This document provides details for a federal construction contract opportunity issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The solicitation number is 36C25523R0084_1 and seeks to construct a Primary Care and Women's Health Building, Project #657-503. Interested parties should review the attached final construction drawings, comprising 39 pages, for specifications and requirements. The opportunity type is listed as a solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CG101
GRADING PLAN
N
0 6030
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CG102
GRADING PLAN
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CG103
GRADING PLAN
AMVETS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CU101
UTILITY OVERALL LAYOUT PLAN
0 12060
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CU102
UTILITY PLAN
0 12060
0 2010
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CU103
UTILITY PLAN
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CU201
SANITARY PLAN AND PROFILE
0 4020
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CU202
SANITARY PLAN AND PROFILE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CU203
SANITARY PLAN AND PROFILE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CU204
WATER SERVICE PLAN AND PROFILE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CU501
UTILITY DETAILS
CJ101
EROSION CONTROL PLAN
N
0 6030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CJ102
EROSION CONTROL PLAN
N
0 6030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
CJ501
EROSION CONTROL DETAILS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
LP101
LANDSCAPE PLAN
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
LP102
LANDSCAPE PLAN
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 W. MAIN STREET, MARION, IL
657-503
2021-06-30 SLP DSMRevisions: Date:
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
CONSTRUCTION DOCUMENTS
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t 6
1221 N PENNSYLVANIA ST. INDIANAPOLIS, IN 46202
317.800.6388 WWW.GUIDONDESIGN.COM
LP103
LANDSCAPE DETAILS
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0509-0005
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30
STRUCTURAL
NOTES & ABBREVIATIONS
S-001
DSWC
ABCDEF C.5
C.6
C.7
C.26
2.5
3.5
1.6
4.2
B.3
F17
F7 F7 F6 F7 F6 F6 F6
F9
F6
F6 F5
F5 F5
F11
F5
F11
F5
F7 F5
F5
F5
F12
F17F17
F6F6F6 F7
F6 F7F7
F9
F9
F7
F6
F7
F14
F16
F16
F11
F14
F14
F14
F14
F11
F16
F16
F14
F11
F14
F14
F14
F11
F11
F5
F24
F24
F5
F9
F17
P1C P1A P1A P1A P1A P1A P1B
P2A P2A
P1A
P1A
P1A P1B
P1A P1A
P1A
P1A
P1A P1B
P1A
P1A
P2A
P1BP1AP1AP1AP1AP1AP1C
P2 P3P3P3P3P4P1D
P4P4P4P4P4P4 P1A
P4P4P4P4P4P4 P1A
P2 P3P3P3P3P3P1D
P1A
/2
/2
/2
/8
/8
/2
32' - 1 3/8" 21' - 2 5/8" 21' - 2 1/2" 21' - 2 1/2" 21' - 2 1/2" 10' - 7 1/4" 36' - 0" 12' - 0"
[95' - 0"] [95' - 0"] [95' - 0"]
[95' - 0"] [95' - 0"] [95' - 0"] [95' - 0"]
[94' - 4"] [94' - 4"]
[95' - 0"]
[95' - 0"]
[95' - 0"]
[95' - 0"] [95' - 0"]
[95' - 0"]
[95' - 0"]
[94' - 8"]
[95' - 0"]
[94' - 8"]
[95' - 0"]
[95' - 0"]
[95' - 0"]
[95' - 0"]
[94' - 4"][94' - 4"]
[95' - 0"] [95' - 0"]
[95' - 0"]
[95' - 0"][95' - 0"] [95' - 0"]
[95' - 0"]
[95' - 0"]
[95' - 0"]
[95' - 0"] [94' - 8"] [94' - 8"] [94' - 8"] [94' - 8"] [94' - 8"]
[95' - 0"]
[93' - 8"] [94' - 4"] [94' - 8"]
[94' - 8"] [94' - 4"]
[94' - 4"]
[94' - 8"] [94' - 4"]
[94' - 8"] [93' - 8"]
[95' - 0"][95' - 0"][95' - 0"] [94' - 8"][94' - 8"]
[95' - 0"]
[95' - 0"]
[95' - 0"]
[95' - 0"]
[95' - 0"]
PERIMETER FND WALL
& FTG (TYP)
PIER & FTG (TYP)
P1A
SOG
2.1
S-502
DOOR
S-502
DOOR
S-502
TYP
E.5
4.1
3.6
5.1
SOG
P1A
P1A
P1A
P2A
S-502
S-502
S-502
S-502
DOOR
S-502
(-1'-10")
(-1'-10")
(-1'-10") (-1'-10")
(-1'-10")
(-1'-10")
(-1'-10")(-1'-10")
S-502
S-502
DOOR
S-502
DOOR
S-502
TYP
S-502
DOOR
S-502
TYP
/8
S-502
DOOR
S-502
DOOR
S-502
DOOR
/2
2' - 1" 2' - 1"
0' - 10 1/2"
/2
/2
1' - 3"
1' - 3"
1' - 3"
1' - 3" 1' - 3" 1' - 3 1/2"
/2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
TRUE
NORTH
KEYPLAN
/3
/2
:1
:4
P
M
SF101
STRUCTURAL
FOUNDATION PLAN
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30 WC DS0509-0005
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1 PLAN - FOUNDATION
1. FOR GENERAL NOTES SEE DRAWING S-001.
2. TOP OF SLAB ELEVATION = 100'-0" (FINISH FLOOR ELEVATION +100'-00"),
UNLESS NOTED OTHERWISE AS [XX'-X"] FROM 0'-0".
3. BOTTOM OF FOOTING ELEVATION = [XX'-XX"] FROM 0'-0" AS NOTED ON
DRAWING.
4. TOP OF PIER ELEVATION = 98'-8" UNLESS NOTED OTHERWISE AS (XXX'-
XX") FROM 0'-0".
5. TOP OF GRADE BEAM ELEVATION = 98'-8" UNLESS NOTED OTHERWISE AS
(XXX'-XX") FROM 0'-0".
6. "SOG" DENOTES 5" CONCRETE SLAB-ON-GRADE REINFORCED WITH 6x6-
W2.9xW2.9 WWR ON VAPOR RETARDER AND 6" POROUS FILL.
7. COORDINATE ALL SLEEVES, PENETRATIONS, AND DEPRESSIONS WITH
ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS.
8. COORDINATE SIZE AND LOCATION OF EQUIPMENT AND SLAB OPENINGS WITH
ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS.
9. REFER TO S-701 FOR COLUMN SCHEDULE.
GENERAL SHEET NOTES:
Revisions: Date:
F
C A
PF
PF
ABCDEF C.5
C.6
C.7
C.26
2.5
3.5
S-201
1.6
4.2
S-203
S-204
S-202
S-202
S-203
S-201
B.3
S-204
HSS BRACE FRAMING;
SEE S-200 SERIES DWGS
(TYP)
/2
/2
/2
/8
/8
/2
32' - 1 3/8" 21' - 2 5/8" 21' - 2 1/2" 21' - 2 1/2" 21' - 2 1/2" 10' - 7 1/4" 36' - 0" 12' - 0"
S-201
S-202
S-204
S-203
2.1
HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2
HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2
HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2
HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2 HSS5X5X1/2
HSS9X5X5/8 HSS9X5X5/8
HSS9X5X5/8 HSS9X5X5/8
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/2
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/2
E.5
4.1 4.1
3.6
5.1
HSS
S-203
S-203
S-203
S-203
H S
S X
X
/2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
TRUE
NORTH
KEYPLAN
/1
/2
:1
:2
A M
SF111
STRUCTURAL
FRAMING PLAN
1ST FLOOR
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30 WC DS0509-0005
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1
PLAN - 1ST FLOOR
GENERAL SHEET NOTES:
1. FOR GENERAL NOTES SEE DRAWING S-001.
2. TOP OF SLAB ELEVATION = 100'-0", UNLESS NOTED OTHERWISE AS (X'-X") FROM
100'-0".
3. COORDINATE ALL SLEEVES AND PENETRATIONS WITH ARCHITECTURAL, MECHANICAL,
ELECTRICAL, AND PLUMBING DRAWINGS.
4. REFER TO S-701 FOR COLUMN SCHEDULE.
5. REFER TO S-200 SERIES DRAWINGS FOR BRACE FRAME ELEVATIONS.
Revisions: Date:
F
C A
ABCDEF C.5
C.6
C.7
C.26
2.5
3.5
1.6
4.2
COLUMN BELOW;
SEE COLUMN SCHEDULE
S-701 (TYP)
D1
D1
SCREEN WALL; REFER
TO ARCH DWGS
S-501
SIM
S-501
TYP
S-501
TYP
B.3
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W10X26 W10X26
W12X45 W12X45
W12X45 W12X45
W12X45 W12X45
W12X45 W12X45
W12X45 W12X45
W12X45 W12X45
W12X45 W12X45
W10X26 W10X26
W12X45 W12X45
W18X46
28K10
28K10
W21X68
28K10
28K10
28K10
28K10
28K10
28K10
28K10
28K10
28K10
28K10
28K10
28K10
28K10
28K10
W21X68
28K10
28K10
28K10
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W18X46
W10X26 W10X26 W10X26 W10X26 W10X26
W10X26 W10X26 W10X26 W10X26 W10X26
W10X26 W10X26 W10X26 W10X26 W10X26
W10X26 W10X26 W10X26 W10X26 W10X26
W10X26 W10X26 W10X26 W10X26 W10X26
W10X26 W10X26 W10X26 W10X26 W10X26
W10X26 W10X26 W10X26 W10X26 W10X26
W10X26 W10X26 W10X26 W10X26 W10X26
W10X26 W10X26 W10X26
W10X26 W10X26 W10X26
W10X26 W10X26 W10X26
W10X26 W10X26 W10X26
W10X26 W10X26 W10X26
W10X26 W10X26 W10X26
W10X26 W10X26 W10X26
W10X26 W10X26 W10X26
W10X26 W10X26 W10X26
W10X26 W10X26 W10X26 W10X26 W10X26
W10X26 W10X26 W10X26
W10X26
W10X26
W10X26
W10X26
W10X26
W10X26
W10X19
W10X19
W10X19
W10X19
W10X19
W10X19
W10X19
W10X19
W10X19
W10X19
W10X19
W10X19
W14X48 W14X48 W14X48W14X48
W14X48 W14X48 W14X48
W14X48
W14X48 W14X48 W14X48W14X48
W14X48 W14X48 W14X48W14X48
W14X48 W14X48 W14X48W14X48
W14X48 W14X48 W14X48W14X48
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
PANEL WALL POST &
BRACING; SEE S-540 (TYP)
W21X44
SCREEN WALL POST & BRACING;
SEE S-540 (TYP)
W X
W X
W X
W X
W21X68
W21X68
W21X68
W21X68
28K10
W21X68
W21X68
W21X68
/2
/4
/8
/8
/8
/2
32' - 1 3/8" 21' - 2 5/8" 21' - 2 1/2" 21' - 2 1/2" 21' - 2 1/2" 10' - 7 1/4" 36' - 0" 12' - 0"
MECH UNIT DESIGN LOAD AT 3300
LBS EA; REFER TO MECH DWGS
ROOF PENETRATION;
REFER TO MECH DWGS
FOR SIZE AND LOCATION
AND SEE S-530 (TYP)
W X
W X
W X
W X
RD; REFER TO PLUMB DWGS
FOR SIZE AND LOCATION (TYP)
W X
0 W8X10
W X
W X
W8X10
W X
W X
W8X10
W X
W X
0 W8X10
W X
W X
W8X10
W X
W8X10
W X
W8X10
W X
W8X10
W X
W X
W X
W X
W X
W X
0W12X40
W12X45
W X
W X
W X
W X
W X
W X
0W12X40 W12X45
W X
W X
W10X19
MECH EQUIPMENT DESIGN LOAD
950 LBS; REFER TO MECH DWGS
(TYP)
W X
W X
W X
W X
W10X19
W10X19
S-501
SIM
D1
D1
D1
HSS BRACING BELOW (TYP); SEE
SF111 AND S-200 SERIES DWGS
MECH PIPE PENETRATIONS;
REFER TO MECH DWGS FOR
SIZE AND LOCATION (TYP)
2.1
S-501
S-501
W X
W X
W X
E.5
4.1
REFER TO MECH DWGS
FOR EQUIP CLEARANCE
(TYP)
7' - 5" 7' - 7" 7'-7"*
MECH EQUIPMENT DESIGN LOAD
60 LBS; REFER TO MECH DWGS
(TYP)
MECH EQUIPMENT DESIGN LOAD
950 LBS; REFER TO MECH DWGS
(TYP)
MECH EQUIPMENT DESIGN LOAD
3325 LBS; REFER TO MECH DWGS
(TYP)
W X
W X
W12X40
W10X19
RD; REFER TO PLUMB DWGS
FOR SIZE AND LOCATION
(TYP)
S-501
TYP
3.6
5.1
S-501
TYP
EQ. EQ. EQ.
6' - 0"
6' - 0"
E Q
E Q
EQ. EQ. EQ.
EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ.
/4
/4
9' - 0" 9' - 0" 9' - 0" 9' - 0"
S-540
TYP
TYP
9' - 0"
S-540
TYP
28K10
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
W X
HORIZONTAL
BRACING (TYP)
.2 K
.9 K
K
K
.2 K
.2 K
K
K
.2 K
K
.2 K
K
.9 K
.1 K
.1 K
.1 K
.1 K
.1 K
.2 K
.1 K
.2 K
K
.2 K
K
.2 K
.2 K
.2 K
.2 K
.2 K
.2 K
.1 K
.1 K
.7 K
.7 K
.9 K
.1 K
.9 K
.1 K
.9 K
.9 K
.7 K
.7 K
K
K
K
K
.7 K
.7 K
.8 K
.8 K
S-501
SIM
D1
W X
ROOF HATCH; REFER
TO ARCH DWGS
S-540
@ ENDS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
TRUE
NORTH
KEYPLAN
/3
/2
:1
:5
P
M
SF121
STRUCTURAL
FRAMING PLAN
ROOF
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30 WC DS0509-0005
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1 FRAMING PLAN - ROOF
GENERAL SHEET NOTES:
1. FOR GENERAL NOTES SEE DRAWING S-001.
2. TOP OF STEEL ELEVATION = XX'-X" AS NOTED ON DRAWINGS. REFER TO
ARCHITECTURAL DRAWINGS FOR INFORMATIION NOT SHOWN.
3. "D1" - DENOTES 3"- 16 GAGE METAL ROOF DECK.
4. WHERE SPACING BETWEEN BEAMS IS NOT INDICATED, BEAMS ARE INTENDED TO BE
EQUALLY SPACED BETWEEN SUPPORTS, UNLESS NOTED OTHERWISE.
5. COORDINATE ALL SLEEVES AND PENETRATIONS WITH ARCHITECTURAL, MECHANICAL,
ELECTRICAL, AND PLUMBING DRAWINGS.
6. CORRDINATE SIZE AND LOCATION OF EQUIPMENT AND OPENINGS WITH ARCHITECTURAL,
MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS.
7. REFER TO S-701 FOR COLUMN SCHEDULE.
8. [E-XXX.X K] DENOTES THE BLAST REACTION AT THE END OF THE BEAM.
9. SEE GENERAL NOTES FOR THE DETAIL OF THE BLAST LOAD.
Revisions: Date:
F
C A
CDE C.5 B.3
H S
S X X /2
H S
S X X /2
H S S X X /2
H S S
X X /2
H S S X X /2
H S S X X /2
H S S X X /2
H S S X X /2
K)
K)
K)
K)
54K)
54K)
54K)
54K)
C DC.5B.3
H S S X X /2
H S S X X /2
H S S X X /2
H S S X X /2 H
S S X X /2
H S S
X X /2
K)
54K) (±
K)
54K) (±
K)
54K)
S-203
S-203
S-203
CDE C.5 B.3
H S
S X X /2
H S
S X X /2
H S S X X /2
H S S
X X /2
H S S X X /2
H S S X X /2 H
S S X X /2
H S S X X /2
K)
54K) (±
K)
54K) (±
K)
54K) (±
K)
54K)
S-203
S-203
S-203
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/3
/2
:1
:3
P
M
S-201
STRUCTURAL
BRACE FRAME ELEVATIONS
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30 WC DS0509-0005
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/16" = 1'-0"1
BRACE FRAME ELEVATION - COLUMN LINE 5
SCALE: 3/16" = 1'-0"2
BRACE FRAME ELEVATION - COLUMN LINE 4.2
SCALE: 3/16" = 1'-0"3
BRACE FRAME ELEVATION - COLUMN LINE 3
1. FOR GENERAL NOTES SEE DRAWING S-001.
2. (± XXX) DENOTES ASD AXIAL LOAD. + = TENSION, - = COMPRESSION.
3. (- XXX) DENOTES LRFD AXIAL LOAD.
4. SEE S-501 AND S-550 SERIES DRAWINGS FOR TYPICAL BRACING DETAILS.
GENERAL SHEET NOTES:
Revisions: Date:
CDE C.5 B.3
S
S X X /2
H S
S X X /2
H S S X X /2
H S S
X X /2
H S
S X
X
/2
H S S 5X
5X 1/2
K)
54K)
K)
54K)
K
54K)
10' - 8 1/8" 10' - 7 3/8" 8' - 4"
AB
H S S 9X
5X 5/
8 H S S 9X
5X 5/8
(±111K) 135K)
1K
5K
18' - 0 3/8"
A B
H S S 9X
5X 5/
8 H S S 9X
5X 5/8
4K
5K ) (-135K)
(±114K)
17' - 11 5/8"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/3
/2
:1
:3
P
M
S-202
STRUCTURAL
BRACE FRAME ELEVATIONS
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30 WC DS0509-0005
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/16" = 1'-0"1
BRACE FRAME ELEVATION - COLUMN LINE 2
SCALE: 3/16" = 1'-0"2
BRACE FRAME ELEVATION - COLUMN LINE C.6
SCALE: 3/16" = 1'-0"3
BRACE FRAME ELEVATION - COLUMN LINE C.7
GENERAL SHEET NOTES:
1. FOR GENERAL NOTES SEE DRAWING S-001.
2. (± XXX) DENOTES ASD AXIAL LOAD. + = TENSION, - = COMPRESSION.
3. (- XXX) DENOTES LRFD AXIAL LOAD.
4. SEE S-501 AND S-550 SERIES DRAWINGS FOR TYPICAL BRACING DETAILS.
5 4 3 2 14.2
S S X X /2
H S S X X /2
H S S X X /2
H S S X X /2 H
S S X X /2
H S S X X /2
4.1
K)
7.
7K
38K)
227.7K)
K)
4K
40K)
404K)
K)
7.
7K
38K)
227.7K)
4 3 24.2
H S S 9X
5X 5/
8 H S S 9X
5X 5/8
H S S 7X
5X 1/
2 H S S 7X
5X 1/2
4.1
K)
7.
9K
(±63K) (-229.8K)
K)
9.
8K
(±86K) (-227.9K)
FIRST FLOOR
100' - 0"
TOP OF CANOPY
114' - 6"
4 34.2
H S S 7X
5X 1/
2 H S S 7X
5X 1/2
4.1
K)
8K
(±77K)(-138K)
FIRST FLOOR
100' - 0"
TOP OF CANOPY
114' - 6"
4 34.2 4.1
K)
8.
1K
(±99K) (-118.1K)
H S S 9X
5X 5/
8 H S S 9X
5X 5/8
FIRST FLOOR
100' - 0"
TOP OF CANOPY
114' - 6"
4 34.2 4.1
H
SS
7X 5X
1/ 2 H
SS
7X5X1/2
K)
8.
1K
(±77K) (-118.1K)
FIRST FLOOR
100' - 0"
TOP OF CANOPY
114' - 6"
4 34.2 4.1
H S S 7X
5X 1/
2 H S S 7X
5X 1/2
K)
8.
1K
(±77K) (-118.1K)
FIRST FLOOR
100' - 0"
TOP OF CANOPY
114' - 6"
4 34.2 4.1
H S S 9X
5X 5/
8 H S S 9X
5X 5/8
4K
8.
1K
(±114K) (-118.1K)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/3
/2
:3
:4
P
M
S-203
STRUCTURAL
BRACE FRAME ELEVATIONS
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30 WC DS0509-0005
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/16" = 1'-0"1
BRACE FRAME ELEVATION - COLUMN LINE F
SCALE: 3/16" = 1'-0"2
BRACE FRAME ELEVATION - COLUMN LINE E
SCALE: 3/16" = 1'-0"3
BRACE FRAME ELEVATION - COLUMN LINE D
GENERAL SHEET NOTES:
SCALE: 3/16" = 1'-0"4
BRACE FRAME ELEVATION - COLUMN LINE C.5
SCALE: 3/16" = 1'-0"5
BRACE FRAME ELEVATION - COLUMN LINE C
SCALE: 3/16" = 1'-0"6
BRACE FRAME ELEVATION - COLUMN LINE B.3
SCALE: 3/16" = 1'-0"7
BRACE FRAME ELEVATION - COLUMN LINE B
1. FOR GENERAL NOTES SEE DRAWING S-001.
2. (± XXX) DENOTES ASD AXIAL LOAD. + = TENSION, - = COMPRESSION.
3. (- XXX) DENOTES LRFD AXIAL LOAD.
FIRST FLOOR
100' - 0"
TOP OF CANOPY
114' - 6"
432 2.5 3.51.6 6' - 10" 29' - 1" 5' - 9 3/4" 8' - 8 1/4"8' - 1 1/2"
H S
S X
X
/2
2.1 4.13.6
K
K )H
S S
X
X
/2
FIRST FLOOR
100' - 0"
TOP OF CANOPY
114' - 6"
H S
S X
X
/2 H
S S
X
X
/2
5.1
294.5K
64K
4.
5K
K
3/8" PLATE
BOTH SIDES;
SEE 10/S-5014' - 0" 4' - 0"
FIRST FLOOR
100' - 0"
TOP OF CANOPY
114' - 6"
32.5
H S S X X /2
H S S X X /2
K)
7.
4K
66K)
207.4K)
3/8" PLATE
BOTH SIDES;
SEE 10/S-501
4' - 0" 4' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/1
/2
:1
:2
A M
S-204
STRUCTURAL
BRACE FRAME ELEVATIONS
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30 WC DS0509-0005
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/16" = 1'-0"1
BRACE FRAME ELEVATION - COLUMN LINE C.26
SCALE: 3/16" = 1'-0"2
BRACE FRAME ELEVATION - COLUMN LINE A
SCALE: 3/16" = 1'-0"3
BRACE FRAME ELEVATION - COLUMN LINE A
GENERAL SHEET NOTES:
1. FOR GENERAL NOTES SEE DRAWING S-001.
2. (± XXX) DENOTES ASD AXIAL LOAD. + = TENSION, - = COMPRESSION.
3. (- XXX) DENOTES LRFD AXIAL LOAD.
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0509-0005
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30
STRUCTURAL
SECTIONS & DETAILS
S-501
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0509-0005
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30
STRUCTURAL
SECTIONS & DETAILS
S-502
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0509-0005
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30
STRUCTURAL
TYPICAL DETAILS
S-530
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0509-0005
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30
STRUCTURAL
TYPICAL STEEL DETAILS
S-540
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0509-0005
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30
STRUCTURAL
BASEPLATE DETAILS
S-550
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0509-0005
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30
STRUCTURAL
BASEPLATE DETAILS
S-551
FIRST FLOOR FIRST FLOOR
100' - 0" 100' - 0"
LOWER ROOF - TOP OF
PRECAST PANEL
LOWER ROOF - TOP OF
PRECAST PANEL
118' - 0" 118' - 0"
Column Locations
A-1 A-1.6 A-2.5 A-3 A-3.6 A-4.1 A-4.2 A-5.1 A-6 B-1 B-2 B-3 B-4.2 B-5 B-6 B.3-1 B.3-2 B.3-3 B.3-4.2 B.3-5 B.3-6 C-1 C-2 C-3 C-4.2 C-5 C-6 C.5-1 C.5-2 C.5-3
FIRST FLOOR FIRST FLOOR
100' - 0" 100' - 0"
LOWER ROOF - TOP OF
PRECAST PANEL
LOWER ROOF - TOP OF
PRECAST PANEL
118' - 0" 118' - 0"
Column Locations
C.5-4.2 C.5-5 C.5-6 C.26-1.6 C.26-2.1 C.26-2.5 C.26-3 C.26-3.5 C.26-3.6 C.26-4.1 D-1 D-2 D-3 D-4.2 D-5 D-6 E-1 E-2 E-3 E-4.2 E-5 E-6 F-1 F-2 F-3 F-4 F-4.2 F-5 F-6 A-C.6
FIRST FLOOR FIRST FLOOR
100' - 0" 100' - 0"
LOWER ROOF - TOP OF
PRECAST PANEL
LOWER ROOF - TOP OF
PRECAST PANEL
118' - 0" 118' - 0"
Column Locations
A-C.7 B-C.6 B-C.7
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
H S
S -1
/2 X
-1
/2 X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S -1
/2 X
-1
/2 X
/8
H S
S .5 x .5 x .3
H S
S .5 x .5 x .3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/1
/2
:0
:4
A M
S-701
STRUCTURAL
COLUMN SCHEDULE
CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30 WC DS0509-0005
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
BASEPLATE BP-2H
BP-1A BP-1A
BP-1A
BP-1A
BP-1A BP-1A BP-2B
BASEPLATE BP-1A BP-2 BP-1A BP-1A BP-1A BP-2 BP-1A BP-1 BP-2K BP-2G BP-1 BP-1A BP-2FBP-2 BP-3B BP-3B BP-2F
BASEPLATE BP-4 BP-3 BP-1A BP-3 BP-4 BP-3B BP-3 BP-1A BP-3A BP-4ABP-1A BP-2G BP-2E BP-2B BP-2C BP-2D BP-2D BP-1B BP-2C BP-2H
BP-2H BP-2H
BP-1A BP-2F BP-4 BP-4 BP-3 BP-1A BP-2F BP-4BP-2
BP-2J BP-1A BP-1A BP-1A BP-2J BP-1A
BP-1A
1. FOR GENERAL NOTES SEE DRAWING S-001.
2. FOR BASE PLATE INFORMATION SEE DRAWING S-550 AND S-551.
GENERAL SHEET NOTES:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0509-0005
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT PRIMARY CARE AND
WOMEN'S HEALTH BUILDING
2401 WEST MAIN ST., MARION, IL
657-503
Project Director
2021-06-30
STRUCTURAL
FOUNDATION SCHEDULES & DETAILS
S-702
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
INCANDESCENT WALL MOUNTED LIGHTING
INCANDESCENT SURFACE MOUNT LIGHTING
SURFACE MOUNTED FLUORESCENT
RECESSED FLUORESCENT
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
PENDANT LIGHT
ACCESS PANEL
EXIT LIGHTING
S
D
SPEAKER
SMOKE DETECTOR
INCANDESCENT RECESSED LIGHTING
A 9'-0"
CEILING TAG CEILING TYPE
FINISHED CEILING HEIGHT
REFER TO CEILING LEGEND FOR MORE
INFORMATION
EXTENT OF REVISION
REVISION SET
MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ATCH ATTACHMENT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BEV BEVEL
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL OR CHANNEL CELSIUS
C CONC CAST CONCRETE
C TO C CENTER TO CENTER
CAB CABINET
CB CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CLEANOUT
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST CONCRETE STONE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEG NEGATIVE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER…