLES AND CONDUIT.
j. IF CABLE INTERCEPT CANNOT MAINTAIN CABLE LENGTH WITHOUT
SPLICES IN A MANOR THAT FINAL TERMINATIONS AND CABLE
LENGTHS REACH NEW SWITCHBOARD, PROVIDE TWO NEW SETS
OF CABLES FROM DPB-DD8.9-277VQ MATCHING EXISTING.
k. EXTEND 2 SETS OF CONDUITS FROM CABLE INTERCEPT OR DPB-
DD8.9-277VQ TO SWITCHBOARD. DISCONNECT TEMPORARY
CABLES AND COMPLETE ALL FIVE SETS OF CABLE TERMINATIONS
AT NEW SWITCHBOARD.
l. COMPLETE REMAINING INSTALLATION INCLUDING REMOVAL OF
TEMPORARY CABLES LABELING AND CLEAN UP.
GENERAL:
A. ANY POWER OUTAGE FOR EQUIPMENT SAFETY POWER SYSTEM
SHALL HAVE METHOD OF PROCEDURE SUBMITTED 8 WEEKS
BEFORE EXPECTED WORK BEGINS FOR THE OUTAGE. INCLUDE
METERED LOAD OF POWER TO CONFIRM TEMPORARY POWER WILL
BE ADEQUATE.
B. PREPARE ALL FEEDERS, SWITCHBOARDS AND JUNCTION BOXES
THAT DO NOT REQUIRE A POWER OUTAGE PRIOR TO STARTING
WORK.
C. SIZING FOR TEMPORARY CABLES AND EQUIPMENT SHALL MATCH
EXISTING CABLES AND EQUIPMENT THAT REQUIRES TEMPORARY
POWER.
D. REPLACE ONE ATS AND ASSOCIATED SWITCHBOARDS AT A TIME.
DURING POWER OUTAGE, ONLY THE TIME TO TRANSFER AND
EQUIPMENT POWER SINGLE FEEDER AT A TIME SHOULD TAKE
PLACE. NO ASSUMPTION SHOULD BE MADE THAT COMBINING
MULTIPLE FEEDER REPLACEMENTS IN A SINGLE TIME PERIOD IS
ALLOWED. MULTIPLE FEEDER REPLACEMENTS MAY ONLY BE
ALLOWED IF METHOD OF PROCEDURE (MOP) IS APPROVED.
Revisions: Date:
1. DEDUCT 4: REMOVE SCOPE OF WORK FOR REPLACEMENT AND
ASSOCIATED WORK FOR THE REPLACEMENT OF ATS-EQ1, ATS-EQ2,
ATS-EQ3, AND ATS-EQ4 INCLUDING ATS METERING, SUPPLY AND LOAD
FEEDERS, SWITCHBOARDS DPB-G13-277VQ, DPB-H14-277VQ, DPB-
G14-277VQ, DPB-J13-277VQ, AND CAMLOCK BOX FOR DEDUCT
ALTERNATE 4. NOTE, THIS MEANS ALL WORK SHOWN ON THIS SHEET.
SHEET DEDUCT GENERAL NOTES:
BUILDING ONE EQUIPMENT POWER
ATS'S PHASING:
M
E N
L
E NN
L
E
L
E N M
GEN
GEN
M
ATS-C3
600A-4P
480V
BYPASS
ISOLATION
S P A C E
ATS-C1
GE-ZENITH
600A-4 POLE
480Y/277V -3ɸ-4W
BYPASS ISOLATION
SOLID GROUND
DS-C2
800A 600V
FERRAZ
SHAWMUH
800AF
DS-DPB-J4-480VC
800A 600V
FUSTRON
FRN-R-35
DPB-G13-277VC, (DP-CRITICAL-2), 480Y/277V-3 ɸ-4W, 800A BUS 25KAIC, 87.5KVA PEAK LOAD
250AF
150AT
3P
250AF
150AT
3P3P
400AF
300AT
3P
60AF
40AT
3P
60AF
50AT150AT
3P
150AF
150AT
3P
250AF
100AT
3P
250AF
150AT
3P
150AF60AF
60AT
3P
250AF
150AT
3P
60AT
60AF
DP-CRITICAL 1, GE-SPECTRA SERIES, 480Y/277V-3~-4W,
600A BUS 65KAIC
3P
300AT
400AF
3P
175AT
250AF
3P
100AT
100AF
3P
225AT
250AF
3P
ATS-C2
GE-ZENITH
800A-4 POLE
480Y/277V-3
BYPASS ISOLATION
SOLID GROUND
FOR CONT.
SEE SHEET
ED12
FOR CONT.
SEE SHEET
ED10
100A 3P3P
100A
DPB-G14-480VC, 600A,
(DP-CRITICAL 3)
3P 400A
3P 225A
SPARE SPARE
(2)SETS OF (4)#350
(1)#1 G. 3"C.
800AF
800AT
3P
G3G2
1600AF
1600AT
3P
1600AF
1600AT
3P
G1
MASTER
CONTROL
1600AF
1600AT
3P
1600AT
1600AF
3P
1600AF
1600AT
3P
800AF
800AT
3P
600AF
600AT
3P
1200AF
800AT
3P
400AF
3P
200AT
480Y/277V-
1250KW
3P
600AF
3P
400AF
200AT
480Y/277V-
1250KW
2000A2000A2000A4000A
S P A C E
2000A
600AF
600AT
3P
600AF
600AT
3P
S P A R E
3P
150AF
125AT
2000A2000A2000A
(4) SETS OF (4)#600, (1)#4/0G, 4"C
GENERATOR
CONNECTION
CABINET
1600A BUS DUCT
S P A C E3P
1600AF
1600AT1
A
F E E D E R
BUS DUCT
MAIN
ATS-EQ ATS-EQ2ATS-ELATS-LSATS-C2ATS-GENATS-C1ATS-C3
600AT
ATS-FPATS-C4
800AF
400AT
3P
S P A C E
S P A R E
800AF
800AT
3P
S P A C E
400AF
200AT
3P
S P A R E
800AF
800AT
3P
800AF
400AT
3P
150AF
125AT
3P
S P A R E
2000A 2000A 1600A 1600A 1600A
S P A R E
ATS-C4D
P B C
V N
V N
I-0
ATS-C3
I-0
LP
B G N
P
LB
G
LP
,5
A
TS
M C C
LT-1
ST-.4
TS
C
LT-1
LTd-3
ST-8
STd-1
P P B .5
TS
B
V N
V N
LP
,2
800AF
400AT
3P
LT-1
LTd-3
ST-8
STd-1
800AF
400AT
3P
LT-1
LTd-3
ST-4
STd-1
400AF
200AT
3P
LT-1
LTd-1
ST-4
STd-1 LT-1
LTd-3
ST-9
STd-1
800AF
300AT
3P
LT-1
LTd-3
ST-6
STd-1
800AF
600AT
3P
1600AF
1600AT
3P
LT-1
LTd-4
STPU-2
STd-1
400AF
400AT
3P
LT-1
LTd-1
ST-1
STd-1
800AF
400AT
3P
LT-1
LTd-3
ST-5
STd-1
800AF
800AT
3P
LT-1
LTd-3
ST-4
STd-1
800AF
800AT
3P
LT-1
LTd-3
ST-4
STd-1
LT-1
LTd-3
ST-6
STd-1
800AF
400AT
3P
GFs-.02 GFd-1
I-5 GFs-.02 GFd-4
I-2 GFs-.02
GFd-1 I-5
ATS-C4
1600A.4P 480Y/277V 3∅, 4W
BYPASS
ISOLATION
800A
GE SKLB
SRPK
800/800
800A
GE SKLB
SRPK
800/800
800AF
600AT
3P
200AF
200AT
3P
250A 3P
250A 3P
DPB-H15-480VC, 1600A, 3∅, 4W, 480/277
(5) SETS OF (4)#500,
(1)#4/0 G. 3-1.2"C.
S P A R E
S P A R E
S P A R E
LP
E V C
D P B L4 V C
TS
L4 V C
D P B L4 .4 V C
D P J9 V C
LP
J9 V C
D P B .3
V N
D P C
D P L4 .3
P P E a
E
LE
V A
TO
R
M N
(2) SETS OF
(4)#350,(1)#1G,2 1/2"C
M E D
A
IR
M E D
V A C
P U M P
V A C
P U M P
2P P B J V C
L P J V C
L P M V C
P P B N V C
X F M R
T B G V C
L P B H V C
L P B C V C
X F M R
T F V C
CABLE
TOP
BOX
T X E V C
O L D
C A T H
L A B
M D P
P P B L V C
D P B J V N
X F M R
T F V C K V A
600A PLUG-IN
BUSDUCT-CRITICAL
SPACE
400AF
SPACE
600AF
3P
800AT
1200AF
3P
200AT
3P
400AF600AF
3P
600AT
600AF
600AT
DPB-J4-480VC, 480Y/277V-3ɸ-4W 800A BUS 65KAIC
3P
250A
HJD65K
3P
250A
HJD65K
3P
30A
3P
200A
C T R M
B
C T R M
B
G A R A G E
E L E C
R M
E
100A
3P
50A
3P
300A
3P
HJD65K
250A
3P
HJD65K
100A
3P
X F M R
L O C A T E D
IN
A
U P S
800A-3P
HDML65K
S P A R E
S P A R E
50A
3P
HJD65K
300A
3P
HJD65K
C T
R M
B M
P P B P V C
P P B H b V C
L P H V C
TS-E4-120VC
DSS-E4-120VC
TO ATS GEN
T B P V C
T B L
K V A
TO 3-B, 2000AF,
1600AT, 3P, MAIN
HOSPITAL NORMAL
SWITCHGEAR
DPB-H14-277VN, 1600A, 480V, 3∅, 4W, 65KAIC
(1)#1/0 G. 3-1/2""C.
(2)SETS OF (4)#500,
DPB-Ha13-277VN, 2000A BUS
TO ATS-EQ EMERGENCY FEED SIDE
TO ATS-EQ2 EMERGENCY FEED SIDE
TO ATS-LS EMERGENCY FEED SIDE
TO ATS-LS NORMAL SIDE
TO ATS-EL EMERGENCY FEED SIDE
TO ATS-EL NORMAL FEED SIDE
480Y/277V-
3∅-4W
PARALLELING SWITCHGEAR, EGB-F14-277VG,
5000A BUS, 480Y/277V, 3∅, 4W
3P
1600AF
---AT
SPARE
3P
1600AF
---AT
SPARE
3P
1600AF
---AT
SPARE
(1)#1/0 G. 3-1/2"C.
(2)SETS OF (4)#500,
(1)#1/0 G. 3"C.
(2)SETS OF (4)#350,
(1)#1/0 G. 3-1/2"C.
(2)SETS OF (4)#500,
(1)#1/0 G. 3"C.
(2)SETS OF (4)#350,
(2)SETS OF (4)#350, (1)#1/0 G. 3"C.
(2)SETS OF (3)#350, (1)#1/0 G. 3"C.
(5)SETS OF (4)#500, (1)#1/0 G. 3-1/2""C.
(5)SETS OF (3)#500, (1)#4/0 G. 3"C.
(5)SETS OF (4)#500, (1)#4/0 G. 3"C.
(2)SETS OF (4)#350,
(1)#1 G. 3"C.
(2)SETS OF (4)#350,
(1)#1/0 G. 3"C. (2)SETS OF (4)#350,
(1)#1/0 G. 3"C.
(1)#1 G. 3"C.
(2)SETS OF (4)#350,
D022B
D022B
D020
D022
D020
D020
D020
D022 D022
D020 D020
D022 D022
D023 D023
D022C
3 3
1 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 23133
A u to d e s k D o c s /2
.0
V A
C o lu m b ia
M
O
C o rr e c t E le c tr ic a l D e fi c ie n c ie s /5
A
-2
-1
.E
.R
.r v t
/1
/2
:4
:4
P
M
ED11
B1 CRITICAL ATS ONE-LINE
DIAGRAM DEMOLITIONIntroba
6 S Old Orchard Ave Suit 285
Saint Louis, MO 63119
800.404.7677
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S TRUMAN
VAMC
800 Hospital Drive, Columbia, MO 65201
589A4-23-104
05/17/2024
SHEET NOTES:
1. DISCONNECT AND REMOVE EXISTING ATS. PREPARE EXISTING
INCOMING FEEDERS FOR RECONNECTION TO NEW ATS.
2. DISCONNECT AND REMOVE EXISTING 800A DISCONNECT SWITCH.
REMOVE INCOMING AND OUTGOING FEEDERS. SALVAGE BELOW SLAB
CONDUIT FOR REUSE. REFER TO NEW WORK PLAN FOR MORE
INFORMATION.
3. DISCONNECT AND REMOVE EXISTING SWITCHBOARD. DISCONNECT
AND PREPARE EXISTING BRANCH CIRCUITING FOR RECONNECTION TO
NEW SWITCHBOARD. REFER TO NEW WORK PLAN FOR MORE
INFORMATION.
4. REMOVE EXISTING FEEDER FROM DEMOLISHED 800A DISCONNECT
SWITCH TO BELOW PIPE BASEMENT. PREPARE EXISTING CONDUIT AND
WIRE FOR RECONNECTION/EXTENSION. REFER TO NEW WORK PLAN
FOR MORE INFORMATION.
5. DEMOLISH EXISTING FEEDER FROM EXISTING ATS-C4 TO EXISTING
DISTRIBUTION SWITCHBOARD DPB-H15-480VC. REFER TO NEW WORK
PLAN FOR MORE INFORMATION.
6. DEMOLISH EXISTING FEEDER FROM EXISTING ATS-C2 TO EXISTING
DISCONNECTS TO EXISTING DISTRIBUTION PANELBOARD DPB-
G13-277VC. REFER TO NEW WORK PLAN FOR MORE INFORMATION.
7. REMOVE EXISTING FEEDERS.
NO SCALEED11
ATS DEMO B1 CRITICAL1
GENERAL:
A. ANY POWER OUTAGE FOR CRITICAL POWER SYSTEM SHALL HAVE
METHOD OF PROCEDURE (MOP) SUBMITTED 8 WEEKS BEFORE
EXPECTED WORK BEGINS FOR THE OUTAGE. INCLUDE METERED
LOAD OF POWER TO CONFIRM TEMPORARY POWER WILL BE
ADEQUATE.
B. PREPARE ALL FEEDERS, SWITCHBOARDS AND JUNCTION BOXES
THAT DO NOT REQUIRE A POWER OUTAGE PRIOR TO STARTING
WORK.
C. SIZING FOR TEMPORARY CABLES AND EQUIPMENT SHALL MATCH
EXISTING CABLES AND EQUIPMENT THAT REQUIRES TEMPORARY
POWER.
D. REPLACE ONE ATS AND ASSOCIATED SWITCHBOARDS AT A TIME.
E. DURING POWER OUTAGE, ONLY THE TIME TO TRANSFER A LIFE
SAFETY POWER SINGLE FEEDER AT A TIME SHOULD TAKE PLACE.
NO ASSUMPTION SHOULD BE MADE THAT COMBINING MULTIPLE
FEEDER REPLACEMENTS IN A SINGLE TIME PERIOD IS ALLOWED.
MULTIPLE FEEDER REPLACEMENTS MAY ONLY BE ALLOWED IF
METHOD OF PROCEDURE (MOP) IS APPROVED.
1. ATS-C4 SYSTEM:
a. COMPLETE INSTALLATION OF CRITICAL POWER CAM LOCK BOX
DPB-H15-277VC EXCEPT FOR FINAL TERMINATIONS TO
SWITCHBOARD DPB-H15-277VC.
b. PROVIDE COMPLETE TEMPORARY POWER ATS SYSTEM INCLUDING
800ATS, TEMPORARY NORMAL SUPPLY CONDUCTORS FROM DPB-
HA13-277VN SWITCHGEAR AND TEMPORARY 800A SPARE BREAKER,
TEMPORARY CRITICAL SUPPLY CONDUCTORS FROM PARALLELING
SWITCHGEAR EGB-F14-277VG AND TEMPORARY 800A BREAKER,
TEMPORARY LOAD SIDE CABLES TO CAM LOCK BOX.
c. REMOVE SUPPLY CABLES FROM ATS-C4 TO SWITCHBOARD DPB-
H15-277VC. INSTALL CAMLOCK BOX BI-DIRECTIONAL BREAKER AND
NEW DPB-J4-480VC BREAKER IN SWITCHBOARD DPB-H15-177VC.
TERMINATE CAMLOCK BOX CABLES.
d. COMPLETE TEMPORARY POWER TRANSFER TO TEMPORARY ATS
FOR SWITCHBOARD DPB-H15-277VC AND ISOLATE SWITCHBOARD
TO PREPARE FOR THE FEEDER SECTION RECONFIGURATION AND
SWITCHBOARD ADDITIONS.
e. INSTALL NEW DPB-H15-277VC-1 AND FEEDER TO ATS -C4.
f. PROVIDE TESTING OF ATS-C4.
g. AFTER TESTING IS COMPLETE, INSTALL FEEDER CONNECTION
BETWEEN DPB-H15-277VC-1 AND DPB-H15-277VC-2 AND
DISCONNECT TEMPORARY ATS SYSTEM.
h. COMPLETE SWITCHBOARD DPB-J4-480VC FEEDER RELOCATION TO
DPB-H15-277VC.
i. COMPLETE REMAINING INSTALLATION INCLUDING LABELING AND
CLEAN UP.
j. REMOVE TEMPORARY ATS SYSTEM.
2. ATS-C1 SYSTEM:
a. PREPARE ATS C1 AND SWITCHBOARD REPLACEMENT AS MUCH AS
POSSIBLE.
b. PROVIDE A TEMPORARY DP CRITICAL-1 POWER SWITCHBOARD
WITH SAME OVERCURRENT AND BRANCH CIRCUIT PROTECTION AS
EXISTING. PROVIDE TEMPORARY CONNECTION FROM CRITICAL
POWER CAM LOCK BOX TO TEMPORARY SWITCHBOARD.
c. TRANSFER ONE BRANCH FEEDER FROM CRITICAL-1 POWER
SWITCHBOARD TO TEMPORARY SWITCHBOARD AT A TIME. PULL
CABLES OUT FROM NEAREST PULL BOX AND EXTEND AS NEEDED
FOR TEMPORARY POWER. PROVIDE NEW JUNCTION BOXES AND
CONDUIT IF NEEDED.
d. AFTER ALL LOADS HAVE BEEN TEMPORARY LOCATED TO TEMP
POWER SWITCHBOARD, REPLACE DP CRITICAL-1 SWITCHBOARD
AND ATS-C1.
e. PROVIDE TESTING OF ATS-C1.
f. TRANSFER LOADS BACK FROM TEMPORARY SWITCHBOARD TO
NEW SWITCHBOARD. EXTEND CABLES AND CONDUIT AS NEEDED
FOR A COMPLETE INSTALLATION.
g. COMPLETE REMAINING INSTALLATION INCLUDING, REMOVAL OF
TEMPORARY CABLES AND EQUIPMENT, LABELING AND CLEAN UP.
3. ATS-C2 SYSTEM:
a. PREPARE ATS C2 AND SWITCHBOARD REPLACEMENT AS MUCH AS
POSSIBLE.
b. PROVIDE A TEMPORARY DP CRITICAL-2 POWER SWITCHBOARD
WITH SAME OVERCURRENT AND BRANCH CIRCUIT PROTECTION AS
EXISTING. PROVIDE TEMPORARY CONNECTION FROM CRITICAL
POWER CAM LOCK BOX TO TEMPORARY SWITCHBOARD.
c. TRANSFER ONE BRANCH FEEDER FROM CRITICAL-2 POWER
SWITCHBOARD TO TEMPORARY SWITCHBOARD AT A TIME. PULL
CABLES OUT FROM NEAREST PULL BOX AND EXTEND AS NEEDED
FOR TEMPORARY POWER. PROVIDE NEW JUNCTION BOXES AND
CONDUIT IF NEEDED.
d. AFTER ALL LOADS HAVE BEEN TEMPORARY LOCATED TO TEMP
POWER SWITCHBOARD, REPLACE DP CRITICAL-2 SWITCHBOARD
AND ATS-C2.
e. PROVIDE TESTING OF ATS-C2.
f. TRANSFER LOADS BACK FROM TEMPORARY SWITCHBOARD TO
NEW SWITCHBOARD AND COMPLETE INSTALLATION. EXTEND
CABLES AND CONDUIT AS NEEDED FOR A COMPLETE
INSTALLATION.
g. COMPLETE REMAINING INSTALLATION INCLUDING REMOVAL OF
TEMPORARY CABLES AND EQUIPMENT, LABELING AND CLEAN UP.
4. ATS-C3 SYSTEM:
a. PREPARE ATS C3 AND SWITCHBOARD REPLACEMENT AS MUCH AS
POSSIBLE.
b. DISCONNECT AND PROTECT SUPPLY CABLES FROM DISTRIBUTION
SWITCHBOARD DPB-G14-480VC.
c. PROVIDE TEMPORARY CABLES FROM CRITICAL CAM LOCK BOX AND
TERMINATE ON DPB-G14-480VC.
d. REPLACE ATS-C3 AND PROVIDE TESTING.
e. TRANSFER LOADS BACK FROM CRITICAL CAM LOCK BOX TO
PERMANENT SUPPLY CONDUCTORS.
f. COMPLETE REMAINING INSTALLATION INCLUDING REMOVAL OF
TEMPORARY CABLES LABELING AND CLEAN UP.
Revisions: Date:
BUILDING ONE CRITICAL POWER ATS'S
PHASING:
L
NE
ATS-LS
600A-4 POLE
480Y/277V-3~-4W
BYPASS ISOLATION
SOLID GROUND
ATS-EL
600A-4
POLE
480Y/277V-3ɸ-3W
BYPASS
ISOLATION
SOLID
GROUND
FOR CONT.
SEE SHEET
ED11
S P A C E
S P A C E
150AT
3P
100AT
3P
150AT
3P
150AF150AF 150AF
DP-LIFE SAFETY, GE SPECTRA SERIES, 600A,
150AT
3P
150AF
L P B D D .9 V E
L P B H V E
L P B H V E
TO DPB-J14-480VE
175A
FD35K
3P
PPP-K8-480VQ
EATON PRL3A
600A
S P A C E175A
FD35K
3P
125A
FD35K
3P
125A
FD35K
3P
125A
FD35K
3P
E
LE
V A
TO
R
E
LE
V A
TO
R
E
LE
V A
TO
R
E
LE
V A
TO
R
E
LE
V A
TO
R
TO CIRCUIT BREAKER IN PARALLELING SWITCHGEAR EGB-F14-277CG
TO CIRCUIT BREAKER IN PARALLELING SWITCHGEAR EGB-F14-277CG
TO CIRCUIT BREAKER IN DPB-H14-277VN
TO CIRCUIT BREAKER IN DPB-Ha13-277VN, 2000A BUS
(2)SETS OF (4)#350, (1)#1/0G. 3"C.
(2)SETS OF (4)#350, (1)#1/0G. 3"C.
(2)SETS OF (4)#350,
(1)#1/0G. 3"C.
250AT
3P
250AF
L P B G V E
480V-3∅, 4W, 65KAIC
E45
D022
D020
D022
1 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 23133
A u to d e s k D o c s /2
.0
V A
C o lu m b ia
M
O
C o rr e c t E le c tr ic a l D e fi c ie n c ie s /5
A
-2
-1
.E
.R
.r v t
/1
/2
:4
:4
P
M
ED12
B1 LIFE SAFETY ATS ONE-LINE
DIAGRAM DEMOLITIONIntroba
6 S Old Orchard Ave Suit 285
Saint Louis, MO 63119
800.404.7677
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S TRUMAN
VAMC
800 Hospital Drive, Columbia, MO 65201
589A4-23-104
05/17/2024
SHEET NOTES:
1. DISCONNECT AND REMOVE EXISTING ATS. PREPARE EXISTING
INCOMING AND OUTGOING FEEDERS FOR RECONNECTION TO NEW
ATS.
12" = 1'-0"
ATS DEMO B1 LIFE SAFETY
GENERAL:
A. ANY POWER OUTAGE FOR LIFE SAFETY POWER SYSTEM SHALL
HAVE METHOD OF PROCEDURE SUBMITTED 8 WEEKS BEFORE
EXPECTED WORK BEGINS FOR THE OUTAGE. INCLUDE METERED
LOAD OF POWER TO CONFIRM TEMPORARY POWER WILL BE
ADEQUATE.
B. PREPARE ALL FEEDERS, SWITCHBOARDS AND JUNCTION BOXES
THAT DO NOT REQUIRE A POWER OUTAGE PRIOR TO STARTING
WORK.
C. SIZING FOR TEMPORARY CABLES AND EQUIPMENT SHALL MATCH
EXISTING CABLES AND EQUIPMENT THAT REQUIRES TEMPORARY
POWER.
D. REPLACE ONE ATS AND ASSOCIATED SWITCHBOARDS AT A TIME.
E. DURING POWER OUTAGE, ONLY THE TIME TO TRANSFER A LIFE
SAFETY POWER SINGLE FEEDER AT A TIME SHOULD TAKE PLACE.
NO ASSUMPTION SHOULD BE MADE THAT COMBINING MULTIPLE
FEEDER REPLACEMENTS IN A SINGLE TIME PERIOD IS ALLOWED.
MULTIPLE FEEDER REPLACEMENTS MAY ONLY BE ALLOWED IF
METHOD OF PROCEDURE (MOP) IS APPROVED.
1. ATS-LS SYSTEM:
a. PREPARE ATS LS REPLACEMENT AS MUCH AS POSSIBLE.
b. DISCONNECT AND PROTECT SUPPLY CABLES FROM DISTRIBUTION
SWITCHBOARD DPB-LIFE SAFETY.
c. PROVIDE TEMPORARY CABLES FROM CRITICAL CAM LOCK BOX AND
TERMINATE ON DPB-LIFE SAFETY SWITCHBOARD.
d. REPLACE ATS-LS AND PROVIDE TESTING.
e. TRANSFER LOADS BACK FROM CRITICAL CAM LOCK BOX TO
PERMANENT SUPPLY CONDUCTORS.
f. COMPLETE REMAINING INSTALLATION INCLUDING REMOVAL OF
TEMPORARY CABLES LABELING AND CLEAN UP.
2. ATS-EL SYSTEM:
a. PREPARE ATS EL REPLACEMENT AS MUCH AS POSSIBLE.
b. DISCONNECT AND PULL BACK LOAD SIDE CABLES FROM ATS-EL.
c. PROVIDE TEMPORARY CABLES FROM CRITICAL CAM LOCK BOX AND
SPLICE WITH LOAD SIDE ATS-EL CABLES.
d. REPLACE ATS-EL AND PROVIDE TESTING.
e. PROVIDE NEW JUNCTION BOX AND EXTEND CABLES AS NEEDED TO
TRANSFER LOADS BACK FROM CRITICAL CAM LOCK BOX TO
PERMANENT SUPPLY CONDUCTORS.
l. COMPLETE REMAINING INSTALLATION INCLUDING REMOVAL OF
TEMPORARY CABLES LABELING AND CLEAN UP.
Revisions: Date:
1. DEDUCT 3: REMOVE SCOPE OF WORK FOR REPLACEMENT AND
ASSOCIATED WORK FOR THE REPLACEMENT OF ATS-1, ATS-3, ATS-EL,
ATS LS, AND ATS-CH INCLUDING ATS METERING, SUPPLY AND LOAD
FEEDERS AND ATS-CH DISCONNECTS FOR DEDUCT ALTERNATE 3.
NOTE, THIS MEANS ALL WORK SHOWN ON THIS SHEET.
SHEET DEDUCT GENERAL NOTES:
BUILDING ONE LIFE SAFETY POWER
ATS'S PHASING:
N E
L
E N
L
E N
L
E N
M
L
E N
M
60 60
40 40
ATS-3
ASCO-7000
250A
CLOSED TRANSITION
MAINT. BYPASS
SOLID NEUTRAL
NO NEUTRAL
CONDUCTORS
ATS-1
ASCO-7000
400A
CLOSED TRANSITION
MAINT. BYPASS
(3)#350,(1)#4G,2 1/2"C
(3)#350,(1)#4G,2 1/2"C
(2) SETS OF (3)#350MCM,(1)#4G, 2-1/2"C
800AT
3P
300AT
3P
400AT
3P
800AT
3P
300AT
3P
400AT
3P
800AF800AF 800AF 800AF800AF 800AF
400AT
3P
800AF
3200AT
3P
3200AF
800A
SPACE
3P
300AP
3P
400AP
3P
800AP
3P
400AT
3P
800AF 800AF800AF 800AF
1200AT
3P
1600AF
150A
3P 3P 3P
100A 100A 200A
P-9 P-10
150A 150A
HJ150 HJ150 HJ150
S-11A S-11B
MCC-D8-480VA
480/277V, 3 PHASE, 3W
800A BUS
400A
MAIN
3P
100AF
100AT
3P
250AF250AF
175AT
3P
150AF
150AT
3P
125AT
3P
250AF
SPACE
3P
250AF
125AT
3P
TO
LP
B V N (3)#6, (1)#6G. 3/4"C.
S P A C E
1200A
3P
800A
3P
1200AF
3P
400AF
3P
1200A
3P
1200A
3P
S P A C E
S P A C E
S P A C E
S P A C E
C H
IL
LE
R
C H
IL
LE
R
C H
IL
LE
R
1000A1200A1200A
1000AT200AT
601A
4000AT
3P, LSIG
4000AF
NO
LSIG
400AF
3P
200AT
400AF
3P
200AT
1600AF
3P
1200AT
LSILSILSIG
C H
IL
LE
R
100AF
3P
60AT
LSI
ATS-4
ASCO-7000
400A
SWITCHED
NEUTRAL
MDP
SIEMENS
RCIII
SOLID NEUTRAL
NO NEUTRAL
CONDUCTORS
LVB-B3-277VN
(2) SETS OF (3)#3/0,(1)#3G,2"C
(2) SETS OF (3)#3/0,(1)#3G,2"C
(2) SETS OF (3)#3/0,(1)#3G,2"C
LVB-C8-277VG
GE AKD-8
SWITCHGEAR
GROUND FAULT MONITORING:
MAIN
ATS-2
ATS-4
DPB-C8-480VA, SQUARE D,
HCM23646 E1, 600A, 2A,
25A, 19A
DPB-D8-277VE, 480/277V, 400A, 22KAIC
T O
M C C D V N
T O
M C C D V N
E-POWER
SIEMENS-NF352
60A
N-POWER
SIEMENS-NF352
60A
(3)#6,(1)#6G,1"C (3)#2,(1)#6G,1 1/4"C
FROM LPB-H12-277VE
2500A
4000A SUPPLY, 4W
2000A VERTICAL, 4W
200,000 AIC 2000A
4000A, 480Y/277V
ALTERNATE
SOURCE SECTION
TO T6B
TO LP1-B1-277VN
ATS-2
ASCO-7000
SWITCHED
NEUTRAL
CLOSED TRANSITION
MAINT. BYPASS
DPB-B3-277VC
TO 200A RECPT FOR
TEMP MRI TRAILER
HOOK-UP
(2) SETS OF (4)#3/0,(1)#3G,2"C (3) SETS OF (4)#300,
(1)#1/0G, 3"C
(3) SETS OF (4)#300, (1)#1/0G. 3"C.
(2) SETS OF (4)#3/0,(1)#3G,2"C
(3)#6, (1)#6G. 3/4"C.
MDP
SIEMENS
RCIII
4000A
3P NC
4000A
100AF
3P
60AT
LSI
TO T6
SWBD MDP-B2-277VN
RCIII, 480Y/277V, 4000A
E46
E46
E009 E009
E009
E009
E003
E009
E003A E009
ATS-CH
480V, 100A, 3P
SOLID GROUND
CLOSED TRANSITION
TRANSFER SWITCH
WALL MOUNTED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 23133
A u to d e s k D o c s /2
.0
V A
C o lu m b ia
M
O
C o rr e c t E le c tr ic a l D e fi c ie n c ie s /5
A
-2
-1
.E
.R
.r v t
/1
/2
:4
:4
P
M
ED13
ACA & CHILLER HOUSE ATS
ONE-LINE DIAGRAM DEMOLITIONIntroba
6 S Old Orchard Ave Suit 285
Saint Louis, MO 63119
800.404.7677
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S TRUMAN
VAMC
800 Hospital Drive, Columbia, MO 65201
589A4-23-104
05/17/2024
SHEET NOTES:
1. DISCONNECT AND REMOVE EXISTING ATS. PREPARE EXISTING
INCOMING AND OUTGOING FEEDERS FOR RECONNECTION TO NEW
ATS.
2. DISCONNECT AND REMOVE DISCONNECT SWITCH. PREPARE EXISTING
INCOMING AND OUTGOING FEEDERS FOR RECONNECTION TO MANUAL
TRANSFER SWITCH.
3. DISCONNECT AND REMOVE EXISTING FEEDERS.
NO SCALEED13
ATS DEMO ACA1
ATS NEW CHILLER HOUSE
NO SCALE
ED13
GENERAL:
A. ANY POWER OUTAGE FOR ACA EQUIPMENT SAFETY POWER
SYSTEM SHALL HAVE METHOD OF PROCEDURE SUBMITTED 8
WEEKS BEFORE EXPECTED WORK BEGINS FOR THE OUTAGE.
INCLUDE METERED LOAD OF POWER TO CONFIRM TEMPORARY
POWER WILL BE ADEQUATE.
B. PREPARE ALL FEEDERS, SWITCHBOARDS AND JUNCTION BOXES
THAT DO NOT REQUIRE A POWER OUTAGE PRIOR TO STARTING
WORK.
C. REPLACE ONE ATS AND ASSOCIATED SWITCHBOARD WORK AT A
TIME.
D. DURING POWER OUTAGE, ONLY THE TIME TO TRANSFER AN
EQUIPMENT POWER SINGLE FEEDER AT A TIME SHOULD TAKE
PLACE. NO ASSUMPTION SHOULD BE MADE THAT COMBINING
MULTIPLE FEEDER REPLACEMENTS IN A SINGLE TIME PERIOD IS
ALLOWED. MULTIPLE FEEDER REPLACEMENTS MAY ONLY BE
ALLOWED IF METHOD OF PROCEDURE (MOP) IS APPROVED.
A. ACA ATS-3 EQUIPMENT POWER SYSTEM:
a. REVIEW ABOVE CEILING ROUTING OF NORMAL SUPPLY FEEDER.
FEEDER WILL REQUIRED ADDITIONAL PULL BOXES TO AVOID HARD
CEILINGS.
b. INSTALL NORMAL AND EMERGENCY SUPPLY FEEDER TO ATS-3
FROM SWITCHGEAR LVB-B3-277VN AND LVB-C8-277VG EXCEPT FOR
TERMINATIONS.
c. PREPARE ATS-3 SYSTEM REPLACEMENT AS MUCH AS POSSIBLE.
d. REPLACE ATS-3 AND TERMINATE CABLES.
e. COMPLETE REMAINING INSTALLATION INCLUDING REMOVAL OF
TEMPORARY CABLES LABELING AND CLEAN UP.
2. ACA ATS-1 EQUIPMENT POWER SYSTEM:
a. RELOCATE FIRE ALARM AND ATS TERMINATION PANEL BOXES TO
ALLOW ROOM AND WORKING CLEARANCE FOR THE NEW ATS-1
g. PREPARE ATS-1 SYSTEM REPLACEMENT AS MUCH AS POSSIBLE.
h. REPLACE ATS-1.
i. COMPLETE REMAINING INSTALLATION INCLUDING REMOVAL OF
TEMPORARY CABLES LABELING AND CLEAN UP.
Revisions: Date:
ACA BUILDING POWER ATS'S PHASING:
1. DEDUCT 3: REMOVE SCOPE OF WORK FOR REPLACEMENT AND
ASSOCIATED WORK FOR THE REPLACEMENT OF ATS-1, ATS-3, ATS-EL,
ATS LS, AND ATS-CH INCLUDING ATS METERING, SUPPLY AND LOAD
FEEDERS AND ATS-CH DISCONNECTS FOR DEDUCT ALTERNATE 3.
NOTE, THIS MEANS ALL WORK SHOWN ON THIS SHEET.
SHEET DEDUCT GENERAL NOTES:
#6G
#6G
#6G
C1
B1 C1
N.C.
B1
B1A1
A1
PL HC PL HC PL HC
M
M
K
M
K
T1
1500KVA
PAD MTD XFMR.
13.8KV∆-480Y/277V
T2
1500KVA
PAD MTD XFMR.
13.8KV∆-480Y/277V
T3
1500KVA
PAD MTD XFMR.
13.8KV∆-480Y/277V
T5
1500KVA
PAD MTD XFMR.
13.8KV∆-480Y/277V
T4
1500KVA
PAD MTD XFMR.
13.8KV∆-480Y/277V
400A
NON-FUSED
NEMA 4X
FIRE PUMP
DISCONNECT
SWITCH
3P
2-B
MAIN C
2000AF
2000AT
(BUS C)
2000AF
1600AT
3P
1-C
3P
4-C
MAIN B
2000AT
2000AF
(BUS B)
N.C.
1600AT
3P
2000AF
5-D 3-B
N.O.
3P N.C.
MAIN A
2000AT
2000AF
7-B
(BUS A)
2000AT
3P
2000AF
WPH-16
SPACE
1600A-3P 6-C 5-B
1200A BUSDUCT
1600AF
1200AT
3P
6-B
MAIN HOSPITAL NORMAL SWITCHGEAR
2000A BUSDUCT
N.O.
KEY INTERLOCKS (TYP.)
65KAIC
3P
1200AT
1600AF
1-B
SM-5
100E
SM-5
125E
SM-5
100E
#1096 #1098 #1095
T1-S T2-S T3-S
2-C
TIE B-C
2000AF
2000AT
3P
5-C
TIE A-B
2000AF
2000AT
3P
SETTINGS:
GFPU AT 0.2
GFD AT 1 (I T OUT)
LTPU AT 1
LTD AT 3
STPU AT 6.5
STD AT 1 (I T OUT)
TO
DPB-H14-277VN
N .C
E
S M
T O
T
T
N .C
E
S M
T O
T
T
N .O
E
S M
T O
T
N .C
E
S M
T O
T
T
N .C
E
S M
T O
T
T
N .C
E
S M
T O
T
SG-H14-MVN1
13.8KV 1200A BUS
SG-H14-MVN1
13.8KV 1200A BUS
1200AF
400AT
3P N.O.
1200AF
400AT
3P N.O.
KIRK KEY
INTERLOCKED
WITH
LVBE2-277VNCB4
NORMALLY OPEN
KIRK KEY
INTERLOCKED
WITH
LVBE2-277VNCB5
NORMALLY
CLOSED
LVBE2-277VNCB4LVBE2-277VNCB5
2500A BUS DUCT
3ɸ, 4W WITH
GROUND
3000A
POWER
FUSES
3000A
POWER
FUSES
TO 2500A BUS DUCT
3∅. 4W WITH GROUND
TO 2500A BUS DUCT
3∅. 4W WITH GROUND
DPB-Ja14-277VN
1200A BUSDUCT
TO DPB-G13-480VNTO DPB-J4-480VN
TO
DPB-HA13-277VNTO DPB-J13-277VN
TO 1200A BREAKER
#1087 N.O. TIE
TO 1200A BREAKER
#1087 N.O. TIE
TO GEN G4
TO GEN G4
CHILLER HOUSE
INCOMING SERVICE.
ATS-EQ1
REFER TO ED10
ATS-EQ2
REFER TO ED10
OUTSIDE
SOUTH SIDE
OUTSIDE
SOUTH SIDE
OUTSIDE
SOUTH SIDE
OUTSIDE
NORTH SIDE
OUTSIDE
NORTH SIDE
D023
D022D D022D
1 1 1
1 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 23133
A u to d e s k D o c s /2
.0
V A
C o lu m b ia
M
O
C o rr e c t E le c tr ic a l D e fi c ie n c ie s /5
A
-2
-1
.E
.R
.r v t
/1
/2
:4
:4
P
M
ED14
TRANSFORMER ONE-LINE
DIAGRAM DEMOLITIONIntroba
6 S Old Orchard Ave Suit 285
Saint Louis, MO 63119
800.404.7677
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S TRUMAN
VAMC
800 Hospital Drive, Columbia, MO 65201
589A4-23-104
05/17/2024
SHEET NOTES:
1. DISCONNECT AND REMOVE EXISTING EXTERIOR 1500KVA, PAD
MOUNTED TRANSFORMER. INSPECT EXISTING PAD FOR DAMAGE.
REPAIR OR REPLACE AS REQUIRED. PREPARE EXISTING INCOMING
AND OUTGOING FEEDERS FOR RECONNECTION TO NEW
TRANSFORMER.
2. REPLACE PRIMARY FEEDERS AND FIRE PUMP DISCONNECT SWITCH.
EXTEND SECONDARY CONDUIT AND CONDUCTORS ONLY AS REQUIRED
FOR TRANSFORMER REPLACEMENT.
NO SCALEED14
XFMR DEMO1
Revisions: Date:
1. DEDUCT 1: REMOVE SCOPE OF WORK FOR REPLACEMENT AND
ASSOCIATED WORK FOR THE REPLACEMENT OF TRANSFORMER 4 AND
TRANSFORMER 5 FOR DEDUCT ALTERNATE 1.
2. DEDUCT 2: REMOVE SCOPE OF WORK FOR REPLACEMENT AND
ASSOCIATED WORK OF TRANSFORMER 1, TRANSFORMER 2, AND
TRANSFORMER 3 INCLUDING FIRE PUMP DISCONNECT SWITCH FOR
DEDUCT ALTERNATE 2.
DN
UP
DN
DN
EaGa
Ha
Ja J
H
G F EFa Eb
J
J
J J
J
A. THE INTENT OF THE DEMOLITION DRAWINGS IS TO DEFINE THE SCOPE OF ELECTRICAL DEMOLITION WORK. EXISTING ELECTRICAL SYSTEMS (DEVICES, FIXTURES, EQUIPMENT, WIRING, AND RACEWAYS INCLUDING DATA/COMMUNICATION SYSTEMS). EXISTING ELECTRICAL SYSTEMS SERVING ADJACENT AREAS SHALL REMAIN UNLESS OTHERWISE INDICATED. RE-SUPPORT EXISTING CONDUITS AND CABLES THAT MUST
REMAIN. REFER TO FLOORPLANS FOR INDICATION OF DEMOLITION TYPE FOR EACH AREA:
a. BLANKET DEMOLITION AREAS:
• EXISTING ELECTRICAL SYSTEMS WITHIN LIMITS OF DEMOLITION SHALL BE REMOVED UNLESS
OTHERWISE INDICATED.
b. SELECTIVE DEMOLITIONS AREAS:
• PROVIDE DEMOLITION FOR ITEMS AS SHOWN. EXISTING ELECTRICAL SYSTEMS WITHIN LIMITS OF
DEMOLITION SHALL REMAIN UNLESS OTHERWISE INDICATED.
B. ITEMS INDICATED WITH A SUBSCRIPT 'E' SHALL BE EXISTING TO REMAIN (E-EXISTING). ITEMS INDICATED WITH A
SUBSCRIPT 'D' OR SHOWN DASHED SHALL BE REMOVED (D-DEMOLITION). ITEMS INDICATED WITH A SUBSCRIPT
'R' SHALL BE REMOVED, STORED, AND REINSTALLED PER NEW WORK (R-RELOCATION).
C. THESE DRAWINGS DO NOT IDENTIFY EACH INDIVIDUAL ITEM TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ITEMS WHICH MUST BE REMOVED TO FACILITATE NEW CONSTRUCTION. SEE ARCHITECTURAL PLANS FOR EXACT LIMITS OF DEMOLITION AND CONSTRUCTION. THESE PLANS ARE BASED
ON PAST PROJECT DRAWINGS AND SITE OBSERVATIONS. THE DRAWINGS ARE PROVIDED TO THE
CONTRACTOR AS AN AID IN DETERMINING THE EXTENT OF WORK REQUIRED FOR DEMOLITION AND TO PROVIDE GENERAL INFORMATION ABOUT EXISTING SYSTEMS. THESE DRAWINGS MAY NOT BE ACCURATE IN ALL AREAS. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS AND
IS ENCOURAGED TO REVIEW FACILITY DRAWINGS PRIOR TO THE BID DATE.
D. THE OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL ITEMS REMOVED. IF OWNER REFUSES SALVAGE, CONTRACTOR IS RESPONSIBLE FOR DISPOSAL.
E. WHERE EXISTING WALLS ARE TO BE REMOVED, ALL ASSOCIATED ELECTRICAL EQUIPMENT SHALL BE REMOVED. DISCONNECT POWER SO THAT DEVICES AND EQUIPMENT MAY BE REMOVED WITH WALLS. SEE ARCHITECTURAL DRAWINGS FOR WALLS TO BE REMOVED. ABANDON CONCEALED CONDUITS WHERE WALLS ARE NOT REMOVED. CONCEALED CONDUITS MAY BE REUSED WHERE AVAILABLE. WHERE EXISTING CIRCUITING/CABLING IS TO BE DEMOLISHED AND NOT REUSED, REMOVE CONDUCTORS AND ASSOCIATED ACCESSIBLE RACEWAYS/CONDUIT BACK TO THE SOURCE. WHERE EXISTING ELECTRICAL CONDUITS SERVING CIRCUITS TO BE DEMOLISHED ARE EMBEDDED IN CONCRETE FLOORS OR WALLS, CONDUITS MAY BE ABANDONED IN PLACE. EXISTING CONDUCTORS SHALL BE REMOVED BACK TO SOURCE AND CONDUITS SHALL BE CUT AT SURFACE OF CONCRETE AND FILLED. EXISTING BACK BOXES AND CONDUITS REMAINING FROM DEVICES BEING REMOVED MAY BE UTILIZED FOR NEW DEVICES WHERE LOCATIONS PERMIT. REMOVE AND PATCH WHERE BOXES ARE NOT REUSED. REMOVE CONCRETE EQUIPMENT PADS THAT REMAIN, TO BE FLUSH
WITH FLOOR/GRADE.
F. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL ELECTRICAL DEMOLITION ITEMS. DISCONNECT AND REMOVE ELECTRICAL DEVICES, EQUIPMENT AND ASSOCIATED WIRING AS REQUIRED TO ACCOMMODATE NEW WORK. IF THE CONTRACTOR IS UNCLEAR REGARDING A SPECIFIC ITEM TO REMAIN OR BE REMOVED, THE
CONTRACTOR SHALL SEEK CLARIFICATION FROM THE ARCHITECT.
G. SYSTEMS SERVING ADJACENT AREAS AND ITEMS THAT REMAIN SHALL BE MAINTAINED AT ALL TIMES. MODIFY SYSTEMS AS REQUIRED THROUGHOUT CONSTRUCTION TO MAINTAIN CONTINUITY OF SERVICE. DO NOT INTERRUPT SERVICE WITHOUT OWNER'S PRIOR WRITTEN APPROVAL. LIMIT DURATION OF INTERRUPTION ONLY TO THE TIME NECESSARY FOR DISCONNECTION AND IMMEDIATE RECONNECTION. INTERRUPTION TO SERVICE DEEMED BY OWNER AS ESSENTIAL MAY REQUIRE PREMIUM TIME AND SHALL BE INCLUDED WITH THE BID.
EXTREME CARE SHALL BE TAKEN BY THE CONTRACTOR TO IDENTIFY EXISTING SYSTEM COMPONENTS ASSOCIATED WITH THESE SERVICES. APPROPRIATE METHODS OF MARKING THESE SHALL OCCUR TO ELIMINATE THE POSSIBILITY OF ACCIDENTAL INTERRUPTION. FOR CONDUIT AND CABLING THAT CAN REMAIN, PROVIDE SUPPORT AS REQUIRED. RELOCATE EXISTING JUNCTION BOXES THAT BECOME INACCESSIBLE DUE
TO NEW WORK.
H. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE TEMPORARY POWER AND LIGHTING
AS REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO PROCEED.
I. PROTECT EXISTING ELECTRICAL EQUIPMENT THAT REMAINS. IF DAMAGED OR DISTURBED IN THE COURSE OF THE WORK, REMOVE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY, QUALITY, AND
FUNCTIONALITY.
J. PATCH AND REPAIR OPENINGS IN EXISTING WALLS AND FLOORS RESULTANT FROM SPECIFIED ELECTRICAL DEMOLITION. PATCH SHALL MATCH EXISTING CONSTRUCTION, FIRE RATING, AND FINISH. SEE ARCHITECTURAL
SPECIFICATIONS FOR MEANS AND METHODS.
K. THIS PROJECT WILL BE PHASED. SEE PROJECT MANUAL AND ARCHITECTURAL PLANS FOR DETAILS. SYSTEM SERVICES TO AREAS NOT IN THE CURRENT PHASE OF CONSTRUCTION SHALL BE MAINTAINED AT ALL TIMES.
L. WHERE DEMOLITION OF EQUIPMENT INVOLVES REMOVAL OF EQUIPMENT LOCATED ON CONCRETE HOUSEKEEPING PADS, PADS SHALL ALSO BE REMOVED AND FLOOR/GRADE SHALL BE FINISHED TO MATCH
ADJACENT SURFACE.
M. ALL UNLABELED ELECTRICAL DEVICES [WITH CIRCUITRY OR DEVICES MODIFIED DURING CONSTRUCTION] [THAT EXIST IN ALL ROOMS WHERE THERE IS WORK WITHIN SCOPE] SHALL BE CIRCUIT TRACED AS NEEDED WITH A
LABEL PROVIDED.
(ELECTRICAL DEMOLITION NOTES APPLY TO ALL ELECTRICAL DEMOLITION PLANS AND
ALL ELECTRICAL DEMOLITION WORK)
ELECTRICAL DEMOLITION GENERAL NOTES:
EX 1250KW GENSET #1
EX 1250KW GENSET #2
EX ATS-GEN
EX LPB-G14-277VG
EX LPB-G14-120VG
EX ATS-EL EX ATS-LS
EX DS-C2
EX DS-DPB-J4-480VC
EX DS-LPB-G14
EX TS-G14-120VG
EX LPB-Hb14-120VG
EX ATS-C3
EX DPB-G14-480VC
EX TB-Ha13.5-120VC
EX TB-Ha13.5-120VN
EX DPB-H13-120VN
EX ATS-C1
E X
D P
B -G
-4
V
N
E X
D P
B -G
-2
V
C
EX TB-H14-120VQ
EX LPB-H14-120VQ
EX DPB-H13-120VC
EX PPB-J13-277VC
EX DPB-J13-277VN EX LPB-H13-120VN
EX TB-H13-120VN
DPB-Ja14-277VN
EX EGB-F14-277VG
EX MSG-H14-MVN
EX SG-H14-MVN1
EX MCCB-G14-480VQF
EX ACA BLDG ATS
E X
L P
B -G
-1
V
N
EX MCCB-H13-480VNF EX MCCB-H13-480VNR
EX T3-S EX T2-S EX T1-S
EX DPB-Ha13-277VN
EX LPB-H12-277VC
EX LPB-H12-120VC
EX LPB-H12-277VE
EX DPB-H15-480VC
EX ATS-C4
EX LPB-G12-120VE
EX LPB-G12-120VN
EX LPB-G12-277VN
EX DPB-G12-208VN
EX TB-G12-120VC
EX TB-G12-120VN
EX TB-G12-120VE
EX PPB-WH-277VE
EX DPB-H14-277VN
E X
D P
-C R
IT
IC
A L-
EX DP-LIFE SAFETY
3 3
T3
1500KVA
PAD MT'D.
XFMR
13.8KVA
480Y/277V
T2
1500KVA
PAD MT'D.
XFMR
13.8KVA
480Y/277V
T1
1500KVA
PAD MT'D.
XFMR
13.8KVA
480Y/277V
4 4 4
EX AHU
EX
D/S
EX F/A PULL BOXEX CONTROL PANEL
E X
V F
D H
E -3
E
X V
F D
H E
-4
E X
V F
D H
E -3
E
X V
F D
H E
-3
E X
V F
D E
F -1
EX CONTROL PANEL
CL'G HUNG
CL'G HUNG
EX DPB-G12-208VC
DOOR
OPENING
E X
V F
D
E X
P U
LL
B
O X
E X
T B
-G
-1
V
NCL'G HUNG
EX AHU
EX DUCT
EXISTING CONCRETE PAD
EX AHU
EX
PVC
EX
3/4"C.
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EX. DIST. PANEL DPB-H14-480VQ
EX ATS-EQ
EX ATS EQ2
FUSE CAB
EX PIPE
UNIT HTR SWCH EX PULL BOX
EX ATS-C2
EX PULL BOX
EX PULL BOX
EX TLS 350
EX F/A PNL
EX MISC PNL
WALL MT'D
EX MISC PNL
EX MISC XFMR
EX MISC PNL
EX SG-H14-MVN1
FILTER
BOX
EX MCCB-G14-480VQR
E X
A T
S -E
C
P U
LL
B
O X
MAIN HOSPTIAL NORMAL SWITCHGEAR
PARALLELING
SWITCHGEAR
D022CD022D
D022D023
D020
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 23133
A u to d e s k D o c s /2
.0
V A
C o lu m b ia
M
O
C o rr e c t E le c tr ic a l D e fi c ie n c ie s /5
A
-2
-1
.E
.R
.r v t
/1
/2
:4
:4
P
M
ED50
ENLARGED ELECTRICAL
DEMOLITION PLANS - BASEMENTIntroba
6 S Old Orchard Ave Suit 285
Saint Louis, MO 63119
800.404.7677
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S TRUMAN
VAMC
800 Hospital Drive, Columbia, MO 65201
589A4-23-104
05/17/2024
SHEET NOTES:
1. REFER TO B1 EQUIPMENT ATS ONE-LINE DIAGRAM DEMOLITION, SHEET ED10 FOR MORE INFORMATION.
2. REFER TO B1 CRITICAL ATS ONE-LINE DIAGRAM DEMOLITION, SHEET ED11 FOR MORE INFORMATION.
3. REFER TO B1 LIFE SAFETY ATS ONE-LINE DIAGRAM DEMOLITION, SHEET ED12 FOR MORE INFORMATION.
4. REFER TO TRANSFORMER ONE-LINE DIAGRAM DEMOLITION, SHEET ED14 FOR MORE INFORMATION.
5. RELOCATE EXISTING 45 KVA TRANSFORMER TB-G13-120VN AND EXISTING 150A, 208Y/120V, 3PH, 4 W, PANELBOARD LPB-G13-120VN TO ALLOW FOR NEW DISTRIBUTION PANELBOARD AND CAM LOCK BOXES.
EXTEND BRANCH CIRCUIT CONDUITS, CONDUCTORS AS REQUIRED FOR PANELBOARD AND TRANSFORMER RELOCATION. PROVIDE ALL JUNCTION BOXES, GROUNDS CONDUIT AND CONDUCTORS TO EXTEND PRIMARY , SECONDARY AND BRANCH CIRCUITS TO NEW LOCATION. REFER TO NEW WORK PLAN FOR MORE
INFORMATION.
6. DEMOLISH EXISTING VERTICAL BRANCH MECHANICAL DUCT FROM MAIN HORIZONTAL DUCT TO BELOW
FLOOR IN PIPE BASEMENT. SEAL HORIZONTAL DUCT AND MATCH INSULATION.
7. RELOCATED RECEPTACLE AND EXTEND BRANCH CIRCUIT TO ALLOW FOR INSTALLATION OF NEW SWITCHBOARD. NEW LOCATION TO BE IN ACCESSIBLE LOCATION ADJACENT TO NEW SWITCHBOARD AND
RELOCATED PANELBOARD.
1/4" = 1'-0"ED50
ENLARGED MAIN ELECTRICAL ROOM DEMOLITION- D020,D022,D022D,D0231
N
04' 4' 8'
Revisions: Date:
1. DEDUCT 2: REMOVE SCOPE OF WORK FOR REPLACEMENT AND ASSOCIATED WORK OF TRANSFORMER 1, TRANSFORMER 2, AND TRANSFORMER 3 INCLUDING FIRE PUMP DISCONNECT SWITCH FOR DEDUCT ALTERNATE 2.
2. DEDUCT 4: REMOVE SCOPE OF WORK FOR REPLACEMENT AND ASSOCIATED WORK FOR THE REPLACEMENT OF ATS-EQ1, ATS-EQ2, ATS-EQ3, AND ATS-EQ4 INCLUDING ATS METERING, SUPPLY AND LOAD FEEDERS, SWITCHBOARDS DPB- G13-277VQ, DPB-H14-277VQ, DPB-G14-277VQ, DPB-J13-277VQ, AND CAMLOCK BOX FOR DEDUCT ALTERNATE 4.
EE3275
Yes
01-CBA8-32725
Yes Unit is mounted in cabinet on S wall of corridor , approx. 20ft from SE Basement exit to FM Trailer.
JAN19
FLR1_1-134-2943753_PH4
FE
D
E
F
C
B
EX ATS-4
EX DPB-D8-277VE
EX LPB-D8-277VE
E X
M C
C -D
8-
0V A
EX MISC VFD
EX LPB-C8-277VC
TB-C8-120VC
ATS-3EX ATS-1
EX DPB-C8-480VQ
E X
B U
S B
A R
EX TB-5
EX
SURGE
PROT.
EX DPB-
D8-120VE
EX PPB-
D8-120VE-1
EX PPB-
D8-120VE-2
EX LVB-C8-277VG
EX LVB-H14-277VG
TB-D8-120VE-1
EX MISC XFMR
E X
P P
B -C
8-
0V N
E X
P P
B -C
8-
0V C
E X
V F
D
E X
P U
LL
B
O X
T
E009
T
EX PPB-C8-120VE
PPB-C8-120VC
ATS-2
EX PPB-B3-277VE
TB-6
E X
P P
B -B
3-
0V N
-1
E X
P P
B -B
3-
0V N
-2
E X
L P
B -B
3-
7V N
DPB-B3-480VN
E X
M R
I D /S
E X
C
LC
D /S
E X
W
IR
E W
A Y
GND BUS
EX XFMR
EX HOUSE PUMPS D/S
EX PPB-F6-120VN
SECT A,B,C D/S
EX TB-1
N150-TB-1-B3
EX PP1/PP2-D2-120VC D/S EX TB-3
EX PP1/PP2-D6.3-120VC D/S
EX MCC-B3-480VN
EX N150-TB-2-B3
EX DPB-B3-277VC
D P
B -B
3-
7V N
LVB-B3-277VN
EX MISC XFMR
EX MISC D/S
FLR MT'D
2 2
E003
A. THE INTENT OF THE DEMOLITION DRAWINGS IS TO DEFINE THE SCOPE OF ELECTRICAL DEMOLITION WORK. EXISTING ELECTRICAL SYSTEMS (DEVICES, FIXTURES, EQUIPMENT, WIRING, AND RACEWAYS INCLUDING DATA/COMMUNICATION SYSTEMS). EXISTING ELECTRICAL SYSTEMS SERVING ADJACENT AREAS SHALL REMAIN UNLESS OTHERWISE INDICATED. RE-SUPPORT EXISTING CONDUITS AND CABLES THAT MUST
REMAIN. REFER TO FLOORPLANS FOR INDICATION OF DEMOLITION TYPE FOR EACH AREA:
B. THESE DRAWINGS DO NOT IDENTIFY EACH INDIVIDUAL ITEM TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ITEMS WHICH MUST BE REMOVED TO FACILITATE NEW CONSTRUCTION. THE DRAWINGS ARE PROVIDED TO THE CONTRACTOR AS AN AID IN DETERMINING THE EXTENT OF WORK REQUIRED FOR DEMOLITION AND TO PROVIDE GENERAL INFORMATION ABOUT EXISTING SYSTEMS. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO THE BID DATE.
C. THE OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL ITEMS REMOVED. IF OWNER REFUSES SALVAGE, CONTRACTOR IS RESPONSIBLE FOR DISPOSAL.
D. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE TEMPORARY POWER AND LIGHTING
AS REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO PROCEED.
E. PROTECT EXISTING ELECTRICAL EQUIPMENT THAT REMAINS. IF DAMAGED OR DISTURBED IN THE COURSE OF THE WORK, REMOVE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY, QUALITY, AND
FUNCTIONALITY.
F. PATCH AND REPAIR OPENINGS IN EXISTING WALLS AND FLOORS RESULTANT FROM SPECIFIED ELECTRICAL DEMOLITION. PATCH SHALL MATCH EXISTING CONSTRUCTION, FIRE RATING, AND FINISH. SEE ARCHITECTURAL
SPECIFICATIONS FOR MEANS AND METHODS.
G. ANY CONDUIT, SUPPORTS OR DEVICES ABANDONED BY THE SCOPE OF THIS WORK SHALL BE REMOVED.
(ELECTRICAL DEMOLITION NOTES APPLY TO ALL ELECTRICAL DEMOLITION PLANS AND
ALL ELECTRICAL DEMOLITION WORK)
ELECTRICAL DEMOLITION GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 23133
A u to d e s k D o c s /2
.0
V A
C o lu m b ia
M
O
C o rr e c t E le c tr ic a l D e fi c ie n c ie s /5
A
-2
-1
.E
.R
.r v t
/1
/2
:4
:4
P
M
ED51
ENLARGED ELECTRICAL
DEMOLITION PLANS - BASEMENTIntroba
6 S Old Orchard Ave Suit 285
Saint Louis, MO 63119
800.404.7677
CORRECT ELECTRICAL
DEFICIENCIES, HARRY S TRUMAN
VAMC
800 Hospital Drive, Columbia, MO 65201
589A4-23-104
05/17/2024
SHEET NOTES:
1. REFER TO ACA & CHILLER ATS ONE-LINE DIAGRAM DEMOLITION, SHEET ED13 FOR MORE INFORMATION.
2. REFER TO TRANSFORMER ONE-LINE DIAGRAM DEMOLITION, SHEET ED14 FOR MORE INFORMATION.
3. RELOCATED THERMOSTAT TO ALLOW FOR INSTALLATION OF NEW ATS.
4. REMOVE EXISTING SOUTH 3-WAY LIGHTING SWITCH.
5. REMOVE ONE 3-WAY SWITCH LEG AS NEEDED TO ALLOW LIGHTS TO TURN ON/OFF AFTER REMOVAL OF
SOUTH 3-WAY SWITCH.
N
N
1/4" = 1'-0"ED51
ENLARGED ELECTRICAL ROOM DEMOLITION- E0093
1/4" = 1'-0"ED51
ENLARGED…
This is the start of the file's text. The full file is on GovTribe.