This set of documents includes construction drawings and specifications for a plumbing repair project at a Department of Veterans Affairs medical center. The project involves replacing deteriorated sanitary piping underneath the concrete slab in Building 104 to address blockages. Work includes saw cutting the floor in various areas, installing new piping, floor drains, cleanouts, and interceptors. Drawings show demolition plans, new piping layouts, schedules for fixtures and interceptors, and standard installation details. The related solicitation is for contract 36C25223B0005 to complete project 550-21-109 for repairing the B104 sanitary sewer at VA Illiana Health Care System in Danville, Illinois. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 12.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment-1 Material Staging.pdf | ||
| 36C25223B0005 0001.docx | DOCX document | |
| 36C25223B0005.docx | DOCX document | |
| P07 Wage Determination Vermillion County 10-14-2022.pdf | ||
| P01 550-21-109 BID Specifications.pdf | ||
| 550-21-109 SOW Synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair B104 Sanitary Sewer
VA Illiana Health Care System
Project Number: 550-21-109
VA Illiana Health Care System (VAIHCS)
Danville, IL.
N.T.S.
SITE LOCATION MAP
BUILDING 104 LOCATION
N.T.S.
VICINITY MAP
PROJECT SITE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
M
E
N G
I N
E E
R I N
G P
R O
J E
C T
S M
A T
O C
R
E P
A I R
B
S
A N
I T
A R
Y
S
E W
E
L L I A
N A
P
R O
D U
C T
I O
N
D
O C
U M
E N
T S
A
R C
H I T
E C
T U
R A
L G
I D
W G
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Repair B104 Sanitary Sewer
Illiana
Danville, IL
550-21-109
Project Director
Revisions: Date:
Virtual Energy Solutions
444 W. Lake St, Suite1700 Chicago, IL 60606 312.583.7023 POC: Gary Collins
GI001
COVER SHEET
08/25/2021
ISSUED FOR
CONSTRUCTION / BID
SAJEP
ISSUED FOR CONSTRUCTION / BID
ISSUED FOR 100% CD
ISSUED FOR 95% CD
ISSUED FOR 65% DD
08/25/2021
07/22/2021
06/24/2021
04/14/2021
DRAWING LIST
GI001 COVER SHEET
P001 PLUMBING SYMBOLS AND ABBREVIATIONS
PD101 PLUMBING PARTIAL 1ST FLOOR DEMOLITION PLAN
PP101 PLUMBING 1ST FLOOR PLAN
P501 PLUMBING SCHEDULES & DETAILS
REFER
KEYNOTE
EQUIPMENT TAG
GENERAL SYMBOLS
ELEVATION SYMBOL
DETAIL REFERENCE (TOP=DETAIL NUMBER,
BOTTOM=DRAWING NUMBER)
PLAN CONTINUATION REFERENCE
(BOTTOM=DRAWING NUMBER)
SECTION DESIGNATION (TOP=SECTION
NUMBER, BOTTOM=DRAWING NUMBER)
POINT OF NEW CONNECTION TO EXISTING
WHEN ON DEMO SHEET: END POINT OF DEMO
X0.0
FLANGE
UNION
ANCHOR
PIPE GUIDE
PIPE SLEEVE
PIPE CAP
ELBOW UP
ELBOW DOWN
FITTINGS
FILTER
GATE VALVE
BALL VALVE
BUTTERFLY VALVE
WALL HYDRANT/HOSE BIBB
THERMOMETER
PRESSURE GAUGE
SOLENOID VALVE
GAS REGULATOR
CHECK VALVE
BALANCING VALVE
PRESSURE RELIEF VALVE
STRAINER
PIPE FLEXIBLE CONNECTION
PRESSURE REDUCING VALVE
THERMOSTATIC MIXING VALVE
REDUCED PRESSURE
BACKFLOW PREVENTER
PIPING OR EQUIPMENT
TO BE DEMOLISHED
GAS SHUT OFF VALVE
WATER METER
HB
VALVES
VACUUM BREAKER
FLOOR SINK
FLOOR DRAIN
PIPE TRAP
CLEANOUT
FLOOR CLEANOUT
FCO
FD
ROOF DRAIN
RD
DRAINS AND CLEANOUTS
DRAIN LINE
LV
LAV
LABORATORY VACUUM
LAVATORY
FTG FOOTING
ID
IW
IE
LA
IN
HT
HTR
HB
HD
GPM
G
GA
GAL
HEAT TRACE
INVERT ELEVATION
INSIDE DIAMETER
INDIRECT WASTE
LABORATORY AIR
INCHES
HEATER
GALLONS PER MINUTE
HOSE BIBB
HUB DRAIN
GAUGE
GALLON
GAS
EQUIP
FT
FCO
FLR
FPM
ES
EWC
EXT
ET
EW
EA
ELEV
EJ
ELEC
DFU
DIA
DN
DET
D
DIM
EQUIPMENT
EMERGENCY SHOWER
ELECTRIC WATER COOLER
FEET PER MINUTE
FLOOR CLEANOUT
FEET
FLOOR
EXTERIOR
EXPANSION TANK
DRAINAGE FIXTURE UNIT
EYEWASH
EXPANSION JOINT
EACH
ELEVATION
ELECTRICAL
DIAMETER
DETAIL
DOWN
DIMENSION
VENT THRU ROOFVTR
WH
WCO
W
WC
WALL HYDRANT
WALL CLEANOUT
WATER CLOSET
WASTE/WATER
V
VAC
UR
TYP
TP
VENT
VACUUM
TRAP PRIMER
URINAL
TYPICAL
REVOLUTIONS PER MINUTE
SH SHOWER
TEMP
TD
STM
S/S
STD
TRENCH DRAIN
TEMPERATURE
STAINLESS STEEL
STORM
STANDARD
RV
SD
SAN
SCH
S
RPM
RELIEF VALVE
SUBSOIL DRAIN
SANITARY
SCHEDULE
STORM
CLG
CTR
CO
CO2
BTU
CA
BTUH
CFM
BOT
BOP
CEILING
CARBON DIOXIDE
CENTER
CLEANOUT
BRITISH THERMAL UNIT
BRITISH THERMAL UNITS PER HOUR
BOTTOM OF PIPE ELEVATION
CUBIC FEET PER MINUTE
COMPRESSED AIR
BOTTOM
AP
AFF
ADJ
ALT
ABOVE FINISHED FLOOR
ACCESS PANEL
ADJUSTABLE
ALTERNATE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCH
PRESSURE REDUCING VALVE
OUTSIDE DIAMETER
OVERFLOW DRAIN
RD
PSI
PSIG
PSF
PRV
P
ROOF DRAIN
PUMP
NPT
NTS
OD
OFD
OC
NIC
NATIONAL PIPE THREAD
NOT TO SCALE
ON CENTER
NOT IN CONTRACT
MB
MH
MFR MANUFACTURER
MOP BASIN
MANHOLE
ZVB ZONE VALVE BOX
WAGD WASTE ANESTHETIC GAS DISPOSAL
DCW DOMESTIC COLD WATER
DHR DOMESTIC HOT WATER RETURN
DHW DOMESTIC HOT WATER
SF SQUARE FEET
A AIR
BHP BRAKE HORSEPOWER
FLA FULL LOAD AMPERES
GPH GALLONS PER HOUR
FTHD FEET HEAD
HP HORSEPOWER
PH PHASE
TDH TOTAL DYNAMIC HEAD
VFD VARIABLE FREQUENCY DRIVE
IN WC INCHES WATER COLUMN
FD FLOOR DRAIN
EFF EFFICENCY
LWT LEAVING WATER TEMPERATURE
EWT ENTERING WATER TEMPERATURE
MBH ONE THOUSAND BTUH
NPSH NET POSITIVE SUCTION HEAD
AAP AREA ALARM PANEL
MAP MASTER ALARM PANEL
TMV THERMOSTATIC MIXING VALVE
AW ACID WASTE
AV ACID VENT
BAS BUILDING AUTOMATION SYSTEM
ABBREVIATIONS ABBREVIATIONS
CM COFFEE MAKER
DDCA DOUBLE DETECTOR CHECK ASSEMBLY
DI DEIONIED WATER
DW DISHWASHER
EP ELEVATOR PIT
EPP ELEVATOR PIT PUMP
EWH ELECTRIC WATER HEATER
F FAHRENHEIT
GM GAS METER
GWH GAS WATER HEATER
H2 HYDROGEN
HE HELIUM
IM ICE MAKER
MA MEDICAL AIR
N2 NITROGEN
N2O NITROUS OXIDE
O2 OXYGEN
RO REVERSE OSMOSIS WATER
REDUCED PRESSURE ZONERPZ
BACKFLOW PREVENTER
SP SUMP PIT
WM WASHING MACHINE
PIPING ANNOTATION
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
DIRECT EXPANSION REFRIGERANT
LAB COMPRESSED AIR
DX
LA
MA MEDICAL COMPRESSED AIR
DCW
DHW
DHR
LAB VACUUMLVAC
MEDICAL VACUUMMVAC
SANITARY WASTE LINE
OVERFLOW DRAIN LINEOD
SAN
DEIONIZED WATERDI
STORMSTRM
INDIRECT WASTEIW
ACID WASTEAW
VENT LINEV
LAB VENTLV
HYDROGENH2
OXYGENO2
NITROGENN2
NATURAL GASNG
NITROUS OXIDEN20
CARBON DIOXIDECO2
HELIUMHe
ZERO DEGREE AIR0° AIR
DRAIN TILEDT
WASTE ANALYTICAL GASWAGD
COMPRESSED AIRCA
ACID VENTAV
MW MEDICAL WASTE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
M
E
N G
I N
E E
R I N
G P
R O
J E
C T
S M
A T
O C
R
E P
A
S
A N
I T
A R
Y
S
E W
L I A
P
R O
D U
C T
I O
N
D
O C
U M
E N
T S
P
F P
P
D
W G
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Repair B104 Sanitary Sewer
Illiana
Danville, IL
550-21-109
Project Director
Revisions: Date:
Virtual Energy Solutions
444 W. Lake St, Suite1700 Chicago, IL 60606 312.583.7023 POC: Gary Collins
P001
PLUMBING SYMBOLS AND
ABBREVIATIONS
08/25/2021
ISSUED FOR
CONSTRUCTION / BID
SAJEP
ISSUED FOR CONSTRUCTION / BID
ISSUED FOR 100% CD
ISSUED FOR 95% CD
ISSUED FOR 65% DD
08/25/2021
07/22/2021
06/24/2021
04/14/2021
AutoCAD SHX Text S
AutoCAD SHX Text M
N.I.C.
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
4'0 8' 16'
1/8" = 1'=0"
PLAN
NORTH
FIRST FLOOR PARTIAL DEMOLITION PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
M
E
N G
I N
E E
R I N
G P
R O
J E
C T
S M
A T
O C
R
E P
A
S
A N
I T
A R
Y
S
E W
L I A
P
R O
D U
C T
I O
N
D
O C
U M
E N
T S
P
F P
P
D D
W G
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Repair B104 Sanitary Sewer
Illiana
Danville, IL
550-21-109
Project Director
Revisions: Date:
Virtual Energy Solutions
444 W. Lake St, Suite1700 Chicago, IL 60606 312.583.7023 POC: Gary Collins
N.I.C.
N.I.C.
N.T.S.
KEYPLAN
PD101
FIRST FLOOR PARTIAL
DEMOLITION PLAN
08/25/2021
ISSUED FOR
CONSTRUCTION / BID
SAJEP
ISSUED FOR CONSTRUCTION / BID
ISSUED FOR 100% CD
ISSUED FOR 95% CD
ISSUED FOR 65% DD
ISSUED FOR 35% SD
08/25/2021
07/22/2021
06/24/2021
04/14/2021
3/12/2021
KEYNOTES:
SAW CUT FLOOR IN THIS LOCATION. REPLACE EXISTING SANITARY PIPING
UNDER SLAB TO EXISTING MOP BASIN. DISCONNECT EXISTING MOP BASIN
FROM EXISTING SANITARY WASTE CONNECTION.
SAW CUT FLOOR IN THIS LOCATION. REPLACE EXISTING SANITARY PIPING
UNDER SLAB TO EXISTING FLOOR DRAIN. DISCONNECT AND DEMOLISH
EXISTING FLOOR DRAIN FROM EXISTING SANITARY WASTE AND VENT
PIPING CONNECTIONS.
SAW CUT FLOOR IN THIS LOCATION. REPLACE EXISTING SANITARY PIPING
UNDER SLAB TO EXISTING FLOOR DRAINS, FLOOR CLEAN OUT AND
ADJOINING FIXTURES WHERE REQUIRED. EXISTING NEWLY INSTALLED
FLOOR SINK TO REMAIN. DISCONNECT AND DEMOLISH EXISTING FLOOR
DRAINS AND FLOOR CLEAN OUT FROM EXISTING SANITARY WASTE AND
VENT PIPING CONNECTIONS. DISCONNECT EXISTING FIXTURES FROM
EXISTING SANITARY WASTE AND VENT CONNECTIONS FOR NEW SANITARY
WORK.
EXISTING LINE TO BE LINED. RUN LINING FROM MANHOLE TO CLEAN OUT IN
VENDING ROOM 131. ALSO EXTEND LINING FROM BRANCH IN MEN'S TOILET
ROOM 30'-0" SOUTH INTO FOOD PREP 135.
EXISTING SANITARY PIPING FROM DISH WASHING AREA TO BE REVISED.
SAW CUT FLOOR IN THIS AREA AND CAP EXISTING SANITARY PIPING
UNDER SLAB FOR ABANDONMENT. REFER TO NEW WORK PLANS FOR NEW
PIPING LAYOUT.
SAW CUT FLOOR AT THIS LOCATION. DISCONNECT EXISTING SANITARY
FROM DISHWASHING AREA AND CAP EXISTING SANITARY PIPING UNDER
SLAB FOR ABANDONMENT. DEMOLISH EXISTING FLOOR CLEAN OUT AND
INSTALL NEW.
DEMOLISH EXISTING FLOOR CLEAN OUT, RISER AND ELBOW. CLEAN OUT
AREA AND PIPING AND INSTALL NEW FLOOR CLEAN OUT IN SAME
LOCATION. PROVIDE PROPER STONE BEDDING FOR INSTALLATION.
GENERAL CONSTRUCTION NOTES:
1. SAW CUTTING AND PIPING REPLACEMENT SHALL BE
DONE DURING OFF HOURS.
2. COORDINATE SHUT DOWN TIMES AND LOCATIONS
WITH VA FACILITIES AND STAFF.
3. CONTRACTOR TO DEVELOP PHASING PLAN AND PLAN
MUST BE APPROVED BY FACILITY COR PRIOR TO
STARTING ANY WORK. COORDINATION WITH
FACILITIES INFECTION CONTROL TEAM SHALL BE
INCLUDED IN PHASING DISCUSSION.
4. FACILITIES SHALL REMAIN OPERATIONAL DURING
CONSTRUCTION.
5. FLOOR AREA TILES REMOVED DURING
CONSTRUCTION, SHALL BE REPLACED TO MATCH
SURROUNDING SPACES WHEN WORK IS COMPLETE.
AutoCAD SHX Text 144D
AutoCAD SHX Text Break
AutoCAD SHX Text Room
AutoCAD SHX Text Mech.
AutoCAD SHX Text 144D1
AutoCAD SHX Text Dry
AutoCAD SHX Text 144C
AutoCAD SHX Text
AutoCAD SHX Text Dishwashing
AutoCAD SHX Text Storage
AutoCAD SHX Text Clerk
AutoCAD SHX Text 144B
AutoCAD SHX Text Time
AutoCAD SHX Text Room
AutoCAD SHX Text 134A6
AutoCAD SHX Text Conf.
AutoCAD SHX Text Food Serv.
AutoCAD SHX Text 134A1
AutoCAD SHX Text Chief
AutoCAD SHX Text Clerk
AutoCAD SHX Text 134A2
AutoCAD SHX Text Program
AutoCAD SHX Text Food Serv.
AutoCAD SHX Text 134A3
AutoCAD SHX Text Asst. Chief
AutoCAD SHX Text Typist
AutoCAD SHX Text 134A5
AutoCAD SHX Text Clerk
AutoCAD SHX Text Center
AutoCAD SHX Text 134J2
AutoCAD SHX Text Commun.
AutoCAD SHX Text Links
AutoCAD SHX Text 134J1
AutoCAD SHX Text
HR
AutoCAD SHX Text 134B
AutoCAD SHX Text 134A
AutoCAD SHX Text 134A4
AutoCAD SHX Text Tlt.
AutoCAD SHX Text Nourishment
AutoCAD SHX Text 134J
AutoCAD SHX Text Prep
AutoCAD SHX Text Storage
AutoCAD SHX Text 134K
AutoCAD SHX Text Refrig..
AutoCAD SHX Text 119A
AutoCAD SHX Text Vestibule
AutoCAD SHX Text Equipment
AutoCAD SHX Text 132A
AutoCAD SHX Text Room
AutoCAD SHX Text Storage
AutoCAD SHX Text Cart
AutoCAD SHX Text 144E
AutoCAD SHX Text Storage
AutoCAD SHX Text Cart
AutoCAD SHX Text 144F
AutoCAD SHX Text Room
AutoCAD SHX Text Conference
AutoCAD SHX Text 144G
AutoCAD SHX Text Mech.
AutoCAD SHX Text
AutoCAD SHX Text 134C1
AutoCAD SHX Text Elec.
AutoCAD SHX Text Stor.
AutoCAD SHX Text 134C2
AutoCAD SHX Text 134C
AutoCAD SHX Text Food
AutoCAD SHX Text Storage
AutoCAD SHX Text
AutoCAD SHX Text Receiving
AutoCAD SHX Text C1-9C
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Storage
AutoCAD SHX Text C1-9D
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Storage
AutoCAD SHX Text 134D
AutoCAD SHX Text Ingredient
AutoCAD SHX Text Control
AutoCAD SHX Text 134E
AutoCAD SHX Text Food
AutoCAD SHX Text Prep
AutoCAD SHX Text C1-9B
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Storage
AutoCAD SHX Text C1-9A
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Storage
AutoCAD SHX Text
AutoCAD SHX Text Clean
AutoCAD SHX Text Linen
AutoCAD SHX Text
AutoCAD SHX Text Stor.
AutoCAD SHX Text
AutoCAD SHX Text Receiving/
AutoCAD SHX Text Recyl.
AutoCAD SHX Text C1-9
AutoCAD SHX Text Prep
AutoCAD SHX Text Food
AutoCAD SHX Text
AutoCAD SHX Text 134I
AutoCAD SHX Text Food
AutoCAD SHX Text Prep
AutoCAD SHX Text 134H
AutoCAD SHX Text Food
AutoCAD SHX Text Prep
AutoCAD SHX Text Mech.
AutoCAD SHX Text 134F
AutoCAD SHX Text Tip
AutoCAD SHX Text 134G
AutoCAD SHX Text C1-7
AutoCAD SHX Text C1-8
AutoCAD SHX Text 140A
AutoCAD SHX Text Cart
AutoCAD SHX Text Wash
AutoCAD SHX Text
AutoCAD SHX Text Mech.
AutoCAD SHX Text Room
AutoCAD SHX Text 134P
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Stor.
AutoCAD SHX Text 134N
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Stor.
AutoCAD SHX Text 139B
AutoCAD SHX Text Women
AutoCAD SHX Text Tlt.
AutoCAD SHX Text
AutoCAD SHX Text Clean
AutoCAD SHX Text Linen
AutoCAD SHX Text
AutoCAD SHX Text Women's
AutoCAD SHX Text Lounge
AutoCAD SHX Text
AutoCAD SHX Text Barber
AutoCAD SHX Text Shop
AutoCAD SHX Text 138A
AutoCAD SHX Text Stor.
AutoCAD SHX Text 139A
AutoCAD SHX Text Locker
AutoCAD SHX Text Room
AutoCAD SHX Text 137D
AutoCAD SHX Text Patient
AutoCAD SHX Text Effects
AutoCAD SHX Text 137B
AutoCAD SHX Text Locker
AutoCAD SHX Text Room
AutoCAD SHX Text 139C
AutoCAD SHX Text Shower
AutoCAD SHX Text Lounge
AutoCAD SHX Text Men's
AutoCAD SHX Text
AutoCAD SHX Text 137A
AutoCAD SHX Text Men's
AutoCAD SHX Text Toilet
AutoCAD SHX Text Showers
AutoCAD SHX Text 137C
AutoCAD SHX Text Prep
AutoCAD SHX Text Food
AutoCAD SHX Text
AutoCAD SHX Text Generator
AutoCAD SHX Text Emerg.
AutoCAD SHX Text
AutoCAD SHX Text 105A
AutoCAD SHX Text 107A
AutoCAD SHX Text
DAV-
AutoCAD SHX Text
HSC
AutoCAD SHX Text
AutoCAD SHX Text Kitchen
AutoCAD SHX Text
AutoCAD SHX Text Stor.
AutoCAD SHX Text 108A
AutoCAD SHX Text Vending
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HVAC
AutoCAD SHX Text Alley/Vacant
AutoCAD SHX Text Bowling
AutoCAD SHX Text
AutoCAD SHX Text
2,340 SF
AutoCAD SHX Text
235 SF
AutoCAD SHX Text Storage
AutoCAD SHX Text Canteen
AutoCAD SHX Text
ICE
AutoCAD SHX Text
REF/FRZ
AutoCAD SHX Text
POP CORN
AutoCAD SHX Text C1-1
AutoCAD SHX Text C1-9C1
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Storage
AutoCAD SHX Text
CLEANOUT 4 INV=1'-10" BG
AutoCAD SHX Text
CLEANOUT 2 INV=4'-8" BG
AutoCAD SHX Text
CLEANOUT 8 INV=5'-5" BG
AutoCAD SHX Text
TRUNK LINE INV=5'-4" BG
AutoCAD SHX Text
PROBLEM POINT
AutoCAD SHX Text EXPANDED DISH WASHING AREA NEW TO SPACE. AREA INCLUDES SLOP SINK. BLOCKAGE POINT IN THIS AREA.
AutoCAD SHX Text
DROPS DOWN TO CONNECT TO TRUNK INV=6'-2" BG
AutoCAD SHX Text
1. SLOP SINK AREASLOP SINK AREA
AutoCAD SHX Text
4. OFFICE 134A2
AutoCAD SHX Text
6. INGREDIENT ROOM
AutoCAD SHX Text
3. HALLWAY TO KITCHEN
AutoCAD SHX Text
5. MEAT LOCKER
AutoCAD SHX Text
7. OUTSIDE MANHOLE ACCESS
AutoCAD SHX Text
ACCESSED TO INSPECT LINE
AutoCAD SHX Text
NOT ACCESSABLE - FLOOR DRAIN UNABLE TO BE OPENED
AutoCAD SHX Text
CLEANOUT 9 TO BE DEMOLISHED AND REPLACED.
AutoCAD SHX Text
STOPPED 92' FROM OUTSIDE ACCESS MH
AutoCAD SHX Text
CLEANOUT 3 INV=6'-0" BG
AutoCAD SHX Text
CLEANOUT 1 INV=3'-8" BG
AutoCAD SHX Text
PIPING TO BE LINED
AutoCAD SHX Text
CLEANOUT 5
AutoCAD SHX Text
CLEANOUT 6 INV=2'-7" BG
AutoCAD SHX Text
CLEANOUT 7 INV=1'-8" BG
AutoCAD SHX Text
2. FREEZER/PREFAB SALAD REFRIGERATION AREA
AutoCAD SHX Text
INV= 2'7" AT TRUNK CONNECTION
AutoCAD SHX Text
TRUNK JUNCTION POINT INACCESSIBLE
AutoCAD SHX Text
(E) 6" SAN
AutoCAD SHX Text
(E) 6" SAN
AutoCAD SHX Text
(E) 6" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 3" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 2" SAN
AutoCAD SHX Text
(E) 3" SAN
AutoCAD SHX Text
(E) 3" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 2" SAN
AutoCAD SHX Text
(E) 2" SAN
AutoCAD SHX Text
(E) 3" SAN
AutoCAD SHX Text
(E) 3" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN TO BE ABANDONED IN PLACE.
AutoCAD SHX Text
(E) FS TO REMAIN
AutoCAD SHX Text
(E) SINK WITH GARBAGE DISPOSAL
AutoCAD SHX Text
(E) HAND SINK
AutoCAD SHX Text
(E) SINK
AutoCAD SHX Text
EXISTING FLOOR CLEANOUT TO BE DEMOLISHED AND REPLACED.
AutoCAD SHX Text
POP CORN
AutoCAD SHX Text
WHEELCHAIR LIFT
AutoCAD SHX Text
LEGEND: GEOMETRIC
AutoCAD SHX Text
TELEVISED AND CLEANED SEWER
NOT REQUIRED TO INSPECT
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FD-1 FD-1
FS-1
MB-1
FCO
FCO
SI-1
GI-2
GI-1
GI-1
4'0 8' 16'
1/8" = 1'=0"
PLAN
NORTH
FIRST FLOOR PARTIAL PIPING PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
M
E
N G
I N
E E
R I N
G P
R O
J E
C T
S M
A T
O C
R
E P
A
S
A N
I T
A R
Y
S
E W
L I A
P
R O
D U
C T
I O
N
D
O C
U M
E N
T S
P
F P
P
P D
W G
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Repair B104 Sanitary Sewer
Illiana
Danville, IL
550-21-109
Project Director
Revisions: Date:
Virtual Energy Solutions
444 W. Lake St, Suite1700 Chicago, IL 60606 312.583.7023 POC: Gary Collins
N.I.C.
N.I.C.
N.T.S.
KEYPLAN
PP101
FIRST FLOOR PARTIAL PIPING
PLAN
08/25/2021
ISSUED FOR
CONSTRUCTION / BID
SAJEP
ISSUED FOR CONSTRUCTION / BID
ISSUED FOR 100% CD
ISSUED FOR 95% CD
ISSUED FOR 65% DD
08/25/2021
07/22/2021
06/24/2021
04/14/2021
KEYNOTES:
INSTALL NEW SANITARY PIPING. REPLACE EXISTING MOP BASIN WITH NEW.
RECONNECT TO EXISTING DOMESTIC AND VENT PIPING. CONNECT TO TO
NEW SANITARY.
INSTALL NEW SANITARY PIPING. INSTALL NEW FLOOR DRAIN IN SAME
LOCATION AS EXISTING. RECONNECT NEW SANITARY TO EXISTING VENT
PIPING. CONNECT FLOOR DRAIN TO TO NEW SANITARY.
INSTALL NEW SANITARY PIPING. INSTALL NEW FLOOR DRAIN AND FLOOR
CLEAN OUT IN SAME LOCATION. RECONNECT NEW SANITARY TO EXISTING
FIXTURES AND RECONNECT FIXTURES TO EXISTING VENT AND DOMESTIC
WATER PIPING.
LINE EXISTING PIPING. RUN NEW LINING FROM MANHOLE TO CLEAN OUT IN
VENDING ROOM 131. ALSO EXTEND LINING FROM BRANCH IN MEN'S TOILET
ROOM 30'-0" INTO FOOD PREP 135.
INSTALL NEW SANITARY PIPING FROM DISH WASHING AREA. INSTALL NEW
UNDERSLAB GREASE INTERCEPTOR. INSTALL WITH PDI-G101 FLOW
RESTRICTOR AND VENT. ROUTE VENTING TO INSIDE WALL AND CONNECT
TO EXISTING VENTING ABOVE CEILING.
SAW CUT FLOOR AT THIS LOCATION. DISCONNECT EXISTING SANITARY
FROM DISHWASHING AREA AND CAP EXISTING SANITARY PIPING UNDER
SLAB FOR ABANDONMENT. INSTALL NEW FLOOR CLEAN OUT.
INSTALL NEW FLOOR CLEAN OUT IN THIS LOCATION. CUT EXISTING
SANITARY PIPING AND ADD NEW TEE, RISER AND FLOOR CLEAN OUT.
INSTALL NEW SOLIDS INTERCEPTOR AND GREASE INTERCEPTOR AT THIS
LOCATION. ROUTE DISCHARGE FROM GARBAGE DISPOSAL THROUGH NEW
INTERCEPTORS PRIOR TO ROUTING BACK THROUGH WALL TO SANITARY
CONNECTION. COORDINATE WITH EXISTING EQUIPMENT AND FIXTURES TO
LOCATE INTERCEPTORS BELOW COUNTER. INTERCEPTORS SHALL BE
INSTALLED SO COVERS ARE ACCESSIBLE FOR MAINTENANCE.
INSTALL NEW UNDERSLAB GREASE INTERCEPTOR FOR SOUP DRAINS IN
THIS LOCATION. INSTALL WITH PDI-G101 FLOW RESTRICTOR AND VENT.
ROUTE VENTING TO INSIDE WALL AND CONNECT TO EXISTING VENTING
ABOVE CEILING. COORDINATE WITH EXISTING EQUIPMENT AND FIXTURES
TO LOCATE INTERCEPTOR SO COVER IS ACCESSIBLE FOR MAINTENANCE.
EXISTING PIPING IS PACKED WITH GREASE REMNANTS. BOTH ENDS OF
PIPE ARE TO BE OPENED UP FOR OTHER ADDITIONAL REPAIRS AND SHALL
BE THOROUGHLY CLEANED OUT PRIOR TO LINING.
SAW CUT FLOOR AT THIS LOCATION. CLEAN OUT DEBRIS AND AND
DEMOLISH EXISTING FLOOR CLEAN OUT AND NEARBY PIPING THAT IS
DAMAGED/ERODED. INSTALL NEW STONE BEDDING AND INSTALL NEW
FLOOR CLEAN OUT.
GENERAL CONSTRUCTION NOTES:
1. SAW CUTTING AND PIPING REPLACEMENT SHALL BE
DONE DURING OFF HOURS.
2. COORDINATE SHUT DOWN TIMES AND LOCATIONS
WITH VA FACILITIES AND STAFF.
3. CONTRACTOR TO DEVELOP PHASING PLAN AND PLAN
MUST BE APPROVED BY FACILITY COR PRIOR TO
STARTING ANY WORK. COORDINATION WITH
FACILITIES INFECTION CONTROL TEAM SHALL BE
INCLUDED IN PHASING DISCUSSION.
4. FACILITIES SHALL REMAIN OPERATIONAL DURING
CONSTRUCTION.
5. FLOOR AREA TILES REMOVED DURING
CONSTRUCTION, SHALL BE REPLACED TO MATCH
SURROUNDING SPACES WHEN WORK IS COMPLETE.
AutoCAD SHX Text 144D
AutoCAD SHX Text Break
AutoCAD SHX Text Room
AutoCAD SHX Text Mech.
AutoCAD SHX Text 144D1
AutoCAD SHX Text Dry
AutoCAD SHX Text 144C
AutoCAD SHX Text
AutoCAD SHX Text Dishwashing
AutoCAD SHX Text Storage
AutoCAD SHX Text Clerk
AutoCAD SHX Text 144B
AutoCAD SHX Text Time
AutoCAD SHX Text Room
AutoCAD SHX Text 134A6
AutoCAD SHX Text Conf.
AutoCAD SHX Text Food Serv.
AutoCAD SHX Text 134A1
AutoCAD SHX Text Chief
AutoCAD SHX Text Clerk
AutoCAD SHX Text 134A2
AutoCAD SHX Text Program
AutoCAD SHX Text Food Serv.
AutoCAD SHX Text 134A3
AutoCAD SHX Text Asst. Chief
AutoCAD SHX Text Typist
AutoCAD SHX Text 134A5
AutoCAD SHX Text Clerk
AutoCAD SHX Text Center
AutoCAD SHX Text 134J2
AutoCAD SHX Text Commun.
AutoCAD SHX Text Links
AutoCAD SHX Text 134J1
AutoCAD SHX Text
HR
AutoCAD SHX Text 134B
AutoCAD SHX Text 134A
AutoCAD SHX Text 134A4
AutoCAD SHX Text Tlt.
AutoCAD SHX Text Nourishment
AutoCAD SHX Text 134J
AutoCAD SHX Text Prep
AutoCAD SHX Text Storage
AutoCAD SHX Text 134K
AutoCAD SHX Text Refrig..
AutoCAD SHX Text 119A
AutoCAD SHX Text Vestibule
AutoCAD SHX Text Equipment
AutoCAD SHX Text 132A
AutoCAD SHX Text Room
AutoCAD SHX Text Storage
AutoCAD SHX Text Cart
AutoCAD SHX Text 144E
AutoCAD SHX Text Storage
AutoCAD SHX Text Cart
AutoCAD SHX Text 144F
AutoCAD SHX Text Room
AutoCAD SHX Text Conference
AutoCAD SHX Text 144G
AutoCAD SHX Text Mech.
AutoCAD SHX Text
AutoCAD SHX Text 134C1
AutoCAD SHX Text Elec.
AutoCAD SHX Text Stor.
AutoCAD SHX Text 134C2
AutoCAD SHX Text 134C
AutoCAD SHX Text Food
AutoCAD SHX Text Storage
AutoCAD SHX Text
AutoCAD SHX Text Receiving
AutoCAD SHX Text C1-9C
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Storage
AutoCAD SHX Text C1-9D
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Storage
AutoCAD SHX Text 134D
AutoCAD SHX Text Ingredient
AutoCAD SHX Text Control
AutoCAD SHX Text 134E
AutoCAD SHX Text Food
AutoCAD SHX Text Prep
AutoCAD SHX Text C1-9B
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Storage
AutoCAD SHX Text C1-9A
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Storage
AutoCAD SHX Text
AutoCAD SHX Text Clean
AutoCAD SHX Text Linen
AutoCAD SHX Text
AutoCAD SHX Text Stor.
AutoCAD SHX Text
AutoCAD SHX Text Receiving/
AutoCAD SHX Text Recyl.
AutoCAD SHX Text C1-9
AutoCAD SHX Text Prep
AutoCAD SHX Text Food
AutoCAD SHX Text
AutoCAD SHX Text 134I
AutoCAD SHX Text Food
AutoCAD SHX Text Prep
AutoCAD SHX Text 134H
AutoCAD SHX Text Food
AutoCAD SHX Text Prep
AutoCAD SHX Text Mech.
AutoCAD SHX Text 134F
AutoCAD SHX Text Tip
AutoCAD SHX Text 134G
AutoCAD SHX Text C1-7
AutoCAD SHX Text C1-8
AutoCAD SHX Text 140A
AutoCAD SHX Text Cart
AutoCAD SHX Text Wash
AutoCAD SHX Text
AutoCAD SHX Text Mech.
AutoCAD SHX Text Room
AutoCAD SHX Text 134P
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Stor.
AutoCAD SHX Text 134N
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Stor.
AutoCAD SHX Text 139B
AutoCAD SHX Text Women
AutoCAD SHX Text Tlt.
AutoCAD SHX Text
AutoCAD SHX Text Clean
AutoCAD SHX Text Linen
AutoCAD SHX Text
AutoCAD SHX Text Women's
AutoCAD SHX Text Lounge
AutoCAD SHX Text
AutoCAD SHX Text Barber
AutoCAD SHX Text Shop
AutoCAD SHX Text 138A
AutoCAD SHX Text Stor.
AutoCAD SHX Text 139A
AutoCAD SHX Text Locker
AutoCAD SHX Text Room
AutoCAD SHX Text 137D
AutoCAD SHX Text Patient
AutoCAD SHX Text Effects
AutoCAD SHX Text 137B
AutoCAD SHX Text Locker
AutoCAD SHX Text Room
AutoCAD SHX Text 139C
AutoCAD SHX Text Shower
AutoCAD SHX Text Lounge
AutoCAD SHX Text Men's
AutoCAD SHX Text
AutoCAD SHX Text 137A
AutoCAD SHX Text Men's
AutoCAD SHX Text Toilet
AutoCAD SHX Text Showers
AutoCAD SHX Text 137C
AutoCAD SHX Text Prep
AutoCAD SHX Text Food
AutoCAD SHX Text
AutoCAD SHX Text Generator
AutoCAD SHX Text Emerg.
AutoCAD SHX Text
AutoCAD SHX Text 105A
AutoCAD SHX Text 107A
AutoCAD SHX Text
DAV-
AutoCAD SHX Text
HSC
AutoCAD SHX Text
AutoCAD SHX Text Kitchen
AutoCAD SHX Text
AutoCAD SHX Text Stor.
AutoCAD SHX Text 108A
AutoCAD SHX Text Vending
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HVAC
AutoCAD SHX Text Alley/Vacant
AutoCAD SHX Text Bowling
AutoCAD SHX Text
AutoCAD SHX Text
2,340 SF
AutoCAD SHX Text
235 SF
AutoCAD SHX Text Storage
AutoCAD SHX Text Canteen
AutoCAD SHX Text
ICE
AutoCAD SHX Text
REF/FRZ
AutoCAD SHX Text
POP CORN
AutoCAD SHX Text C1-1
AutoCAD SHX Text C1-9C1
AutoCAD SHX Text Refrig.
AutoCAD SHX Text Storage
AutoCAD SHX Text
CLEANOUT 4 INV=1'-10" BG
AutoCAD SHX Text
CLEANOUT 2 INV=4'-8" BG
AutoCAD SHX Text
CLEANOUT 8 INV=5'-5" BG
AutoCAD SHX Text
TRUNK LINE INV=5'-4" BG
AutoCAD SHX Text
PROBLEM POINT
AutoCAD SHX Text EXPANDED DISH WASHING AREA NEW TO SPACE. AREA INCLUDES SLOP SINK. BLOCKAGE POINT IN THIS AREA.
AutoCAD SHX Text
DROPS DOWN TO CONNECT TO TRUNK INV=6'-2" BG
AutoCAD SHX Text
1. SLOP SINK AREASLOP SINK AREA
AutoCAD SHX Text
4. OFFICE 134A2
AutoCAD SHX Text
6. INGREDIENT ROOM
AutoCAD SHX Text
3. HALLWAY TO KITCHEN
AutoCAD SHX Text
5. MEAT LOCKER
AutoCAD SHX Text
7. OUTSIDE MANHOLE ACCESS
AutoCAD SHX Text
ACCESSED TO INSPECT LINE
AutoCAD SHX Text
STOPPED 92' FROM OUTSIDE ACCESS MH
AutoCAD SHX Text
CLEANOUT 3 INV=6'-0" BG
AutoCAD SHX Text
CLEANOUT 1 INV=3'-8" BG
AutoCAD SHX Text
PIPING TO BE LINED
AutoCAD SHX Text
CLEANOUT 5
AutoCAD SHX Text
CLEANOUT 6 INV=2'-7" BG
AutoCAD SHX Text
CLEANOUT 7 INV=1'-8" BG
AutoCAD SHX Text
2. FREEZER/PREFAB SALAD REFRIGERATION AREA
AutoCAD SHX Text
INV= 2'7" AT TRUNK CONNECTION
AutoCAD SHX Text
TRUNK JUNCTION POINT INACCESSIBLE
AutoCAD SHX Text
(E) 6" SAN
AutoCAD SHX Text
(E) 6" SAN
AutoCAD SHX Text
(E) 6" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 3" SAN
AutoCAD SHX Text
(E) 3" SAN
AutoCAD SHX Text
(E) 3" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) 4" SAN
AutoCAD SHX Text
(E) FS TO REMAIN
AutoCAD SHX Text
(E) SINK WITH GARBAGE DISPOSAL
AutoCAD SHX Text
(E) HAND SINK
AutoCAD SHX Text
(E) SINK
AutoCAD SHX Text
3" SAN
AutoCAD SHX Text
4" SAN
AutoCAD SHX Text
4" SAN
AutoCAD SHX Text
2" SAN
AutoCAD SHX Text
2" SAN
AutoCAD SHX Text
3" SAN
AutoCAD SHX Text
FLOW RESTRICTER WITH 2" VENT OUTLET
AutoCAD SHX Text
4" SAN
AutoCAD SHX Text
4" SAN
AutoCAD SHX Text
2" VENT UP, CONNECT TO EXISTING VENT IN CEILING.
AutoCAD SHX Text
(E) SANITARY TO BE ABANDONED IN PLACE
AutoCAD SHX Text FLOW RESTRICTER WITH 2" VENT OUTLET, ROUTE VENT TO WALL AND CONNECT TO EXISTING ABOVE CEILING.
AutoCAD SHX Text
FLOW RESTRICTER WITH 2" VENT OUTLET
AutoCAD SHX Text
2" VENT UP, CONNECT TO EXISTING VENT IN CEILING.
AutoCAD SHX Text
LINING START AT MANHOLE
AutoCAD SHX Text
LINING FINISH AT CLEANOUT APPROX 160'
AutoCAD SHX Text
LINING START AT JUNCTION
AutoCAD SHX Text
LINING FINISH INTO FOOD PREP APPROX 30'-0"
AutoCAD SHX Text
LINING START AT JUNCTION
AutoCAD SHX Text
LINING FINISH AT CLEANOUT APPROX 82'
AutoCAD SHX Text
POP CORN
AutoCAD SHX Text
WHEELCHAIR LIFT
AutoCAD SHX Text
LEGEND: GEOMETRIC
AutoCAD SHX Text
TELEVISED AND CLEANED SEWER
AutoCAD SHX Text
NON-TELEVISED LINES
PROPOSED PIPE LINING AREAS
PLUMBING FIXTURE SCHEDULE
TAG FIXTURE TYPE ADA
FIXTURE FAUCET OR FLUSH VALVE P-TRAP DRAIN SUPPLIES AND STOPS SEAT ROUGH-IN CARRIER
MOUNTING NOTE TAG
MANUFACTURER MODEL MANUFACTURER MODEL FLOWRATE MANUFACTURER MODEL MANUFACTURER MODEL MANUFACTURER MODEL MANUFACTURER MODEL
SAN
[IN]
VENT
[IN]
DCW
[IN]
DHW
[IN]
MANUFACTURER MODEL
MB-1 MOP BASIN NO FIAT TSBCR1100 T & S BRASS B-0665-BSTR 2.2 GPM -- -- -- -- -- -- -- -- 3 1 1/2 1/2 1/2 -- -- MOUNT TO FLOOR IN SAME LOCATION AS EXISTING. 2 MB-1
NOTE:
1 - PROVIDE WITH HOSE BRACKET, MOP HANGER, ALUMINUM BUMPER GUARDS, AND STAINLESS STEEL WALL GUARDS.
2 - REPAIR FLOOR AND WALLS AFTER INSTALLATION OF NEW DRAIN LINE.
DRAIN/CLEANOUT SCHEDULE
TAG MANUFACTURER MODEL SERVICE BODY MATERIAL
STRAINER/COVER
OPTIONS DETAIL NOTE
SIZE
[IN]
FINISH
FCO ZURN ZB1400 SANITARY CAST IRON VARIES NICKEL BRONZE NL -- -- ROUND COVER
FD-1 ZURN ZN415C SANITARY CAST IRON 8 NICKEL BRONZE NL -- -- ROUND DRAIN
FS-1 ZURN Z1752-YS-3 SANITARY STAINLESS STEEL 12 STAINLESS STEEL --
3/4 GRATE, 12" x 12" SQUARE SS RECEPTOR AND SS STRAINER
NOTE: 1. - FLOOR DRAINS SHALL BE SAME SIZE AS EXISTING.
INTERCEPTOR SCHEDULE
TAG MANUFACTURER MODEL
LIQUID CAPACITY
[GALLONS]
MAX FLOW RATE
[GPM]
MAX GREASE
CAPACITY [LBS]
INLET
[IN]
OUTLET
[IN]
DIMENSIONS [IN]
DETAIL NOTE
L W H
GI-1 MIFAB LIL-35 39 35 86 3 3 33 25.5 22.25
GI-2 MIFAB LIL-7 5.8 7 37 2 2 19.5 15.5 12.5
SI-1 MIFAB LIL-7-S 5.8 7 3 GAL/FT^3 2 2 19.5 15.5 12.5 1
NOTE: 1. - INSTALL SOLIDS INTERCEPTOR AFTER GARBAGE DISPOSAL AND BEFORE GI-2
SOLIDS INTERCEPTOR DETAIL
N.T.S.
GREASE INTERCEPTOR DETAIL
N.T.S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
M
E
N G
I N
E E
R I N
G P
R O
J E
C T
S M
A T
O C
R
E P
A
S
A N
I T
A R
Y
S
E W
L I A
P
R O
D U
C T
I O
N
D
O C
U M
E N
T S
P
F P
P
D
W G
A
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Repair B104 Sanitary Sewer
Illiana
Danville, IL
550-21-109
Project Director
Revisions: Date:
Virtual Energy Solutions
444 W. Lake St, Suite1700 Chicago, IL 60606 312.583.7023 POC: Gary Collins
P501
PLUMBING SCHEDULES &
DETAILS
08/25/2021
ISSUED FOR
CONSTRUCTION / BID
SAJEP
ISSUED FOR CONSTRUCTION / BID
ISSUED FOR 100% CD
ISSUED FOR 95% CD
ISSUED FOR 65% DD
08/25/2021
07/22/2021
06/24/2021
04/14/2021
AutoCAD SHX Text
OUTLET
AutoCAD SHX Text
2" SAN
AutoCAD SHX Text
INLET
AutoCAD SHX Text
2" SAN
AutoCAD SHX Text
COVER
AutoCAD SHX Text
BOLTED STEEL GASTIGHT
AutoCAD SHX Text
CO
AutoCAD SHX Text
2" SAN INLET
AutoCAD SHX Text
2" SAN OUTLET
AutoCAD SHX Text
MESH SCREEN(S) / SOLIDS COLLECTOR
AutoCAD SHX Text
COVER
AutoCAD SHX Text
BOLTED STEEL GASTIGHT
AutoCAD SHX Text
FLOW CONTROL DEVICE WITH VENT
AutoCAD SHX Text
SOLIDS BAFFLE
AutoCAD SHX Text
INLET BAFFLE
OUTLET BAFFLE
| GI001 |
| P001 |
| PD101 |
| PP101 |
| P501 |
File details come from the government source that posted it. Updated .