P01 - Drawings - 528A6-24-603 Replace CLC Doors.pdf
PDF 3 MB Posted
- Attached to
- Y1DA--528A6-24-603 Replace CLC Doors Federal contract opportunity
- Solicitation number
- 36C24226B0015
About this file
These are architectural design development drawings for a U.S. Department of Veterans Affairs (VA) project to replace CLC doors at Buildings 78 and 76 located in Bath, NY, with project number 528A6-24-603. The documents include a cover sheet, site location map, site plan, floor plans for two buildings, and a detailed door schedule and specifications. The drawings focus on replacing existing doors, with multiple door types (B-1 through B-4) illustrated and detailed, including technical specifications for hardware, glazing, and installation requirements. The drawings provide comprehensive architectural details for door replacements, including dimensions, mounting instructions, and specific notes on installation procedures, materials, and functional requirements for the VA facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24226B0015 0001.docx | DOCX document | |
| S04 - pre Sign in sheet - 36C24226B0015 Replace CLC Doors.pdf | ||
| P01 - Specs - 528A6-24-603 Replace CLC Doors.pdf | ||
| P01 - SOW - 528A6-24-603 Replace CLC Doors.pdf | ||
| 36C24226B0015.docx | DOCX document | |
| FAR 52.225-2 Buy American Certification.pdf | ||
| LOS certification - 1.2023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bath VAMC
FIREPLACE
SHED
SHED
GARDEN PLOT
FI
RE
P
IT
SHED
EMPTY TRANSFORMER
BLOCK BUILDING
DUGOUT
CONCRETE WALL
DUGOUT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
G001
Cover Sheet
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Bath, NY
528A6-24-603
Issue Date AAA MCCRevisions: Date:
Project Director NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
Design Development Replace CLC Doors
DRAWING INDEX
DISCIPLINE/
SHEET NO. DESCRIPTION
G001 COVER SHEET & DRAWING INDEX
A101 BUILDING 78_PLAN
A102 BUILDING 76_PLAN
A103 DOOR SCHEDULE & DETAILS
AutoCAD SHX Text
REPLACE CLC
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A6-24-603 BUILDING 78 BATH, NY
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
SITE LOCATION
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 29A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DOORS
GEC
EMS
EMS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A101
Building 78_Plan
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Bath, NY
528A6-24-603
Issue Date AAA MCCRevisions: Date:
Project Director NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
Design Development Replace CLC Doors
FIREPLACE
SHED
SHED
GARDEN PLOT
FI
RE
P
IT
SHED
EMPTY TRANSFORMER
BLOCK BUILDING
DUGOUT
CONCRETE WALL
DUGOUT
CONSTRUCTION
STAGING AREA
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_FOUNTAINS
AutoCAD SHX Text
MILLBROOK
AutoCAD SHX Text K-5264
AutoCAD SHX Text
EW
AutoCAD SHX Text 78-4
AutoCAD SHX Text 78-3
AutoCAD SHX Text 78-1
AutoCAD SHX Text 78-2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
B-78 PLAN
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
%%UGENERAL NOTES:
AutoCAD SHX Text
1. REFER TO DOOR SCHEDULE AND DETAILS FOR INFORMATION REGARDING NEW DOORS REFER TO DOOR SCHEDULE AND DETAILS FOR INFORMATION REGARDING NEW DOORS 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS PRIOR TO SUBMITTALS AND ORDERING. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS PRIOR TO SUBMITTALS AND ORDERING. 3. ALL CONTROL ACCESS SHALL BE CAREFULLY DISCONNECTED AND RECONNECTED TO MAINTAIN INTENDED ALL CONTROL ACCESS SHALL BE CAREFULLY DISCONNECTED AND RECONNECTED TO MAINTAIN INTENDED OPERATIONS INCLUDING PIV READERS, POWER ACTUATORS, ETC. 4. OPENINGS SHALL BE PATCHED AND PREPARED PRIOR TO NEW DOOR INSTALLATION. ALL REPAIRS SHALL MATCH OPENINGS SHALL BE PATCHED AND PREPARED PRIOR TO NEW DOOR INSTALLATION. ALL REPAIRS SHALL MATCH ADJACENT - EXISTING FINISH COLOR, MATERIAL, AND TEXTURE. 5. NOTIFY THE COR IMMEDIATELY OF ANY DISCREPANCIES, DISCOVERED CONDITIONS, OR DELAYS. NOTIFY THE COR IMMEDIATELY OF ANY DISCREPANCIES, DISCOVERED CONDITIONS, OR DELAYS. 6. ALL PERSONNEL ENTERING THE SITE SHALL COMPLY WITH THE VA MEDICAL CENTER RULES AND REGULATIONS. ALL PERSONNEL ENTERING THE SITE SHALL COMPLY WITH THE VA MEDICAL CENTER RULES AND REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR SCREENING ALL EMPLOYEES AND SUB CONSULTANTS. 7. WORK THAT IS REQUIRED TO MEET THE INTENT OF THE WORK BUT IS NOT SPECIFICALLY SHOWN, SHALL BE WORK THAT IS REQUIRED TO MEET THE INTENT OF THE WORK BUT IS NOT SPECIFICALLY SHOWN, SHALL BE CONSIDERED THE RESPONSIBILITY OF THE CONTRACTOR. ALL EFFORTS HAVE BEEN MADE TO SHOW CLEAR INTENT OF THE DESIRED PRODUCT. 8. ALL INTERIOR PORTIONS OF THE WORK AREA SHALL BE CONTAINED BY ICRA BARRIERS MEETING THE STANDARDS ALL INTERIOR PORTIONS OF THE WORK AREA SHALL BE CONTAINED BY ICRA BARRIERS MEETING THE STANDARDS OF THE VA IN CORRELATION WITH THE WORK BEING PERFORMED. ACCESS SHALL BE PROVIDED AROUND BARRIERS TO ALLOW ADA ACCESSIBILITY. ALL BARRIERS SHALL POST THE ICRA PERMIT AS WELL AS ALL TEMPORARY EXITING SIGNAGE. 9. ALL OPENINGS SHALL BE SECURED AT THE END OF EACH WORK DAY. ALL OPENINGS SHALL BE SECURED AT THE END OF EACH WORK DAY. 10. ALL FRAMES SHALL ANCHORED, GROUTED SOLID, AND SEALED PER DETAILS.ALL FRAMES SHALL ANCHORED, GROUTED SOLID, AND SEALED PER DETAILS.
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 29A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UDEMOLITION GENERAL NOTES:
AutoCAD SHX Text
1. THIS DEMOLITION DRAWING INDICATES MAJOR ARCHITECTURAL ITEMS FOR REMOVAL, PATCH AND THIS DEMOLITION DRAWING INDICATES MAJOR ARCHITECTURAL ITEMS FOR REMOVAL, PATCH AND REPAIR. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS IN THE FIELD AND NOTIFY VA COR OF ANY DISCREPANCIES 2. EXISTING DOORS AND FRAMES VARY IN COMPOSITION INCLUDING WOOD AND ALUMINUM. EXISTING DOORS AND FRAMES VARY IN COMPOSITION INCLUDING WOOD AND ALUMINUM. 3. ALL REMOVALS ARE TO BE PROPERLY DISPOSED OF BY THE CONTRACTOR UNLESS OTHERWISE ALL REMOVALS ARE TO BE PROPERLY DISPOSED OF BY THE CONTRACTOR UNLESS OTHERWISE INDICATED BY THE DRAWINGS SUCH AS ITEMS TO BE SALVAGED 4. ALL REMOVALS, CUTTING AND PATCHING SHALL BE DONE SO AS TO PRESERVE THE STRUCTURAL ALL REMOVALS, CUTTING AND PATCHING SHALL BE DONE SO AS TO PRESERVE THE STRUCTURAL INTEGRITY OF THE EXISTING CONSTRUCTION AND MAINTAIN WEATHERTIGHTNESS 5. ALL EXISTING CONSTRUCTION TO REMAIN SHALL BE PATCHED WITH COMPONENTS AND ASSEMBLIES ALL EXISTING CONSTRUCTION TO REMAIN SHALL BE PATCHED WITH COMPONENTS AND ASSEMBLIES SIMILAR TO THE EXISTING CONSTRUCTION MATERIAL, FORM, COLOR AND TEXTURE 6. WHERE EXISTING FINISHES ARE TO REMAIN, PROTECT FROM DAMAGE OR DEBRIS WHERE EXISTING FINISHES ARE TO REMAIN, PROTECT FROM DAMAGE OR DEBRIS 7. ALL SALVAGE ITEMS TO BE REMOVED CAREFULLY, PROTECTED AND REINSTALLED OR DELIVERED ALL SALVAGE ITEMS TO BE REMOVED CAREFULLY, PROTECTED AND REINSTALLED OR DELIVERED TO OWNER AS INDICATED. SALVAGE ITEMS INCLUDE BUT NOT LIMITED TO: MOTOR DRIVE UNITS. 8. PROVIDE SIGNAGE AND SECURITY BARRIERS AS REQUIRED TO DIRECT FOOT TRAFFIC TO PROPER PROVIDE SIGNAGE AND SECURITY BARRIERS AS REQUIRED TO DIRECT FOOT TRAFFIC TO PROPER EXIT(S) AND ENTRANCE(S) TO BUILDING. PROJECT INVOLVES CLOSURE OF EMERGENCY EXITS AND MAY REQUIRE PHASING TO MAINTAIN BUILDING EGRESS. 9. PROTECT ALL ADJACENT BUILDING SYSTEMS TO MAINTAIN OPERATION AND KEEP FREE FROM DUST PROTECT ALL ADJACENT BUILDING SYSTEMS TO MAINTAIN OPERATION AND KEEP FREE FROM DUST AND DEBRIS THROUGHOUT DURATION OF CONSTRUCTION ACTIVITIES 10. CATALOGUE ALL ITEMS TO BE REINSTALLED TO ORIGINAL LOCATION AND SAFELY STORE. CATALOGUE ALL ITEMS TO BE REINSTALLED TO ORIGINAL LOCATION AND SAFELY STORE. 11. THE NUMBER OF DOORS THAT CAN BE CLOSED AT ONE TIME MAY BE RESTRICTED BY THE COR THE NUMBER OF DOORS THAT CAN BE CLOSED AT ONE TIME MAY BE RESTRICTED BY THE COR WITH DIRECTION FROM THE FIRE AND SAFETY DEPARTMENT AS TO NOT LIMIT ACCESS/EGRESS AT ANY GIVEN TIME. 12. WHERE EXISTING OPERATING PROCEDURES ARE PRESENT, CONTRACTOR SHALL INSTALL NEW DOOR WHERE EXISTING OPERATING PROCEDURES ARE PRESENT, CONTRACTOR SHALL INSTALL NEW DOOR TO MEET EXISTING. THIS INCLUDES, BUT NOT LIMITED, TO THE FOLLOWING: -- PIV ACCESS CARD READER - SHALL REMAIN, NEW DOOR, FRAME AND HARDWARE SHALL PIV ACCESS CARD READER - SHALL REMAIN, NEW DOOR, FRAME AND HARDWARE SHALL CONNECT TO EXISTING READER AND BE COMPATIBLE WITH ACCESS CONTROL SYSTEM. -- ALARMED EXIT DEVICE - SHALL REMAIN, NEW DOOR, FRAME, AND HARDWARE SHALL ALARMED EXIT DEVICE - SHALL REMAIN, NEW DOOR, FRAME, AND HARDWARE SHALL CONNECT TO EXISTING ALARM DEVICE AND BE COMPATIBLE WITH ACCESS CONTROL SYSTEM. -- POWERED OPENER - NEW POWERED OPENER/CLOSER SHALL BE PROVIDED WHERE POWERED OPENER - NEW POWERED OPENER/CLOSER SHALL BE PROVIDED WHERE PROVIDED WHERE WHERE INDICATED AND CONNECTED TO EXISTING ACTUATOR(S), TO REMAIN, AND BE ACTUATOR(S), TO REMAIN, AND BE COMPATIBLE WITH ACCESS CONTROL SYSTEM. SOME LOCATIONS UTILIZE 1 OR 2 ACTUATORS. -- SOME LOCATIONS MAY UTILIZE 1 OR MORE OF ACCESS CONTROL DEVICES. CONTRACTOR SOME LOCATIONS MAY UTILIZE 1 OR MORE OF ACCESS CONTROL DEVICES. CONTRACTOR DEVICES. CONTRACTOR CONTRACTOR SHALL CONFIRM DOOR OPERATION PRIOR TO SUBMITTAL.
AutoCAD SHX Text CAREFULLY REMOVE EXISTING DOOR AND FRAME IN ITS ENTIRETY INCLUDING, BUT NOT LIMITED TO DOOR, FRAME, THRESHOLD, ANCHORS, INTEGRATED TRANSOM, HARDWARE, MECHANICAL UNITS, ETC. PREPARE OPENING TO RECEIVE NEW DOOR AND FRAME AS SCHEDULED. ANY ELECTRICAL WIRING FROM ACCESS CONTROL DEVICES SHALL BE PROTECTED AND SECURED UNTIL INSTALLATION OF NEW DOOR AND FRAME. MOTOR DRIVE UNITS TO BE SALVAGED AND TURNED OVER TO THE VA.
AutoCAD SHX Text
%%UDEMOLITION PLAN KEYNOTES:
1HA2-76
1HA1-76
134B
123A
O122
O119 O118 O113
O120 O117 O114
1HA5-76
O105
O103 O102
O115O123
1HA4-76
O124
O116
139 141
O110 O109
O110A
O104
O104A
O101
O101B
144A
144D
125 126
120A
O125
O124A
145D
145C
136 140
136A 140C
140B
140D 140A
109110
101 102
O121
O106O107O112
O111 O108
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A102
Building 76_Plan
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Bath, NY
528A6-24-603
Issue Date AAA MCCRevisions: Date:
Project Director NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
Design Development Replace CLC Doors
FIREPLACE
SHED
SHED
GARDEN PLOT
FI
RE
P
IT
SHED
EMPTY TRANSFORMER
BLOCK BUILDING
DUGOUT
CONCRETE WALL
DUGOUT
CONSTRUCTION
STAGING AREA
AutoCAD SHX Text
TO CRAWL SPACE BELOW
AutoCAD SHX Text 76-1
AutoCAD SHX Text
AutoCAD SHX Text
%%UGENERAL NOTES:
AutoCAD SHX Text
1. REFER TO DOOR SCHEDULE AND DETAILS FOR INFORMATION REGARDING NEW DOORS REFER TO DOOR SCHEDULE AND DETAILS FOR INFORMATION REGARDING NEW DOORS 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS PRIOR TO SUBMITTALS AND ORDERING. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS PRIOR TO SUBMITTALS AND ORDERING. 3. ALL CONTROL ACCESS SHALL BE CAREFULLY DISCONNECTED AND RECONNECTED TO MAINTAIN INTENDED ALL CONTROL ACCESS SHALL BE CAREFULLY DISCONNECTED AND RECONNECTED TO MAINTAIN INTENDED OPERATIONS INCLUDING PIV READERS, POWER ACTUATORS, ETC. 4. OPENINGS SHALL BE PATCHED AND PREPARED PRIOR TO NEW DOOR INSTALLATION. ALL REPAIRS SHALL MATCH OPENINGS SHALL BE PATCHED AND PREPARED PRIOR TO NEW DOOR INSTALLATION. ALL REPAIRS SHALL MATCH ADJACENT - EXISTING FINISH COLOR, MATERIAL, AND TEXTURE. 5. NOTIFY THE COR IMMEDIATELY OF ANY DISCREPANCIES, DISCOVERED CONDITIONS, OR DELAYS. NOTIFY THE COR IMMEDIATELY OF ANY DISCREPANCIES, DISCOVERED CONDITIONS, OR DELAYS. 6. ALL PERSONNEL ENTERING THE SITE SHALL COMPLY WITH THE VA MEDICAL CENTER RULES AND REGULATIONS. ALL PERSONNEL ENTERING THE SITE SHALL COMPLY WITH THE VA MEDICAL CENTER RULES AND REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR SCREENING ALL EMPLOYEES AND SUB CONSULTANTS. 7. WORK THAT IS REQUIRED TO MEET THE INTENT OF THE WORK BUT IS NOT SPECIFICALLY SHOWN, SHALL BE WORK THAT IS REQUIRED TO MEET THE INTENT OF THE WORK BUT IS NOT SPECIFICALLY SHOWN, SHALL BE CONSIDERED THE RESPONSIBILITY OF THE CONTRACTOR. ALL EFFORTS HAVE BEEN MADE TO SHOW CLEAR INTENT OF THE DESIRED PRODUCT. 8. ALL INTERIOR PORTIONS OF THE WORK AREA SHALL BE CONTAINED BY ICRA BARRIERS MEETING THE STANDARDS ALL INTERIOR PORTIONS OF THE WORK AREA SHALL BE CONTAINED BY ICRA BARRIERS MEETING THE STANDARDS OF THE VA IN CORRELATION WITH THE WORK BEING PERFORMED. ACCESS SHALL BE PROVIDED AROUND BARRIERS TO ALLOW ADA ACCESSIBILITY. ALL BARRIERS SHALL POST THE ICRA PERMIT AS WELL AS ALL TEMPORARY EXITING SIGNAGE. 9. ALL OPENINGS SHALL BE SECURED AT THE END OF EACH WORK DAY. ALL OPENINGS SHALL BE SECURED AT THE END OF EACH WORK DAY. 10. ALL FRAMES SHALL ANCHORED, GROUTED SOLID, AND SEALED PER DETAILS.ALL FRAMES SHALL ANCHORED, GROUTED SOLID, AND SEALED PER DETAILS.
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 29A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UDEMOLITION GENERAL NOTES:
AutoCAD SHX Text
1. THIS DEMOLITION DRAWING INDICATES MAJOR ARCHITECTURAL ITEMS FOR REMOVAL, PATCH AND THIS DEMOLITION DRAWING INDICATES MAJOR ARCHITECTURAL ITEMS FOR REMOVAL, PATCH AND REPAIR. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS IN THE FIELD AND NOTIFY VA COR OF ANY DISCREPANCIES 2. EXISTING DOORS AND FRAMES VARY IN COMPOSITION INCLUDING WOOD AND ALUMINUM. EXISTING DOORS AND FRAMES VARY IN COMPOSITION INCLUDING WOOD AND ALUMINUM. 3. ALL REMOVALS ARE TO BE PROPERLY DISPOSED OF BY THE CONTRACTOR UNLESS OTHERWISE ALL REMOVALS ARE TO BE PROPERLY DISPOSED OF BY THE CONTRACTOR UNLESS OTHERWISE INDICATED BY THE DRAWINGS SUCH AS ITEMS TO BE SALVAGED 4. ALL REMOVALS, CUTTING AND PATCHING SHALL BE DONE SO AS TO PRESERVE THE STRUCTURAL ALL REMOVALS, CUTTING AND PATCHING SHALL BE DONE SO AS TO PRESERVE THE STRUCTURAL INTEGRITY OF THE EXISTING CONSTRUCTION AND MAINTAIN WEATHERTIGHTNESS 5. ALL EXISTING CONSTRUCTION TO REMAIN SHALL BE PATCHED WITH COMPONENTS AND ASSEMBLIES ALL EXISTING CONSTRUCTION TO REMAIN SHALL BE PATCHED WITH COMPONENTS AND ASSEMBLIES SIMILAR TO THE EXISTING CONSTRUCTION MATERIAL, FORM, COLOR AND TEXTURE 6. WHERE EXISTING FINISHES ARE TO REMAIN, PROTECT FROM DAMAGE OR DEBRIS WHERE EXISTING FINISHES ARE TO REMAIN, PROTECT FROM DAMAGE OR DEBRIS 7. ALL SALVAGE ITEMS TO BE REMOVED CAREFULLY, PROTECTED AND REINSTALLED OR DELIVERED ALL SALVAGE ITEMS TO BE REMOVED CAREFULLY, PROTECTED AND REINSTALLED OR DELIVERED TO OWNER AS INDICATED. SALVAGE ITEMS INCLUDE BUT NOT LIMITED TO: MOTOR DRIVE UNITS. 8. PROVIDE SIGNAGE AND SECURITY BARRIERS AS REQUIRED TO DIRECT FOOT TRAFFIC TO PROPER PROVIDE SIGNAGE AND SECURITY BARRIERS AS REQUIRED TO DIRECT FOOT TRAFFIC TO PROPER EXIT(S) AND ENTRANCE(S) TO BUILDING. PROJECT INVOLVES CLOSURE OF EMERGENCY EXITS AND MAY REQUIRE PHASING TO MAINTAIN BUILDING EGRESS. 9. PROTECT ALL ADJACENT BUILDING SYSTEMS TO MAINTAIN OPERATION AND KEEP FREE FROM DUST PROTECT ALL ADJACENT BUILDING SYSTEMS TO MAINTAIN OPERATION AND KEEP FREE FROM DUST AND DEBRIS THROUGHOUT DURATION OF CONSTRUCTION ACTIVITIES 10. CATALOGUE ALL ITEMS TO BE REINSTALLED TO ORIGINAL LOCATION AND SAFELY STORE. CATALOGUE ALL ITEMS TO BE REINSTALLED TO ORIGINAL LOCATION AND SAFELY STORE. 11. THE NUMBER OF DOORS THAT CAN BE CLOSED AT ONE TIME MAY BE RESTRICTED BY THE COR THE NUMBER OF DOORS THAT CAN BE CLOSED AT ONE TIME MAY BE RESTRICTED BY THE COR WITH DIRECTION FROM THE FIRE AND SAFETY DEPARTMENT AS TO NOT LIMIT ACCESS/EGRESS AT ANY GIVEN TIME. 12. WHERE EXISTING OPERATING PROCEDURES ARE PRESENT, CONTRACTOR SHALL INSTALL NEW DOOR WHERE EXISTING OPERATING PROCEDURES ARE PRESENT, CONTRACTOR SHALL INSTALL NEW DOOR TO MEET EXISTING. THIS INCLUDES, BUT NOT LIMITED, TO THE FOLLOWING: -- PIV ACCESS CARD READER - SHALL REMAIN, NEW DOOR, FRAME AND HARDWARE SHALL PIV ACCESS CARD READER - SHALL REMAIN, NEW DOOR, FRAME AND HARDWARE SHALL CONNECT TO EXISTING READER AND BE COMPATIBLE WITH ACCESS CONTROL SYSTEM. -- ALARMED EXIT DEVICE - SHALL REMAIN, NEW DOOR, FRAME, AND HARDWARE SHALL ALARMED EXIT DEVICE - SHALL REMAIN, NEW DOOR, FRAME, AND HARDWARE SHALL CONNECT TO EXISTING ALARM DEVICE AND BE COMPATIBLE WITH ACCESS CONTROL SYSTEM. -- POWERED OPENER - NEW POWERED OPENER/CLOSER SHALL BE PROVIDED WHERE POWERED OPENER - NEW POWERED OPENER/CLOSER SHALL BE PROVIDED WHERE PROVIDED WHERE WHERE INDICATED AND CONNECTED TO EXISTING ACTUATOR(S), TO REMAIN, AND BE ACTUATOR(S), TO REMAIN, AND BE COMPATIBLE WITH ACCESS CONTROL SYSTEM. SOME LOCATIONS UTILIZE 1 OR 2 ACTUATORS. -- SOME LOCATIONS MAY UTILIZE 1 OR MORE OF ACCESS CONTROL DEVICES. CONTRACTOR SOME LOCATIONS MAY UTILIZE 1 OR MORE OF ACCESS CONTROL DEVICES. CONTRACTOR DEVICES. CONTRACTOR CONTRACTOR SHALL CONFIRM DOOR OPERATION PRIOR TO SUBMITTAL.
AutoCAD SHX Text CAREFULLY REMOVE EXISTING DOOR AND FRAME IN ITS ENTIRETY INCLUDING, BUT NOT LIMITED TO DOOR, FRAME, THRESHOLD, ANCHORS, INTEGRATED TRANSOM, HARDWARE, MECHANICAL UNITS, ETC. PREPARE OPENING TO RECEIVE NEW DOOR AND FRAME AS SCHEDULED. ANY ELECTRICAL WIRING FROM ACCESS CONTROL DEVICES SHALL BE PROTECTED AND SECURED UNTIL INSTALLATION OF NEW DOOR AND FRAME. MOTOR DRIVE UNITS TO BE SALVAGED AND TURNED OVER TO THE VA.
AutoCAD SHX Text
%%UDEMOLITION PLAN KEYNOTES:
AutoCAD SHX Text
AutoCAD SHX Text
B-76 PLAN
AutoCAD SHX Text
SCALE: N.T.S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A103
Door Schedule & Details
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Bath, NY
528A6-24-603
Issue Date AAA MCCRevisions: Date:
Project Director NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
Design Development Replace CLC Doors
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text 3'-0"
AutoCAD SHX Text 3'-0"
AutoCAD SHX Text B-1
AutoCAD SHX Text 10'-0"
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text 2'-6"
AutoCAD SHX Text 2'-6"
AutoCAD SHX Text B-2
AutoCAD SHX Text 9'-10"
AutoCAD SHX Text 14'-0"
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text
AS SCHED
AutoCAD SHX Text
AS SCHED
AutoCAD SHX Text
AS SCHED
AutoCAD SHX Text B-3
AutoCAD SHX Text
GL-1
AutoCAD SHX Text
GL-1
AutoCAD SHX Text
GL-1
AutoCAD SHX Text
GL-1
AutoCAD SHX Text
AS SCHED
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text B-4
AutoCAD SHX Text 8'-0"
AutoCAD SHX Text
GL-1
AutoCAD SHX Text
AS SCHED
AutoCAD SHX Text
AS SCHED
AutoCAD SHX Text 2'-11"
AutoCAD SHX Text
GL-1
AutoCAD SHX Text D-1
AutoCAD SHX Text
GLAZING TYPES
AutoCAD SHX Text
GL-1
AutoCAD SHX Text
INSULATED, LOW E, IMPACT SAFETY RATED
AutoCAD SHX Text
HARDWARE SET 1: AUTO OPEN
AutoCAD SHX Text
BELT DRIVE MOTOR UNIT SENSORS SLIDE CONTROLLER KEYED LOCK
AutoCAD SHX Text DOOR IS POWERED OPEN/CLOSE UTILIZING SENSORS (BOTH SIDE) TO AUTOMATICALLY OPEN WHEN APPROACHED. DURING OFF HOURS, INTERIOR SENSOR SHALL REMAIN ACTIVE FOR EXISTING, EXTERIOR SENSOR SHALL AUTOMATICALLY BE DISABLED VIA A SET SCHEDULE SET BY THE VA. EXISTING EXTERIOR BADGE READER SHALL OPEN THE DOOR WHILE IN OFF HOURS IN PERMISSION IS GIVEN. POWER BUTTON SHALL ALLOW DISABLING OF MOTOR WITH BEST COMPATIBLE KEYED LOCK TO ALLOW DOORS TO BE SECURED. (CYLINDER TO BE PROVIDED BY VA.) COORDINATE WITH THE SITE SECURITY FOR INTEGRATION OF BADGE READER AND SECURED ACCESS.
AutoCAD SHX Text
HARDWARE NOTES:
AutoCAD SHX Text
1. HARDWARE SETS REPRESENT ANTICIPATED COMPONENTS AND BASIC DESCRIPTION OF HARDWARE SETS REPRESENT ANTICIPATED COMPONENTS AND BASIC DESCRIPTION OF FUNCTION AND ACCESS CONTROL. CONTRACTOR IS TO PROVIDE ALL ADDITIONAL HARDWARE REQUIRED TO MEET INTENDED FUNCTION AND TO MEET ALL VA CODE REQUIREMENTS. 2. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION ON HARDWARE. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION ON HARDWARE. 3. REFER TO SPECS FOR VARIATION IN HARDWARE STYLES FOR ALL DOORS. HARDWARE REFER TO SPECS FOR VARIATION IN HARDWARE STYLES FOR ALL DOORS. HARDWARE TYPES LISTED ON THIS DRAWINGS ARE FOR BASIC UNDERSTANDING OF FUNCTION. INCLUDE ALL NECESSARY COMPONENTS TO MEET SPECIFICATION AND INTENDED FUNCTIONS AS DESCRIBED HERE. 4. NOTIFY COR IMMEDIATELY OF ANY DISCREPANCIES WHERE SPECIFIED HARDWARE NOTIFY COR IMMEDIATELY OF ANY DISCREPANCIES WHERE SPECIFIED HARDWARE CONFLICTS WITH HARDWARE FUNCTION AS DESCRIBED ON THIS DRAWINGS. 5. LOCK SETS MUST BE COMPATIBLE WITH AND ACCEPT BEST S.F.I.C 7 PIN LOCK SETS MUST BE COMPATIBLE WITH AND ACCEPT BEST S.F.I.C 7 PIN CORES(PROVIDED BY VA). 6. ALL DOORS SHALL USE KICKPLATES AND THRESHOLDS. ALL DOORS SHALL USE KICKPLATES AND THRESHOLDS. 7. ALL FRAMES AND DOORS REQUIRING ELECTRICAL COMPONENTS (STRIKES, OPENERS, ALL FRAMES AND DOORS REQUIRING ELECTRICAL COMPONENTS (STRIKES, OPENERS, ETC.) SHALL BE PREPARED BY THE MANUFACTURER TO RECEIVE ELECTRICAL WIRING. 8. CONTRACTOR SHALL REPLACE ALL WIRING TO DEVICES AND POWER SOURCES IF CONTRACTOR SHALL REPLACE ALL WIRING TO DEVICES AND POWER SOURCES IF NOT LONG ENOUGH, DAMAGED, OR OTHERWISE NOT SUITABLE FOR INSTALLATION OF NEW DOOR/HARDWARE. 9. CONTRACTOR SHALL REPLACE ANY ACTUATORS OR RELATED DEVICES NOT CONTRACTOR SHALL REPLACE ANY ACTUATORS OR RELATED DEVICES NOT FUNCTIONAL OR COMPATIBLE WITH NEW HARDWARE.
AutoCAD SHX Text GENERAL NOTES: 1. ALL DOORS TO BE SURFACE MOUNTED TO EXTERIOR FINISH WALL. ALL DOORS TO BE SURFACE MOUNTED TO EXTERIOR FINISH WALL. 2. HARDWARE MOUNTING HEIGHT TO MEET VA/ADA REQUIREMENTS HARDWARE MOUNTING HEIGHT TO MEET VA/ADA REQUIREMENTS 3. ALL ROUGH OPENINGS AND EXISTING CONDITIONS SHALL BE VERIFIED PRIOR TO ORDERING ANY DOORS OR FRAMES. NOTIFY COR OF ANY DISCREPANCIES IMMEDIATELY UPON DISCOVERY. ALL ROUGH OPENINGS AND EXISTING CONDITIONS SHALL BE VERIFIED PRIOR TO ORDERING ANY DOORS OR FRAMES. NOTIFY COR OF ANY DISCREPANCIES IMMEDIATELY UPON DISCOVERY. 4. ROUGH OPENINGS SHALL BE PROTECTED AND PATCHED TO MATCH EXISTING ROUGH OPENINGS SHALL BE PROTECTED AND PATCHED TO MATCH EXISTING 5. COORDINATE WITH COR FOR DOORS REQUIRING POWER CONNECTIONS FOR ALL SHUTDOWNS. COORDINATE WITH COR FOR DOORS REQUIRING POWER CONNECTIONS FOR ALL SHUTDOWNS. 6. ALL DOORS TO RECEIVE ALUMINUM THRESHOLD COMPATIBLE WITH OPENING. ALL DOORS TO RECEIVE ALUMINUM THRESHOLD COMPATIBLE WITH OPENING. 7. PRIOR TO INSTALL, CLEAN ANY EXPOSED LINTEL OF ANY RUST OR FLAKING PAINT. PRIME AND PAINT PRIOR TO INSTALL OR NEW DOOR. NOTIFY COR OF CORRODED LINTELS IMMEDIATELY PRIOR TO INSTALL, CLEAN ANY EXPOSED LINTEL OF ANY RUST OR FLAKING PAINT. PRIME AND PAINT PRIOR TO INSTALL OR NEW DOOR. NOTIFY COR OF CORRODED LINTELS IMMEDIATELY UPON DISCOVERY AND PROVIDE TEMPORARY SHORING OF ROUGH OPENING. 8. PAINT (PT) COLORS SHALL BE SELECTED BY VA COR. PAINT (PT) COLORS SHALL BE SELECTED BY VA COR. 9. ALL OPENINGS SHALL REMAIN WEATHERTIGHT AND SECURE THROUGHOUT CONSTRUCTION. CLOSURE OF EXITS SHALL BE COORDINATED WITH LOCAL VAFD. NUMBER OF EXITS CLOSED AT ALL OPENINGS SHALL REMAIN WEATHERTIGHT AND SECURE THROUGHOUT CONSTRUCTION. CLOSURE OF EXITS SHALL BE COORDINATED WITH LOCAL VAFD. NUMBER OF EXITS CLOSED AT ONE TIME MAY BE LIMITED TO MAINTAIN SUFFICIENT EMERGENCY EGRESS. 10. CONTRACTOR IS RESPONSIBLE FOR POSTING ALL INTERIOR AND EXTERIOR DETOUR SIGNAGE AS DIRECTED BY COR AND VAFD. CONTRACTOR IS RESPONSIBLE FOR POSTING ALL INTERIOR AND EXTERIOR DETOUR SIGNAGE AS DIRECTED BY COR AND VAFD. 11. CONTRACTOR SHALL MAKE ALL EFFORT TO LIMIT THE CLOSURE DURATION OF A SINGLE OPENING TO LESS THAN 1 WEEK. CONTRACTOR SHALL MAKE ALL EFFORT TO LIMIT THE CLOSURE DURATION OF A SINGLE OPENING TO LESS THAN 1 WEEK. 12. PROVIDE AND PREPARE FRAMES/DOOR/HARDWARE FOR ELECTRICAL COMPONENTS AS NECESSARY TO MEET DOOR OPERATIONS / FUNCTIONAL DESCRIPTION. EXISTING WIRING MAY BE PROVIDE AND PREPARE FRAMES/DOOR/HARDWARE FOR ELECTRICAL COMPONENTS AS NECESSARY TO MEET DOOR OPERATIONS / FUNCTIONAL DESCRIPTION. EXISTING WIRING MAY BE REUSED. IF WIRING OR COMPONENTS ARE FOUND TO BE UNSUITABLE, CONTACT COR IMMEDIATELY BEFORE PROCEEDING. ALL WIRING SHALL BE RUN WITHIN FRAMES, DOORS AND FRAMES SHALL IF WIRING OR COMPONENTS ARE FOUND TO BE UNSUITABLE, CONTACT COR IMMEDIATELY BEFORE PROCEEDING. ALL WIRING SHALL BE RUN WITHIN FRAMES, DOORS AND FRAMES SHALL BE PREPARED FOR ANY INTEGRAL HARDWARE. DOOR SPECIFIC NOTES: 1. EXISTING DOOR IS INCORPORATED IN WANDERGUARD SYSTEM. RECONNECT NEW DOOR TO EXISTING WANDERGUARD. EXISTING DOOR IS INCORPORATED IN WANDERGUARD SYSTEM. RECONNECT NEW DOOR TO EXISTING WANDERGUARD. 2. EXISTING DOOR UTILIZES AUTOMATIC ACTUATOR/OPENER. NEW DOOR SHALL BE POWERED OPENER AND UTILIZE EXISTING ACTUATOR AND POWER SUPPLY. EXISTING DOOR UTILIZES AUTOMATIC ACTUATOR/OPENER. NEW DOOR SHALL BE POWERED OPENER AND UTILIZE EXISTING ACTUATOR AND POWER SUPPLY. 3. EXISTING DOOR UTILIZES PIV ACCESS CONTROL. NEW DOOR AND HARDWARE SHALL BE COMPATIBLE WITH EXISTING ACCESS CONTROL AND MAINTAIN EXISTING ACCESS OPERATIONS. EXISTING DOOR UTILIZES PIV ACCESS CONTROL. NEW DOOR AND HARDWARE SHALL BE COMPATIBLE WITH EXISTING ACCESS CONTROL AND MAINTAIN EXISTING ACCESS OPERATIONS. 4. DOOR SHALL UTILIZE EXISTING ELECTRICAL CONNECTION. DOOR SHALL OPERATE UTILIZING MOTION SENSORS CALIBRATED TO OPEN WITHIN 5' OF DOOR.DOOR SHALL UTILIZE EXISTING ELECTRICAL CONNECTION. DOOR SHALL OPERATE UTILIZING MOTION SENSORS CALIBRATED TO OPEN WITHIN 5' OF DOOR.
AutoCAD SHX Text
FRAME TYPES
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
DOOR TYPES
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL HEAD & JAMB DETAILS
AutoCAD SHX Text
SCALE: N.T.S.
| 528A6-24-603 - G001 |
| Sheets and Views |
| G001 |
| 528A6-24-603 - A101 |
| Sheets and Views |
| A101 |
| 528A6-24-603 - A102 |
| Sheets and Views |
| A102 |
| 528A6-24-603 - A103 |
| Sheets and Views |
| A103 |
File details come from the government source that posted it. Updated .