This document contains a bid price schedule for asbestos, lead, and mold abatement services for VISN 5 over four option years. Unit pricing is provided for various abatement, removal, disposal, containment, and restoration activities. Pricing is included for tasks such as removing asbestos insulation, lead-containing paint, and contaminated materials. Common services covered include waste disposal, scaffolding, barriers, air filtration, and surface cleaning. The schedule also requests a multiplier to apply to pricing for work outside normal hours. The related opportunity is a solicitation for an Indefinite Delivery/Indefinite Quantity contract to provide abatement services within Veterans Integrated Service Network 5 of the Department of Veterans Affairs.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE YEAR

BASE YEAR BID ITEMS ASBESTOS ABATEMENT MATERIALS/EQUIPMENT — UNIT PRICING

No. 0AWork DescriptionUnitsQty$/UnitTotal
0A1*Re-Mobilization to remove containment on project after TEM clearance resultsEA2
0A2*Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency ResponseEA10
0A3Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency ResponseEA10
0A4Cleaning of Surfaces. Special cleaning of contaminated surfacesSF1400
0A5Remove asbestos insulation from ductworkSF3000
0A6Wrap and cut and remove insulated ductwork.SF3000
0A7Remove asbestos mastic from ductwork or pipe insulationSF870
0A8Remove asbestos from fittings and valves, up to 4" diameter pipeEA69
0A9Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPSEA34
0A10Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPSEA27
0A11Bulk Asbestos Removal — Remove fireproofing from flat surfaceSF1380
0A12Bulk Asbestos Removal — Remove fireproofing from irregular surfaceSF690
0A13Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & latheSF690
0A14Remove Asbestos from Pipe by Glove Bag (pipe up to 3" IPS)LF140
0A15Remove Asbestos from Pipe by Glove Bag (pipe 3.5" to 8" diameter, IPS)LF90
0A16Remove Asbestos from Fittings and Valves by Glove Bag (up to 8", IPS)EA9
0A17Remove Asbestos pipe support blocks, bottom half of pipe at supports.EA9
0A18Remove Asbestos Cement BoardSF70
0A19*Disposal asbestos waste in certified landfill loads less than 5 CYCY44
0A20*Disposal asbestos waste in certified landfill loads greater than 5 CYTON10
0A21Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPSLF140
0A22Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPSLF90
0A23Remove Asbestos from pipe in containment, 10" to 12" diameter pipe/IPSLF70
0A24Remove Asbestos from pipe in containment, 14" to 16" diameter pipe/IPSLF35
0A25Remove/Replace Asbestos Flexible Duct Connection (up to 24"duct)SF300
0A26Removal of fiberglass batt insulation up to 12" thickSF70
0A27Removal of up to 12" thick fiberglass blown-in insulation in attic.SF70
0A28Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remainsEA70
0A29Apply penetrating encapsulant on ceiling and other structural surfacesSF700
0A30Seal exposed ends of asbestos pipe insulation.EA35
0A31Spray apply one (1) coat of penetrating encapsulant — Flat surfaceSF700
0A32Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanksSF700
0A33Remove of floor tiles or carpet and remove mastic with chemicalsSF3000
0A34Remove floor tiles — each additional layerSF3000
0A35Remove of linoleum and remove mastic with chemicalsSF3000
0A36Remove windows and perimeter sealant as asbestos & install temporary protection in opening with plywood and studs — Wrap, seal as asbestos and/or lead paint or bothSF of rough opng3000
0A37Remove asbestos containing caulking exterior of building first floor or on scaffoldingLF3000
0A38Excavate and remove contaminated dirt, by hand — Crawl SpaceCU. FT.850
0A39In a crawl space, remove debris, flatten contaminated earth, pour a fiber reinforced, 3" thick 3000 psi concrete slab, float finish. All equipment including concrete pump.SF2500
0A40Contaminated Waste: Bag, Remove from work area.BAG2500
0A41Contaminated Waste Wrapped Items Remove from work areaEA1290
0A42Excavate and remove contaminated dirt, by hand — Crawl SpaceCU. FT.690
0A43Remove vinyl wall base & asbestos glueLF470
0A44Remove mastic by HEPA filtered bead blasting rather than chemicalsSF3000

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

LEAD CONTAINING PAINT ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0BWork DescriptionUnitsQty$/UnitTotal
0B1Abrasive Blasting flat, round, shapedSF170
0B2Chemical stripping larger areas not covered belowSF170
0B3Chemical Stripping - paint from Window SashSF170
0B4Chemical Stripping - paint from Window SillLF170
0B5Scrape & Encapsulate - paint on Window SashSF170
0B6Scrape & Encapsulate - paint on Window SillsLF170
0B7Scrape & Encapsulate - paint on masonrySF170
0B8Power Tool CleaningSF170
0B9EncapsulationSF170
0B10Removal of material- TrimLF70
0B11Removal of material- DrywallSF140
0B12Remove windows with lead containing paint & install temporary protection in opening with plywood and studs — Wrap, seal as containing lead paintSF of rough opng2980
0B13Removal of abandoned pipe or de-energized conduit > 4” diaLF70
0B14Removal of abandoned pipe or de-energized conduit < 4” diaLF35
0B15TCLP sampling of wasteEA9
0B16Seal hazardous waste in DOT-standard 55 gal drums, store, transport, and disposal in a licensed landfillDRUM9
0B17Loading for transport and disposal waste in a truck or dumpsterCY17

MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0CWork DescriptionUnitsQty$/UnitTotal
0C1Removal of Material-Drywall on studs or furringSF1400
0C2Removal of Material-Carpet & glueSF170
0C3Removal of Material -Carpet Tile & glueSF170
0C4Removal of Material-VCT & glueSF480
0C5Removal of Material-Linoleum & glueSF480
0C6Removal of Material-Ceramic TileSF35
0C7Removal of Material - Plywood on floor or wallSF350
0C8Removal of Material- Contaminated Fiberglass Batt Insulation up to 6" thickSF350
0C9Removal of Contaminated Fiberglass Insulation 7" up to 12" thickSF350
0C10Removal of up to 12" thick fiberglass blown-in insulation in attic.SF70
0C11Mold Remediation/Removal on Concrete Wall or FloorSF340
0C12Mold Remediation/Removal on DrywallSF690
0C13Multiplier for Off-Hours - Outside 8AM - 4:30PM0

ITEMS COMMON TO ASBESTOS, LEAD, AND MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0DWork DescriptionUnitsQty$/UnitTotal
0D1*Mobilization on projects. Work area isolationEA2
0D2*Mobilization on projects. No work area isolationEA1
0D3*Emergency ResponseEA1
0D4*Work PlanEA3
0D5Elevated Work Surfaces in containment. Scaffolding (per SF floor area)Per SF Floor Area260
0D6HEPA negative air machine (each)Per WEEK87
0D7Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wipingSF13800
0D8Decontamination System. 2" x 4" @ 16", 5/8" plywood each side — 3 Stage Personal Decontamination Chamber with showerEA2
0D9Decontamination System. Disposable 3-stage decontamination system including showerEA2
0D10Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheetingSF of Partition350
0D11Install and Remove Temporary 1Hr. Fire Rated Partition with 2" x 4" @ 16" studs & 5/8" drywall on each side, joints taped and fire caulking, one self closing locking doorSF of Partition3500
0D12Sealing and Protecting the Work Area on existing wall surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.SF of Surface ea. Layer13800
0D13Sealing and Protecting the Work Area on existing ceiling surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.SF of Surface ea. Layer13800
0D14Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywoodSF1700
0D15Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" — 8 ft. highSF of Partition350
0D16Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" — 12 ft. highSF of Partition350
0D17Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" —16 ft. highSF of Partition350
0D18*Exterior (or interior) 1/2 in. x 48 in. x 96 in. Cellular White PVC Panel on studs or furring (intended for transite replacement). Exterior grade caulking all joints and seams.SF350
0D19*General non-HAZMAT waste haul and disposal charges - Loads greater than 5 CYPer Ton10
0D20*General waste non-HAZMAT haul and disposal charges - Loads less than 5 CYPer CY44
0D21Truck and temporary storage of small quanties of hazardous waste in a secure location.Per CY44
0D22Install new commercial carpet tile, 24 x 24SY170
0D23Install new commercial carpetSY170
0D24Install new commercial floor tile, 12" x 12"SF170
0D25Install new 5/8" drywall over studs or furring (not incl.), tape and finish.SF of D.W.1380
0D26Install new 3 1/2" metal or wood studs @ 16" o.c. for walls up to 10' high.SF of Wall1380
0D27Painting, new, on drywall or masonry, 3 coats.SF of Wall1380
0D28Patching drywall damaged in abatement or removing base, ready for PaintSF of patch170
0D29Insulate F.G. w/ PVC Jacket fittings and valves, up to 4" diameter pipe, IPSEA70
0D30Insulate F.G. w/ PVC Jacket fittings and valves, 6" to 8" diameter pipe, IPSEA34
0D31Insulate F.G. w/ PVC Jacket fittings and valves, 10" — 12" diameter pipe, IPSEA27
0D32Insulate 2" F.G. w/ PVC Jacket Pipe, up to 4" diameter pipe, IPSLF140
0D33Insulate 2" F.G. w/ PVC Jacket Pipe, 5" to 8" diameter pipe/Iron Pipe Size IPSLF86
0D34Replacement Material- Fiberglass Batt Insulation up to 6" thickSF345
0D35Replacement Material Fiberglass Insulation 7" up to 12" thickSF345
0D36Replacement Material up to 12" thick fiberglass blown-in insulation in attic.SF70
0D37New pipe support blocks, bottom half of pipe at supports, and new pipe insulation shields. Nominal pipe size 6".EA9
GRAND TOTAL BASE YEAR

YEAR 1

YEAR 1 BID ITEMS ASBESTOS ABATEMENT MATERIALS/EQUIPMENT — UNIT PRICING

No. 0AWork DescriptionUnitsQty$/UnitTotal
1A1*Re-Mobilization to remove containment on project after TEM clearance resultsEA2
1A2*Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency ResponseEA10
1A3Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency ResponseEA10
1A4Cleaning of Surfaces. Special cleaning of contaminated surfacesSF1400
1A5Remove asbestos insulation from ductworkSF3000
1A6Wrap and cut and remove insulated ductwork.SF3000
1A7Remove asbestos mastic from ductwork or pipe insulationSF870
1A8Remove asbestos from fittings and valves, up to 4" diameter pipeEA69
1A9Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPSEA34
1A10Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPSEA27
1A11Bulk Asbestos Removal — Remove fireproofing from flat surfaceSF1380
1A12Bulk Asbestos Removal — Remove fireproofing from irregular surfaceSF690
1A13Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & latheSF690
1A14Remove Asbestos from Pipe by Glove Bag (pipe up to 3" IPS)LF140
1A15Remove Asbestos from Pipe by Glove Bag (pipe 3.5" to 8" diameter, IPS)LF90
1A16Remove Asbestos from Fittings and Valves by Glove Bag (up to 8", IPS)EA9
1A17Remove Asbestos pipe support blocks, bottom half of pipe at supports.EA9
1A18Remove Asbestos Cement BoardSF70
1A19*Disposal asbestos waste in certified landfill loads less than 5 CYCY44
1A20*Disposal asbestos waste in certified landfill loads greater than 5 CYTON10
1A21Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPSLF140
1A22Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPSLF90
1A23Remove Asbestos from pipe in containment, 10" to 12" diameter pipe/IPSLF70
1A24Remove Asbestos from pipe in containment, 14" to 16" diameter pipe/IPSLF35
1A25Remove/Replace Asbestos Flexible Duct Connection (up to 24"duct)SF300
1A26Removal of fiberglass batt insulation up to 12" thickSF70
1A27Removal of up to 12" thick fiberglass blown-in insulation in attic.SF70
1A28Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remainsEA70
1A29Apply penetrating encapsulant on ceiling and other structural surfacesSF700
1A30Seal exposed ends of asbestos pipe insulation.EA35
1A31Spray apply one (1) coat of penetrating encapsulant — Flat surfaceSF700
1A32Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanksSF700
1A33Remove of floor tiles or carpet and remove mastic with chemicalsSF3000
1A34Remove floor tiles — each additional layerSF3000
1A35Remove of linoleum and remove mastic with chemicalsSF3000
1A36Remove windows and perimeter sealant as asbestos & install temporary protection in opening with plywood and studs — Wrap, seal as asbestos and/or lead paint or bothSF of rough opng3000
1A37Remove asbestos containing caulking exterior of building first floor or on scaffoldingLF3000
1A38Excavate and remove contaminated dirt, by hand — Crawl SpaceCU. FT.850
1A39In a crawl space, remove debris, flatten contaminated earth, pour a fiber reinforced, 3" thick 3000 psi concrete slab, float finish. All equipment including concrete pump.SF2500
1A40Contaminated Waste: Bag, Remove from work area.BAG2500
1A41Contaminated Waste Wrapped Items Remove from work areaEA1290
1A42Excavate and remove contaminated dirt, by hand — Crawl SpaceCU. FT.690
1A43Remove vinyl wall base & asbestos glueLF470
1A44Remove mastic by HEPA filtered bead blasting rather than chemicalsSF3000

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

LEAD CONTAINING PAINT ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0BWork DescriptionUnitsQty$/UnitTotal
1B1Abrasive Blasting flat, round, shapedSF170
1B2Chemical stripping larger areas not covered belowSF170
1B3Chemical Stripping - paint from Window SashSF170
1B4Chemical Stripping - paint from Window SillLF170
1B5Scrape & Encapsulate - paint on Window SashSF170
1B6Scrape & Encapsulate - paint on Window SillsLF170
1B7Scrape & Encapsulate - paint on masonrySF170
1B8Power Tool CleaningSF170
1B9EncapsulationSF170
1B10Removal of material- TrimLF70
1B11Removal of material- DrywallSF140
1B12Remove windows with lead containing paint & install temporary protection in opening with plywood and studs — Wrap, seal as containing lead paintSF of rough opng2980
1B13Removal of abandoned pipe or de-energized conduit > 4” diaLF70
1B14Removal of abandoned pipe or de-energized conduit < 4” diaLF35
1B15TCLP sampling of wasteEA9
1B16Seal hazardous waste in DOT-standard 55 gal drums, store, transport, and disposal in a licensed landfillDRUM9
1B17Loading for transport and disposal waste in a truck or dumpsterCY17

MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0CWork DescriptionUnitsQty$/UnitTotal
1C1Removal of Material-Drywall on studs or furringSF1400
1C2Removal of Material-Carpet & glueSF170
1C3Removal of Material -Carpet Tile & glueSF170
1C4Removal of Material-VCT & glueSF480
1C5Removal of Material-Linoleum & glueSF480
1C6Removal of Material-Ceramic TileSF35
1C7Removal of Material - Plywood on floor or wallSF350
1C8Removal of Material- Contaminated Fiberglass Batt Insulation up to 6" thickSF350
1C9Removal of Contaminated Fiberglass Insulation 7" up to 12" thickSF350
1C10Removal of up to 12" thick fiberglass blown-in insulation in attic.SF70
1C11Mold Remediation/Removal on Concrete Wall or FloorSF340
1C12Mold Remediation/Removal on DrywallSF690
1C13Multiplier for Off-Hours - Outside 8AM - 4:30PM0

ITEMS COMMON TO ASBESTOS, LEAD, AND MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0DWork DescriptionUnitsQty$/UnitTotal
1D1*Mobilization on projects. Work area isolationEA2
1D2*Mobilization on projects. No work area isolationEA1
1D3*Emergency ResponseEA1
1D4*Work PlanEA3
1D5Elevated Work Surfaces in containment. Scaffolding (per SF floor area)Per SF Floor Area260
1D6HEPA negative air machine (each)Per WEEK87
1D7Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wipingSF13800
1D8Decontamination System. 2" x 4" @ 16", 5/8" plywood each side — 3 Stage Personal Decontamination Chamber with showerEA2
1D9Decontamination System. Disposable 3-stage decontamination system including showerEA2
1D10Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheetingSF of Partition350
1D11Install and Remove Temporary 1Hr. Fire Rated Partition with 2" x 4" @ 16" studs & 5/8" drywall on each side, joints taped and fire caulking, one self closing locking doorSF of Partition3500
1D12Sealing and Protecting the Work Area on existing wall surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.SF of Surface ea. Layer13800
1D13Sealing and Protecting the Work Area on existing ceiling surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.SF of Surface ea. Layer13800
1D14Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywoodSF1700
1D15Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" — 8 ft. highSF of Partition350
1D16Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" — 12 ft. highSF of Partition350
1D17Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" —16 ft. highSF of Partition350
1D18*Exterior (or interior) 1/2 in. x 48 in. x 96 in. Cellular White PVC Panel on studs or furring (intended for transite replacement). Exterior grade caulking all joints and seams.SF350
1D19*General non-HAZMAT waste haul and disposal charges - Loads greater than 5 CYPer Ton10
1D20*General waste non-HAZMAT haul and disposal charges - Loads less than 5 CYPer CY44
1D21Truck and temporary storage of small quanties of hazardous waste in a secure location.Per CY44
1D22Install new commercial carpet tile, 24 x 24SY170
1D23Install new commercial carpetSY170
1D24Install new commercial floor tile, 12" x 12"SF170
1D25Install new 5/8" drywall over studs or furring (not incl.), tape and finish.SF of D.W.1380
1D26Install new 3 1/2" metal or wood studs @ 16" o.c. for walls up to 10' high.SF of Wall1380
1D27Painting, new, on drywall or masonry, 3 coats.SF of Wall1380
1D28Patching drywall damaged in abatement or removing base, ready for PaintSF of patch170
1D29Insulate F.G. w/ PVC Jacket fittings and valves, up to 4" diameter pipe, IPSEA70
1D30Insulate F.G. w/ PVC Jacket fittings and valves, 6" to 8" diameter pipe, IPSEA34
1D31Insulate F.G. w/ PVC Jacket fittings and valves, 10" — 12" diameter pipe, IPSEA27
1D32Insulate 2" F.G. w/ PVC Jacket Pipe, up to 4" diameter pipe, IPSLF140
1D33Insulate 2" F.G. w/ PVC Jacket Pipe, 5" to 8" diameter pipe/Iron Pipe Size IPSLF86
1D34Replacement Material- Fiberglass Batt Insulation up to 6" thickSF345
1D35Replacement Material Fiberglass Insulation 7" up to 12" thickSF345
1D36Replacement Material up to 12" thick fiberglass blown-in insulation in attic.SF70
1D37New pipe support blocks, bottom half of pipe at supports, and new pipe insulation shields. Nominal pipe size 6".EA9
GRAND TOTAL YEAR 1

YEAR 2

YEAR 2 BID ITEMS ASBESTOS ABATEMENT MATERIALS/EQUIPMENT — UNIT PRICING

No. 0AWork DescriptionUnitsQty$/UnitTotal
2A1*Re-Mobilization to remove containment on project after TEM clearance resultsEA2
2A2*Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency ResponseEA10
2A3Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency ResponseEA10
2A4Cleaning of Surfaces. Special cleaning of contaminated surfacesSF1400
2A5Remove asbestos insulation from ductworkSF3000
2A6Wrap and cut and remove insulated ductwork.SF3000
2A7Remove asbestos mastic from ductwork or pipe insulationSF870
2A8Remove asbestos from fittings and valves, up to 4" diameter pipeEA69
2A9Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPSEA34
2A10Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPSEA27
2A11Bulk Asbestos Removal — Remove fireproofing from flat surfaceSF1380
2A12Bulk Asbestos Removal — Remove fireproofing from irregular surfaceSF690
2A13Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & latheSF690
2A14Remove Asbestos from Pipe by Glove Bag (pipe up to 3" IPS)LF140
2A15Remove Asbestos from Pipe by Glove Bag (pipe 3.5" to 8" diameter, IPS)LF90
2A16Remove Asbestos from Fittings and Valves by Glove Bag (up to 8", IPS)EA9
2A17Remove Asbestos pipe support blocks, bottom half of pipe at supports.EA9
2A18Remove Asbestos Cement BoardSF70
2A19*Disposal asbestos waste in certified landfill loads less than 5 CYCY44
2A20*Disposal asbestos waste in certified landfill loads greater than 5 CYTON10
2A21Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPSLF140
2A22Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPSLF90
2A23Remove Asbestos from pipe in containment, 10" to 12" diameter pipe/IPSLF70
2A24Remove Asbestos from pipe in containment, 14" to 16" diameter pipe/IPSLF35
2A25Remove/Replace Asbestos Flexible Duct Connection (up to 24"duct)SF300
2A26Removal of fiberglass batt insulation up to 12" thickSF70
2A27Removal of up to 12" thick fiberglass blown-in insulation in attic.SF70
2A28Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remainsEA70
2A29Apply penetrating encapsulant on ceiling and other structural surfacesSF700
2A30Seal exposed ends of asbestos pipe insulation.EA35
2A31Spray apply one (1) coat of penetrating encapsulant — Flat surfaceSF700
2A32Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanksSF700
2A33Remove of floor tiles or carpet and remove mastic with chemicalsSF3000
2A34Remove floor tiles — each additional layerSF3000
2A35Remove of linoleum and remove mastic with chemicalsSF3000
2A36Remove windows and perimeter sealant as asbestos & install temporary protection in opening with plywood and studs — Wrap, seal as asbestos and/or lead paint or bothSF of rough opng3000
2A37Remove asbestos containing caulking exterior of building first floor or on scaffoldingLF3000
2A38Excavate and remove contaminated dirt, by hand — Crawl SpaceCU. FT.850
2A39In a crawl space, remove debris, flatten contaminated earth, pour a fiber reinforced, 3" thick 3000 psi concrete slab, float finish. All equipment including concrete pump.SF2500
2A40Contaminated Waste: Bag, Remove from work area.BAG2500
2A41Contaminated Waste Wrapped Items Remove from work areaEA1290
2A42Excavate and remove contaminated dirt, by hand — Crawl SpaceCU. FT.690
2A43Remove vinyl wall base & asbestos glueLF470
2A44Remove mastic by HEPA filtered bead blasting rather than chemicalsSF3000

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

LEAD CONTAINING PAINT ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0BWork DescriptionUnitsQty$/UnitTotal
2B1Abrasive Blasting flat, round, shapedSF170
2B2Chemical stripping larger areas not covered belowSF170
2B3Chemical Stripping - paint from Window SashSF170
2B4Chemical Stripping - paint from Window SillLF170
2B5Scrape & Encapsulate - paint on Window SashSF170
2B6Scrape & Encapsulate - paint on Window SillsLF170
2B7Scrape & Encapsulate - paint on masonrySF170
2B8Power Tool CleaningSF170
2B9EncapsulationSF170
2B10Removal of material- TrimLF70
2B11Removal of material- DrywallSF140
2B12Remove windows with lead containing paint & install temporary protection in opening with plywood and studs — Wrap, seal as containing lead paintSF of rough opng2980
2B13Removal of abandoned pipe or de-energized conduit > 4” diaLF70
2B14Removal of abandoned pipe or de-energized conduit < 4” diaLF35
2B15TCLP sampling of wasteEA9
2B16Seal hazardous waste in DOT-standard 55 gal drums, store, transport, and disposal in a licensed landfillDRUM9
2B17Loading for transport and disposal waste in a truck or dumpsterCY17

MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0CWork DescriptionUnitsQty$/UnitTotal
2C1Removal of Material-Drywall on studs or furringSF1400
2C2Removal of Material-Carpet & glueSF170
2C3Removal of Material -Carpet Tile & glueSF170
2C4Removal of Material-VCT & glueSF480
2C5Removal of Material-Linoleum & glueSF480
2C6Removal of Material-Ceramic TileSF35
2C7Removal of Material - Plywood on floor or wallSF350
2C8Removal of Material- Contaminated Fiberglass Batt Insulation up to 6" thickSF350
2C9Removal of Contaminated Fiberglass Insulation 7" up to 12" thickSF350
2C10Removal of up to 12" thick fiberglass blown-in insulation in attic.SF70
2C11Mold Remediation/Removal on Concrete Wall or FloorSF340
2C12Mold Remediation/Removal on DrywallSF690
2C13Multiplier for Off-Hours - Outside 8AM - 4:30PM0

ITEMS COMMON TO ASBESTOS, LEAD, AND MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0DWork DescriptionUnitsQty$/UnitTotal
2D1*Mobilization on projects. Work area isolationEA2
2D2*Mobilization on projects. No work area isolationEA1
2D3*Emergency ResponseEA1
2D4*Work PlanEA3
2D5Elevated Work Surfaces in containment. Scaffolding (per SF floor area)Per SF Floor Area260
2D6HEPA negative air machine (each)Per WEEK87
2D7Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wipingSF13800
2D8Decontamination System. 2" x 4" @ 16", 5/8" plywood each side — 3 Stage Personal Decontamination Chamber with showerEA2
2D9Decontamination System. Disposable 3-stage decontamination system including showerEA2
2D10Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheetingSF of Partition350
2D11Install and Remove Temporary 1Hr. Fire Rated Partition with 2" x 4" @ 16" studs & 5/8" drywall on each side, joints taped and fire caulking, one self closing locking doorSF of Partition3500
2D12Sealing and Protecting the Work Area on existing wall surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.SF of Surface ea. Layer13800
2D13Sealing and Protecting the Work Area on existing ceiling surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.SF of Surface ea. Layer13800
2D14Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywoodSF1700
2D15Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" — 8 ft. highSF of Partition350
2D16Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" — 12 ft. highSF of Partition350
2D17Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" —16 ft. highSF of Partition350
2D18*Exterior (or interior) 1/2 in. x 48 in. x 96 in. Cellular White PVC Panel on studs or furring (intended for transite replacement). Exterior grade caulking all joints and seams.SF350
2D19*General non-HAZMAT waste haul and disposal charges - Loads greater than 5 CYPer Ton10
2D20*General waste non-HAZMAT haul and disposal charges - Loads less than 5 CYPer CY44
2D21Truck and temporary storage of small quanties of hazardous waste in a secure location.Per CY44
2D22Install new commercial carpet tile, 24 x 24SY170
2D23Install new commercial carpetSY170
2D24Install new commercial floor tile, 12" x 12"SF170
2D25Install new 5/8" drywall over studs or furring (not incl.), tape and finish.SF of D.W.1380
2D26Install new 3 1/2" metal or wood studs @ 16" o.c. for walls up to 10' high.SF of Wall1380
2D27Painting, new, on drywall or masonry, 3 coats.SF of Wall1380
2D28Patching drywall damaged in abatement or removing base, ready for PaintSF of patch170
2D29Insulate F.G. w/ PVC Jacket fittings and valves, up to 4" diameter pipe, IPSEA70
2D30Insulate F.G. w/ PVC Jacket fittings and valves, 6" to 8" diameter pipe, IPSEA34
2D31Insulate F.G. w/ PVC Jacket fittings and valves, 10" — 12" diameter pipe, IPSEA27
2D32Insulate 2" F.G. w/ PVC Jacket Pipe, up to 4" diameter pipe, IPSLF140
2D33Insulate 2" F.G. w/ PVC Jacket Pipe, 5" to 8" diameter pipe/Iron Pipe Size IPSLF86
2D34Replacement Material- Fiberglass Batt Insulation up to 6" thickSF345
2D35Replacement Material Fiberglass Insulation 7" up to 12" thickSF345
2D36Replacement Material up to 12" thick fiberglass blown-in insulation in attic.SF70
2D37New pipe support blocks, bottom half of pipe at supports, and new pipe insulation shields. Nominal pipe size 6".EA9
GRAND TOTAL YEAR 2

YEAR 3

YEAR 3 BID ITEMS ASBESTOS ABATEMENT MATERIALS/EQUIPMENT — UNIT PRICING

No. 0AWork DescriptionUnitsQty$/UnitTotal
3A1*Re-Mobilization to remove containment on project after TEM clearance resultsEA2
3A2*Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency ResponseEA10
3A3Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency ResponseEA10
3A4Cleaning of Surfaces. Special cleaning of contaminated surfacesSF1400
3A5Remove asbestos insulation from ductworkSF3000
3A6Wrap and cut and remove insulated ductwork.SF3000
3A7Remove asbestos mastic from ductwork or pipe insulationSF870
3A8Remove asbestos from fittings and valves, up to 4" diameter pipeEA69
3A9Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPSEA34
3A10Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPSEA27
3A11Bulk Asbestos Removal — Remove fireproofing from flat surfaceSF1380
3A12Bulk Asbestos Removal — Remove fireproofing from irregular surfaceSF690
3A13Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & latheSF690
3A14Remove Asbestos from Pipe by Glove Bag (pipe up to 3" IPS)LF140
3A15Remove Asbestos from Pipe by Glove Bag (pipe 3.5" to 8" diameter, IPS)LF90
3A16Remove Asbestos from Fittings and Valves by Glove Bag (up to 8", IPS)EA9
3A17Remove Asbestos pipe support blocks, bottom half of pipe at supports.EA9
3A18Remove Asbestos Cement BoardSF70
3A19*Disposal asbestos waste in certified landfill loads less than 5 CYCY44
3A20*Disposal asbestos waste in certified landfill loads greater than 5 CYTON10
3A21Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPSLF140
3A22Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPSLF90
3A23Remove Asbestos from pipe in containment, 10" to 12" diameter pipe/IPSLF70
3A24Remove Asbestos from pipe in containment, 14" to 16" diameter pipe/IPSLF35
3A25Remove/Replace Asbestos Flexible Duct Connection (up to 24"duct)SF300
3A26Removal of fiberglass batt insulation up to 12" thickSF70
3A27Removal of up to 12" thick fiberglass blown-in insulation in attic.SF70
3A28Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remainsEA70
3A29Apply penetrating encapsulant on ceiling and other structural surfacesSF700
3A30Seal exposed ends of asbestos pipe insulation.EA35
3A31Spray apply one (1) coat of penetrating encapsulant — Flat surfaceSF700
3A32Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanksSF700
3A33Remove of floor tiles or carpet and remove mastic with chemicalsSF3000
3A34Remove floor tiles — each additional layerSF3000
3A35Remove of linoleum and remove mastic with chemicalsSF3000
3A36Remove windows and perimeter sealant as asbestos & install temporary protection in opening with plywood and studs — Wrap, seal as asbestos and/or lead paint or bothSF of rough opng3000
3A37Remove asbestos containing caulking exterior of building first floor or on scaffoldingLF3000
3A38Excavate and remove contaminated dirt, by hand — Crawl SpaceCU. FT.850
3A39In a crawl space, remove debris, flatten contaminated earth, pour a fiber reinforced, 3" thick 3000 psi concrete slab, float finish. All equipment including concrete pump.SF2500
3A40Contaminated Waste: Bag, Remove from work area.BAG2500
3A41Contaminated Waste Wrapped Items Remove from work areaEA1290
3A42Excavate and remove contaminated dirt, by hand — Crawl SpaceCU. FT.690
3A43Remove vinyl wall base & asbestos glueLF470
3A44Remove mastic by HEPA filtered bead blasting rather than chemicalsSF3000

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

LEAD CONTAINING PAINT ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0BWork DescriptionUnitsQty$/UnitTotal
3B1Abrasive Blasting flat, round, shapedSF170
3B2Chemical stripping larger areas not covered belowSF170
3B3Chemical Stripping - paint from Window SashSF170
3B4Chemical Stripping - paint from Window SillLF170
3B5Scrape & Encapsulate - paint on Window SashSF170
3B6Scrape & Encapsulate - paint on Window SillsLF170
3B7Scrape & Encapsulate - paint on masonrySF170
3B8Power Tool CleaningSF170
3B9EncapsulationSF170
3B10Removal of material- TrimLF70
3B11Removal of material- DrywallSF140
3B12Remove windows with lead containing paint & install temporary protection in opening with plywood and studs — Wrap, seal as containing lead paintSF of rough opng2980
3B13Removal of abandoned pipe or de-energized conduit > 4” diaLF70
3B14Removal of abandoned pipe or de-energized conduit < 4” diaLF35
3B15TCLP sampling of wasteEA9
3B16Seal hazardous waste in DOT-standard 55 gal drums, store, transport, and disposal in a licensed landfillDRUM9
3B17Loading for transport and disposal waste in a truck or dumpsterCY17

MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0CWork DescriptionUnitsQty$/UnitTotal
3C1Removal of Material-Drywall on studs or furringSF1400
3C2Removal of Material-Carpet & glueSF170
3C3Removal of Material -Carpet Tile & glueSF170
3C4Removal of Material-VCT & glueSF480
3C5Removal of Material-Linoleum & glueSF480
3C6Removal of Material-Ceramic TileSF35
3C7Removal of Material - Plywood on floor or wallSF350
3C8Removal of Material- Contaminated Fiberglass Batt Insulation up to 6" thickSF350
3C9Removal of Contaminated Fiberglass Insulation 7" up to 12" thickSF350
3C10Removal of up to 12" thick fiberglass blown-in insulation in attic.SF70
3C11Mold Remediation/Removal on Concrete Wall or FloorSF340
3C12Mold Remediation/Removal on DrywallSF690
3C13Multiplier for Off-Hours - Outside 8AM - 4:30PM0

ITEMS COMMON TO ASBESTOS, LEAD, AND MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0DWork DescriptionUnitsQty$/UnitTotal
3D1*Mobilization on projects. Work area isolationEA2
3D2*Mobilization on projects. No work area isolationEA1
3D3*Emergency ResponseEA1
3D4*Work PlanEA3
3D5Elevated Work Surfaces in containment. Scaffolding (per SF floor area)Per SF Floor Area260
3D6HEPA negative air machine (each)Per WEEK87
3D7Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wipingSF13800
3D8Decontamination System. 2" x 4" @ 16", 5/8" plywood each side — 3 Stage Personal Decontamination Chamber with showerEA2
3D9Decontamination System. Disposable 3-stage decontamination system including showerEA2
3D10Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheetingSF of Partition350
3D11Install and Remove Temporary 1Hr. Fire Rated Partition with 2" x 4" @ 16" studs & 5/8" drywall on each side, joints taped and fire caulking, one self closing locking doorSF of Partition3500
3D12Sealing and Protecting the Work Area on existing wall surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.SF of Surface ea. Layer13800
3D13Sealing and Protecting the Work Area on existing ceiling surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.SF of Surface ea. Layer13800
3D14Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywoodSF1700
3D15Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" — 8 ft. highSF of Partition350
3D16Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" — 12 ft. highSF of Partition350
3D17Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" —16 ft. highSF of Partition350
3D18*Exterior (or interior) 1/2 in. x 48 in. x 96 in. Cellular White PVC Panel on studs or furring (intended for transite replacement). Exterior grade caulking all joints and seams.SF350
3D19*General non-HAZMAT waste haul and disposal charges - Loads greater than 5 CYPer Ton10
3D20*General waste non-HAZMAT haul and disposal charges - Loads less than 5 CYPer CY44
3D21Truck and temporary storage of small quanties of hazardous waste in a secure location.Per CY44
3D22Install new commercial carpet tile, 24 x 24SY170
3D23Install new commercial carpetSY170
3D24Install new commercial floor tile, 12" x 12"SF170
3D25Install new 5/8" drywall over studs or furring (not incl.), tape and finish.SF of D.W.1380
3D26Install new 3 1/2" metal or wood studs @ 16" o.c. for walls up to 10' high.SF of Wall1380
3D27Painting, new, on drywall or masonry, 3 coats.SF of Wall1380
3D28Patching drywall damaged in abatement or removing base, ready for PaintSF of patch170
3D29Insulate F.G. w/ PVC Jacket fittings and valves, up to 4" diameter pipe, IPSEA70
3D30Insulate F.G. w/ PVC Jacket fittings and valves, 6" to 8" diameter pipe, IPSEA34
3D31Insulate F.G. w/ PVC Jacket fittings and valves, 10" — 12" diameter pipe, IPSEA27
3D32Insulate 2" F.G. w/ PVC Jacket Pipe, up to 4" diameter pipe, IPSLF140
3D33Insulate 2" F.G. w/ PVC Jacket Pipe, 5" to 8" diameter pipe/Iron Pipe Size IPSLF86
3D34Replacement Material- Fiberglass Batt Insulation up to 6" thickSF345
3D35Replacement Material Fiberglass Insulation 7" up to 12" thickSF345
3D36Replacement Material up to 12" thick fiberglass blown-in insulation in attic.SF70
3D37New pipe support blocks, bottom half of pipe at supports, and new pipe insulation shields. Nominal pipe size 6".EA9
GRAND TOTAL YEAR 3

YEAR 4

YEAR 4 BID ITEMS ASBESTOS ABATEMENT MATERIALS/EQUIPMENT — UNIT PRICING

No. 0AWork DescriptionUnitsQty$/UnitTotal
4A1*Re-Mobilization to remove containment on project after TEM clearance resultsEA2
4A2*Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency ResponseEA10
4A3Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency ResponseEA10
4A4Cleaning of Surfaces. Special cleaning of contaminated surfacesSF1400
4A5Remove asbestos insulation from ductworkSF3000
4A6Wrap and cut and remove insulated ductwork.SF3000
4A7Remove asbestos mastic from ductwork or pipe insulationSF870
4A8Remove asbestos from fittings and valves, up to 4" diameter pipeEA69
4A9Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPSEA34
4A10Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPSEA27
4A11Bulk Asbestos Removal — Remove fireproofing from flat surfaceSF1380
4A12Bulk Asbestos Removal — Remove fireproofing from irregular surfaceSF690
4A13Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & latheSF690
4A14Remove Asbestos from Pipe by Glove Bag (pipe up to 3" IPS)LF140
4A15Remove Asbestos from Pipe by Glove Bag (pipe 3.5" to 8" diameter, IPS)LF90
4A16Remove Asbestos from Fittings and Valves by Glove Bag (up to 8", IPS)EA9
4A17Remove Asbestos pipe support blocks, bottom half of pipe at supports.EA9
4A18Remove Asbestos Cement BoardSF70
4A19*Disposal asbestos waste in certified landfill loads less than 5 CYCY44
4A20*Disposal asbestos waste in certified landfill loads greater than 5 CYTON10
4A21Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPSLF140
4A22Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPSLF90
4A23Remove Asbestos from pipe in containment, 10" to 12" diameter pipe/IPSLF70
4A24Remove Asbestos from pipe in containment, 14" to 16" diameter pipe/IPSLF35
4A25Remove/Replace Asbestos Flexible Duct Connection (up to 24"duct)SF300
4A26Removal of fiberglass batt insulation up to 12" thickSF70
4A27Removal of up to 12" thick fiberglass blown-in insulation in attic.SF70
4A28Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remainsEA70
4A29Apply penetrating encapsulant on ceiling and other structural surfacesSF700
4A30Seal exposed ends of asbestos pipe insulation.EA35
4A31Spray apply one (1) coat of penetrating encapsulant — Flat surfaceSF700
4A32Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanksSF700
4A33Remove of floor tiles or carpet and remove mastic with chemicalsSF3000
4A34Remove floor tiles — each additional layerSF3000
4A35Remove of linoleum and remove mastic with chemicalsSF3000
4A36Remove windows and perimeter sealant as asbestos & install temporary protection in opening with plywood and studs — Wrap, seal as asbestos and/or lead paint or bothSF of rough opng3000
4A37Remove asbestos containing caulking exterior of building first floor or on scaffoldingLF3000
4A38Excavate and remove contaminated dirt, by hand — Crawl SpaceCU. FT.850
4A39In a crawl space, remove debris, flatten contaminated earth, pour a fiber reinforced, 3" thick 3000 psi concrete slab, float finish. All equipment including concrete pump.SF2500
4A40Contaminated Waste: Bag, Remove from work area.BAG2500
4A41Contaminated Waste Wrapped Items Remove from work areaEA1290
4A42Excavate and remove contaminated dirt, by hand — Crawl SpaceCU. FT.690
4A43Remove vinyl wall base & asbestos glueLF470
4A44Remove mastic by HEPA filtered bead blasting rather than chemicalsSF3000

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

LEAD CONTAINING PAINT ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0BWork DescriptionUnitsQty$/UnitTotal
4B1Abrasive Blasting flat, round, shapedSF170
4B2Chemical stripping larger areas not covered belowSF170
4B3Chemical Stripping - paint from Window SashSF170
4B4Chemical Stripping - paint from Window SillLF170
4B5Scrape & Encapsulate - paint on Window SashSF170
4B6Scrape & Encapsulate - paint on Window SillsLF170
4B7Scrape & Encapsulate - paint on masonrySF170
4B8Power Tool CleaningSF170
4B9EncapsulationSF170
4B10Removal of material- TrimLF70
4B11Removal of material- DrywallSF140
4B12Remove windows with lead containing paint & install temporary protection in opening with plywood and studs — Wrap, seal as containing lead paintSF of rough opng2980
4B13Removal of abandoned pipe or de-energized conduit > 4” diaLF70
4B14Removal of abandoned pipe or de-energized conduit < 4” diaLF35
4B15TCLP sampling of wasteEA9
4B16Seal hazardous waste in DOT-standard 55 gal drums, store, transport, and disposal in a licensed landfillDRUM9
4B17Loading for transport and disposal waste in a truck or dumpsterCY17

MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0CWork DescriptionUnitsQty$/UnitTotal
4C1Removal of Material-Drywall on studs or furringSF1400
4C2Removal of Material-Carpet & glueSF170
4C3Removal of Material -Carpet Tile & glueSF170
4C4Removal of Material-VCT & glueSF480
4C5Removal of Material-Linoleum & glueSF480
4C6Removal of Material-Ceramic TileSF35
4C7Removal of Material - Plywood on floor or wallSF350
4C8Removal of Material- Contaminated Fiberglass Batt Insulation up to 6" thickSF350
4C9Removal of Contaminated Fiberglass Insulation 7" up to 12" thickSF350
4C10Removal of up to 12" thick fiberglass blown-in insulation in attic.SF70
4C11Mold Remediation/Removal on Concrete Wall or FloorSF340
4C12Mold Remediation/Removal on DrywallSF690
4C13Multiplier for Off-Hours - Outside 8AM - 4:30PM0

ITEMS COMMON TO ASBESTOS, LEAD, AND MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING

No. 0DWork DescriptionUnitsQty$/UnitTotal
4D1*Mobilization on projects. Work area isolationEA2
4D2*Mobilization on projects. No work area isolationEA1
4D3*Emergency ResponseEA1
4D4*Work PlanEA3
4D5Elevated Work Surfaces in containment. Scaffolding (per SF floor area)Per SF Floor Area260
4D6HEPA negative air machine (each)Per WEEK87
4D7Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wipingSF13800
4D8Decontamination System. 2" x 4" @ 16", 5/8" plywood each side — 3 Stage Personal Decontamination Chamber with showerEA2
4D9Decontamination System. Disposable 3-stage decontamination system including showerEA2
4D10Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheetingSF of Partition350
4D11Install and Remove Temporary 1Hr. Fire Rated Partition with 2" x 4" @ 16" studs & 5/8" drywall on each side, joints taped and fire caulking, one self closing locking doorSF of Partition3500
4D12Sealing and Protecting the Work Area on existing wall surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.SF of Surface ea. Layer13800
4D13Sealing and Protecting the Work Area on existing ceiling surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.SF of Surface ea. Layer13800
4D14Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywoodSF1700
4D15Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" — 8 ft. highSF of Partition350
4D16Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" — 12 ft. highSF of Partition350
4D17Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" —16 ft. highSF of Partition350
4D18*Exterior (or interior) 1/2 in. x 48 in. x 96 in. Cellular White PVC Panel on studs or furring (intended for transite replacement). Exterior grade caulking all joints and seams.SF350
4D19*General non-HAZMAT waste haul and disposal charges - Loads greater than 5 CYPer Ton10
4D20*General waste non-HAZMAT haul and disposal charges - Loads less than 5 CYPer CY44
4D21Truck and temporary storage of small quanties of hazardous waste in a secure location.Per CY44
4D22Install new commercial carpet tile, 24 x 24SY170
4D23Install new commercial carpetSY170
4D24Install new commercial floor tile, 12" x 12"SF170
4D25Install new 5/8" drywall over studs or furring (not incl.), tape and finish.SF of D.W.1380
4D26Install new 3 1/2" metal or wood studs @ 16" o.c. for walls up to 10' high.SF of Wall1380
4D27Painting, new, on drywall or masonry, 3 coats.SF of Wall1380
4D28Patching drywall damaged in abatement or removing base, ready for PaintSF of patch170
4D29Insulate F.G. w/ PVC Jacket fittings and valves, up to 4" diameter pipe, IPSEA70
4D30Insulate F.G. w/ PVC Jacket fittings and valves, 6" to 8" diameter pipe, IPSEA34
4D31Insulate F.G. w/ PVC Jacket fittings and valves, 10" — 12" diameter pipe, IPSEA27
4D32Insulate 2" F.G. w/ PVC Jacket Pipe, up to 4" diameter pipe, IPSLF140
4D33Insulate 2" F.G. w/ PVC Jacket Pipe, 5" to 8" diameter pipe/Iron Pipe Size IPSLF86
4D34Replacement Material- Fiberglass Batt Insulation up to 6" thickSF345
4D35Replacement Material Fiberglass Insulation 7" up to 12" thickSF345
4D36Replacement Material up to 12" thick fiberglass blown-in insulation in attic.SF70
4D37New pipe support blocks, bottom half of pipe at supports, and new pipe insulation shields. Nominal pipe size 6".EA9
GRAND TOTAL YEAR 4