This is a Sources Sought notice for soil and sod materials required by Black Hills National Cemetery under the Department of Veterans Affairs National Cemetery Administration. The document seeks information from potential contractors regarding the availability and capability to supply the following materials: Concrete Sand, Road Base Gravel, Crushed Fines, 3/8" Clean Gravel Chips, Topsoil, and Fill Dirt. The sources sought is issued as a pre-solicitation notice to identify qualified vendors and gather market information prior to the formal solicitation process under Solicitation Number 36C78627Q50000.
The document serves as a market research tool to determine contractor interest and capability for these aggregate and soil materials before the government issues a competitive request for proposals or quotes. Potential contractors are encouraged to submit information demonstrating their ability to provide these materials in the required quantities and specifications. This pre-solicitation phase allows the Department of Veterans Affairs to refine requirements and establish a qualified vendor base for the upcoming formal procurement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE SUBMISSION OF PRICING, CAPABILITIES FOR PLANNING PURPOSES, AND OTHER MARKET INFORMATION IS HIGHLY ENCOURAGED AND ALLOWED UNDER THIS RFI IN ACCORDANCE WITH (IAW) FAR 15.201(e).
This is a SOURCES SOUGHT ANNOUNCEMENT ONLY.
It is neither a solicitation announcement nor a request for proposals or quotes and does not obligate the Government to award a contract. Requests for a solicitation will not receive a response. Responses to this sources sought must be in writing. The purpose of this sources sought announcement is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service- Disabled Veteran Owned Small Businesses and Veteran Owned Small Businesses interested and capable of providing the services described below. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company possesses the necessary functional area expertise and experience to compete for this acquisition.
The North American Classification System (NAICS) code for this acquisition is NAICS Code
212321– Construction Sand and Gravel Mining (500 employees)
**Responses to this notice shall include Sources Sought number “36C78627Q50000 Black Hills National Cemetery” in the subject line of the email no later than 5/22/2026 @ 4:00pm EST sent to April.Graves@va.gov
**The following shall be provided in the capabilities statement or in body of email:
1. Company name
1. Address
1. Point of contact
1. Phone, fax, and email
1. DUNS number/ UIE number
1. Type of Large or small business, e.g. Services Disabled Veteran Owned Small Business, Veteran-owned small business?
1. Must provide a capability statement that addresses the organizations qualifications and ability to perform as a contractor for the work described below.
1. Provide any relevant FSS, NAC, GSA Contract vehicles the company holds if applicable.
7. If you are an FSS GSA/NAC or NASA SEWP contract holder or other federal contract holder, are the items/solutions you are providing information for available on your schedule/contract?
1. Please review salient characteristics/ and provide feedback or suggestions. If none, please reply as N/A.
8. List any available options to meet needs as outlined in the statement of work.
8. Please include any questions about the statement of work below.
8. Please provide sample pricing of 1 ton of each deliverable if available.
National Cemetery Administration (NCA) Black Hills National Cemetery (BHNC)
CEMETERY MATERIALS-STATEMENT DESCRIPTION OF NEED
Requirement of Aggregate Materials
GENERAL INFORMATION
Title of Project: Aggregate Materials Requirement Black Hills National Cemetery has a requirement for the following materials: Concrete Sand, ¾” Base Course Road Gravel, Dry Fines, and 3/8” Clean Crushed Stone Aggregate Statement of Need:
The vendor shall provide material only when requested by the cemetery Contracting Officer Representative (COR). The transportation/delivery of material to the cemetery will be provided by the vendor and offloaded in a designated location provided by the COR at the time of delivery. The delivery price shall be included in the total price of the contract.
SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES
Description of Tasks and Associated Deliverable: The Vendor shall provide the following material upon request by the COR:
| CLIN |
| ITEM |
| MAX QTY |
| UNIT |
| SAMPLE UNIT PRICE |
| 0001 |
| Provide and Deliver: 3/4" Road Base Gravel |
| 120 |
| Ton |
| 0002 |
| Provide and Deliver: Crushed Fines |
| 90 |
| Ton |
| 0003 |
| Provide and Deliver: 3/8" Clean Gravel Chips |
| 180 |
| Ton |
| 0004 |
| Provide and Deliver: Concrete Sand |
| 90 |
| Ton |
| 0005 |
| Provide and Deliver: Screened Topsoil |
| 75 |
| Ton |
| 0006 |
| Provide and Deliver: Fill Dirt |
| 75 |
| Ton |
FOB: Destination The contractor shall deliver to Black Hills National Cemetery located at 20901 Pleasant Valley Drive, Sturgis, SD 57785 the following: Concrete Sand, ¾” Base Course Road Gravel, Dry Fines, and 3/8” Clean Crushed Stone Aggregate. See Attachment B for map of Black Hills National Cemetery Period of Performance: The term of this contract shall be for a period from Date of contract award through 365 calendar days plus four (4) 1-year Options, if exercised. Contractor shall submit an invoice electronically, in arrears, at the end of each month.
Federal Holidays: (Holidays observed by the Federal Government)
| New Year's Day | 1st day of January | |
| Martin Luther King's Birthday President's Day | Third Monday in January Presidents’ Day | Third Monday in February |
| Memorial Day | Last Monday in May | |
| Juneteenth Day | 19th day of June | |
| Independence Day | 4th day in July | |
| Labor Day | First Monday in September | |
| Columbus Day | Second Monday in October | |
| Veterans Day | 11th day in November | |
| Thanksgiving Day | Fourth Thursday in November | |
| Christmas Day | 25th day of December |
Requirements:
MANUFACTURED CONCRETE SAND: Concrete sand to be delivered to the Maintenance Compound and used daily as stabilizing aggregate for interment operations (first or subsequent interments in traditional sections) to prevent sunken graves among other required tasks in need of sand.
Quantities: Estimated at 5 Trips (Truckload/15 tons) each base and option year.
Delivery: As needed/requested by authorized cemetery staff. Concrete sand is to be delivered from Monday thru Friday from 8:00 am to 4:30 pm. Material shall be delivered within fifteen (15) days from day requested.
*Truck size is restricted to 15 tons – No pup or side dump trailer allowed in this area. Truckload of concrete sand fluctuates; depends on production plant.
DRY FINES: Dry Fines to be delivered to Maintenance Compound and used daily for interment operations and head stone maintenance.
Quantity: Estimated at 3 Trips (Truckload/15 tons) each base and option year.
Delivery: As needed/requested by authorized cemetery staff. Dry fines are to be delivered from Monday thru Friday from 8:00 am to 4:30 pm. Material shall be delivered within fifteen (15) days from day requested.
*Truck size is restricted to 15 tons – No pup or side dump trailer allowed in this area. Truckload of dry fine fluctuates; depends on production plant.
CRUSHED STONE AGGREGATE: 3/8” Clean Crushed Stone Aggregate to be delivered to the Spoils Area and used daily as stabilizing aggregate for interment operations (first or subsequent interments in traditional sections) to prevent sunken graves.
Quantities: Estimated at 3 Trips (Truckload/15 tons) each base and option year.
Delivery: As needed/requested by authorized cemetery staff. Crushed stone aggregate is to be delivered from Monday thru Friday from 8:00 am to 4:30 pm. Material shall be delivered within fifteen (15) days from day requested.
*Truckload of 3/8” Crushed Stone Aggregate fluctuates; depends on production plant.
CRUSHED ROCK (GRAVEL): 3/4” Base Course Road Gravel delivered to the Spoils Area and used as stabilizing aggregate for gravel road maintenance and other required tasks in need of gravel.
Quantities: Estimated at 3 Trips (Truckload/15 tons) each base and option year.
Delivery: As needed/requested by authorized cemetery staff. Crushed rock (Gravel) is to be delivered from Monday thru Friday from 8:00 am to 4:30 pm. Material shall be delivered within fifteen (15) days from day requested.
*Truckload of ¾” base course road gravel fluctuates; depends on production plant.
ROLES AND RESPONSIBILITIES
The Contractor employees shall behave with appropriate decorum, courtesy, and respect while within the Cemetery or at its perimeter or entrances. See Attachment A Dignity Clause for more information.
All personnel delivering material must be trained in NCA rules of behavior and aware of their surroundings at all times to prevent any damage to Government property.
The Contractor must meet all safety requirements of Black Hills National Cemetery’s Safety Officer, Department of Veterans Affairs, Occupational Safety and Health Administration, and the State of South Dakota. It is incumbent upon the Contractor to be familiar with these requirements and maintain regular and routine contact with the COR and Safety Officer of Black Hills National Cemetery.
The contractor will obtain all necessary licenses and/or permits required to perform this work. Contractor will take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor will be responsible for any injury to himself/herself, his/her employees, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by contractor’s employee’s fault or negligence and will maintain personal liability and property damage insurance having coverage for a limit as required by the laws of the State of South Dakota.
Contractor shall be consistent and fully compliant with all applicable Federal, State, County, city laws, and Environmental Protection Agency guidelines and regulations.
The Contractor shall perform the services as specified herein. Changes in delivery schedules or delays must be communicated with the COR. The contractor must request, in writing, any deviations to these hours and receive approval from the COR in advance of any changes.
Due to the location of the material storage area in the Maintenance Compound, there is a restriction on the size of the delivery truck. The Maintenance Compound can accommodate a delivery truck no larger than a 15-ton load capacity. No side-dump or pup-trailers are permitted as these larger delivery trucks cannot turn around in the Maintenance Compound. The Spoils Area has no delivery restrictions.
For safety reasons, contractor personnel are not allowed to be transported throughout the cemetery holding onto or riding in the back of any open pickup truck or other vehicle.
At the end of each workday, unless otherwise specified by the COR, the contractor shall remove all debris resulting from work. At all times rubbish and trash generated by the contractor shall be kept clear of vehicular and pedestrian circulation throughout the site.
The contractor shall submit electronic invoices through Tungsten network within ten (10) calendar days after the material is delivered. The contractor and Black Hills National Cemetery POC shall jointly review the dispatch tickets to proceed accordingly with the correct invoice processing.
Identification is required for contractor’s vehicles and its personnel.
Contractor’s vehicle shall access cemetery thru BHNC main entrance, located at 20901 Pleasant Valley Drive, Sturgis, SD 57785. The driver shall wait to receive drop-off instructions by BHNC authorized personnel.
Transited and drop-off/delivery areas shall be maintained safe and secured. Contractors shall use public restrooms located near the main entrance.
Areas are to be left in a condition equal to or better than that which existed. In the event damages result to turf, structures, headstone, markers, monuments, irrigation sprinkler, trees, gravesites, curb, road, flower vases, facility structures, fences, disfigurement or damage to structure or property on or adjacent to this project, third parties, etc., due to neglect by the Contractor, repair, replacement and/or replacement costs of the damaged item will be required at no additional cost to the Government as directed by the COR.
Documentation Requirements:
· Valid driver’s license / DOT CDL appropriate License
· Insurance documents
ATTACHMENT - A – DIGNITY CLAUSE
DIGNITY CLAUSE
Respect for Headstones and Markers in National Cemeteries; Handling of Markers and Headstones
1. Every action by contractor personnel at a national cemetery must be performed with the special care, reverence, dignity, and respect that acknowledges the cemetery as the final resting place that commemorates the service and sacrifice that service members, Veterans and their families made for our Nation. Critically important is the awareness required of the Contractor employees of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.
a. Contractors cannot walk, stand, lean, sit or jump on headstones or markers. Nor can they drive over them.
b. No tools, equipment or other items will be placed or leaned on headstones or markers.
c. Use care not to scratch or damage markers in any manner.
d. Contractor shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.
e. Additionally, should any activity result in the exposure and/or damage to any remains, container for remains (e.g., casket or urn), or outer burial container, the contractor must contact the COR, Director/Assistant Director, or Contracting Officer (CO) for guidance.
2. Any doubts as to proper procedures shall be brought to the attention of the COR, Director/Assistant Director, or CO for guidance or resolution.
3. The contractor is required to discuss the guidance with employees and/or subcontractors and have each employee sign a statement of compliance and deliver the signed statement to the COR before work may begin. (END)
ATTACHMENT – B Black Hills National Cemetery Map *Cemetery map annotating locations for deliveries and locations where truck size is restricted.
image1.jpeg