P01 - Atch. 1 - Combined Drawings - 554-21-105.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25921R0091
About this file
This document package includes construction drawings and specifications for installing a water softening system at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The drawings show the existing piping configuration, proposed modifications including new branch lines and connections to the boiler water makeup line, and notes outlining the required construction sequence.
The related federal contract opportunity is solicitation number 36C25921R0091 to install the water softening system. The requirement is identified as Z1DA-554-21-105 under opportunity number VA-21-00041590. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19. No other details are provided in the opportunity description.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25921R0091 0001_1.docx | DOCX document | |
| S04 - Pre-Bid Attendance_Water Softening System.pdf | ||
| P01 - Atch. 2 - Specifications - 554-21-105.pdf | ||
| 36C25921R0091_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RENDERED IMAGEAREA OF WORK SHEET INDEX
ROCKY MOUNTAIN REGIONAL VA MEDICAL CENTER
AURORA, CO
VA PROJECT #: 554-21-105
DESIGN WATER SOFTENING SYSTEM
02/24/2021
GI001
COVER SHEET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
554-21-105
1700 N WHEELING ST, AURORA, CO 80045
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
DESIGN WATER SOFTENING
SYSTEM
N o r t h
BUILDING 6
ENERGY
CENTER
1. SWITCH OVER SITE DOMESTIC WATER SUPPLY FROM THE WATER TANKS TO
DIRECT FROM THE CITY UTILITY, TAG OUT THE DOMESTIC WATER BOOSTER
PUMPS, AND CLOSE THE ISOLATION VALVE DOWNSTREAM OF THE NEW
CONNECTIONS TO THE 8" MAIN.
2. INSTALL PIPING FOR THE NEW BRANCH LINES, LEAVING THE CONNECTION TO
THE BOILER WATER MAKEUP LINE FOR LAST.
3. PROVIDE A TEMPRORAY SUPPLY FOR THE BOILER MAKE-UP WATER USING
CONNECTION ON BACKFLOW PREVENTER MANIFOLD. ISOLATE PIPING
UPSTREAM OF BACKFLOW PREVENTER AND MAKE TIE-IN.
4. FLUSH AND SANITIZE THE NEW PIPES.
5. PLACE THE BOILER MAKE-UP WATER SOFTENER BACK IN SERVICE.
6. PLACE THE WATER TANKS, MODIFIED PIPING, AND WATER SOFTENER IN
SERVICE.
CONSTRUCTION SEQUENCE
SHEET
NUMBER SHEET NAME
GI001 COVER SHEET
P-001 PLUMBING LEGEND, DETAILS, SCHEDULE, AND DDC INTEGRATION
PP101 SERVICE LEVEL PLUMBING PIPING PLAN AND ELEVATION
PP102 SERVICE LEVEL PLUMBING PIPING ELEVATIONS
EP101 SERVICE LEVEL ELECTRICAL POWER PLAN
100% CONSTRUCTION DOCUMENTS 02/24/2021
02/24/2021 XX XX
P-001
PLUMBING ABBREVIATIONS
A/E ARCHITECT / ENGINEER
BAS BUILDING AUTOMATION SYSTEM
D DRAIN
DCW DOMESTIC COLD WATER
DWV DRAIN WASTE VENT
E EXISTING
NC NORMALLY CLOSED
NO NORMALLY OPEN
NTS NOT TO SCALE
PD PRESSURE DROP OR DIFFERENCE
PG PRESSURE GAGE
P&ID PROCESS & INSTRUMENTATION
DIAGRAM
PPM PARTS PER MILLION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAGE
SCW SOFTENED COLD WATER
SOO SEQUENCE OF OPERATIONS
TYP TYPICAL
WPD WATER PRESSURE DROP
PLUMBING PIPING SYMBOLS
GENERAL PLUMBING SYMBOLS
DIRECTION OF FLOW
PIPE UP
PIPE DOWN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
554-21-105
1700 N WHEELING ST, AURORA, CO 80045
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
DESIGN WATER SOFTENING
SYSTEM
BALL VALVE
CHECK VALVE
MODULATING CONTROL VALVE
PRESSURE REGULATING VALVE
REFER TO NOTE 1
HOUSEKEEPING PAD REINFORCEMENT SCHEDULE
PAD THICKNESS TOP REINFORCEMENT BOTTOM REINFORCEMENT
4" < T <= 6" WWR 4x4-W4xW4 OR #4@18" EACH WAY NONE
1-#4 CONTINUOUS AT
PERIMETER WITH 1-#4x4'-0"
AT EXTERIOR CORNERS
AND 1-#4x4'-0" DIAGONAL AT
RE-ENTRANT CORNERS
TOP REINFORCEMENT,
REFER TO SCHEDULE
BOTTOM REINFORCEMENT,
WHERE SCHEDULED
T
3/4" CHAMFER, TYPICAL
NOTES:
1. REFER TO PLAN SHEETS FOR HOUSEKEEPING PAD PLAN DIMENSIONS AND THICKNESS.
2. CONTRACTOR SHALL COORDINATE DIMENSIONS AND OTHER SPECIAL REQUIREMENTS WITH EQUIPMENT
MANUFACTURERS AND PROVIDE WHERE REQUIRED WHETHER SHOWN ON STRUCTURAL OR NOT.
3. REFER TO SPECIFICATION SECTION 22 05 11 PARAGRAPH 3.1.I FOR INFORMATION ON THE CONCRETE.
EXTERIOR
CORNERS
2'-0"
2'- 0" 4-#4, 8" DOWELS @ 4"x4" IN FROM
CORNERS. EPOXIED 4" INTO EXISTING
SLAB.
SCALE: NO SCALE
PIPE HANGER DETAIL
PLUMBING VALVE SYMBOLS
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB.
UNIFORM LOAD
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN)
BAND
1-5/8" 12 GAUGE
CHANNEL OR 2"x2"x1/4" ANGLE
1/2" DIA
HANGER RODS WITH
36" MAX SPACING ON EACH
CHANNEL
1" M
AX
NOTES:
SEE SPECIFICATIONS FOR DETAILED
HANGER REQUIREMENTS
8 97
THRU 3/4 1 1/41 1 1/2 2 1/22 3 54 6 108 12 1614 18 2420
30 322825 27
2319 221714 16
-16 -1412 13 -
1210 119
5 FTFT
FT
IN
TUBING
PIPE
NOM SIZE
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
PIPE SUPPORT HANGER
SCALE: NO SCALE
06-WS-2 WATER SOFTENER PROCESS & INSTRUMENTATION DIAGRAM (P&ID)
4" DCW
06-WS-2
(E) TO
CAMPUS DCW
(E) FROM
WATER TANKS
BOOSTER PUMP
(E) BOOSTER PUMP
FROM BASEMENT
WATER STORAGE TANK
INSTRUMENTATION SYMBOLS
PI PRESSURE GAUGE
DCW WATER SOFTENER
PT PRESSURE TRANSMITTER
BUTTERFLY VALVE
SCALE: NO SCALE
06-WS-2 HOUSEKEEPING PAD REINFORCEMENT DETAIL
I/O POINTS LIST - WATER SOFTENER SYSTEM
I/O POINT QUANTITY
GRAPHICS
REQUIRED DO AO DI AI READ WRITE TREND BACnet OBJECT FOOTNOTES
06-WS-02
GENERAL SOFTENER ALARM 1 X X X HARDWIRED -
WATER SUPPLY PRESSURE 1 X X X HARDWIRED -
FOOTNOTES:
06-WS-02 BAS CONTROL SEQUENCE OF OPERATIONS:
1. THE SOFTENER SHALL HAVE FACTORY CONTROLS TO CONTROL INTERNAL
FUNCTIONS AS DESCRIBED IN THE SPECIFICATIONS. BAS SHALL MONITOR
GENERAL ALARM SIGNAL FROM SOFTENER CONTROLS.
2. THE MANUAL HARD WATER BYPASS VALVE SHALL BE TESTED, ADJUSTED, AND
FIELD-BALANCED BY A QUALIFIED WATER SOFTENER INSTALLER TO ACHIEVE A
MIXED SUPPLY TOTAL HARDNESS OF 17 PPM AT THE DESIGN CONTINUOUS FLOW
RATE TO THE BUILDING.
3. ALARMS AND SAFETIES
3.1. ALARM UPON SOFTENER CONTROLS ALARM.
PLUMBING LEGENDS, DETAILS,
SCHEDULE, AND DDC INTEGRATION
MANUAL HARD WATER BYPASS BALANCING
VALVE. SELECT MINIMUM Cv OF 11 (33 GPM
AT 9 PSI PRESSURE DROP).
STRAINER
WATER SOFTENER SCHEDULE
MARK LOCATION AREA AND/OR BLDG
SERVED
SYSTEM AND/OR
SERVICE TYPE
INCOMING WATER
HARDNESS
CONTINUOUS
FLOW RATE
PEAK FLOW
RATE
INLET
PRESSURE
BACK WASH
FLOW RATE
PER TANK
RESIN
CAPACITY PER
TANK
SALT DOSAGE
TANK SIZE
(DIAM)
SALT
CAPACITY OF
BRINE TANK
POWER REQUIRED
REMARKS
AVG PPM GPM GPM PSIG GPM CU FT LBS/CU FT IN LBS AMP PHASE VOLT
06-WS-2 CHILLER ROOM
06-SV1-F2-E5 HOSPITAL DCW RESIN ION
EXCHANGER 106 120 294 75 20 15 15 30 300 3.9 1 120 1, 2
NOTES:
1. BASIS OF DESIGN IS CHEM-AQUA 3ATM-3072-3-DF WITH AMBERLITE IRC200 NA ION 20% CROSS-LINKED RESIN. PROVIDE BASIS OF DESIGN OR APPROVED EQUAL.
2. SELECT WITH MANUFACTURER'S MANIFOLD. MANIFOLD SHALL INCLUDE SAMPLE LINES ROUTED TO EXISTING FLOOR SINK.
GLOBE VALVE
DRAIND
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
FOR REFERENCE ONLY
FLOOR SINK
EXISTING LINE TYPE
NEW LINE TYPE
100% CONSTRUCTION DOCUMENTS 02/24/2021
PIPI
ZA GENERAL ALARM
ZABAS
PRESSURE REGULATED BYPASS. SELECT
MINIMUM Cv OF 50 (150 GPM AT 9 PSI
PRESSURE DROP).
4"
2"
8" NC
4" DCW
(E) TO BOILER
MAKE-UP
4" 4"
4"
PTBAS
8"X 4" 8"X 4"
REDUCER
8" DCW
4"X 2" 4"X 2"
4"X 3" 4"X 3"
C
DN
UP
UP
06-WS-1
06-ET1
STEAM
PRV
D
D
D
B
D
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
SERVICE LEVEL PLUMBING PIPING PLAN
02/25/2021
PP101
SERVICE LEVEL PLUMBING PIPING
PLAN AND ELEVATION
P l a n
N o r t h
T r u
N o r t h
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
554-21-105
1700 N WHEELING ST, AURORA, CO 80045
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
DESIGN WATER SOFTENING
SYSTEM
KEYNOTES
KEY PLAN
GENERAL NOTES
N o r t h
06-SV-F3-01
CONTROL
CENTER
06-SV-E3-01
STAFF TLT
06-SV1-F2-E5
CHILLER RM
06-SV1-ST1
STAIR
06-SV1-SE16
ELEV
A. REFER TO P-001 FOR PLUMBING SYMBOLS, AND ABBREVIATIONS.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. PRIOR TO COMMENCEMENT OF WORK, COORDINATE WITH VHA COR AS
TO SCHEDULING OF THE WORK. REFER TO SPECIFICATIONS FOR
REQUIREMENTS FOR UTILITY INTERRUPTIONS.
D. COORDINATE INSTALLATION OF PIPING WITH EXISTING PIPING AND
HIGH-MOUNTED LUMINAIRES. NEW PIPING SHALL BE INSTALLED ABOVE
THE BOTTOM ELEVATION OF EXISTING LUMINAIRES EXCEPT WITHIN THE
FOOTPRINT OF THE NEW WATER SOFTENER EQUIPMENT PAD.
E. CONTRACTOR SHALL PATCH AND REPAIR ALL DAMAGE CAUSED TO
EXISTING BUILDING TO MATCH EXISTING.
F. CONTRACTOR SHALL SUBMIT A PHASING PLAN AND STERILIZATION PLAN
TO THE VHA COR FOR APPROVAL PRIOR TO BEGINNING WORK.
SCALE: 1/2" = 1'-0"
6" 1' 2' 4' 8'0
SERVICE LEVEL 06-WS-02 PLUMBING PIPING ELEVATION
1. CONNECT TO VERTICAL LENGTH OF EXISTING BOILER WATER MAKEUP
PIPE. EXISTING BOILER WATER MAKEUP ISOLATION VALVE SHALL BE
NORMALLY CLOSED. USE THE EXISTING 1/2" BACKFLOW PREVENTER
BLOW DOWN VALVE FOR PIPE SANITIZING RELIEF.
2. ROUTE WATER SOFTENER AND BRINE TANK DRAINS TO EXISTING FLOOR
SINK. SIZE AND INSTALL PER MANUFACTURER'S INSTRUCTIONS.
3. SEE DETAIL 3/P-001, FOR 06-WS-02 WATER SOFTENER BYPASS VALVES.
4. ALIGN PLAN SOUTH EDGE OF EQUIPMENT PAD TO SOUTH CONTROL
ROOM WALL.
5. CONNECT INLET AND OUTLET PIPING TO MANUFACTURER-PROVIDED
MANIFOLD.
6. ENSURE A MINIMUM OF 4'-0" CLEARANCE IS GIVEN BETWEEN STAIRWAY
LANDING CORNER AND 06-WS-2 EQUIPMENT PAD.
7. 3/4 " VALVED PORT FOR PIPE STERILIZATION.
8. (NOT USED)
9. PIPE SUPPORT LOCATIONS FOR REFERENCE ONLY.
10. FOR DECONFLICTION PURPOSES, VERIFY PRE-DETERMINED CLEAR
PATHWAY FOR 4" DCW INLET AND OUTLET PIPING TO AND FROM NEW
WATER SOFTENER DUE TO HORIZONTAL OR VERTICAL EXISTING PIPING,
EXISTING ELECTRICAL AND EXISTING FIRE CONDUITS.
11. PRIOR TO INSTALLATION OF DRAIN PIPING, DECONFLICT WITH EXISTING
HORIZONTAL AND VERTICAL PIPING MOUNTED OR NEXT TO CONCRETE
WALL BEFORE EXISTING FLOOR SINK.
12. TRANSITION FROM 4" TO 3" DCW INLET/OUTLET PIPING TO 06-WS-02
WATER SOFTENER MANIFOLD. FOR CONNECTIONS, REFER TO
MANUFACTURER'S WRITTEN INSTRUCTIONS FOR EXACT REQUIREMENTS.
15'-3" x 5'-0" x 6" CONCRETE
EQUIPMENT PAD. PAINT TO MATCH
EXISTING 06-WS-1 EQUIPMENT PAD.
06-WS-2
4" DCW INLET
4" DCW OUTLET
3 4
4"
DCW
INLET
8" DCW MAIN
4" DCW INLET
PP101
P P
P P
(E) STEAM VENT
HARD WATER
BYPASS WITH
BALANCING VALVE
(E) CHILLED WATER
06-WS-2
(E) LPS
(E) CWS/R PIPING
(E) 20"x20" EXHAUST AIR DUCT
(E) 8" DCW
DOWN
(E) 8" DCW MAIN UP
FROM BOOSTER
PUMPS
POINT OF CONNECTION BETWEEN (E) 8" DCW MAIN PIPING
AND DCW INLET AND OUTLET PIPING TO AND FROM NEW
WATER SOFTENER (06-WS-02). SEE 1/PP101 FOR CLARITY.
(E) 2'x4' LUMINAIRES, TYP
(E) DCW MAIN
(E) DCW MAIN
(E)STEAM VENT
(E) CONDENSER SUPPLY/RETURN
(E) LOW
PRESSURE
STEAM
(2) 4" DCW INLET AND OUTLET PIPING TO AND FROM (06-WS-02)
NEW WATER SOFTENER. REFER TO 1/PP101 FOR PLAN VIEW.
(E) HIGH PRESSURE STEAM
POINT OF CONNECTION BETWEEN
VERTICAL (E) 8" DCW MAIN PIPING
AND NEW 4" MAKE-UP WATER
PIPING. SEE 1/PP101 FOR CLARITY.
NEW 4" MAKE-UP WATER PIPING TO TIE
INTO (E) MAKE-UP WATER SOFTENER
PIPING. SEE 1/PP101 FOR CLARITY.
PRESSURE REGULATED
BYPASS IN THIS AREA NOT
SHOWN10
10 TYP
TYP
(E) FLOOR SINK
100% CONSTRUCTION DOCUMENTS 02/25/2021
02/25/2021
PP102
SERVICE LEVEL PLUMBING PIPING
ELEVATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
554-21-105
1700 N WHEELING ST, AURORA, CO 80045
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
DESIGN WATER SOFTENING
SYSTEM
KEYNOTES
KEY PLAN
GENERAL NOTES
N o r t h
A. REFER TO P-001 FOR PLUMBING SYMBOLS AND ABBREVIATIONS.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. PRIOR TO COMMENCEMENT OF WORK, COORDINATE WITH VHA COR AS
TO SCHEDULING OF THE WORK. REFER TO SPECIFICATIONS FOR
REQUIREMENTS FOR UTILITY INTERRUPTIONS.
D. COORDINATE INSTALLATION OF PIPING WITH EXISTING PIPING AND
HIGH-MOUNTED LUMINAIRES. NEW PIPING SHALL BE INSTALLED ABOVE
THE BOTTOM ELEVATION OF EXISTING LUMINAIRES EXCEPT WITHIN THE
FOOTPRINT OF THE NEW WATER SOFTENER EQUIPMENT PAD.
E. CONTRACTOR SHALL PATCH AND REPAIR ALL DAMAGE CAUSED TO
EXISTING BUILDING TO MATCH EXISTING.
F. CONTRACTOR SHALL SUBMIT A PHASING PLAN AND STERILIZATION PLAN
TO THE VHA COR FOR APPROVAL PRIOR TO BEGINNING WORK.
(E) 8" DCW MAIN
PIPING UP FROM
BOOSTER PUMPS.
(E) 20"x20"
EXHAUST AIR
DUCT
POINTS OF
CONNECTIONS
BETWEEN (E) 8" DCW
MAIN
AND NEW WATER
SOFTENER INLET AND
OUTLET PIPES.
REFER TO 1/PP101 FOR
PLAN VIEW.
SCALE: 1/2" = 1'-0"
6" 1' 2' 4' 8'0
SERVICE LEVEL EXISTING MAIN DCW SIDE ELEVATION
SCALE: 1/2" = 1'-0"
6" 1' 2' 4' 8'0
WATER SOFTENER SIDE ELEVATION
(E) 8" DCW
DOWN
POINT OF CONNECTION BETWEEN
(E) 8" DCW MAIN PIPING AND NEW 4"
MAKE-UP WATER PIPING. SEE BOTH
2/PP102 AND 1/PP101 PLAN VIEW
FOR CLARITY.
(E) STEAM VENT
(E) CONDENSER
SUPPLY/RETURN
4" DCW INLET AND OUTLET PIPING TO AND
FROM (06-WS-02) NEW WATER SOFTENER.
(E) HIGH PRESSURE STEAM
20"x20" EXHAUST
AIR DUCT
WATER
SOFTENER
INLET AND
OUTLET PIPES.
REFER TO
1/PP101 FOR
PLAN VIEW.
(E) 4" DCW TO
MAKE UP
WATER
SOFTENER
NEW 4" PIPING FOR MAKE-UP
WATER SOFTENER. PROVIDE
ELBOW TO CONNECT TO (E) 4"
MAKE-UP WATER PIPING TO
PRV . SEE 1/PP101 FOR
CLARITY.
(E) STEAM VENT
(E)CONDENSER
SUPPLY/RETURN
(E) HIGH PRESSURE STEAM
(E) EXHAUST GRILLE
(E) 2'x4' LUMINAIRE, TYP
(E) 8" DCW MAIN
(E) DCW DOWN
(E) EXHAUST GRILLE
(E) 8" DCW MAIN
PIPING UP FROM
BOOSTER PUMPS
(E) 8"DCW MAIN
(E) 2'x4' LUMINAIRE, TYP
(E) 8" DCW
MAIN
(E) CONNECTION
BETWEEN DCW
MAIN AND
MAKE-UP WATER
SOFTENER
POINT OF CONNECTIONS
BETWEEN (E) 8" DCW MAIN
AND NEW WATER
SOFTENER INLET AND
OUTLET PIPES.
REFER TO 1/PP101 FOR
PLAN VIEW.
POINT OF CONNECTION
BETWEEN (E) 8" DCW MAIN
PIPING AND NEW 4" MAKE-UP
WATER PIPING. SEE BOTH
2/PP102 AND 1/PP101 PLAN
VIEW FOR CLARITY.
(E) PIPING
(E) SUPPLY AIR
(E) SUPPLY AIR
KEY PLAN
GENERAL NOTES
SERVICE LEVEL
1. FOR DECONFLICTION PURPOSES, VERIFY PRE-DETERMINED CLEAR
PATHWAY FOR 4" DCW INLET AND OUTLET PIPING TO AND FROM NEW
WATER SOFTENER DUE TO HORIZONTAL OR VERTICAL EXISTING PIPING,
EXISTING ELECTRICAL AND EXISTING FIRE CONDUITS.
UP
DN
UP
UP
06-AC-01
06-WS-1
6- W
CC
H
6- W
CC
H
6- W
CC
H
6- W
CC
H
6-
LL
HX
6-SSR 1
06-ET1
STEAM
PRV
C
B
D
E
UP
DN
06-TEQL14
06-EQL14
06-EQH14
RA
C
B
D
E
A
02/25/2021
EP101
BUILDING 6 SERVICE LEVEL
ELECTRICAL POWER PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
554-21-105
1700 N WHEELING ST, AURORA, CO 80045
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
DESIGN WATER SOFTENING
SYSTEM
KEYNOTES
KEY PLAN
GENERAL NOTES
N o r t h
A. GENERAL CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS AND REPORT ANY DISCREPANCIES TO THE VHA COR
BEFORE PROCEEDING WITH WORK.
B. PRIOR TO COMMENCEMENT OF WORK, COORDINATED SCHEDULING
REQUIRED WITH VHA COR, VHA ENGINEERING SECTION, AND CONTROL
CENTER PERSONNEL FOR ANY BASEMENT OR SERVICE LEVEL
DEMOLITION AND INSTALLATION OF ANY PIPING, VALVES, AND
CONTROLS.
C. PROVIDE 3/4" RGS CONDUIT AND MATCH RGS CONDUIT COLOR TO
EXISTING RECEPTACLE CONDUIT COLOR. COORDINATE WITH VHA
COR/ENGINEERING GROUP. PROVIDE 2 #12 AND 1 #12 GROUND FOR
OUTLET CIRCUIT.
D. PROVIDE 6" BY 6" JUNCTION BOX FOR CIRCUIT EQL14-13 TO COMPLETE
SYSTEM BACK TO PANEL.
E. ROUTE CONDUIT UP TO CEILING STRUCTURE, MATCH EXISTING
ROUTING PATTERNS AND UTILIZE EXISTING CONDUIT MOUNTING
SUPPORTS.
F. SECURE CONDUIT TO CEILING MOUNTED CONDUIT SUPPORT, A
MAXIMUM OF 4.5' APART. SPACE CONDUIT A MINIMUM OF 3" APART.
1. USE EXISTING SPARE, 20A, BREAKERS FOR OUTLET CIRCUIT(S). PANEL
LOCATED ON FLOOR ABOVE. RUN CONDUIT UP TO FIRST FLOOR ABOVE.
CORE DRILL AND SAW CUT AS REQUIRED FOR FLOOR AND WALL
PENETRATIONS. SEAL REMAINING ANNULUS WITH FIRE CAULK. REFER TO
SPECIFICATION "FIRE STOPPING" 07-84-00. SEE DETAIL 3 "FLOOR SLAB
PENETRATION DETAIL." FOR ADDITIONAL INFORMATION.
2. PROVIDE MOUNTING FOR CONDUIT ROUTING AND TO MOUNT
RECEPTACLES AT THE SIDES AND REAR OF THE TANKS.
3. FIELD VERIFY WITH MECHANICAL/PLUMBING, EXACT LOCATIONS FOR
RECEPTACLES. MOUNT APPROXIMATELY 114" AFF.
SCALE:
2' 4' 8' 16' 32'
1/8" = 1'-0"
ENERGY CENTER SERVICE LEVEL ELECTRICAL PLAN
P l a n
N o r t h
T r r t h
06-11-SE16
ELEV
06-01-B2-01
VEST
06-11-V1
VEST
06-11-ST1
STAIR
06-01-F2-01
CORRIDOR
06-11-F2-E17
MV
TRANSFORMERS
06-EQL14-15
SCALE: NO SCALE
STEEL MOUNTED RECEPTACLES AND CONDUIT
06-EQL14-13
RECEPTACLE,
DUPLEX (MOUNT
18"AFF. UNLESS
NOTED OTHERWISE)
ELECTRICAL SYMBOLS - POWER PLAN
BRANCH CIRCUIT HOMERUN. LINES INDICATE NUMBER OF
CIRCUITS,NEUTRAL, AND SWITCH LEG CONDUCTORS.
ONE SEPARATE GREEN GROUNDING CONDUCTOR SHALL
BE PROVIDED FOR EACH HOMERUN; NOT SHOWN
SCALE:
2' 4' 8' 16' 32'
1/8" = 1'-0"
ENERGY CENTER FIRST LEVEL ELECTRICAL PLAN
P l a n
N o r t h
T r r t h
06-EMDCP3
SUBSTATION
06-EMDCP5
SUBSTATION
CONDUIT, TYP
MINERAL WOOL
(FIRMLY PACKED)
FIRESTOP SEALANT PER
SPECIFICATION SECTION 07 84
00, FIRESTOPPING
(3/8") MAX
JUNCTION BOX
(SIZE AS REQUIRED) CONDUIT FITTING
SPRING NUT,
TYP
INTEGRAL GALVANIZED
LIPPED STEEL MOUNTING
CHANNEL, TYP
FLOOR SLAB,
TYP
STEEL EXPANSION
ANCHOR, TYP
SCALE: NO SCALE
FLOOR SLAB PENETRATION DETAIL
| 554-21-105 GI001 |
| Sheets and Views |
| GI001 |
| 554-21-105 P-001 |
| Sheets and Views |
| P-001 |
| 554-21-105 PP101 |
| Sheets and Views |
| PP101 |
| 554-21-105 PP102 |
| Sheets and Views |
| PP102 |
| 554-21-105 EP101 |
| Sheets and Views |
| EP101 |
File details come from the government source that posted it. Updated .