P09 Drawings - 589A6-19-205.pdf
PDF 28 MB Posted
- Solicitation number
- 36C25521R0028
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25521R0028_1.docx | DOCX document | |
| P09 Specifications - 589A6-19-205.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
UP
UP
UP
UP
DN
UP
DN
UP
UP
DEPARTMENT OF VETERANS AFFAIRS
DWIGHT D. EISENHOWER VA MEDICAL CENTER
4101 S. 4TH ST. TRWY.
LEAVENWORTH, KANSAS 66048
UPGRADE STERILE PROCESSING
VA PROJECT NO. 589A6-19-205
1 OCTOBER 2020
G001
GENERAL - COVER SHEET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE STERILE PROCESSING
TO MEET TEMP & HUMIDITY
Dwight D. Eisenhower Medical Center
589-C92284
Project Director
10/01/2020 DEH/HK MVRevisions: Date:
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC.
401 N. FRONT ST., SUITE 380 COLUMBUS, OH 43215
CODE REQUIREMENTS FOR RENOVATION
FIRE RATINGS
SYMBOLS LEGENDCONTRACTOR GENERAL NOTES
VA GENERAL NOTES
MAXIMUM ALLOWABLE TRAVEL DISTANCE
SUITE TRAVEL DISTANCE
CORRIDOR ACCESS (MIN.)
CORRIDORS I-2 BED MOVEMENT
ALLOWABLE DEAD END CORRIDOR
125 FEET
300 FEET
50 FEET
96 INCHES
------ SQ.FT.
NFPA 13 SPRINKLER SYSTEM
CORRIDOR SERVING 50 PEOPLE OR LESS
CORRIDORS NON-HOSPITAL
COMMON PATH OF TRAVEL 100 FEET
44 INCHES
36 INCHES
INTERIOR WALL AND CEILING FINISH REQUIREMENTS
INTERIOR FLOOR FINISH REQUIREMENTS
EXIT
CLASS A
CLASS 1
CORRIDORS
CLASS A
ROOMS
CLASS B
OCCUPANCY CATEGORY -
SEISMIC DESIGN CATEGORY B
-WIND ZONE
BUILDING CODE
EXISTING BUILDING AREA
BUILDING OCCUPANCY CLASSIFICATION
TYPE OF CONSTRUCTION
TRAVEL DISTANCE
FIRE SUPPRESSION SYSTEM
CORRIDOR WIDTH
INTERIOR FINISHES
SEISMIC / WIND REQUIREMENTS
-- STORIES / ------ FT.EXISTING BUILDING HEIGHT
------ SQ.FT.PROJECT AREA
NFPA 101
EXISTING HEALTHCARE AND EXISTING BUSINESS
-- STORIES
NFPA 13 SPRINKLER SYSTEM
50 FEET
60 INCHES
300 FEET
CLASS A OR B
BUSINESS
APPLICABLE CODES:
- LIFE SAFETY CODE, NFPA 101 - 2009
- NFPA NATIONAL FIRE CODES - 2009
- GUIDELINES FOR DESIGN & CONSTRUCTION OF HOSPITAL AND HEALTH CARE FACILITIES - 2006
- INTERNATIONAL BUILDING CODE - 2009
- INTERNATIONAL MECHANICAL CODE - 2006
- INTERNATIONAL PLUMBING CODE - 2009
- ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS, 36 CFR PART 1191 - 2004
GENERAL NOTES:
1) ALL RATED INTERIOR PARTITION SHOULD BE CONSTRUCTED IN ACCORDANCE
WITH THE RATED PARTITION SCHEDULE UNLESS NOTED OTHERWISE ON THE
FLOOR PLANS
2) CONTRACTOR TO PATCH AND REPAIR ALL NEW AND EXISTING FIREPROOFING
AFTER INSTALLATION OF NEW WORK AS REQUIRED TO MAINTAIN REQUIRED FIRE
RATING. CONTRACTOR TO USE MATERIALS COMPATIBLE WITH EXISTING
FIREPROOFING FOR PATCH WORK.
NON-LOADBEARING WALLS AND PARTITIONS HOURS UL DESIGN #
SMOKE BARRIERS (709)
FIRE WALLS (706)
FIRE PARTITIONS (708)
EXIT ENCLOSURES (707.3.2 / 1022.1)
HORIZONTAL EXITS (707.3.7 / 1025.1)
INCIDENTAL USE AREAS (707.3.7 / 509)
OCCUPANCIES SEPARATION (707.3.9 / 508.4)
EXIT PASSAGEWAYS (707.3.4 / 1023.1)
SHAFT ENCLOSURES (713)
CORRIDOR WALLS (708.3 / 1017.1) 0
# U438
# U411
# U465
100 FEET
ELEVATION INDICATION
FIRE EXTINGUISHER
REVISION INDICATION
SECTION INDICATION
DETAIL INDICATION
GENERAL DIMENSIONING
ROOM NAME
ROOM NUMBER
AREA DETAILED
STARTING POINT
NOTE: THE ± INDICATES A DIMENSION THAT CAN VARY.
(NOTIFY THE ARCHITECT OF ANY CHANGE IN THAT DIMENSION IF IT
IS GREATER THAN 1")
NOTE: DIMENSIONS ARE TAKEN FROM/TO
FINISH SURFACE, UNLESS OTHERWISE NOTES.
STARTING POINT
ON ELEVATION
NORTH ARROW
DOOR DESIGNATION
WINDOW SYMBOL
FEC
ALIGN WITH EXISTING CONSTRUCTION
CENTER LINE / ELEVATION LINE
PROPERTY LINE
COLUMN GRID
ARCHITECTURAL SCOPE OF WORK
FINISH SYMBOLS
CEILING DESIGNATION
MATCHLINE
LINETYPE SYMBOLS
IN PLAN
NEW DOOR DESIGNATION
PARTITION TYPE SYMBOL
WORK ABOVE, BEYOND
OR TO BE REMOVED
BREAK LINE
SECTION NUMBER
SHEET WHERE SHOWN
SHEET WHERE SHOWN
REVISION NUMBER
DETAIL NUMBER
DENOTES CORNER GUARD
LOCATION
PARTITION TYPE
KEYNOTE INDICATOR
WINDOW TYPE
OR BORROWED LIGHT
CG
INTERIOR AND/OR
EXTERIOR
MULTIPLE INTERIOR
NEW DOOR
EMERGENCY DOOR DESIGNATION
EMERGENCY SWING
DOUBLE EGRESS DOOR DESIGNATION
ROOM NAME
1 1
A101
SIM
RM #
WALL:
FLOOR:
BASE:
NAME
WALL FINISH
FLOOR FINISH
BASE FINISH
ROOM FINISH TAG
N
NEW DOOR
BUMPER GUARD, CHAIR RAIL, HAND RAIL
FOR LOCATION SEE PLANS
ROOM INDICATION
KEYNOTE SYMBOL
FACE OF SURFACE INDICATORO'-O"
O'-O" ±
NEW DOOR
A1
A101
A1
A201
A1
A3
A4 A2A201
EXISTING DOOR DESIGNATION
EXISTING DOOR
A
SHEET NUMBER OF ADJACENT DRAWING
A
NOTE: CLEAR = THE ACTUAL FIELD DIMENSION MAY NEVER BE LESS
THEN THE CLEAR DIMENSION INDICATED, BUT MAY BE GREATER BY
1" MAX.
CLEAR
O'-O"
NOTE: HOLD = THE ACTUAL FIELD DIMENSION MUST BE EQUAL TO
THE DIMENSION INDICATED AND MUST BE MAINTAINED
HOLD
O'-O"
8' - 6"
C-1
CEILING HEIGHT
CEILING TYPE
A1
A1 / A111
VIEW NUMBER OF ADJACENT DRAWING
WALL PROTECTION TAG
WP-3A
DOOR NUMBER
SF1
STOREFRONT DESIGNATION
STOREFRONT NUMBER
FIRE EXTINGUISHER
CABINET
FIRE EXTINGUISHER
FE
1. THE CONTRACT DOCUMENTS ARE COMPRISED OF THE PROJECT MANUAL, THE DRAWINGS, AND ANY ADDITIONAL OWNER PROVIDED INFORMATION. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL ITEMS NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK BY THE CONTRACTOR. THE CONTRACT DOCUMENTS ARE COMPLIMENTARY, AND WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS
IF REQUIRED BY ALL.
2. THE CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE APPLICABLE CODES OF THE STATE, COUNTY, CITY, FEDERAL LAWS AND REGULATIONS, OSHA (OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION), SANITARY LAWS, STATUTES AND ORDINANCES. NO WORK SHALL BE
INSTALLED IN VIOLATION OF ANY CODES.
3. THE CONTRACTOR SHALL ARRANGE FOR INSPECTIONS NECESSARY TO OBTAIN A CERTIFICATE OF OCCUPANCY.
4. THE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO SUBMITTING A BID/ PROPOSAL. THE CONTRACTOR SHALL BECOME GENERALLY FAMILIAR WITH THE PROJECT, AND WITH THE IMPACT OF THE NEW WORK ON THE EXISTING CONDITIONS. THIS INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING EXISTING CONDITIONS: FIRE RATING OF THE HORIZONTAL AND VERTICAL ASSEMBLIES AND THEIR EXISTING CONDITION, PENETRATIONS THROUGH FIRE RATED ASSEMBLIES, MISSING OR INOPERABLE DAMPERS IN RATED ASSEMBLIES. ANY QUESTIONS OR COMMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO SUBMITTING A BID/PROPOSAL.
5. THE CONTRACTOR SHALL MAINTAIN AT THE JOB SITE COPY OF ALL DRAWINGS, SPECIFICATIONS, BULLETINS, APPROVED SHOP DRAWINGS, OTHER SUBMITTALS, SAMPLES AND OTHER CONTRACT MODIFICATIONS. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL PROVIDE THE OWNER
ONE COMPLETE SET OF PROJECT RECORD DOCUMENTS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES, FOR THE
COORDINATION OF WORK AND FOR THE WORK PERFORMED BY THE SUB-CONTRACTORS.
7. EACH TRADE CONTRACTOR IS RESPONSIBLE TO COORDINATE THE SEQUENCE OF ONE'S WORK WITH THAT OF ALL OTHER TRADES. ANY CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT, AND SHALL BE RESOLVED PRIOR TO THE INSTALLATION OF THE WORK
INVOLVED.
8. ALL CODE REQUIRED EXITS AND INTERIM LIFE SAFETY SYSTEMS, WHICH INCLUDE BUT ARE NOT LIMITED TO EXIT LIGHTS, EMERGENCY LIGHTS, ALARMS, SPRINKLERS, ETC. SHALL BE MAINTAINED IN OPERABLE CONDITION THROUGHOUT THE CONTRACT PERIOD.
9. WHENEVER IT IS NECESSARY TO PROVIDE TEMPORARY "PATHS OF EGRESS" THROUGH THE AREAS OF THE WORK, SUCH PATHS SHALL BE PROVIDED BY THE CONTRACTOR WITH ADEQUATE ARTIFICIAL LIGHT, DIRECTION SIGNS, CLEARANCES, FIRE PROTECTION, ETC., AND SHALL BE
CONSTRUCTED AND MAINTAINED SAFE FROM FIRE, SMOKE, AND OTHER PHYSICAL DANGERS.
10. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN CONSTRUCTION SITE IN A SAFE CONDITION PER OSHA – “OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION” AND ANY APPLICABLE LAWS, REGULATIONS AND ORDINANCES AT ALL TIMES FOR THE PUBLIC, ALL PERSONNEL INVOLVED IN THE WORK, OR ESSENTIAL TO ITS EXECUTION, INCLUDING INSPECTORS, SUPERVISORS, ARCHITECTS’ REPRESENTATIVES, FIELD TESTING PERSONNEL.
11. THE CONTRACTOR SHALL INSTALL PERMANENT OR TEMPORARY FIRE HOSES AND PROVIDE ADEQUATE FIRE EXTINGUISHERS THROUGHOUT THE LIMIT OF WORK PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL MAINTAIN SUCH EQUIPMENT IN WORKING ORDER THROUGHOUT CONSTRUCTION. THE TYPE, QUANTITY AND LOCATION OF THIS EQUIPMENT SHALL BE REASONABLY ADEQUATE TO SUIT THE CONDITIONS AND
COMPLY WITH ALL APPLICABLE LAWS, REGULATIONS AND ORDINANCES.
12. THE CONTRACTOR SHALL PROVIDE FIRE PROTECTION AT EACH WASTE CONTAINER AND AS REQUIRED BY LOCAL AUTHORITIES
13. THE CONTRACTOR SHALL PROVIDE CHASES TO CONCEAL MECHANICAL, PLUMBING, AND ELECTRICAL WORK. PIPING LOCATED INSIDE THE BUILDING SHALL BE CONCEALED IN FURRED SPACES WITH THE EXCEPTION OF PIPING IN STAIRWAYS, EQUIPMENT ROOMS, AND MECHANICAL ROOMS.
THE CONTRACTOR SHALL COORDINATE WITH THE OTHER TRADES TO PROVIDE FURRING FOR PIPING INSTALLED IN FINISHED AREAS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ARCHITECT PRIOR TO LOCATING AND/OR PROVIDING “FURRED SPACES” NOT INDICATED ON THE
DRAWINGS.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING AND RESTORING EXISTING BUILDING CONSTRUCTION TO ITS ORIGINAL CONDITIONS FROM ANY DAMAGES DURING CONSTRUCTION FROM WORK PERFORMED IN CONNECTION WITH THIS CONTRACT. WHERE DAMAGED OR WORN ITEMS CANNOT BE REPAIRED OR RESTORED, THE CONTRACTOR SHALL PROVIDE REPLACEMENTS OF A KIND. ANY REPAIR, RESTORATION AND REPLACEMENT SHALL BE BY METHODS AND WITH MATERIALS SO AS NOT TO VOID ANY EXISTING WARRANTIES IN PLACE.
15. THE CONTRACTOR SHALL COMPLETE FINAL CLEANING IN ACCORDANCE WITH THE PROJECT MANUAL PRIOR TO THE PUNCH LIST.
1. ALL WORK SHALL BE PERFORMED DURING NORMAL BUSINESS HOURS OF 8:00 AM - 4:30 PM, EXCEPT SATURDAY, SUNDAY AND HOLIDAYS. THE CONTRACTOR SHALL OBTAIN PERMISSION FROM THE CONTRACTING OFFICER FOR WORK OUTSIDE OF NORMAL DAYTIME HOURS EITHER WITHIN OR
OUTSIDE THE LIMITS OF CONSTRUCTION.
2. THE CONTRACTOR MAY BE REQUIRED TO WORK OFF HOURS AND OVERTIME TO COMPLETE OR CONSTRUCT PORTIONS OF THIS WORK IN COMPLIANCE WITH THE CONTRACT STIPULATED TIME PERIOD OR AS DIRECTED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE
GOVERNMENT.
3. THE CONTRACTOR SHALL COMPLY WITH THE LATEST EDITIONS OF ALL OSHA REGULATIONS AND REQUIREMENTS AT THEIR OWN EXPENSE.
4. PRIOR TO ANY WELDING, CUTTING, BRAZING, SOLDERING, THE CONTRACTOR SHALL BE REQUIRED TO OBTAIN A HOT WORK PERMIT FROM THE
DEPARTMENT OF VETERANS AFFAIRS FIRE DEPARTMENT.
5. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE SAFETY OF THE WORKSITE AND SHALL TAKE ALL ACTIONS TO ELIMINATE ANY SAFETY HAZARDS THAT MAY POSE A THREAT OF HARM TO PATIENTS, EMPLOYEES OF THE GOVERNMENT, AND EMPLOYEES OF THE CONTRACTOR OR OTHERS. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO TAKE IMMEDIATE ACTION TO ALLEVIATE ANY SAFETY HAZARD THAT MAY EXIST WITHOUT DIRECTION FROM THE CONTRACTING OFFICER OR HIS DESIGNEE. THE CONTRACTOR SHALL ALSO TAKE IMMEDIATE CORRECTIVE ACTION TO ALLEVIATE ANY SAFETY
HAZARD, CONDITION, ETC., WHEN DIRECTED BY THE CONTRACTING OFFICER.
6. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ON SITE, THE LOCATIONS OF EXISTING UTILITIES, EXISTING CONDITIONS, FIELD
MEASUREMENTS AND DIMENSIONS, AND QUANTITIES.
7. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE LOCATION, (DEPTH, DIRECTION, SIZE) OF ALL EXISITNG UTILITIES IN THE VICINITY OF THE WORK AREA. THE CONTRACTOR SHALL REPAIR ANY UTILITY DISRUPTED, BROKEN, OR OTHERWISE RENDERED NON-FUNCTIONAL DUE TO THE WORK
PERFORMED AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. THE CONTRACTOR SHALL BE RESPONSIBLE TO REROUTE ANY EXISTING UTILITY AS REQUIRED TO COORDINATE THE INSTALLATION OF NEW WORK IN THE COURSE OF THIS PROJECT. THE CONTRACTOR IS ADVISED THAT THE VETERANS ADMINISTRATION HAS ATTEMPTED TO IDENTIFY MAJOR UTILITIES TO
BE REROUTED
9. THE CONTRACTOR SHALL IDENTIFY ANY NON-FUNCTIONING UTILITY/SYSTEM, PRIOR TO THE START OF WORK TO THE CONTRACTING OFFICER.
IDENTIFICATION OF SUCH AFTER THE START OF WORK SHALL BE DEEMED AS DISTURBED OR DAMAGED BY THE CONTRACTOR AND SHALL BE REPAIRED
BY AND AT THE EXPENSE OF THE CONTRACTOR.
10. THE CONTRACTOR SHALL PROVIDE PROPER SUPPORT OF ANY UTILITY ENCOUNTERED IN THE COURSE OF THIS WORK.
11. THERE SHALL BE NO CLAIMS AGAINST THE DEPARTMENT OF VETERANS AFFAIRS FOR WORK STOPPAGES DUE TO ACTS OF GOD, WEATHER CONDITIONS, STOP WORK ORDERS (VERBAL AND/OR WRITTEN), UNDERESTIMATION OF WORK, ESTIMATED QUANTITIES, MATERIALS, SUPPLIES, TOOLS, OR
CORRECTION OF SAFETY PROBLEMS.
12. THE CONTRACTOR SHALL SAW CUT WITH A PROPER BLADE ANY CONCRETE WORK REQUIRED TO BE REMOVED IN THE COURSE OF THIS WORK. ALL HOLES SHALL BE CORED DRILLED WITH DIAMOND CORE BITS. THE USE OF JACK HAMMERS IS PROHIBITED.
13. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ALL DEBRIS FROM THE MEDICAL CENTER DAILY AND DISPOSE OF THE PREMISES IN
ACCORDANCE WITH MEDICAL CENTER, LOCAL, STATE, FEDERAL REGULATIONS.
14. THE CONTRACTOR AND HIS SUB CONTRACTORS SHALL PROVIDE THEIR OWN STORAGE SPACES AND BE RESPONSIBLE FOR ITS SECURITY.
CONTRACTORS ARE PROHIBITED FROM USING VA SPACES FOR STORAGE.
15. CONTRACTOR SHALL INSTALL AND MAINTAIN DUST BARRIERS AS REQUIRED TO MAINTAIN INFECTION CONTROL AS INDICATED ON THE DRAWINGS AND
OR THE SPECIFICATIONS.
16. THE CONTRACTOR SHALL MAINTAIN SECURITY FOR THE WORK AREA AND PROVIDE DUPLICATE KEYS AND LOCK COMBINATIONS TO THE RE/COR FOR THE PURPOSE OF SECURITY INSPECTIONS OF EVERY AREA OF PROJECT INCLUDING TOOL BOXES AND PARKED MACHINES TO TAKE ANY EMERGENCY
ACTION(S) WHEN REQUIRED.
17. CONTRACTOR’S EMPLOYEES SHALL PARK IN APPROVED OR DESIGNATED PARKING SPACES ONLY.
18. ANY RIGGING REQUIRED SHALL BE PERFORMED BY PROFESSIONAL RIGGERS AT THE EXPENSE OF THE CONTRACTOR.
19. THE CONTRACTOR SHALL MAINTAIN THE WORK SITE IN A NEAT AND CLEAN CONDITION. THE WORK SITE SHALL BE BROOM CLEANED AT THE END OF
EACH WORKING DAY.
20. THE CONTRACTOR SHALL LEAVE THE WORK SITE CLEAN AND SECURED AT THE END OF EACH WORKING DAY. THE WORK SITE SHALL NOT BE LEFT
UNATTENDED AT ANY TIME, UNLESS THE WORK AREA IS PROPERLY SECURED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE STERILE PROCESSING
TO MEET TEMP & HUMIDITY
Dwight D. Eisenhower Medical Center
589-C92284
09/01/2020 AMG401 N. Front St., Suite 380 Columbus, OH 43215
C P ro je c t
P a th \R e v it -2
\6
C e n tr a l_ a g ra n t.
rv t
/2
/2
:5
:4
P
M
G002
CODE ANALYSIS & PROJECT
INFORMATION
Revisions: Date:
License # 115355License # 115355License # 115355License dheiserdheiserdheiser
George ShmidheiserGeorge ShmidheiserGeorge Shmidheiser Expiration Date 12/31/21Expiration Date 12/31/21Expiration Date 12/31/21chmidheiser
10/01/2020
GR101
PICTURES FOR REFERENCE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE STERILE PROCESSING
TO MEET TEMP & HUMIDITY
Dwight D. Eisenhower Medical Center
589-C92284
Project Director
10/01/2020 DEH/HK MVRevisions: Date:
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC.
UP
C127B
C127A
B127
B135
B139
B130
B128B
B128A
B128
B126
B126A
B124A
B124
B122
C125A
C125
B134A
B134
B134B
B1-C4B1-C5
B1-C6
B126B
C127C
B126C
B134F
B1-E2
CLEAN SPD ROOM
OFFICE
CLEAN ANTE ROOM
SOILED ANTE ROOM
MECHANICAL
ROOM
HAC
SOILED SPD ROOM
LOCKER ROOM
BREAK ROOM
CORRIDOR
B131
ELECTRICAL ROOM
TELECOM
STORAGE
B137A
STORAGE/EQUIPMENT
OFFICE BIOMED
DN
DN
UP
UP
UP
UP
DN
UP
DN
UP
UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE STERILE PROCESSING
TO MEET TEMP & HUMIDITY
Dwight D. Eisenhower Medical Center
589-C92284
Project Director
10/01/2020 DEH/HK MVRevisions: Date:
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC.
401 N. FRONT ST., SUITE 380 COLUMBUS, OH 43215
IH101
ICRA PLAN
C127B
C127A
C127D
B127B135
B139
B130
B128B
B128A
B128
B126
B126A B124A
B124
B122
C125A
C125
B134A
B134
B134C
B134B
C127
B120
B1-C4
B1-C5
B1-C6
B126B
C127C
C1-C6
B126C
B134F
B1-E2
C127J
CLEAN SPD ROOM
OFFICE
CLEAN ANTE ROOM
SOILED ANTE ROOM
MECHANICAL ROOM
HAC
SOILED SPD ROOM
LOCKER ROOM
BREAK ROOM
CORRIDOR
B131
ELECTRICAL ROOM
STORAGE
DN
DN
UP
UP
UP
UP
DN
UP
DN
UP
UP
IH102
FIRST FLOOR ICRA
CONSTRUCTION ROUTE PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE STERILE PROCESSING
TO MEET TEMP & HUMIDITY
Dwight D. Eisenhower Medical Center
589-C92284
Project Director
10/01/2020 DEH/HK MVRevisions: Date:
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC.
IH201
ICRA CONSTRUCTION DETAILS
ANTE ROOM
ELEVATION
AREA UNDER
FRAMED
PICTURE
OF
C.O.R.
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
GENERAL NOTES:
LOW RISK
OFFICE AREAS
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
LOW RISK GROUP
CONSTRUCTION PROJECT TYPE
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
I II II III/IV
II
II III/IV
III/IV
III
III/IV
IV
IV
IV
I
I
II
CONSTRUCTION PROJECT BY PATIENT RISK
IC MATRIX - CLASS OF PRECAUTIONS:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK
NOTE:
C
LA
SS
V
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL.
8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL
SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
CONSTRUCTION
RESTRICTED AREA
THIS IS A
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXXXX XXXX XXXX
CHILLER PLANT AFTER HOURS
CONTACT PHONE 82329
FIRE EMERGENCY DIAL 911
XXXXXX XXXX XXXX
XXXXXX XXXX XXXX
CLASS IV WORK ITEMS NOTES:
LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
WITH CONTACT
INFORMATION
TYPICAL ALTERNATIVE
CONSTRUCTION LAYOUT
CLASS IV
CROSS-SECTION 'A-A' MOBILE CONTAINMENT CARTC
O
R R
ID
O
R
H A
LL
W
A Y
CLASS IV
(CONST. BARRIER TYPES)
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.
E1
F1
C4 C8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE STERILE PROCESSING
TO MEET TEMP & HUMIDITY
Dwight D. Eisenhower Medical Center
589-C92284
Project Director
10/01/2020 DEH/HK MVRevisions: Date:
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC.
LIFE SAFETY PLAN GENERAL NOTES
LIFE SAFETY PLAN LEGEND
UP
UP
KEY PLAN
1. THE LIFE SAFETY PLANS ARE "DIAGRAMMATIC ONLY". THEIR PURPOSE IS
SOLELY TO REPRESENT THE LIFE SAFETY COMPONENTS FOR THE PROJECT (AS
INCLUDED IN THE CONSTRUCTION DOCUMENTS PREPARED BY THE ARCHITECT,
AND THE ENGINEERS. THE CONTRACTOR SHALL USE THE CONSTRUCTION
DOCUMENTS (NOT THE LIFE SAFETY PLANS) FOR THE IMPLEMENTATION OF THE
REQUIRED LIFE SAFETY COMPONENTS INTO THE PROJECT.
2. THE CONTRACTOR SHALL MAINTAIN ALL MEANS OF EGRESS FOR THE
DURATION OF DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL
PROVIDE FIRE RATED TEMPORARY PARTITIONS, AND COVERED WALKS TO
MAINTAIN EGRESS AND SAFE PASSAGE FROM THE BUILDING TO THE PUBLIC WAY
AND AS REQUIRED BY AUTHORITY HAVING JURISDICTION.
3. THE CONTRACTOR SHALL PROVIDE EXHAUST FANS WITH HEPA FILTERS TO
KEEP SPACE WITHIN DEMOLITION / CONSTRUCTION AREA UNDER NEGATIVE
PRESSURE AS LOCATIONS AND CONDITIONS DICTATE.
4. THE CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION WHILE WORKING
IN THE SPACES BELOW OR ABOVE THE AREA OF DEMOLITION OR CONSTRUCTION.
5. THE CONTRACTOR SHALL PROVIDE BARRIERS, TEMPORARY PARTITIONS TO
PROTECT OCCUPANTS FROM PHYSICAL HAZARD AND NOISE DURING DEMOLITION /
CONSTRUCTION.
6. THE CONTRACTOR SHALL DETERMINE THE LOCATION OF CONSTRUCTION
DOORS IN CONSTRUCTION BARRIERS. DOORS AND FRAMES IN CONSTRUCTION
BARRIERS TO BE GASKET HOLLOW METAL. DOORS TO BE SELF CLOSING AND
LOCKABLE.
7. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY UPON
DISCOVERY OF ANY LIFE SAFETY COMPONENT THAT IS SHOWN ON THE LIFE
SAFETY PLANS BUT HAS NOT BEEN INCLUDED IN THE CONSTRUCTION DOCUMENTS
PREPARED BY THE ARCHITECT, AND THE ENGINEERS.
8. THE EXISTING-TO-REMAIN PORTIONS OF THE BUILDING WERE PROVIDED TO
THE ARCHITECT BY THE OWNER. ARRAY ARCHITECTS TAKES NO RESPONSIBILITY
FOR THEIR ACCURACY BEYOND THE LIMITS OF THE DESIGNATED “SCOPE OF WORK”
AS DEFINED ON THE ARCHITECTURAL FLOOR PLANS.
EXIT ACCESS CORRIDORS
NOTE:
RATED PARTITIONS AND SMOKE BARRIERS SHOWN ON THE EGRESS PLAN ARE A
COMBINATION OF NEW AND EXISTING CONSTRUCTION.
EXIT DISCHARGE EXIT / HORIZONTAL EXIT
ETD
ETD - TRAVEL DISTANCE TO AN EXIT
CPT - COMMON PATH OF TRAVEL DISTANCE
DET - DEAD END TRAVEL DISTANCE
CPT/DET
NON-RATED SMOKE PARTITION
1 HOUR FIRE-RATED BARRIER / PARTITION
2 HOUR FIRE -BARRIER / PARTITION
FIRE EXTINGUISHER CABINET
MECH / STOR
LOCKER
ROOM
TOILET
BREAK ROOM
EVS
SOILED ANTE
ROOM
CLEAN ANTE
ROOM
CLEAN SPD
ROOM
HAC
CORRIDOR
OFFICE
MECH
BIOMED ENG
ELEC
STOR
CORRIDOR
CORRIDOR
VESTIBULE
ELEV
STAIR
STOR
VEG REFRIG
UNIV WASTE
MECHANICAL
ROOM
SOILED SPD
ROOM
ARCHITECTURAL SCOPE OF WORK
ARCHITECTURAL SCOPE OF WORK
LOADING
DOCK
ETD = 194' - 2"
C P
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE STERILE PROCESSING
TO MEET TEMP & HUMIDITY
Dwight D. Eisenhower Medical Center
589-C92284
09/01/2020 AMG401 N. Front St., Suite 380 Columbus, OH 43215
C P ro je c t
P a th \R e v it -2
\6
C e n tr a l_ a g ra n t.
rv t
/2
/2
:5
:4
P
M
ALS101
LIFE SAFETY PLAN - FIRST FLOOR
1/8" = 1'-0" F1
LIFE SAFETY PLAN - FIRST FLOOR
N
1/8" = 1'-0"
Revisions: Date:
License # 115355License # 115355License # 115355License dheiserdheiserdheiser
George ShmidheiserGeorge ShmidheiserGeorge Shmidheiser
DEMOLITION PLAN GENERAL NOTES CONTRACTOR RESPONSIBILITIES W ITH
REGARD TO EXISTING CONDITIONS NOTES
CUTTING AND PATCHING GENERAL NOTESDEMOLITION PLAN LEGEND
KEY PLAN
13.411.810.17.94.8
F.7
F.3
C.03
B.01
MECH / STOR
B134A
LOCKER
ROOM
B128A
TOILET
B128B
BREAK ROOM
B128
EVS
B130
SOILED ANTE
ROOM
B126A
CLEAN ANTE
ROOM
B124A
CLEAN SPD
ROOM
B124
HAC
B126B
CORRIDOR
B1-C5
OFFICE
B122
MECH
B127
BIOMED ENG
B129
ELEC
B131
STOR
B135
CORRIDOR
B1-C4
VESTIBULE
B134F
ELEV
B1-E2
STAIR
B1-S3
STOR
B137
VEG REFRIG
B137A
D3
D4
MECHANICAL
ROOM
B126C
SOILED SPD
ROOM
B126
ARCHITECTURAL SCOPE OF WORK
ARCHITECTURAL SCOPE OF WORK
D5 D5
D5
D5
D7D7
CORRIDOR
B1-C6
AD101E8
1. DEMOLITION WORK SHALL BE EXECUTED IN CONFORMANCE WITH ALL CODES
AND ORDINANCES AS SET FORTH BY ALL AUTHORITIES HAVING JURISDICTION.
2. THE “ARCHITECTURAL SCOPE OF WORK” LINES SHOWN ON THE ARCHITECT’S
DEMOLITION PLAN APPLY ONLY TO THE LIMITS OF THE ARCHITECTURAL WORK.
SEE OTHER DISCIPLINES’ DRAWINGS FOR THE LIMIT OF THEIR DEMOLITION WORK.
3. THE SCOPE OF DEMOLITION WORK SHOWN IS INTENDED TO PREPARE THE
BUILDING TO RECEIVE THE NEW WORK. THE CONTRACTOR SHALL REMOVE ALL
EXISTING ITEMS OF CONSTRUCTION AND EQUIPMENT WITHIN THE PROJECT AREA
AS REQUIRED TO ALLOW FOR THE EXECUTION OF THE NEW WORK.
4. THE CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH PHASING
PLANS TO DETERMINE THE SCOPE OF WORK TO BE PERFORMED IN EACH PHASE.
5. THE CONTRACTOR SHALL BRACE ALL EXISTING STRUCTURES AND
STRUCTURAL ELEMENTS AS NECESSARY DURING DEMOLITION. THE CONTRACTOR
SHALL ENGAGE A STRUCTURAL ENGINEER TO DETERMINE REQUIREMENTS.
6. NO FLOOR OR STRUCTURAL MEMBERS SHALL BE CUT WITHOUT PERMISSION
OF A REGISTERED STRUCTURAL ENGINEER.
7. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY IF ANY
DEMOLITION OR NEW CONSTRUCTION WORK CANNOT BE PERFORMED DUE TO
EXISTING FIELD CONDITIONS.
8. WHERE NEW FLOORING IS INDICATED, THE CONTRACTOR SHALL REMOVE ALL
EXISTING FLOOR FINISHES AND ADHESIVE DOWN TO THE CONCRETE SLAB, AND
LEAVE FLOOR SMOOTH FOR NEW FINISH. THE CONTRACTOR SHALL FOLLOW
MANUFACTURER'S REQUIREMENTS FOR SUB-FLOOR PREPARATION.
9. WHERE NEW WALL FINISH MATERIALS ARE SCHEDULED FOR EXISTING WALLS
TO REMAIN, THE CONTRACTOR SHALL COORDINATE AND REMOVE THE EXISTING
FINISH MATERIALS ACCORDINGLY. UPON REMOVAL OF THE EXISTING FINISH
MATERIALS, THE CONTRACTOR SHALL REPAIR THE EXISTING WALL TO A LEVEL 4
WALL FINISH.
10. WHERE NEW CEILING ARE INDICATED, THE CONTRACTOR SHALL REMOVE ALL
EXISTING CEILING TO ALLOW FOR PROPER INSTALLATION OF NEW CEILINGS.
11. AFTER DEMOLITION WORK IS COMPLETE, THE CONTRACTOR SHALL REPAIR ALL
HOLES IN EXISTING-TO-REMAIN FLOORS, WALLS, FIRE BARRIERS, AND ROOFS TO
COMPLY WITH ORIGINAL FIRE/SMOKE/SOUND ASSEMBLIES, FIRE PROTECTION
REQUIREMENTS, AND STRUCTURAL INTEGRITY.
1. THE CONTRACTOR SHALL PERFORM A SITE VISIT. IN DOING SO THE
CONTRACTOR HAS AGREED THAT ONE HAS INVESTIGATED THE EXISTING
CONDITIONS TO BE RENOVATED AND COMPARE THEM TO THE WORK TO BE
PERFORMED ACCORDING TO THE CONTRACT DOCUMENTS.
2. THE EXISTING INFORMATION INCLUDED WITHIN THE CONTRACT DOCUMENTS
ARE BASED UPON INFORMATION PROVIDED BY THE OWNER AND FURTHER
SUPPLEMENTED BY LIMITED FIELD OBSERVATIONS AND MEASUREMENT AND
MAY NOT REFLECT ALL EXISTING CONDITIONS. THE CONTRACTOR IS
RESPONSIBLE FOR COMPLETE VERIFICATION OF ALL EXISTING FIELD
CONDITIONS.
3. THE CONTRACTOR SHALL FIELD-VERIFY THE EXISTING CONDITIONS AS THEY
RELATED TO SPECIFIC PORTIONS OF THE WORK. VERIFICATION SHALL BE
UNDERTAKEN IN ADVANCE TO ALLOW FOR TIMELY IDENTIFICATION OF EXISTING
CONDITIONS THAT MAY AFFECT THE SCHEDULED INSTALLATION OF NEW WORK
AS DOCUMENTED AND TO AVOID UNDUE AND UNREASONABLE DELAYS TO THE
PROJECT CONSTRUCTION SCHEDULE. SHOULD SUCH CONDITIONS BE
DISCOVERED, A MINIMUM PERIOD OF TEN (10) WORKING DAYS SHALL BE
ALLOWED FOR THE ARCHITECT TO EVALUATE THE CONDITIONS AND MAKE
RECOMMENDATIONS TO ACCOMMODATING NEW WORK BASED ON ACTUAL
CONDITION.
4. THE CONTRACTOR SHALL FIELD-VERIFY THE LOCATION AND EXTENT OF THE
LIFE SAFETY SYSTEM (INCLUDING BUT NOT LIMITED TO SPRINKLER SYSTEMS,
SMOKE DETECTION SYSTEMS, EMERGENCY LIGHTING SYSTEMS) AS THEY MAY
BE AFFECTED BY THE NEW WORK. THE CONTRACTOR IS RESPONSIBLE FOR
ACCOMMODATING THESE SYSTEMS WHEN AFFECTED BY NEW WORK SO THAT
ALL APPLICABLE CODES REQUIREMENTS ARE SATISFIED.
5. THE CONTRACTOR SHALL IDENTIFY EXISTING COMPONENTS AND
ASSEMBLIES WITHIN THE BUILDING THAT ARE CONSTRUCTED AS FIRE-RATED
ASSEMBLIES; SHALL NOTE ANY DISCREPANCIES AND/OR CONFLICTS INVOLVING
EXISTING CONDITIONS AND BRING THEM TO THE ARCHITECT'S ATTENTION
IMMEDIATELY.
6. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER ANY
CONSTRUCTION ACTIVITIES WHICH MAY IMPEDE NORMAL OPERATION,
INCLUDING ANY ACTIVITY WHICH CREATES EXCESSIVE NOISE, AND NOTIFY ANY
OCCUPANTS OF THE BUILDING OF ANY CONSTRUCTION ACTIVITIES WHICH MAY
AFFECT THEIR ABILITY TO OPERATE NORMALLY.
7. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT
DAMAGE TO AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS
WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED AND
SHALL BE RESPONSIBLE FOR DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES.
8. THE CONTRACTOR SHALL AT ALL TIMES MAINTAIN THE BUILDING IN A
WEATHER TIGHT CONDITION.
1. THE CONTRACTOR SHALL REPLACE OR REPAIR ANY EXISTING-TO-REMAIN
MATERIALS AND FINISHES WHICH ARE DAMAGED DURING DEMOLITION OR
CONSTRUCTION OR ANY OTHER WORK PREFORMED UNDER THIS CONTRACT. THE
CONTRACTOR SHALL PATCH, REPAIRED AND ALIGN ALL EXISTING CONSTRUCTION
SO AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIR AND PREPARE EXISTING
SURFACE TO RECEIVE NEW SCHEDULED FINISHES.
2. THE CONTRACTOR SHALL REMOVE ALL EXISTING CEILINGS TO ALLOW FOR
PROPER INSTALLATION OF MECHANICAL, PLUMBING AND ELECTRICAL WORK, AND
PATCH AND REPAIR EXISTING CEILINGS TO MATCH EXISTING.
3. WHEN ACCESS IS REQUIRED FOR THE INSTALLATION OF NEW WORK ABOVE
EXISTING CEILING SYSTEMS TO REMAIN, THE CONTRACTOR IS RESPONSIBLE FOR
THE REMOVAL AND REINSTALLATION OF THE EXISTING SYSTEM IN ITS ENTIRETY.
4. WHERE EXISTING DUCTS, PIPES AND ELECTRICAL CONDUITS ARE LEFT
EXPOSED FROM DEMOLITION WORK IN FINISHED SPACES, THE CONTRACTOR
SHALL ENCLOSE THEM WITH A GYPSUM WALLBOARD PARTITION.
5. WHERE PIPES, CONDUITS, DUCTWORK, ETC. ARE TO BE REMOVED FROM ANY
FLOOR OR ROOF ASSEMBLY TO REMAIN, THE CONTRACTOR SHALL INFILL THE
OPENING WITH MATERIALS TO MAINTAIN DESIGNATED FIRE OR SMOKE RATING, AS
INDICATED BELOW:
A. WHERE OPENINGS ARE ACCESSIBLE TO FOOT TRAFFIC, EXPOSED TO
VIEW, OR ARE GREATER THAN 2", THE OPENING MUST BE FILLED WITH A
CONCRETE SYSTEM SIMILAR TO EXISTING.
B. AREAS NOT EXPOSED TO VIEW, OR GREATER THAN 6", THE OPENING MUST
BE FILLED WITH A CONCRETE SYSTEM SIMILAR TO EXISTING.
C. AREAS NOT EXPOSED TO VIEW, CONCEALED BY CONSTRUCTION OR
WHERE THE OPENING IS LESS THAN 6" THE OPENING MUST BE FILLED
WITH A UL DESIGN SYSTEM AS SPECIFIED IN DIVISION 7 "THROUGH
PENETRATION RESISTIVE MATERIAL".
6. WHERE LEVEL CHANGES, HOLES, DEPRESSIONS, OR FORMED TRENCHES ARE
UNCOVERED IN EXISTING CONCRETE SLAB BY THE REMOVAL OF EXISTING WALLS /
EXISTING FLOORING OR ANY OTHER DEMOLITION ACTION, THE CONTRACTOR
SHALL PATCH AND REPAIR EXISTING CONCRETE SURFACES WITH A LATEX OR
GYPCRETE LEVELING COMPOUND UNLESS SPECIFIED OTHERWISE TO PRODUCE A
SMOOTH LEVEL SURFACE TO RECEIVE NEW FINISHES.
7. IF ANY EXISTING FIREPROOFING AND/OR RATED ASSEMBLIES TO REMAIN ARE
DAMAGED DURING DEMOLITION, THEY SHALL BE REPLACED OR REPAIRED TO
CONFORM TO THE ORIGINAL FIRE PROTECTION REQUIREMENTS.
REMOVE EXISTING WALL CONSTRUCTION, SHOWN WITH DASHED LINES, IN ITS
ENTIRETY FROM FLOOR TO STRUCTURE ABOVE INCLUDING DOORS, DOOR FRAMES,
BORROWED LIGHTS, ASSOCIATED ELEC. / MECH. WORK, ETC. PREPARE AREA FOR
NEW CONSTRUCTION.
REMOVE EXISTING DOOR OR BORROWED LIGHT INCLUDING FRAME ASSEMBLY,
SHOWN WITH DASHED LINES. CLOSE EXISTING OPENING WITH METAL STUDS AT
16" O.C. AND GYPSUM BOARD ON EACH SIDE. ALIGN NEW WORK FLUSH WITH
EXISTING ADJACENT PARTITION. MATCH EXISTING WALL THICKNESS, UNLESS
NOTED OTHERWISE IN ARCHITECTURAL PLAN.
PROVIDE OPENING IN EXISTING PARTITION, SHOWN WITH DASHED LINES, AS
REQUIRED TO ACCOMMODATE NEW CONSTRUCTION.
LIMIT OF ARCHITECTURAL WORK
EXISTING WINDOWS
EXISTING WINDOW
REMOVE DOOR AND
FRAME
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE STERILE PROCESSING
TO MEET TEMP & HUMIDITY
Dwight D. Eisenhower Medical Center
589-C92284
09/01/2020 AMG401 N. Front St., Suite 380 Columbus, OH 43215
C P ro je c t
P a th \R e v it -2
\6
C e n tr a l_ a g ra n t.
rv t
/2
/2
:5
:3
P
M
AD101
DEMOLITION PLAN - FIRST FLOOR
1/4" = 1'-0" F1
DEMOLITION PLAN - FIRST FLOOR
DEMOLITION KEYNOTES
D1 REMOVE DOOR. SAVE FOR REINSTALLATION. SEE DOOR B134F.A ON FLOOR
PLAN FOR NEW LOCATION.
D2 REMOVE PARTITION TO EXTENTS SHOWN ON PLAN. PATCH & REPAIR WALLS AS
NEED - PAINT TO MATCH EXISTING. PATCH & REPAIR FLOORING TO MATCH
EXISTING.
D3 REMOVE CRASH RAIL. MODIFY TO ACCOMMODATE NEW PARTITION OR
REPLACE, MATCHING EXISTING. PATCH & REPAIR WALL AS NEEDED - PAINT TO
MATCH EXISTING. SEE FLOOR PLAN FOR NEW PARTITION LOCATION.
D4 REMOVE CRASH RAIL. PATCH & REPAIR WALL AS NEEDED - PAINT TO MATCH
EXISTING.
D5 REMOVE LAY-IN CEILING & ALL LIGHT FIXTURES, DIFFUSERS, & DEVICES. TURN
CEILING PANELS OVER TO OWNER. SEAL ALL EXISTING & NEW OPENINGS
THROUGH OR INTO WALLS & CEILING/STRUCTURE TO MAKE SPACE AIR TIGHT.
D7 REMOVE PORTION OF LAY-IN CEILING AS REQUIRED FOR HVAC WORK ABOVE.
REINSTALL LAY-IN CEILING WHEN WORK IS COMPLETE.
N
1/4" = 1'-0"
Revisions: Date:
1/4" = 1'-0" E8
CLEAN SPD ROOM B124 - EAST
License # 115355License # 115355License # 115355License dheiserdheiserdheiser
George ShmidheiserGeorge ShmidheiserGeorge Shmidheiser
FLOOR PLAN GENERAL NOTES
KEY PLAN
PARTITION TYPES GENERAL NOTES
PARTITION TYPES LEGEND
13.411.810.17.94.8
F.7
F.3
C.03
B.01
MECH / STOR
B134A
LOCKER
ROOM
B128A
TOILET
B128B
BREAK ROOM
B128
EVS
B130
SOILED ANTE
ROOM
B126A
CLEAN ANTE
ROOM
B124A
CLEAN SPD
ROOM
B124
HAC
B126B
CORRIDOR
B1-C5
OFFICE
B122
MECH
B127
BIOMED ENG
B129
ELEC
B131
STOR
B135
CORRIDOR
B1-C4
CORRIDOR
B1-C6
VESTIBULE
B134F
ELEV
B1-E2
STAIR
B1-S3
STOR
B137
VEG REFRIG
B137A
6"
MECHANICAL
ROOM
B126C
SOILED SPD
ROOM
B126
ARCHITECTURAL SCOPE OF WORK
ARCHITECTURAL SCOPE OF WORK
EXST'G
FEC
A1 A2
A2
E Q
E Q
B
-C
.B
B
F .B C6
AE700
AE700
C7
A4
A4
A5A6
A7
A8
A9
B134F.A
AE101 E9
2' - 0"
PUSH
PLATE3' - 0"
PUSH
PLATE
1. SEE SHEET AE700 FOR NON-STRUCTURAL METAL FRAMING DETAILS AND
PARTITION TYPES.
2. DOOR B134F.A: EXISTING DOOR, FRAME, & HARDWARE TO REMAIN.
DOOR B134F.B: EXISTING DOOR TO REMAIN. NEW INTERLOCK BETWEEN
DOORS B134F.B & B1-C5.B.
DOOR B1-C5.B: DURA-GLIDE 5300 SERIES BY STANLEY, 3-PANEL
TELESCOPIC LEFT HAND, 84" W x 92" H. NEW INTERLOCK
BETWEEN DOORS B134F.B & B1-C5.B.
3. ALL DIMENSIONS ARE FROM FINISHED FACE OF GYPSUM WALLBOARD TO
FINISHED FACE OF GYPSUM WALLBOARD UNLESS NOTED OTHERWISE.
4. THE “ARCHITECTURAL SCOPE OF WORK” LINES SHOWN ON THE
ARCHITECT'S FLOOR PLANS APPLY ONLY TO THE LIMITS OF
ARCHITECTURAL NEW CONSTRUCTION AND RENOVATION. SEE OTHER
DISCIPLINES’ DRAWINGS FOR THE LIMITS OF NEW CONSTRUCTION AND
RENOVATION FOR THEIR DISCIPLINE.
5. THE CONTRACTOR SHALL NOT SCALE DRAWINGS. DIMENSIONS HAVE BEEN
PROVIDED THROUGHOUT THE CONTRACT DOCUMENTS FOR THE
CONTRACTOR'S USE IN COORDINATING THE WORK. IF ANY DIMENSIONS
ARE FOUND IN CONFLICT THE CONTRACTOR SHALL NOTIFY AND OBTAIN
CLARIFICATION FROM THE ARCHITECT.
6. WHERE NEW GYPSUM BOARD WALLS/PARTITIONS/BARRIERS ARE A
CONTINUATION OF AN EXISTING WALL OR COLUMN ENCASEMENT, THE
FACE OF NEW GYPSUM BOARD SHALL BE ALIGNED WITH THE FACE OF
EXISTING SURFACE UNLESS OTHERWISE INDICATED ON DRAWINGS. THE
CONTRACTOR SHALL ACCOUNT FOR ANY ADDITIONAL LAYERS OF DRYWALL
NECESSARY TO PROVIDE THE CONTINUATION, ALIGNMENT, OR
PRESERVATION OF THE FIRE RATING IDENTIFIED. .
7. THE CONTRACTOR SHALL PROVIDE LEVEL TRANSITION BETWEEN EXISTING
AND NEW CONCRETE SLABS AND BETWEEN NEW AND EXISTING FINISHES.
THE CONTRACTOR SHALL IDENTIFY WHERE THE FLOOR DIPS OR RISES,
CLEAN THE FLOOR AND APPLY SELF-LEVELING COMPOUND TO THE FLOOR
AS REQUIRED TO ACHIEVE AN EVEN SUBSTRATE AND AN EVEN TRANSITION
BETWEEN EXISTING AND NEW CONSTRUCTION.
8. THE CONTRACTOR SHALL BUILD OUT PARTITIONS TO ACCOMMODATE
DEPTH REQUIRED BY FIRE EXTINGUISHER CABINETS AND RECESSED
POWER PANELS LOCATED THROUGHOUT THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL OBTAIN THE ARCHITECT’S APPROVAL FOR THEIR
FINAL LOCATION.
9. THE CONTRACTOR SHALL TAKE INTO ACCOUNT THE THICKNESS OF THE
SCHEDULED FINISH MATERIALS SUCH AS CERAMIC TILE, SOLID SURFACE,
ETC. PRIOR TO LAYOUT OF METAL STUD PARTITIONS OR CMU WALLS, SINCE
THE TOTAL WALL THICKNESS MUST BE CONSIDERED SO THAT THE
REQUIRED "MINIMUM FACE TO FINISH" AND "MINIMUM CLEAR FACE OF
FINISH" DIMENSIONS CAN BE MAINTAINED AFTER THE INSTALLATION OF
FINISH MATERIALS.
1. INSTALLATION OF METAL STUD PARTITIONS SHALL COMPLY WITH ASTM C754.
2. FOR STUD GAUGE AND THICKNESS REFER TO NON-STRUCTURAL METAL
FRAMING DETAILS ON SHEET AE700.
3. WHERE STUDS EXTEND TO UNDERSIDE OF STRUCTURE ABOVE, PROVIDE
DEFLECTION TRACK AT TOP OR ANOTHER APPROVED METHOD TO ALLOW FOR
A 1" DEFLECTION OF THE STRUCTURE.
4. GYPSUM BOARD INSTALLATION SHALL COMPLY ASTM C840.
5. WHEN INFILLING OR ABUTTING EXISTING PARTITIONS CONTRACTOR TO ADD
AN ADDITIONAL LAYER OF GYPSUM WALLBOARD TO PARTITION TYPE AND/OR
SKIM COAT WALL AS REQUIRED TO PROVIDE A FLUSH SURFACE. THICKNESS
OF GYPSUM WALLBOARD AND/OR STUD SIZE TO BE DETERMINED IN FIELD TO
PROVIDE FLUSH SURFACE.
6. THE SOUND TRANSMISSION CLASS (STC) VALUE NOTED ON THE DRAWINGS IS
THE LABORATORY TESTED RESULT OF THE PUBLISHED TEST NUMBER
ACCOMPANYING THE STC VALUE. IF NO TEST NUMBER IS LISTED, THE STC
VALUE IS A CALCULATION OF SIMILAR ASSEMBLIES AND THEIR LABORATORY
MEDIAN STC RATINGS. ALL INSTALLATION DETAILS AND MATERIALS ARE TO
COMPLY WITH THE UNITED STATES GYPSUM (USG) APPLICATION
REQUIREMENTS TO MAXIMIZE INSTALLED ACOUSTICAL PERFORMANCE.
EXISTING PARTITION TO REMAIN
TYPICAL NON-RATED PARTITION
NEW WALL BASE TO MATCH EXISTING; BOTH SIDES OF PARTITION
EXISTING WINDOWS
EXISTING WINDOW
INFILL WITH PARTITION CONSTRUCTION
TO MATCH EXISTING; PAINT TO MATCH
EXISTING ON BOTH SIDES OF PARTITION
NEW WINDOW AND FRAME; PAINT TO
MATCH EXISTING
REPAINT EXISTING FRAMES, BOTH SIDES
OF PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE STERILE PROCESSING
TO MEET TEMP & HUMIDITY
Dwight D. Eisenhower Medical Center
589-C92284
09/01/2020 AMG401 N. Front St., Suite 380 Columbus, OH 43215
C P ro je c t
P a th \R e v it -2
\6
C e n tr a l_ a g ra n t.
rv t
/1
/2
:5
:4
A
M
AE101
FLOOR PLAN - FIRST FLOOR
1/4" = 1'-0" F1
FLOOR PLAN - FIRST FLOOR
FLOOR PLAN KEYNOTES
A1 MODIFIED OR NEW CRASH RAIL - MATCH EXISTING.
A2 PAINT & WALL BASE FOR NEW PARTITION TO MATCH EXISTING FINISHES IN
ROOM.
A3 (NOT USED.)
A4 PATCH & REPAIR OPENING IN WALL WITH 5/8" GYPSUM WALLBOARD - PAINT TO
MATCH EXISTING. SEAL ALL PIPE PENETRATIONS THROUGH WALL.
A5 PATCH, REPAIR, & SEAL FLOOR OPENING AROUND WASTE PIPE.
A6 PATCH, REPAIR, & SEAL WALL OPENING AROUND EXHAUST DUCT.
A7 PATCH, REPAIR, & SEAL WALL OPENING BEHIND PIPING.
A8 REMOVE 18" x 18" DOOR GRILLE. INFILL WITH STAINLESS STEEL BLANK-OFF
PLATES ON BOTH SIDES AND RIGID INSULATION BETWEEEN.
A9 RELOCATE ROOM SIGNAGE CLOSER TO DOOR TO AVOID NEW PARTITION.
N
1/4" = 1'-0"
1/4" = 1'-0" E9
CLEAN SPD ROOM B124 - EAST
Revisions: Date:
License # 115355License # 115355License # 115355License dheiserdheiserdheiser
George ShmidheiserGeorge ShmidheiserGeorge Shmidheiser
KEY PLAN
REFLECTED CEILING PLAN GENERAL NOTES
REFLECTED CEILING PLAN LEGEND
13.411.810.17.94.8
F.7
F.3
C.03
B.01
MECH / STOR
B134A
TOILET
B128B
HAC
B126B
LOCKER
ROOM
B128A
BREAK ROOM
B128
EVS
B130
MECHANICAL
ROOM
B126C
SOILED ANTE
ROOM
B126A
CLEAN ANTE
ROOM
B124A
SOILED SPD
ROOM
B126
CLEAN SPD
ROOM
B124
OFFICE
B122
CORRIDOR
B1-C4
MECH
B127
BIOMED ENG
B129
ELEC
B131
STOR
B135
VEG REFRIG
B137A
STOR
B137
CORRIDOR
B1-C6
CORRIDOR
B1-C5
ELEV
B1-E2
STAIR
B1-S3
LOADING
DOCK
B1-C7
VESTIBULE
B134F
ARCHITECTURAL SCOPE OF WORK
ARCHITECTURAL SCOPE OF WORK
8' - 0" C-1/P-1
8' - 0" C-1/P-1
8' - 0" C-1/P-1
8' - 0" C-1/P-1
2' - 8" 1' - 0"
5' - 6"
3'
5" 6'
0"
6'
0" 6'
0"
6'
0"
4' - 0" 3' - 7"
4'
5"
E Q
E Q
3' - 4"
8' - 0" 8' - 0" 8' - 0" 4' - 7"
3' - 0" 8' - 0" 8' - 0" 4' - 8"
2'
2" 5'
0"
5'
0"
2'
6" 4'
0"
6'
6"
C1 C2 C2
C3 C3C3
C3
C4
C4
B8
AE700
TYP
B8
AE700
TYP
C8
AE700
C5
4' - 0"
2'
0"
C6
C6
2'
0" 1' - 0" C7
C4
AE700
C8C9
C2
AE700
C3
C3
C3
C10
C10
C10
1. THE "ARCHITECTURAL SCOPE OF WORK" LINES SHOWN ON THE ARCHITECT'S
REFLECTED CEILING PLANS APPLY ONLY TO THE LIMITS OF THE
ARCHITECTURAL NEW CONSTRUCTION AND RENOVATION. SEE OTHER
DISCIPLINES' DRAWINGS FOR THE LIMITS OF RENOVATION PERTAINING TO EACH
DISCIPLINE.
2. CEILING C-1 TO BE SUSPENDED GYPSUM WALLBOARD CEILING, PAINTED P-1.
PAINT P-1 TO MATCH EXISTING PAINT USED FOR GYPSUM WALLBOARD
CEILINGS.
3. ACCESS PANEL BASIS OF DESIGN - ACUDOR ADWT-2424 W/ ALLEN HEAD SCREW
LOCKS, STAINLESS STEEL CONSTRUCTION, PIANO HINGE.
4. ALL CEILING HEIGHTS MUST MEET CODE MINIMUMS FOR VARYING SPACE
TYPES. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY
FIELD DISCREPANCY WHERE THE INDICATED CEILING HEIGHT CAN NOT BE
MAINTAINED.
5. SPRINKLER HEADS ARE NOT INDICATED ON THE REFLECTED CEILING PLANS.
SPRINKLER HEADS TO ALIGN WITH EACH OTHER IN BOTH NORTH/SOUTH AND
EAST/WEST DIRECTIONS WHERE THEY OCCUR IN A SINGLE SPACE. THE
CONTRACTOR SHALL INSTALL REQUIRED SPRINKLER HEADS IN ALL SPACES TO
PROVIDE (100%) COVERAGE AS DEFINED IN NFPA. REFER TO FIRE PROTECTION
DRAWINGS FOR LOCATIONS OF THE SPRINKLER HEADS.
6. THE CONTRACTOR SHALL INSTALL ALL CEILING DEVICES TO ALIGN WITH EACH
OTHER IN BOTH NORTH/SOUTH AND EAST/WEST DIRECTIONS AS PRACTICAL
WHERE THEY OCCUR IN A SINGLE SPACE.
7. NEITHER SPRINKLER HEADS NOR CONCEALED SPRINKLER HEAD COVERS
SHALL BE PAINTED. THE CONTRACTOR SHALL INSPECT ALL INSTALLED
SPRINKLER HEADS AND REMOVE ANY SPRINKLER HEADS ACCIDENTALLY
PAINTED DURING CONSTRUCTION AND REPLACED WITH NEW SPRINKLER
HEADS.
8. THE CONTRACTOR SHALL COORDINATE WITH ALL TRADES AND INCLUDE
ACCESS PANELS OF APPROPRIATE SIZE AND TYPE IN ALL NON-ACCESSIBLE
CEILINGS AND SOFFITS WHERE ACCESS FOR UTILITIES AND BUILDING SERVICES
ARE REQUIRED.
9. EXIT SIGN REQUIREMENTS:
a. EXITS SIGNS SHALL BE READILY VISIBLE FROM ANY DIRECTION OF TRAVEL.
b. PROVIDE EXIT SIGNS TO CLEARLY INDICATE THE DIRECTION OF EGRESS
TRAVEL IN CASES WHERE THE EXIT OR THE PATH OF EGRESS TRAVEL IS
NOT IMMEDIATELY VISIBLE TO THE OCCUPANTS.
c. INTERVENING MEANS OF EGRESS DOORS WITHIN EXITS SHALL BE MARKED
BY EXIT SIGNS.
d. EXIT SIGN PLACEMENT SHALL BE SUCH THAT NO POINT IN AN EXIT ACCESS
CORRIDOR OR EXIT PASSAGEWAY IS MORE THAN 100' OR THE "LISTED
VIEWING DISTANCE" FOR THE SIGN, WHICHEVER IS LESS, FROM THE
NEAREST VISIBLE EXIT SIGN.
e. EXIT SIGNS SHALL BE CENTERED OVER DOORS AND CORRIDORS.
10'-6" C-1 /P-12
GYPSUM WALLBOARD CEILING
24" x 24" LIGHT FIXTURE
24" x 48" LIGHT FIXTURE
24" x 24" RETURN GRILLE
24" x 24" SUPPLY DIFFUSER
CEILING TYPE & FINISH DESIGNATION -
SEE GENERAL NOTES FOR FINISHES
24" x 24" ACCESS PANEL -
SEE GENERAL NOTES FOR BASIS OF DESIGN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE STERILE PROCESSING
TO MEET TEMP & HUMIDITY
Dwight D. Eisenhower Medical Center
589-C92284
09/01/2020 AMG401 N. Front St., Suite 380 Columbus, OH 43215
C P ro je c t
P a th \R e v it -2
\6
C e n tr a l_ a g ra n t.
rv t
/1
/2
:5
:4
A
M
AE102
REFLECTED CEILING PLAN - FIRST
FLOOR
1/4" = 1'-0" F1
REFLECTED CEILING PLAN - FIRST FLOOR
N
REFLECTED CEILING PLAN KEYNOTES
C1 NEW ADDITIONAL RETURN - LOCATE WITHIN EXISTING CEILING GRID.
C2 NEW ADDITIONAL SUPPLY - LOCATE WITHIN EXISTING CEILING GRID.
C3 EXISTING CEILING, LIGHT FIXTURES, DIFFUSERS, & DEVICES TO REMAIN.
C4 REWORK CEILING GRID AS NEEDED TO ACCOMMODATE NEW PARTITION.
RELOCATE ANY LIGHT FIXTURES, DIFFUSERS, OR DEVICES THAT CONFLICT WITH
NEW PARTITIONS.
C5 PATCH & SEAL ALL OPENINGS AROUND COLUMN ENCLOSURE ABOVE FINISHED
CEILING.
C6 "CLARITY" AUDIO SYSTEM - VERIFY EXACT LOCATION WITH OWNER.
C7 IN SHADED AREA, PATCH & REPAIR ALL OPENINGS IN DECK ABOVE WITH 5/8"
GYPSUM WALLBOARD. SEAL ALL PIPE PENETRATIONS THROUGH DECK ABOVE.
C8 INFILL OPENING IN EXTERIOR WALL WHERE FAN WAS REMOVED - SEE DETAIL.
C9 NEW OPENING IN EXTERIOR WALL FOR DUCT - SEE DETAIL & SEE MECHANICAL.
VERIFY LOCATION WITH HVAC CONTRACTOR.
C10 REMOVE CEILING TILES AS NEEDED TO PERFORM ABOVE CEILING WORK.
REPLACE TILES WHEN WORK IS COMPLETE.
1/4" = 1'-0"
Revisions: Date:
License # 115355License # 115355License # 115355License dheiserdheiserdheiser
George ShmidheiserGeorge ShmidheiserGeorge Shmidheiser
TYPICAL NON-STRUCTURAL METAL
FRAMING NOTES
5/8" TYPE X GYPSUM WALLBOARD
CARRY WALLBOARD TO
UNDERSIDE OF STRUCTURAL
SYSTEM ABOVE AND SEAL TIGHT
FASTEN DEFLECTION TRACK TO
FLOOR/ROOF DECK ABOVE AS REQUIRED BY
SPECIFICATIONS
FINISHED CEILING
SEALANT
UNFINISHED FLOOR SLAB
3 5/8" METAL STUDS @ 16" O.C. MAX.
3 5/8" METAL RUNNER
SEALANT
5/8" TYPE X GYPSUM WALLBOARD
DOUBLE
STUDS
ABOVE CEILING
OPENING
WALL MOUNTED EQUIPMENT.
SEE MOUNTING DETAIL TYPE B
LESS THAN 4'-0" 10'-0" MAX. LESS THAN 4'-0" 10'-0" MAX. 10'-0" MAX.
10'-0" MAX
20 GA BOTTOM
TRACK
20 GA MTL TOP
TRACK
UNDERSIDE OF
SLAB, FLOOR OR
ROOF DECK
2" WIDE 22 GA
METAL STRAP
1. NON-STRUCTURAL METAL FRAMING SHALL COMPLY WITH THE FOLLOWING:
1a. FOR HEIGHTS UP TO AND INCLUDING 14'-0" USE 20 GA (0.0296 INCH THICK)
AT 16" O.C.
1b. FOR HEIGHTS ABOVE 14'-0", USE 18 GA (0.0428 INCH THICK) AT 16" O.C.
2. ANY DEVIATION FROM THE DETAILS, GUAGE, AND STUD THICKNESS
INDICATED, THE CONTRACTOR SHALL SUBMIT PROJECT SPECIFIC
MANUFACTURER ENGINEERED SHOP DRAWINGS FOR THE ARCHITECT TO
REVIEW.
3. ALL DOUBLE STUDS AT SIDES OF OPENING SHALL EXTEND TO UNDERSIDE OF
SLAB OR ROOF DECK.
4. IN NO CASE SHALL DOUBLE STUDS AT SIDES OF OPENING BE CUT FOR
DUCTWORK OR OTHER MECHANICAL SYSTEMS.
BASE CABINETS
SEE MOUNTING DETAIL TYPE A
EQUIPMENT. SEE
MOUNTING DETAIL TYPE B
HAND RAIL SEE
MOUNTING DETAIL
TYPE B
CRASH RAIL SEE
MOUNTING DETAIL
TYPE A
WALL MOUNTED CABINETS.
SEE MOUNTING DETAIL TYPE A
WALL MOUNTED
ACCESSORIES
SEE MOUNTING
DETAIL TYPE B
01 03
01 03
03 0 6 0
6'-0" MAX.
VERTICAL BUMPER GUARD
SEE MOUNTING DETAIL
TYPE B
DOUBLE DOOR/CORRIDOR OPENING BELOW CEILING
OPENING
BELOW CEILING LARGE
OPENING
ABOVE CEILING
LARGE OPENING
ABOVE AND BELOW CEILING
COMBINATION OPENINIG
LESS THAN 4'-0"
C E
IL
IN
G
B E
LO
W
C E
IL
IN
G
A B
O V
E
THAN 2'-0"
LESS
ABOVE CEILING
OPENING
DOOR OPENING
DOUBLE
STUDS
DOUBLE
STUDS
DOUBLE
STUDS
DOUBLE
STUDS
DOUBLE
STUDS
DOUBLE 20 GA METAL STUDS
AT BOTH JAMBS
20 GA METAL
TRACK
20 GA METAL
TRACK
20 GA METAL TRACK
1"X 25 GA METAL STRAP
PLATES AT 3'-6" OC EA SIDE
DOUBLE 18 GA METAL STUDS
AT BOTH JAMBS
CLIP ANGLE 20 GA X 1
1/2" X 1 1/2" X 3" FOR 3
5/8" STUDS AND 5" FOR
6" STUDS
01 JAMB DETAIL 05 HEAD DETAIL FOR STACKED OPENINGS 06 HEAD DETAIL FOR OPENING EQUAL OR GREATER THAN 4'-0"03 JAMB DETAIL FOR OPENING EQUAL OR GREATER THAN 4'-0" 04 OPENING HEAD DETAIL
20 GA METAL STUD
CLIP ANGLE 20 GA X 1 1/2" X
1 1/2" X 3" FOR 3 5/8" STUDS
AND 5" FOR 6" STUDS, OR
FOLD WEB TO FORM
ATTACHMENT FLANGE
20 GA METAL TRACK
CLIP ANGLE 20 GA X 1 1/2" X
1 1/2" X 3" FOR 3 5/8" STUDS
AND 5" FOR 6" STUDS, OR
FOLD WEB TO FORM
ATTACHMENT FLANGE
CLIP ANGLE 20 GA X 1 1/2"
X 1 1/2" X 3" FOR 3 5/8"
STUDS AND 5" FOR 6"
STUDS
CLIP ANGLE 20 GA X 1 1/2"
X 1 1/2" X 3" FOR 3 5/8"
STUDS AND 5" FOR 6"
STUDS
20 GA 3 5/8"
SPOT WELDED
BOX BEAM
HEADER
20 GA METAL STUD
20 GA METAL STUDS AT BOTH
SIDES OF OPENING
20 GA METAL
TRACK
CLIP ANGLE 20 GA X 1 1/2" X 1 1/2" X
3" FOR 3 5/8" STUDS AND 5" FOR 6"
STUDS, OR FOLD WEB TO FORM
ATTACHMENT FLANGE
02 JAMB DETAIL FOR OPENING LESS THAN 2'0"
20 GA METAL TRACK
07 OPENING SILL DETAIL
20 GA METAL STUD
20 GA METAL TRACK
CLIP ANGLE 20 GA X 1 1/2" X
1 1/2" X 3" FOR 3 5/8" STUDS
AND 5" FOR 6" STUDS, OR
FOLD WEB TO FORM
ATTACHMENT FLANGE
20 GA METAL TRACK
BOX BEAM HEADER
2x FIRE RETARDANT TREATED
WOOD - VERIFY ROUGH OPENING
WITH DOOR MANUFACTURER
ALUMINUM DOOR TRACK & HOUSING
FINISHED FLOOR
"TRACKLESS" SILL
1/4" SHIM
ALUMINUM "Z" REVEAL MOULDING
5/8" GYPSUM WALLBOARD EACH SIDE
ON 3-5/8" METAL STUDS
TELESCOPING DOOR PANELS
LINE OF HEAD ASSEMBLY ABOVE
16 GA JAMB STUD FULL HEIGHT
2x FIRE RETARDANT TREATED
WOOD - VERIFY ROUGH OPENING
WITH DOOR MANUFACTURER
TELESCOPING DOOR PANELS
ALUMINUM JAMB ASSEMBLY
ALUMINUM "Z" REVEAL MOULDING
1/4" SHIM
5/8" GYPSUM WALLBOARD EACH
SIDE ON 3-5/8" METAL STUDS
RUNNER (8" MAX)
1/4 LENGTH OF
EXISTING PARTITION
CONTINUOUS WALL CHANNEL WITH #6 SCREW
SECURED TO EACH STUD
HEAVY-DUTY GWB MAIN RUNNER @ 4'-0" OC & HEAVY-
DUTY GWB CROSS 'T' @ 2'-0" OC - FASTEN TO WALL
CHANNEL WITH 1/8" POP RIVETS
DRYWALL ATTACHMENT CLIP PER MANUFACTURER
5/8" GYPSUM WALLBOARD
EXISTING PARTITION
CONTINUOUS WALL CHANNEL WITH #6
SCREW SECURED TO EACH STUD
HEAVY-DUTY GWB MAIN RUNNER @ 4'-0" OC &
HEAVY-DUTY GWB CROSS 'T' @ 2'-0" OC - FASTEN
TO WALL CHANNEL WITH 1/8" POP RIVETS
DRYWALL ATTACHMENT CLIP PER
MANUFACTURER
5/8" GYPSUM WALLBOARD - EXTEND PAST
EXISTING STAINLESS STEEL SHROUD
BRACE TO EXISTING PARTITION AS
NEEDED - AVOID EXISTING PIPES & DUCTS
3-5/8" METAL STUDS AT 16" OC
PIPING & DUCTS
TIGHT TO EXISTING
EXISTING EXTERIOR
WALL - VERIFY
COMPOSITION FOR INFILL
BRICK INFILL TO MATCH
EXISTING
8" x 8" x 16" CMU INFILL
BRICK TIES TO CMU AT
16" OC
EXISTING EXTERIOR
WALL - VERIFY
COMPOSITION FOR INFILL
5/8" GYPSUM WALLBOARD ON
METAL STUDS WITH BATT
INSULATION (IF FURRING
EXISTS)
EXISTING FURRING PARTITION -
VERIFY IN FIELD
EXISTING FURRING PARTITION -
VERIFY IN FIELD
EXISTING EXTERIOR
WALL
EXISTING BRICK TIES
TO CMU
EXISTING FURRING
PARTITION - VERIFY
IN FIELD
S E
E M
E C
H A
N
IC
A L
FO
R
O P
E N
IN
G
S
IZ
E
BOX BEAM HEADER
METAL STUD TRACK
NEW DUCT - SEE
MECHANICAL
STEEL ANGLE LINTEL -
SEE STRUCTURAL
SEALANT
SEALANT
SEALANT
SEALANT
WEEP HOLES
METAL FLASHING STEEL ANGLE LINTEL -
SEE STRUCTURAL
Projec…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .