36C25524R0104 0002.docx
DOCX document 21 KB Posted
- Solicitation number
- 36C25524R0104
About this file
This document is an amendment to a solicitation for contract 36C25524R0104, which is for the Renovation of the Environmental Management Area at the Columbia, Missouri VA Medical Center, project number 589A4-23-051. The key details are:
The amendment provides additional information, including answers to all questions received, an updated table of contents, and the demolition specification section. The question and answer period ended on July 26, 2024, and proposals are due on August 15, 2024 by 2:00 PM CDT. The work includes general construction, removal of existing building elements, and phased construction as documented in the specifications and drawings. The contract will be a commercial item, with a NAICS code of 236220 - Commercial and Institutional Building Construction. The product/service code is Z2DA - Repair or Alteration of Hospitals and Infirmaries. All other terms and conditions remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25524R0104 0003.docx | DOCX document | |
| Pages from TERRACON ASBESTOS SURVEY Final Report-NESHAP Survey Report_updated as removed.pdf | ||
| 000110 - TOC.pdf | ||
| 024100 Demolition.pdf | ||
| General Decision Number-MO20240084 07-12-2024.pdf | ||
| Specification 01-33-23.pdf | ||
| Attendance Roster-Renovate Environmental.pdf | ||
| ATTENDANCE ROSTER-RENOVATE ENVIRONMENTAL MANAGEMENT AREA.xlsx | XLSX spreadsheet | |
| 36C25524R0104 0001.docx | DOCX document | |
| 36C25524R0104_1.docx | DOCX document | |
| P09- Revised Final Specifications-589A4-23-051-856 pgs.pdf | ||
| P01-Final Drawings-589A4-23-051-55 pgs.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 589A4-23-051 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth
KS
66048 To all Offerors/Bidders
36C25524R0104
X X X
August 15, 2024, by 2:00 PM CDT See CONTINUATION Page 589A4-23-051, Renovate Environmental Management Area.
The purpose of this Amendment is to provide the following information:
a. All questions received, and their answers are included in this amendment.
b. Specification Table of Contents updated and Specification section 02 41 00 are attached.
c. The Question and Answer period ended July 26, 2024.
d. Proposals are due August 15, 2024, by 2:00 PM CDT.
e. All other terms and conditions remain unchanged.
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes general construction, necessary removal of existing building elements and phased construction for the Environmental Management Area as documented in the specifications and drawings.
Contract Period: Base POP Begin:
POP End:
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries
| GRAND TOTAL |
| __________________ |
CONTINUATION PAGE
Department of Veteran Affairs, Columbia, Missouri VAMC
SOLICITATION-36C25524R0104 Renovate Environmental Management Area, 589A4-23-051-
1. Question: Will this project require certified payroll with the prevailing wage requirements?
Answer: YES
2. Question: Are 10-hour workings days acceptable for construction?
Answer: COL VAMC – The VA provides construction supervision coverage from 6:30am to 7:00pm Monday through Friday. However, the GC shall be always onsite while any or all work is be done, this includes nights and weekend work. The VA does not officially support (4) 10 hour working days.
3. Question: Please confirm the hospital facilities staff will be responsible for removal and storage of their contents.
Answer: COL VAMC – Yes, the VA will be responsible from removal and storage of VA owned furniture and equipment the VA will re-use or store, unless otherwise noted in the plans and specifications. All items remining in the construction space on the agreed day of space take over by the contractor shall be the responsibility of the contractor to remove from the VA premises.
4. Question: Certain shutdowns of systems will be required after working hours (alarms, power, water, etc.) and will need to be coordinated with facilities. Will they be available after hours or do all shutdowns need to happen during regular business hours?
Answer: COL VAMC – Shutdowns need to be scheduled prior to work be started per the specification’s timelines provided. Some shutdowns will be required to be after normal operating hours. Some shutdowns will need to occur during weekend hours. Some shutdowns can take place during normal working hours. This is decided on a case-by-case basis. But yes, the VA provides construction personal for work scheduled after hours and on weekends. The VA’s general night coverage hours are Monday – Thursday, from 4:30pm to 2:00am.
5. Question: Please provide specification for demolition.
Answer: The VA demolition specification section 024100 has been added.
6. Question: Sheet M-001 general note 21 mentions asbestos abatement and refers to most current asbestos report. Will there be any asbestos or lead abatement on this project?
Answer: VA to respond; environmental services were excluded from A/E design.
7. Question: Will this project be tax exempt?
Answer: Materials associated with this project will be Sales Tax exempt, the awarded contractor will be issued Sales Tax Exemption Certificates at the Pre-Construction Conference.
8. Question: Please advise if the designated SSHO and Competent Person role can be fulfilled by the site superintendent?
Answer: Please see spec section 01 35 26 for the requirements of these roles.
9. Question: Will there be carbon fiber reinforcements at hole penetrations?
Answer: The locations of the new penetrations in the existing slab are to be located such that no rebar is to be cut, thus negating the requirement for carbon fiber reinforcement. The existing slab is to be GPR scanned, and the location of the hole coordinated prior to drilling per SS101 Drawing Note 2.
A.2 List of Attachments
See attached document: 000110 - TOC.
See attached document: 024100 Demolition.
Amendment 2-36C25524R0104-RENOVATE ENVIRONMENTAL MANAGEMENT AREA-Project Number-589A4-23-051.