This document appears to be a set of final drawings for a renovation project, titled "RENOVATE ENVIRONMENTAL MANAGEMENT AREA 589A4-23-051", which is associated with Solicitation Number 36C25524R0104. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 for a renovation project. The document contains 55 pages of detailed drawings for the renovation work required under this contract opportunity. No other details about the specific products, services, pricing, or other terms of the solicitation are provided in this file.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25524R0104 0003.docx | DOCX document | |
| Pages from TERRACON ASBESTOS SURVEY Final Report-NESHAP Survey Report_updated as removed.pdf | ||
| 36C25524R0104 0002.docx | DOCX document | |
| 000110 - TOC.pdf | ||
| 024100 Demolition.pdf | ||
| General Decision Number-MO20240084 07-12-2024.pdf | ||
| Specification 01-33-23.pdf | ||
| Attendance Roster-Renovate Environmental.pdf | ||
| ATTENDANCE ROSTER-RENOVATE ENVIRONMENTAL MANAGEMENT AREA.xlsx | XLSX spreadsheet | |
| 36C25524R0104 0001.docx | DOCX document | |
| 36C25524R0104_1.docx | DOCX document | |
| P09- Revised Final Specifications-589A4-23-051-856 pgs.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION
SUBSYSTEM
BUILDING WALL
SECTION
ELEVATION
INTERIOR
ELEVATION
DOORS
ROOM NUMBER
EXTERIOR AND
INTERIOR WINDOWS
PLAN & SECTION
DETAIL REFERENCE
REFERS TO A TYPICAL
ASSEMBLY
LOCATION ON DRAWING
SHEET
SHEET DETAIL IS
LOCATED
REFERS TO NUMBER ON DOOR
SCHEDULE, SEE SHEET A401
REFERS TO NUMBER ON
FLOOR PLAN
REFERS TO FRAME TYPE, SEE
ENLARGED ELEVATIONS ON SHEET A202
LOCATION ON
DRAWING SHEET
ARROW INDICATES DIRECTION OF
ELEVATION
SHEET LOCATION WHERE
ELEVATION IS LOCATED
Room name
A101
SIM
NUMBER INDICATES ELEVATION
ON SHEET
LOCATION ON
DRAWING SHEET
101A
A101
A101
PARTITION
TYPES
REFERS TO INTERIOR PARTITIONS,
SEE SHEET G005
REVISION
REVISIONS ARE SHOWN WITHIN
"CLOUDED" AREA REVISION
NUMBER & DATE WILL APPEAR IN
TITLE BLOCK SPACE SO LABELED
SHEET LOCATION WHERE
ELEVATION IS LOCATED
A101
DEMOLITION NOTE
REFERS TO DEMOLITION
NOTES ON THAT SHEET
X
CONSTRUCTION NOTE REFERS TO CONSTRUCTION
NOTES ON THAT SHEET
X
EXTERIOR AND
INTERIOR STOREFRONT
REFERS TO FRAME TYPE, SEE
ENLARGED ELEVATIONS ON SHEET A20200
SF
REFERS TO EXISTING GRID
LINES IN PROJECT
REFERS TO NEW GRID LINES
EXISTING GRID LINE
NEW GRID LINE
DRAWING LIST
GENERAL
G001 COVER SHEET
G002 LIFESAFETY, ABBREVIATIONS & CODE NOTES
G003 INFECTION CONTROL RISK ASSESSMENT
G004 BASEMENT FLOOR PHASING PARTIAL PLAN
G005 PARTITION TYPES
STRUCTURAL
S001 GENERAL NOTES AND ABBREVIATIONS
SS101 BASEMENT FLOOR FRAMING PLAN - NEW WORK
S301 DETAILS AND SECTIONS
ARCHITECTURAL
AD101 BASEMENT DEMOLITION PLAN
A101 BASEMENT FLOOR PLAN
A102 BASEMENT RCP
A131 ENLARGED PLANS
A201 INTERIOR ELEVATIONS AND SECTIONS
A202 INTERIOR ELEVATIONS AND SECTIONS
A301 DETAILS
A401 DOOR, WINDOW, AND STOREFRONT LEGEND, SCHEDULE & DETAILS
A601 FINISH LEGEND, NOTES & DETAILS
A603 BASEMENT FLOOR FINISH PLAN
A604 BASEMENT WALL FINISH PLAN
A701 BASEMENT FLOOR EQUIPMENT PLAN
MECHANICAL
M001 MECHANICAL NOTES, LEGENDS AND SYMBOLS
MD101 BASEMENT PLAN - MECHANICAL - DEMOLITION
MH101 BASEMENT PLAN - MECHANICAL - NEW WORK
MH102 BASEMENT PLAN - MECHANICAL - NEW WORK PRESSURIZATION
MP101 BASEMENT PLAN - MECHANICAL PIPING - NEW WORK
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M801 MECHANICAL SCHEDULES
PLUMBING
P001 PLUMBING NOTES, LEGENDS AND SYMBOLS
PD101 BASEMENT PLAN - DEMO
PS101 BASEMENT PLAN - NEW WORK
P801 PLUMBING SCHEDULES
FIRE PROTECTION
FP001 FIRE PROTECTION LEGENDS AND SYMBOLS
FX101 BASEMENT PLAN - FIRE PROTECTION - DEMO
FP101 BASEMENT PLAN - FIRE PROTECTION - NEW WORK
FP103 BASEMENT PLAN - FIRE PROTECTION HAZARD CLASSIFICATION
FP501 FIRE PROTECTION DETAILS
ELECTRICAL
E001 ELECTRICAL LEGENDS AND SYMBOLS
E002 ELECTRICAL GENERAL NOTES
ED101 FLOOR PLAN - LIGHTING - DEMO
ED102 FLOOR PLAN - ELECTRICAL EQUIPMENT - DEMO
EL101 FLOOR PLAN - LIGHTING - NEW WORK
EP101 FLOOR PLAN - ELECTRICAL EQUIPMENT - NEW WORK
E501 ELECTRICAL DETAILS
E502 ELECTRICAL DETAILS
E601 ELECTRICAL DIAGRAMS
E801 ELECTRICAL SCHEDULES
FIRE ALARM
FA001 FIRE ALARM LEGENDS AND SYMBOLS
FD101 FLOOR PLAN - FIRE ALARM - DEMO
FA101 FLOOR PLAN - FIRE ALARM - NEW WORK
FA501 FIRE ALARM DETAILS
TELECOM
T001 TECHNOLOGY LEGEND, ABBREVIATIONS, AND NOTES
TD101 TECHNOLOGY DEMOLITION PLAN
TN101 FLOOR PLAN - TECHNOLOGY - NEW WORK
T501 TECHNOLOGY DETAILS
SITE MAP SYMBOLS
NOT FOR CONSTRUCTION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DEPARTMENT OF VETERANS AFFAIRS
THINKFORM DESIGN ARCHITECT LLC
1435 VINE STREET
CINCINNATI, OH 45202
T: 855.821.0274 F: 609.644.4397 Russell DiNardo, AIA NY 031521-1
A u to d e s k D o c s
/2
V A
C o lu m b ia
M O
E M
S /2
V
A C o lu m b ia M
O E
M S
.r v t
/2
/2
:0
:2
P
M
G001
COVER SHEET RENOVATE ENVIRONMENTAL
MANAGEMENT AREA
Harry S Truman Memorial Veterans' Hospital 800 Hospital Drive Columbia, MO 65201
589A4-23-051
28 MAY 2024 TB JC
100% CONSTRUCTION
DRAWINGS MOD 1
RENOVATE ENVIRONMENTAL MANAGEMENT AREA
Harry S Truman Memorial Veterans' Hospital
800 Hospital Drive Columbia, MO 65201
Revisions: Date:
UP
FD
FD
FD
FD
ABBREVIATIONS:
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
ABV ABOVE
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADH ADHESIVE
ADJ ADJACENT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECT
ASB ASBESTOS
ASPH ASPHALT
ASSN ASSOCIATION
AUTO AUTOMATIC
AUX AUXILIARY
BAT BATTEN
BD BOARD
BEV BEVEL
BKG BACKING
BLDG BUILDING
BOT BOTTOM
BTWN BETWEEN
C TO C CENTER TO CENTER
CAB CABINET
CONC CONCRETE
CIR CIRCLE
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
COL COLUMN
CONC FLR CONCRETE FLOOR
CONSTR CONSTRUCTION
CONT CONTINUE
COORD COORDINATE
CPT CARPET OR CARPET TILE
CSWK CASEWORK
CT CERAMIC TILE
CTRL CONTROL
DAT DATUM
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DTL DETAIL
DIFF DIFFERENCE
DIM DIMENSION
DIR DIRECTION
DR DOOR, OR DRAIN
DR OPNG DOOR OPENING
E.J. EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ESP ESPECIALLY
EX EXISTING
EXIST EXISTING
EXP EXPOSED
FA FIRE ALARM
FAS FASCIA
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FLR FINISH FLOOR
FIXT FIXTURE
FLR FLOOR
FP FIRE PROTECTION OR FIREPROOF
FRT FIRE RETARDANT TREATED
FRZ FREEZER
FT FEET OR FOOT
FURN FURNISH OR FURNITURE
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL OR GENERATOR
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GT GROUT
GYP GYPSUM
GYP BD GYPSUM BOARD
HB HOSE BIBB
HC HOLLOW CORE
HDWD HARDWOOD
HM HOLLOW METAL
HT HEIGHT
HVAC HEATING, VENTILATING,
AND AIR CONDITIONING
ID IDENTIFICATION
ILLUM ILLUMINATION
INCL INCLUDED
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
JAN JANITOR
J-BOX JUNCTION BOX
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LDR LEADER
LED LIGHT EMITTING DIODE
LT LIGHT
LVD LOUVERED
LVR LOUVER
LVT LUXURY VINYL TILE
LYR LAYER
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMO MEMORANDUM
MEZZ MEZZANINE
MID MIDDLE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MLWK MILLWORK
MO MASONRY OPENING
MTL METAL
MULL MULLION
NA NOT APPLICABLE
NAT NATURAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NUM NUMERAL
OC ON CENTER
OCC OCCUPY
OFF OFFICE
OPNG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY
AND HEALTH ADMINSTRATION
OZ OUNCE
PART PARTIAL
PAT PATTERN
PEN PENETRATE
PERF PERFORATED
PERP PERPENDICULAR
PFT PORCELAIN FLOOR TILE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PRB PROFILE BASE
PRCST PRECAST
PREFAB PREFABRICATE
PRELIM PRELIMINARY
PREP PREPARATION
PREV PREVIOUS
PROP PROPERTY
PTD PAINTED
PVC POLYVINYL CHLORIDE (PLASTIC)
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QT QUARRY TILE
QTB QUARRY TILE BASE
QTR QUARTER
QTY QUANTITY
R RADIUS OR RISER
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REINF REINFORCE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RESIL RESILIENT
RET RETURN
REV REVISION
RF RUBBER FLOORING
RM ROOM
RND ROUND
RO ROUGH OPENING
SALV SALVAGE
SBSTR SUBSTRATE
SCHED SCHEDULE
SCHEM SCHEMATIC
SECT SECTION
SEP SEPARATE
SF SQUARE FOOT (FEET)
SLNT SEALANT
SMK SMOKE
SPEC SPECIFICATION
SPKLR SPRINKLER
SPLY SUPPLY
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SURF SURFACE
SUSP SUSPEND
SVT SOLID VINYL FLOOR TILE
SYS SYSTEM
T&G TONGUE AND GROOVE
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
THK THICKNESS
THRU THROUGH
TMPD TEMPERED
TO TOP OF ___
TRANS TRANSOM
TRTD TREATED
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
UV ULTRAVIOLET
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VOL VOLUME
W/ WITH
W/O WITHOUT
WD WOOD
WSCT WAINSCOT
WSF WELDED SEAM SHEET FLOORING
WT WEIGHT
2.1. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION
A. DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
1. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
2. INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW).
3. NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW).
4. NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.
5. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
6. VA SEISMIC DESIGN REQUIREMENTS, H-18-8.
7. NATIONAL ELECTRICAL CODE (NEC).
8. INTERNATIONAL PLUMBING CODE (IPC).
9. SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
10. ASME BOILER AND PRESSURE VESSEL CODE.
11. ASME CODE FOR PRESSURE PIPING.
12. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13).
13. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318).
14. MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).
15. ENERGY POLICY ACT OF 2005 (EPACT).
16. DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
17. FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU).
18. EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT.
19. THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
20. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.
21. SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.
B. LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
C. NOTES
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED IN THE VA PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED
EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
D. CONSTRUCTION TYPE CLASSIFICATION: TYPE II (222). THE MINIMUM FIRE RATING FOR ALL LOAD-BEARING STRUCTURAL ELEMENTS IS 2 HRS.
E. OCCUPANCY IS BASED OFF NFPA 101 TABLE 7.1.3.2
CODE NOTES:
A. BUSINESS USE:
1. 6.1.11 BUSINESS
2. SHALL COMPLY WITH CHAPTERS 38/39, NEW BUSINESS OCCUPANCIES/EXISTING BUSINESS OCCUPANCIES”
B. FIRE SUPPRESSION: THE ENTIRE BUILDING IS PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 9.7.
C. OCCUPANT LOAD:
1. THERE IS NO INCREASE TO THE PROPOSED OCCUPANCY OF THE BASEMENT FLOOR.
2. OCCUPANCY FOR EACH ROOM LISTED IN PLAN BELOW. OCCUPANCY CALCULATIONS BASED ON NFPA 101 TABLE 7.1.3.2.
D. CONSTRUCTION, REPAIR AND IMPROVEMENT OPERATIONS:
1. SHALL COMPLY WITH SECTION 4.6.10, AREAS ADJACENT TO PROJECT AREA WILL BE OCCUPIED DURING CONSTRUCTION WITH ALL REQUIRED MEANS OF EGRESS AND REQUIRED FIRE
PROTECTION FEATURES REMAINING IN PLACE AND CONTINUOUSLY MAINTAINED.
E. MEANS OF EGRESS (SECTIONS 7 AND 38)
1. EXIT ACCESS CORRIDORS SERVING MORE THAN 30 SHALL BE 1-HOUR RATED (7.1.3.1).
EXCEPTION (1) REQUIREMENT SHALL NOT APPLY TO EXISTING BUILDINGS PROVIDED THE OCCUPANCY CLASSIFICATION DOES NOT CHANGE & EXCEPTION (38.3.6.1 (3)) WITHIN
BUILDINGS PROTECTED THROUGHOUT BY AN AUTOMATIC SPRINKLER SYSTEM.
2. DOORS (7.2.1.2.3.2): DOOR OPENINGS MEANS OF EGRESS SHALL BE NOT LESS THAN 32 INCHES IN CLEAR WIDTH.
3. DEAD-END CORRIDORS (38.2.5.3.1): DEAD-END CORRIDORS SHALL NOT EXCEED 50 FEET.
4. MEANS OF EGRESS (38.2.3.2): THE CLEAR WIDTH OF ANY CORRIDOR OR PASSAGEWAY SERVING AN OCCUPANT LOAD OF 50 OR MORE SHALL BE NOT LESS THAN 44 INCHES.
F. ARRANGEMENT OF MEANS OF EGRESS (38.2.5)
1. 38.2.5.1 MEANS OF EGRESS SHALL BE ARRANGED IN ACCORDANCE WITH SECTION 7.5.
2. 38.2.5.2.1 COMMON PATH OF TRAVEL SHALL NOT EXCEED 100FT (30M) IN A BUILDING PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN
ACCORDANCE WITH 9.7.1.1(1).
3. 38.2.5.2.2 COMMON PATH OF TRAVEL SHALL NOT EXCEED 100FT (30M) WITHIN A SINGLE TENANT SPACE HAVING AN OCCUPANT LOAD NOT EXCEEDING 30 PERSONS.
G. TRAVEL DISTANCE TO EXITS (38.2.6)
1. 38.2.6.3 TRAVEL DISTANCE SHALL NOT EXCEED 300 FT. IN BUSINESS OCCUPANCIES PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM.
H. INTERIOR FINISH (38.3.3)
1. INTERIOR FINISHES SHALL BE IN ACCORDANCE WITH SECTION 10.2.
2. WALLS AND CEILINGS (38.3.3.2.1): INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE CLASS A OR CLASS B IN EXITS AND EXIT ACCESS CORRIDORS.
3. WALLS AND CEILINGS (38.3.3.2.2): INTERIOR WALL AND CEILING FINISHES SHALL BE CLASS A, CLASS B OR CLASS C IN AREAS OTHER THAN THOSE SPECIFIED IN 39.3.3.2.1.
NFPA 101 BUILDING CODE DESIGN
CRITERIA:
EXIT SIGN
LIFESAFETY LEGEND:
EXIT ACCESS TRAVEL DISTANCE
FIRE EXTINGUISHER CABINETFE CAB
RATED DOOR
EXISTING 2 HOUR RATED FIRE PARTITION
EXISTING SMOKE RATED FIRE PARTITION
EXISTING 1 HOUR RATED FIRE PARTITION
EXISTING PARTITION
NEW 2 HOUR RATED FIRE PARTITION
1 HOUR RATED FIRE PARTITION
EC EXIT CAPACITY
OCC. = # OCCUPANCY = # OF OCCUPANTS
KEY PLAN
PROJECT
SCOPE
CART CLEANING
D001A
EQUIPMENT
D003A
LOGISTICS STORAGE
D003B
TOILET
D004I
STORAGE
D003C
E L
E C
T R
IC
A
L
E
UNIFORMS
D004C
PERSONAL EFFECTS
D004D
EFFECTS
D004F
HIGH DENSITY STORAGE
D004A
CONFERENCE
D004J STAGING + RECEIVING
D004
PREP COUNTER
INFECTION
D002A
REPAIR ROOM
D002
TRAINER
D004P
CHIEF
D004R
ASST. CHIEF
D004Q
EXIT ACCESS TRAVEL DISTANCE = 228' - 3"
CBD3
D019C D018
D025
D025
C003A
C003
D024
D0219E
CARTS
D004S
WORKROOM
D004K
EXIT ACCESS TRAVEL DISTANCE = 97' - 2"
EXIT ACCESS
TRAVEL
DISTANCE =
121' - 5"
EXIT ACCESS TRAVEL DISTANCE = 120' - 11"
TRASH
D001B
ELEC.
D002B
VESTIBULE
CBD1A
CORRIDOR
CBD1B
ADMIN
D004H
FE CAB
FE CAB
CBD4
CORRIDOR
PHONE OPERATOR
D004L
TOILET
D004B
OPERATOR
SUPERVISOR
D004E
OPERATOR
D004M
OPERATOR
SUPERVISOR
D004N
ELEC.
CLOSET
GRID
H-7
D004O
ELEVATOR
#4
ELEVATOR
#5
MORGUE
D031
MORGUE
D029
MORGUE
D028
MORGUE
D011
MORGUE
D025
MORGUE
D030
MORGUE
D027
STAIR
D026
FIRE PUMP ROOM
D017 M & R
D016
M & R
D012
M & R
D010
LOCKSMITH
D006
CORRIDOR
90 RATED
RATED
RATED
45 RATED
45 RATED
45 RATED
90 RATED
90 RATED
45 RATED
90 RATED
45 RATED
D
210 EC180 EC
180 EC
180 EC
180 EC
180 EC
180 EC
180 EC
180 EC
180 EC
180 EC 180 EC
OCC. = 1 OCC. = 1
OCC. = 1
OCC. = 7OCC. = 9OCC. = 1OCC. = 1
OCC. = 1
OCC. = 1
OCC. = 1
OCC. = 1
OCC. = 1
UNIFORM
EXCHANGE
D004B
OCC. = 2
OCC. = 1
OCC. = 1
OCC. = 2 OCC. = 2
OCC. = 1
OCC. = 1
OCC. = 1
RATED
90 RATED
45 RATED
OCC. = 1
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/2
V A
C o lu m b ia
M O
E M
S /2
V
A C o lu m b ia M
O E
M S
.r v t
/2
/2
:4
:2
P
M
G002
LIFESAFETY, ABBREVIATIONS &
CODE NOTES
RENOVATE ENVIRONMENTAL
MANAGEMENT AREA
Harry S Truman Memorial Veterans' Hospital 800 Hospital Drive Columbia, MO 65201
589A4-23-051
28 MAY 2024 TB JC
100% CONSTRUCTION
DRAWINGS MOD 1
N
PROJECT
NORTH
1/8" = 1'-0"
BASEMENT FLOOR PLAN - OPTION 2
INFECTION CONTROL RISK ASSESSMENT
STEP ONE: Construction, Renovation, and/or Maintenance Activity Category
Using the following table, identify the Type of Construction Project Activity (Type A-D)
TYPE A
Inspection and/or facility upkeep generally defined as follows:
• Work can be completed in a single shift, not to exceed 10 hours.
• Patients and/or employees may be in the area depending on the activity.
• Work that does not create dust or debris.
• Removal of ceiling tile or access to mechanical or electrical chase for visual inspection limited to 1 tile per
50 square feet with limited exposure time (not to exceed an hour for each tile) within the shift.
• Minor interior updates (e.g., replacing floor or ceiling tiles, carpentry work to include hanging signage, and painting without sanding) that do not create dust or debris.
• Limited building system maintenance such as plumbing on potable systems limited to faucet replacement etc. and electrical work such as replacement of bulbs, receptacles, or switches.
Infection Control Risk Assessment
Matrix of Precautions for Construction & Renovation
THE PURPOSE OF INFECTION CONTROL PROCEDURES IS TO MINIMIZE THE POTENTIAL FOR THE SPREAD OF INFECTIONS DUE TO DEGRADED AIR QUALITY, ENVIRONMENTAL CONTAMINATION, OR CONTAMINATION OF WATER.
IT IS THE POLICY OF THIS MEDICAL CENTER THAT A SYSTEMATIC APPROACH BASED ON ASSESSMENT AND PLANNING WILL EFFECTIVELY MANAGE THE ISSUE OF TRANSMISSION OF INFECTIOUS DISEASES AND THE AGGRAVATION OF ALLERGIES. THE OVERALL APPROACH RELIES ON PRE-CONSTRUCTION ASSESSMENT, MANAGEMENT OF HVAC SYSTEMS, AND AGGRESSIVE USE OF A VARIETY OF BARRIERS. CONTRACTOR IS TO WORK CLOSELY WITH THE VA FACILITY MANAGEMENT SERVICE CENTER, THE INFECTION CONTROL PROGRAM STAFF AND THE SAFETY AND OCCUPATION HEALTH MANAGER TO HAVE IN PLACE A MONITORING PROGRAM TO ASSURE RIGOROUS IMPLEMENTATION OF THE REQUIRED MEASURES, REFER TO PROJECT SPECIFICATIONS.
A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL INFECTION CONTROL REQUIREMENTS WITH THE DEMOLITION AND NEW CONSTRUCTION. THE CONTRACTOR SHALL REPORT ALL DISCOVERIES TO THE OWNERS' REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING.
B. CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES. CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-CLOSING. PROVIDE DUST CONTROL AND CONTAINMENT STICKY MATS ON ALL ACCESS DOORS INTO CONSTRUCTION AREA. ANTE-ROOM REQUIRED AT CONSTRUCTION ENTRY. PROVIDE MANOMETER MONITORS
FOR ALL CONSTRUCTION BARRIERS.
C. CONTRACTOR TO DISPOSE OF MATERIALS BEFORE 8:00 AND OR AFTER 4:00 PM UNLESS ARRANGED WITH THE VA TO DISPOSE OF DURING NORMAL HOURS. USE ROUTE AGREED UPON BY ICRA TEAM AND COTR FOR TRANSPORT OF TRANSPORT CONTAINERS THROUGH THE FACILITY. CONTRACTORS CAN ONLY DEVIATE TO NORMAL HOURS WITH THE APPROVAL OF THE INFECTION CONTROL NURSE AND COR DUE TO PARTICULAR CIRCUMSTANCES THAT MAY OBSTRUCT PROGRESS. A CLEAR PLAN WILL HAVE TO BE SUBMITTED AND
PRECAUTIONARY INFECTION CONTROL MEASURES IMPLEMENTED.
D. CONTRACTOR TO COVER CARTS WHEN DISPOSING MATERIALS.
E. CONTRACTOR TO CHANGE MATS MULTIPLE TIMES A DAY AS NEEDED AND MOP FLOORS BEHIND THEM
MULTIPLE TIMES A DAY.
F. CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN THE WORK SITE UTILIZING WINDOW EXHAUST FANS STRATEGICALLY LOCATED OR PROVIDED NEGATIVE PRESSURE AIR HEPA UNITS AND EXHAUST TO EXTERIOR OF THE BUILDING. CONTRACTOR TO INCLUDE MONITORING MANOMETER AT
ANTEROOM SO THE NEGATIVE PRESSURE CAN BE INSPECTED.
INFECTION CONTROL NOTES:
TYPE B
General maintenance and repair work generally defined as follows:
• Prolonged inspection and work that may take longer than a single shift but not exceeding a week.
• Patients and employees are not to be in the area until activity is completed.
• Work that creates minimal dust and debris.
• Interior finish or surface repairs, updates, or modifications such as repair of firewalls and barriers, and new flooring that produces minimal dust and debris. Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
• Plumbing work such as installation or replacement of a single fixture or piping for a single fixture. Any work on sanitary plumbing including snaking of drains.
• Electrical work such as installation of cabling/wiring/conduit for a single device, installation of new device such as a light fixture that produces minimal dust and debris.
• Air Handler and/or fan shutdown/startup and HVAC work such as replacement of a single diffuser, single terminal unit or a single device that produces minimal dust and debris.
TYPE C
Small-scale construction, renovation, or maintenance generally defined as follows:
• Work requiring longer than a single week to complete but not exceeding 6 months.
• Patients and employees are not to be in the area until activity is completed.
• Demolition/removal of preexisting floor covering, casework, lay-in ceiling, or other architectural elements.
• Demolition/removal of more than 32 ft2 of drywall/framing, hard ceilings, and doors/framing and minimal infrastructure such as electrical circuits and branch piping.
• Installation of new walls, ceilings and doors including framing, drywall/plaster and associated work.
• Plumbing work such as the installation of new sinks, showers and toilets and associated plumbing.
• Shut down of sections of potable water systems.
• Electrical work such as installation of conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc.
• Modification of existing fire alarm and suppression systems.
• Mechanical work such as the installation of ductwork, diffusers, and terminal units for an area.
TYPE D
Large-scale construction, renovation, or maintenance generally defined as follows:
• Work exceeding 6 months in duration.
• Patients and employees are not to be in the area until activity is completed.
• Large-scale demolition of building components and infrastructure including removal of multiple doors, walls, framing, ceilings, flooring, piping, electrical and HVAC.
• The installation building components such as new walls, ceilings and doors including framing, drywall and associated plaster work.
• Plumbing work such as the installation of:
• new medical gas systems,
• steam/heating hot water, condensate systems,
• multiple sinks, showers and toilets including associated plumbing.
• Shutdown of potable water, steam/heating hot water, condensate, and medical gas systems.
• Electrical work such as installation of electrical feeders, distribution panels, conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc.
• Installation of fire alarm and suppression systems.
• Electrical shutdown of multiple panels.
• Mechanical work such as the installation of air handling equipment, associated ductwork, diffusers, heat exchangers, terminal units and controls.
TABLE TWO: Affected Area Assessment Identify the areas and associated patients that will be affected by the construction/renovation/maintenance activity (see the Figure for a visual representation of adjacent affected areas).
STEP ONE - Activity Type: TYPE D
Project start date:
Completion date:
Permit expiration date
Harry S Truman Memorial Veterans' Hospital 800 Hospital Drive Columbia, MO 65201
Infection Prevention and Control Construction/Renovation/Maintenance Permit
Unique permit number:
Location of construction /renovation/maintenance
Project Manager:
Contact Phone Number:
Contractor:
Overall Patient Risk Category (Low, Medium, High, or Highest)
Activity Category (A, B, C, or, D)
Level of Infection Prevention and Control Precautiond (I, II, III< IV)
Level of Precautions
Control Measures must be in place fomr the duration of the activity (Check the box for the activity's Level of Precautions to indicate the Control Measures)
LEVEL I 1. Perform work activity in a manner that does not create dust.
2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.
3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.
LEVEL II All control measures in Level I and the following:
1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).
2. Ensure worker clothing is clean and free of visible dust before leaving the work area.
3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence.
Rebalance system to address diffuser isolation.
4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system
5. Seal doors, to prevent dust migration.
6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.
LEVEL III All control measures in Levels I and II and the following:
1. Ensure availability of equipment for cleaning hands.
2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors (unless a work specific waiver is approved by VHA’s Office of Healthcare Engineering); this must be maintained continuously 24/7 for the duration of the project. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows is not required to be HEPA-filtered. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.
6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
LEVEL IV All control measures in Levels I, II and III and the following:
1. Barriers must be hard barriers unless temporary to install final barrier.
2. Containment must include an anteroom to ensure pressure control, Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom.
HEPA vacuuming of clothing or use of cover suits is acceptable.
4. Workers must wear shoe covers or have a method to clean shoes in anteroom Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
Additional Requirements:
Infection Preventionist Signature:
Project Manager Signature:
Date:
Date:
All control measures in Levels I and II and the following:
1. Ensure availability of equipment for cleaning hands.
2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors (unless a work specific waiver is approved by VHA’s Office of Healthcare Engineering); this must be maintained continuously 24/7 for the duration of the project. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows is not required to be HEPA-filtered. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.
6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
LEVEL III
All control measures in Levels I, II and III and the following:
1. Barriers must be hard barriers unless temporary to install final barrier.
2. Containment must include an anteroom to ensure pressure control. Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.
4. Workers must wear shoe covers or have a method to clean shoes in anteroom.
Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be changed immediately.
LEVEL IV
Controls defined below shall be completed upon completion of the activity and inspected prior to terminating measures defined in Table 5.
TABLE SIX: - Minimum Infection Prevention and Control Measures Required Upon Completion of the Activity
Measures
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Water systems:
1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminants from the work area.
2. Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications.
Water systems:
1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.
Level of Precautions
LEVEL
I - II
LEVEL
III - IV
All control measures in Level I and the following:
1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).
2. Ensure worker clothing is clean and free of visible dust before leaving the work area.
3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.
4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system.
5. Seal doors to prevent dust migration.
6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash
(covered) from work area using an identified exit route.
7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy.
Sticky mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.
LEVEL II
AFFECTED AREA ASSESSMENT
Area Service(s)/Type(s) of Areas(s) (e.g., OR, Unit/Ward, Sterile Processing, Administrative, etc)
Point of Contact (POC) Point of Contact Information
Activity Area
Area Above
Area Below
Adjacent Area 1
Adjacent Area 2
Adjacent Area 3
Adjacent Area 4
EMS
PATHOLOGY
SUB-BASEMENT
KITCHEN / BioMED
PHONE OPERATOR
M & R
MORGUE / ECC
Using the following table, identify the Patient Risk Groups that will be affected. If more than one risk group will be affected, select the higher risk group.
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
Non-patient care areas:
• Public hallways and gathering areas not in clinical areas
• Office areas not in clinical areas
• Breakrooms not in clinical areas
• Bathrooms or locker rooms not in clinical areas
• Mechanical/electrical rooms not in clinical areas
Patient care support areas such as:
• Waiting areas
• Clinical engineering
(biomedical)
• Materials management
• Sterile processing department – dirty side
• Kitchen, cafeteria, gift shop, coffee shop, and food kiosks
Patient care areas such as:
• Patient care rooms and areas, including spinal cord injury units
• All acute care units, including mental health
• All outpatient units and clinics
• Emergency department
• Community Living Centers, domiciliaries, and transitional residences
• Employee health
• Pharmacy – general work zone
• Medication rooms and clean utility rooms
• Imaging suites – diagnostic imaging
• Laboratory
Procedural, invasive, sterile support and highly compromised patient care areas such as:
• All transplant units
• All intensive care units
• All oncology units and chemotherapy/infusio n centers
• OR theaters and restricted areas
• Hemodialysis units
• Procedural rooms*
• Pharmacy compounding area
• Sterile processing department – clean side
• Transfusion services
• Imaging suites – interventional imaging
• Dedicated isolation wards/units for infectious diseases
TABLE THREE - Patient Risk Category: MEDIUM
Match the Overall Patient Risk Category (Low, Medium, High, Highest) determined from Table 3 with the planned construction/Renovation/Maintenance Activity Category (A, B, C, D) from Table 1 to determine the minimum Level of Infection Prevention and Control Precautions (I, II, III, or IV) using Table 4 below.
TYPE A TYPE B TYPE C TYPE D
I II II III
I
I
II
II
II
III
IV
IVIII
IV
IV
IV
LOW Risk Group
MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
Patient Risk Group
Construction Project Type
An infection prevention and control permit is required for Level III and Level IV. Consult with Infection Prevention and Control for Level I and Level II.
TABLE FOUR - Class of Precautions: CLASS IV
TABLE FOUR: - Level of Infection Prevention and Control Precautions
TABLE THREE: - Patient Risk Category
Controls defined below for the Level of Precautions identified for the activity must be in place before the activity begins and maintained until work is completed and the area is activated. Control measures for each Precaution Level must also include the control measures in the preceding Level(s). As the activity progresses, a full re-evaluation of remaining activity type and patient risk is required prior to downgrading the Level of Precautions.
LEVEL I
1. Perform work activity in a manner that does not create dust.
2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.
3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.
TABLE FIVE: - Required Infection Prevention and Control Measures, by Level of Precautions
Level of Precautions
Control Measures
This page must be posted at the entrance to the project area for Level III and Level IV activities.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s
/2
V A
C o lu m b ia
M O
E M
S /2
V
A C o lu m b ia M
O E
M S
.r v t
/2
/2
:4
:2
P
M
G003
INFECTION CONTROL RISK
ASSESSMENT
RENOVATE ENVIRONMENTAL
MANAGEMENT AREA
Harry S Truman Memorial Veterans' Hospital 800 Hospital Drive Columbia, MO 65201
589A4-23-051
28 MAY 2024 TB JC
100% CONSTRUCTION
DRAWINGS MOD 1
UP UP
INSIDE SCOPE OF PHASE
OUTSIDE SCOPE OF PHASE
PHASING AREA OF WORK
KEY PLAN
PROJECT
SCOPE
ELEVATOR
#4
ELEVATOR
#5
D031
D029 D028
D011
D030 D025 D026
STAIR
D027
MORGUE
D017
FIRE PUMP ROOM
D016
M & R
D010
M & R
D012
M & R
D006
LOCKSMITH
D004L
PHONE OPERATOR
D004B
TOILET
D004E
OPERATOR
SUPERVISOR
D004M
OPERATOR
D004N
OPERATOR
SUPERVISOR
D004O
ELE. CLOSET
GRID H-7
ADMIN STAFF TO BE RELOCATED FOR THE FIRST TWO
PHASES OF CONSTRUCTION. LINENS TO BE RELOCATED
TO TRAILERS AND OTHER FLOORS DURING PHASE 1.
TEMPORARY CONSTRUCTION BARRIERS ARE PLACED TO
LIMIT CONSTRUCTION DEBRIS FROM ACCESSING OTHER
PARTS OF EMS. DEMOLITION AND CONSTRUCTION OF
PHASE 1 TO PROCEED.
PHASE 1:
STORAGE
D001
STORAGE
D001B
STORAGE
D001A
PHARMACY STORAGE
D002
LINEN CAROUSEL
D004B
LINEN
D004C VESTIBULE
STORAGE
D003B
STORAGE
D003C
ASST. CHIEF
OFFICE
D004G
SUPERVISORS
OFFICE
D004H
CHIEF OFFICE
D004I
SUPERVISORS
OFFICE
D004J
ADMIN/SECRETARY
D004K
LINEN STORAGE
D004
STORAGE
D003A
STORAGE
D003D
TOILET
D004A
LINEN STORAGE
D008
STORAGE
D003
CORRIDOR
CBD1B
1 HR TEMP CONSTRUCTION
BARRIER TO SEAL OFF LINEN
CAROUSEL
SEAL FOR TEMP
CONSTRUCTION BARRIER
D004F
MORGUEMORGUE
MORGUE
MORGUEMORGUE
MORGUE
ANTEROOM
CONSTRUCTION ENTRANCE
ELEC.
D002B
EXISTING DOOR USED AS CONSTRUCTION ENTRANCE.
BUILD OUT NEW ELEC. ROOM
SEAL FOR TEMP
CONSTRUCTION BARRIER
AFTER PHASE 1 WORK HAS BEEN COMPLETED, A
PORTION OF EQUIPMENT AND SUPPLIES ARE TO BE
TEMPORARILY RELOCATED. PHASE 2 TEMPORARY
CONSTRUCTION BARRIERS ARE ERECTED. LINENS CAN
MOVE OPERATIONS INTO THE NEWLY CONSTRUCTED
SPACE. ADMIN STAYS REMOTE. DEMOLITION AND
CONSTRUCTION OF PHASE 2 TO PROCEED.
PHASE 2:
NEW PHASE 1 DOOR
SEALED TO PROTECT
PHASE 1 OPERATIONS
DURING PHASE 2
DEMOLITION AND
CONSTRUCTION.
SEAL FOR TEMP
CONSTRUCTION BARRIER
1 HR TEMP
CONSTRUCTION
BARRIER
ELEVATOR
ELEVATOR
STAIR
MORGUE
FIRE PUMP ROOM M & R
M & R
M & R
LOCKSMITH
PHONE OPERATOR
TOILET
OPERATOR
SUPERVISOR
OPERATOR
OPERATOR
SUPERVISOR
ELE. CLOSET
GRID H-7
STORAGE
STORAGE
STORAGE
PHARMACY STORAGE
LINEN CAROUSEL
LINEN VESTIBULE
STORAGE
STORAGE
LINEN STORAGE
STORAGE
STORAGE
TOILET
LINEN STORAGE
STORAGE
CORRIDOR
MORGUEMORGUE
MORGUE
MORGUEMORGUE
MORGUE
#4
#5
D031
D029 D028
D011
D030 D025 D026
D027
D017 D016
D010
D012
D006
D004L
D004B
D004E
D004M D004N
D004O
D001
D001B
D001A
D002
D004B
D004C
D003B
D003C
D004
D003A
D003D
D004A
D008
D003
CBD1B
D004F
EXISTING DOORS USED AS
CONSTRUCTION ENTRANCE
PROVIDE A TEMPORARY BARRIER
BETWEEN PHASES
ELEC.
D002B
AFTER PHASE 2 WORK HAS BEEN COMPLETED, THE
PHASE 3 TEMPORARY CONSTRUCTION BARRIERS ARE
ERECTED. ADMIN CAN MOVE BACK INTO THEIR SPACE.
EQUIPMENT AND SUPPLIES TO BE TEMPORARILY
RELOCATED TO TRAILERS AND CLOSETS ON OTHER
FLOORS. DEMOLITION AND CONSTRUCTION OF PHASE 3
TO PROCEED.
NEW PHASE 2 DOOR SEALED TO PROTECT
PHASE 1 AND 2 OPERATIONS DURING PHASE
3 DEMOLITION AND CONSTRUCTION.
ELEVATOR
ELEVATOR
STAIR
MORGUE
FIRE PUMP ROOM M & R
M & R
M & R
LOCKSMITH
PHONE OPERATOR
TOILET
OPERATOR
SUPERVISOR
OPERATOR
OPERATOR
SUPERVISOR
ELE. CLOSET
GRID H-7
STORAGE
STORAGE
STORAGE
PHARMACY STORAGE
LINEN CAROUSEL
STORAGE
VESTIBULE
STAGING + RECEIVING
CARTS
TOILET
STORAGE
CORRIDOR
MORGUEMORGUE
MORGUE
MORGUEMORGUE
MORGUE
PHASE 3:
#4
#5
D031
D029 D028
D011
D030 D025 D026
D027
D017 D016
D010
D012
D006
D004L
D004B
D004E
D004M D004N
D004O
D001
D001B
D001A
D002
D004B
D004G
D004
D004S
D004A
D003
CBD1B
D004F
TRAINER
D004P
ASST. CHIEF
D004Q
CHIEF
D004R
WORKROOM
D004K
CONFERENCE
D004K
STORAGE
D003D
UNIFORM
D004C
ADMIN
D004H
EXISTING DOORS USED AS
CONSTRUCTION ENTRANCE
ELEC.
D002B
2 HOUR RATED FIRE PARTITION
SMOKE RATED FIRE PARTITION
1 HOUR RATED FIRE PARTITION
PARTITION LEGEND:
1 HOUR TEMPORARY CONSTRUCTION
BARRIER
U.S. OF DECK
CEILING LINE
FINISH FLOOR
FLOOR RUNNER TRACK
4" METAL STUDS @ 16" O.C.
5/8" IMPACT RESISTANT TYPE "X" GYP.
BD. BOTH SIDES
GYP BD CASING. BOTH SIDES
5 1/4"
FLEXIBLE SEALANT BOTH SIDES
EXTEND STUD FRAMING TO STRUCTURE
ABOVE
10 TEMPORARY BARRIER
FLEXIBLE SEALANT BOTH SIDES
1 LAYER OF 5/8" IMPACT RESISTANT TYPE
"X" GYP BD ON BOTH SIDE, 4" (U.N.O.)
METAL STUDS @16" O.C. PARTITION
EXTENDS TO UNDERSIDE OF DECK
ABOVE.
SLIP LEG TRACK
UL U419 1HR
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
P
\2
V
A C o lu m b ia
M O
E M
S \d w g
\0 B
IM
\2
V
A C o lu m b ia
M O
E M
S P
H A
S
IN
G \2
V A
C o lu m b ia
M O
E M
S P h a s in g d e ta c h e d
.r v t
/2
/2
:2
:4
P
M
G004
BASEMENT FLOOR PHASING RENOVATE ENVIRONMENTAL
MANAGEMENT AREA
Harry S Truman Memorial Veterans' Hospital 800 Hospital Drive Columbia, MO 65201
589A4-23-051
10 APRIL 24 TB JC
100% CONSTRUCTION
DOCUMENTS MOD1
THE PURPOSE OF INFECTION CONTROL PROCEDURES IS TO MINIMIZE THE POTENTIAL
FOR THE SPREAD OF INFECTIONS DUE TO DEGRADED AIR QUALITY, ENVIRONMENTAL
CONTAMINATION, OR CONTAMINATION OF WATER. IT IS THE POLICY OF THE VA THAT
A SYSTEMATIC APPROACH BASED ON ASSESSMENT AND PLANNING WILL
EFFECTIVELY MANAGE THE ISSUE OF TRANSMISSION OF INFECTIOUS DISEASES AND
THE AGGRAVATION OF ALLERGIES. THE OVERALL APPROACH RELIES ON PRE-
CONSTRUCTION ASSESSMENT, MANAGEMENT OF HVAC SYSTEMS, AND AGGRESSIVE
USE OF A VARIETY OF BARRIERS. CONTRACTOR IS TO WORK CLOSELY WITH THE VA
FACILITY MANAGEMENT SERVICE CENTER, THE INFECTION CONTROL PROGRAM
STAFF AND THE SAFETY AND OCCUPATION HEALTH MANAGER TO HAVE IN PLACE A
MONITORING A PROGRAM TO ASSURE RIGOROUS IMPLEMENTATION OF THE
REQUIRED MEASURES. REFER TO PROJECT SPECIFICATIONS.
A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND
COORDINATE ALL INFECTION CONTROL REQUIREMENTS WITH THE DEMOLITION AND
NEW CONSTRUCTION. THE CONTRACTOR SHALL REPORT ALL DISCOVERIES TO THE
OWNER'S REPRESENTATIVE FOR RESOLUTION PRIOR TO BEGINNING.
B. CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES TO CONTROL
CONSTRUCTION DEBRIS. BARRIERS MAY CONSIST OF FIELD CONSTRUCTED HARD
WALL BARRIERS, MODULAR WALL SYSTEMS (STARC WALL OR SIMILAR), AND FIRE
RATED PLASTIC SHEETING WHERE AGREED TO BY THE VA INFECTION CONTROL
PROGRAM STAFF. CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-CLOSING.
PROVIDE DUST CONTROL AND CONTAINMENT STICKY MATS AN ALL ACCESS INTO
CONSTRUCTION AREA. ANTE-ROOM, WHERE REQUIRED, SHALL BE AT THE
CONSTRUCTION ENTRY.
C. CONTRACTOR TO DISPOSE OF MATERIALS PRIOR TO END OF WORK DAILY. USE
ROUTE AGREED UPON BY ICRA TEAM AND COTR FOR TRANSPORT OF TRANSPORT
CONTAINERS THROUGH THE FACILITY.
D. CONTRACTOR TO USE HARD COVER CARTS WHEN DISPOSING OF MATERIALS.
E. CONTRACTOR TO CHANGE MATS MULTIPLE TIMES A DAY AS NEEDED AND MOP
FLOORS BEHIND THEM MULTIPLE TIMES A DAY AS OFTEN AS NEEDED TO PREVENT
TRACKNG OF CONSTRUCTION DUST AND DEBRIS.
F. CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN
THE WORK SITE UTILIZING WINDOW EXHAUST FANS STRATEGICALLY LOCATED OR
PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND EXHAUST TO EXTERIOR OF THE
BUILDING. WHERE REQUIRED, CONTRACTOR TO INCLUDE MONITORING MANOMETER
AT ANTEROOM SO THE NEGATIVE PRESSURE CAN BE INSPECTED.
G. MEASURES REQUIRED TO BE TAKEN FOR THE TYPE OF WORK (SEE CHART)
WILL VARY BY DEPARTMENT ADJACENCIES PER FLOOR THROUGHOUT THE HOSPITAL.
REFERENCE THE ICRA CLASS IV CHART AT RIGHT FOR THE MINIMUM REQUIREMENTS
TO BE FOLLOWED IN EACH AREA.
PHASING NOTES
1/8" = 1'-0"G004
BASEMENT PLAN PHASE 11
1/8" = 1'-0"G004
BASEMENT PLAN PHASE 22
1/8" = 1'-0"G004
BASEMENT PLAN PHASE 33
A. ALL STUD SPACING IS 16 INCHES ON CENTER MINIMUM UNLESS NOTED
OTHERWISE.
B. SEE FINISH SCHEDULE FOR LOCATION OF APPLIED FINISHES (SUCH AS
CERAMIC TILE, WALL COVERING, ETC.) THAT MAY AFFECT THE PARTITION
SURFACE AND CONSTRUCTION REQUIREMENTS.
C. WHERE CERAMIC TILE AND CEMENTITIOUS BACKER UNIT ARE NOT
SCHEDULED TO BE THE FULL HEIGHT OF PARTITION, PROVIDE GYPSUM
BOARD (TYPE 'X' @ RATED PARTITIONS) AT THOSE PORTIONS OF THE
PARTITION NOT SCHEDULED TO RECEIVE CERAMIC TILE.
D. ALL SOUND RATED WALLS OR PARTITIONS (STC 45 OR AND ABOVE) SHALL
HAVE AN ACOUSTICAL GASKET AND/OR ACOUSTICAL SEALANT AT THE
TOP, BOTTOM AND SIDES WHERE A SOUND LEAK COULD OCCUR. ALL
PENETRATIONS THROUGH SUCH PARTITIONS SHALL BE GASKETED AND
SEALED ALONG THE PENETRATION PERIMETER. IF PARTITIONS ARE FIRE-
RATED, PROVIDE UL-LABELED FIRE STOPPING IN PLACE OF ACOUSTICAL
SEALANT. AT PARTITIONS THAT ARE SOUND AND FIRE RATED, PROVIDE
ACOUSTICAL SEALANT AT PARTITION PENETRATIONS THAT DO NOT
REQUIRE FIRE STOPPING (EXAMPLE: DUCT PENETRATIONS WITH FIRE
DAMPERS).
E. ALL FIRE AND/OR SMOKE PARTITIONS, FIRE BARRIERS AND FIRE WALLS
SHALL EXTEND FROM FLOOR TO THE UNDERSIDE OF THE DECK, AND BE
ENTIRELY SEALED WITH FIRE SAFING MATERIALS PER AN APPROVED FIRE
RATED ASSEMBLY IN ACCORDANCE WITH A U.L. DESIGN, OR A DESIGN
TESTED BY A TESTING LAB APPROVED BY THE AUTHORITY HAVING
JURISDICTION. ALL PENETRATIONS THROUGH AND EDGES OF PARTITIONS
SHALL ALLOW FOR APPROPRIATE DEFLECTIONS AND MOVEMENT OF
ADJACENT MATERIALS AND RESULTING SPACES PROPERLY FILLED WITH
FIRE SAFING INSULATION AND SEALED TO MAINTAIN THE RATING
INTEGRITY.
F. ALL RATED PARTITIONS SHALL BE PERMANENTLY IDENTIFIED WITH A SIGN
OR STENCILING ABOVE THE CEILING. THE SIGN SHALL READ "X-HOUR
FIRE AND/OR SMOKE BARRIER - PROTECT ALL OPENINGS", AND BE
LOCATED A MAXIMUM 13 FEET O.C. ON CONTINUOUS WALLS. BEGIN NEW
SERIES ON ALL CORNERS. LETTERING AND ARROWS MAY BE UTILIZED TO
INDICATE THE DIRECTION AND EXTENT OF THE FIRE RATING.
G. ALL NON-RATED PARTITIONS OF COMBUSTIBLE CONSTRUCTION
EXTENDING ABOVE THE CEILING SHALL BE FIREBLOCKED AT THE TOP OF
PARTITION AND HORIZONTALLY AT INTERVALS NOT EXCEEDING 10 FEET IF
NECESSARY, WITH 2 INCH NOMINAL LUMBER ALL PENETRATIONS OF THIS
FIRE-STOPPING SHALL BE SEALED.
H. PROVIDE BRACING AT 48" O.C. MAXIMUM ABOVE CEILING TO STRUCTURAL
FRAMING WHERE PARTITION EXCEEDS THE MAXIMUM UNBRACED HEIGHT
OR WHERE REQUIRED TO PROVIDE RIGIDITY TO THE PARTITION BELOW
THE CEILING WHERE CERAMIC TILE OCCURS. ENSURE INTEGRITY OF FIRE
AND SOUND RATINGS OF PARTITION IF BRACING PENETRATES PARTITION
SURFACE.
I. NON-RATED PARTITIONS THAT DO NOT EXTEND TO STRUCTURE OR DECK
ABOVE, IN AREAS WITH ACOUSTICAL TILE CEILINGS, SHALL EXTEND A
MINIMUM OF 6 INCHES ABOVE THE CEILING. SEE NOTE 'J' ABOVE FOR
BRACING REQUIREMENTS. TOP OF PARTITION SHALL BE FIRE-STOPPED
WITH NON-COMBUSTIBLE MATERIAL (I.E. METAL STUD RUNNER).
J. PROVIDE BLOCKING AT ALL ACCESSORIES AND CASEWORK.
K. AT SPACES WITHOUT CEILINGS, SURROUNDING PARTITIONS SHALL
EXTEND TO STRUCTURE OR DECK ABOVE WITHOUT ANY VOIDS ABOVE
TOP OF WALL.
L. SEE…