P09 CLC Accessible Route Detail.pdf

PDF 773 KB Posted

Attached to
Z1DA--542-24-108 | Install New CLC Accessible Route Phase 1 | NCO 4 Construction East
Solicitation number
36C24425B0022
Issued by

About this file

The image depicts a hand-drawn project timeline or schedule diagram for a procurement process at a "New Accessible Point" location. The diagram tracks key milestones from event/onboarding through various stages including a minimum viable product (MVP) stage, cleaning and handling processes, and final deployment. The timeline includes specific date markers for May 20 and May 26, with annotations indicating different project phases and transition points. The document appears to be a project planning or scheduling visualization, likely related to a federal contract or government procurement initiative, showing the progression of a project from initial stages to implementation.

View the file

Other files

File Type Posted
36C24425B0022.docx DOCX document
Drawing CS-1.03 Civil Utility Plan.pdf PDF
36C24425B0022_002.docx DOCX document
Install CLC Acc Rte-Site Visit-VHACOAHILTED_08252025_123538.pdf PDF
36C24425B0022 0001.pdf PDF
Standard Details.pdf PDF
P09 CLC Accessible Route Part Plan.pdf PDF
36C24425B0022_1.docx DOCX document
CLC Accessible Route Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .