Attachment 4 - Contractor Pricing Sheet.pdf

PDF 44 KB Posted

Attached to
Jacob Javits Federal Building Service Elevators Modernization Services Federal contract opportunity
Solicitation number
P02_2019)11485
Issued by
General Services Administration Public Buildings Service Region 2

About this file

This document includes a contractor pricing sheet and related federal contract opportunity notice for elevator modernization services. The contractor pricing sheet provides a work breakdown structure with line items for design services, equipment refurbishment and replacement, integration options, allowances for hazardous material abatement and hoistway repairs, and pricing terms including overhead, profit, and subtotals. The related federal contract opportunity notice indicates this is a pre-solicitation for professional services to modernize two service elevators at the Jacob Javits Federal Building in New York. The scope of work, specifications and 11 attachments provide additional details on the modernization project. Options listed include additional design-build services, integration of a regenerative drive system, replacement of switchboards F1 and F2, and allowances. A presolicitation site visit is scheduled for interested contractors.

View the file

Other files for this federal contract opportunity

Other files attached to Jacob Javits Federal Building Service Elevators Modernization Services, newest first.
File Type Posted
Attachment 1 - Division One.pdf PDF
FOB Service Elevators Modernization - DB SOW - Rev5.pdf PDF
Attachment 3 - General Elevator Requirements.pdf PDF
Attachment 2 - FOB Service Elevators As-Builts.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE:

Refer to Statement of Work and associated attachments for contract description and minimum performance requirements.

Line Item Description Qty Unit Price

1 Design Services

2 Hoist Machine Motors

3 Motor Drives

4 Controllers

5 Selectors

6 Governor

7 Safeties - Refurbish

8 Compensation Ropes

9 Hoist Ropes

10 Governor Rope

11 Governor Pit Sheave

12 Buffers - Refurbish

13 Car Frame & Platform (sling) - Refurbish

14 Guide Rails - Refurbish

15 Guide Shoe Assemblies

16 Counterweight - Refurbish

17 Hoistway Entrance Frame & Sills - Refurbish

18 Hoistway Door Tracks, Hangers, & Rollers

19 Hoistway Doors - Refurbish

20 Hoistway Door Closers & Inter-locks

21 Hoistway Wiring

22 Car Doors

23 Car Door Operator

24 Car Door Protective Device

25 Car Enclosures

26 Car Operating Panel

27 Car Position Indicator

28 Hall Push Button Fixtures

29 Hall Direction Lanterns

30 Lobby, Fire Command Center & Building Manager’s Office Control Panels

31 Fireman’s Service

32 Emergency Communication Device

33 Emergency Car Lighting

34 Traveling Cables

35 CCTV System

36 Security Operations and Features

37 Electrical & Emergency Power Operations

38 HVAC System

39 Machine Room Conditions

40 Pit and Hoistway Conditions

41 Mobilization

BASE CONTRACT TOTAL:

Profit

Overhead

Insurance

Bonds

Vendor Name:

Subtotal:

CONTRACT PRICING FORM

Agency: General Service Administration

Solicitation:

Location of Performance: 26 Federal Plaza - FOB

Description of Work: Two Service Elevators Modernization Services

Originating Office: 2PCM

BASE CONTRACT

Line Item Description Qty Unit Price

1 Hoist Machine Motors

2 Motor Drives

3 Controllers - Integration with base contract

4 Selectors

5 Governor

6 Safeties - Refurbish

7 Compensation Ropes

8 Hoist Ropes

9 Governor Rope

10 Governor Pit Sheave

11 Buffers - Refurbish

12 Car Frame & Platform (sling) - Refurbish

13 Guide Rails - Refurbish

14 Guide Shoe Assemblies

15 Counterweight - Refurbish

16 Hoistway Entrance Frame & Sills - Refurbish

17 Hoistway Door Tracks, Hangers, & Rollers

18 Hoistway Doors - Refurbish

19 Hoistway Door Closers & Inter-locks

20 Hoistway Wiring

21 Car Doors

22 Car Door Operator

23 Car Door Protective Device

24 Car Enclosures

25 Car Operating Panel

26 Car Position Indicator

27 Hall Push Button Fixtures - Integration with base contract

28 Hall Direction Lanterns - Integration with base contract

Lobby, Fire Command Center & Building Manager’s Office Control Panels -

Integration with base contract

30 Fireman’s Service - Interation with base contract

31 Emergency Communication Device

32 Emergency Car Lighting

33 Traveling Cables

34 CCTV System - Integration with base contract

35 Security Operations and Features - Integration with base contract

36 Electrical & Emergency Power Operations

37 Pit and Hoistway Conditions

Line Item Description Qty Unit Price

Furnish and Install PIV Card Readers inside service elevator cabs with integration to

PACS - price unit per cab

Furnish and Install PIV Card Readers at gorund floor, 2nd floor and 6th floor with integration to PACS

Furnish and install card readers in additional floors with integratinon to PACS - price unit per floor

5 Overhead

OPTION #2 TOTAL:

Overhead

OPTION #1 TOTAL:

OPTION #2 - Additional Security Operations and Features

Subtotal:

Profit

OPTION #1 - MODERNIZATION OF SERVICE ELEVATOR #44

Subtotal:

Profit

1 Additional design service to base contract

2 Regenerative Drive System - per service elevator

Line Item Description Qty Unit Price

1 Additional design service to base contract

2 Replacement of switchboards F1 and F2 - price unit per switchboard

Line Item Description Qty Unit Price

1 Additional design service to base contract

2 Installation of automatic sprinkler system in service elevator machine room

Line Item Description Qty Unit Price

1 Hazardous Material Probing and Testing

2 Hazardous Material Abatemenet - Asbestos

3 Patching/Repair Fireproofing

4 Hazardous Material Abatemenet - Thermal Insulation

5 New Thermal Insulation

$50,000.00

Overhead

Allowance #1 TOTAL:

Overhead

OPTION #4 TOTAL:

Allowance #1 - Hazardous Material Abatement Allowance ($50,000)

Subtotal:

Profit

OPTION #5 - Design-Build services for installation of automatic sprinkler system in service elevator machine room

Subtotal:

Profit

Overhead

OPTION #4 TOTAL:

Overhead

OPTION #3 TOTAL:

OPTION #4 - Design-Build services for replacement elevator switchboards “F1” and “F2”.

Subtotal:

Profit

OPTION #3 - Additional Design-Build services for integration of Regenerative Drive Systems.

Subtotal:

Profit

CMU Wall Patching / Repairs - to include removal / cleaning / preparation for new repair

2 Painting

$30,000.00

Allowance #2 - Hoistway Patching and Painting Allowance ($30,000)

Subtotal:

Profit

Overhead

Allowance #2 TOTAL:

File details come from the government source that posted it. Updated .