36C25921R0091 0001_1.docx

DOCX document 27 KB Posted

Attached to
Z1DA--554-21-105 Install Water Softening System (VA-21-00041590)
Solicitation number
36C25921R0091
Issued by

About this file

This is a summary of a federal contract opportunity solicitation. The solicitation number 36C25921R0091 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is seeking offers to install a water softening system at an unspecified VA location. The opportunity type is a solicitation and the solicitation name provided is Z1DA--554-21-105 Install Water Softening System (VA-21-00041590). No other details are included in the file such as response due dates, award dates, pricing terms, or set aside provisions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 554-21-105 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders

36C25921R0091 07-29-2021

X X X

The purpose of this amendment is the following:

A) Provide questions and responses to summited questions.

B) Provide Site Visit attendance and agenda document.

All other conditions remain unchanged.

Water Softening System - Solicitation # 36C25921R0091 Questions:

1. Q: What level of ICRA (if any) will be required in the work area? This project occurs outside of a general public/hospital space.

A: Class II (Type C Work + Low Risk)

2. Q: Form 1442 the description in Box 10 indicates a bid date of August 19, 2021; while box 13a indicates a bid date of 08-18-2021. Per the site visit – is August 19th the correct date?

A: Proposals are due by Aug. 19th by 10:30am.

3. Q: Will we have access to use the building rest rooms?

A: Yes

4. Q: Confirming the submittal schedule will be provided by the VA?

A: VA COR will provide an initial draft submittal schedule, but this is revised by the contractor and submitted to the COR for approval. Contractor is responsible for all submittal requirements found in the specifications.

5. Q: Will this project utilize Submittal Exchange? If yes, who will be paying for this service?

A: If submittals are too large for email (10 MB maximum) it is the contractor’s responsibility to provide a cloud-based service like Submittal Exchange or Procore.

6. Q: Is there a preferred format for scheduling and scheduling software?

A: No

7. Q: When is the anticipated award for this project?

A: Anticipated to award by Sep. 30, 2021

8. Q: Will TB screening be required?

A: No

9. Q: Confirming that the supply and return water lines we are tapping into will be drained/inactive by the VA prior to our tie-in?

A: Yes, VA will isolate and drain but lock-out/tag-out is contractor’s responsibility.

10. Q: The NAICS code has been determined as 236220 however, the only aspect of work that we see in the drawings applicable to a 236220 classification is the equipment pads and anchors. Approximately 98% of this project is specialty trade mechanical. We would like to respectfully request reconsideration to classify this project as 238220.

A: NAICS for this requirement is 236220.

11. Q: The evaluation criteria for past performance on page 17 of the solicitation states that contractors must demonstrate relevancy by providing projects with renovations and general construction in a radiology area. The scope of this project is located in the chiller plant mechanical room and does not include renovation or much general construction. Would contracting please revise the evaluation criteria to relevancies of this project scope.

A: Revised to read “contractors must demonstrate relevancy by providing projects with installation of water softening systems of similar scope, complexity and magnitude”.

12. Q: Can the prime contractor’s Site Superintendent dual role as SSHO as long as they meet the qualifications? Ref. 01 35 26 A: Yes

13. Q: Can SCH 80 PVC ball valves be used in Lieu of the Carbon Steel ball valves called out per this Specification since the piping that is specified in 23 31 2.3 is SCH 80 PVC as well? Ref. 22 31 11 2.5 A: PVC ball valves are acceptable on the Water Softening Skid (vessels pipe and fittings above the house keeping pad) but not in the distribution piping.

14. Q: Can you please verify that the new water softening SCH 80 PVC piping will not be insulated? Ref. 22 07 00 A: Insulation is not required on Water Softening Skid but is on the distribution piping.

15. Q: Please verify that there are available valves to accomplish all work on the domestic cold water system without a shutdown.

A: Yes, we can bypass the section of piping where the water softening system will be tied in. Contactor will need to provide a way to temporarily feed the boiler make-up water when the bypass line is tied-in but this is a simple matter of connecting a hose to existing connection points near the make-up water back flow preventer.

16. Q: Please clarify if the only SCH 80 PVC allowed on this project will be on the Water Softener Skid itself.

A: Yes, copper and stainless steel shall be used for the distribution pipe off of the skid depending on the line size.

17. Q: Please clarify requirements of bottom reinforcement for Housekeeping Pad detail on P-001. The note indicates both top and bottom reinforcement with arrows however, the Housekeeping Pad Schedule has “none” in the box for bottom reinforcement. Ref. P-001 Detail no. 1 A: Only top reinforcement is required.

18. Q: Does the VA have a recommended Delta Controls company that is presently being used onsite? If so may we have their contact information?

A: No, the system will be tied into the existing JCI Metasys BAS system. Any reference to Delta Controls is in error.

19. Q: We did not find any point lists or controls drawings included in the contract documents. . Is the Water softener going to be integrated to existing controls at a later date? or is this a requirement or the contractor?

A: See points list on the top left of drawing P-001. The requirement is one AI and one DI tied into an existing controller mounted on the west wall of the control room.

20. Q: How is the equipment to be brought into the building?

A: Equipment can be brought in from the loading dock to the service elevator in Building L or via the gate on Fitzsimons Pkwy and doors leading to boiler room on east end.

21. Q: Confirm no bottom reinforcement is required for concrete pad.

A: Only top reinforcement is required.

22. Q: Which BAS panel is to be used or is an additional needed?

A: Points will be tied into available IO on existing controller in panel mounted on the outer west wall of the control room.

23. Q: Does BAS conduit need to be cored or any other pathway requirements?

A: No, the existing panel is in the same room near the existing water softening system.

24. Q: Confirm the BAS vendor is to be Delta and not JCI. Spec section 230923 1.1.F States it is Delta.

A: The system will be tied into the existing JCI Metasys BAS system. Any reference to Delta Controls is in error.

Pre-Proposal Site Visit Meeting 36C25921R0091 Install Water Softening System at the Rocky Mountain Reginal Medical Center (RMRMC)

The contractor is to provide all labor, tools, materials, equipment, and supervision required to install a water softening system for the domestic water supply for the Rocky Mountain Regional Veterans Affairs Medical Center (RMRVAMC) campus located at 1700 N Wheeling St, Aurora, CO 80045.

Location: Rocky Mountain Reginal Medical Center (RMRMC)

AGENDA:

· Introduction of Charlie Gritzmacher CS, Dan Davey COR

· The pre-proposal meeting/site walk is not mandatory

· QUESTIONS During site visit MUST BE WRITTEN DOWN

· Address where to send RFQ:

· Electronic submissions to charles.gritzmacher@va.gov

· Pertinent Dates:

· Questions due July 28, 2021 no later than 10:30 AM MT prior to closing of RFQ, any questions submitted after this time will not be reviewed or answered! Submit to charles.gritzmacher@va.gov

· We’ll get the answers back to you timely

· Proposals due on Aug 19, 2021 at 10:30 AM MT via email

· Prospective offerors are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.

· Prospective offerors are prohibited from visiting site other than through formal invitation by Contracting Officer.

· Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded.

· All VA campuses are Tobacco Free, including but not limited to, smokeless tobacco and vaping.

· Masks are to be worn at all times while on VA property.

· Confirmation of construction range is between $250,000 and $500,000.

· Bid Guarantee & Payment/Performance Bonds: Are required at 20% of bid price or $3,000,000.00 whichever is less, if the offer is over $150,000.

· Contractor shall begin performance within 10 days after Notice To Proceed (NTP) and complete within 90 days.

· Post Award Compliance:

· Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor can submit their weekly certified payrolls with their monthly invoice.

See attached document: S04 - Pre-Bid Attendance_Water Softening System.

See attached document: S04 - Pre-Bid Attendance_Water Softening System.

N/A