P01 - 08_550-24-103_BID Drawings.pdf
PDF 10 MB Posted
- Attached to
- Z1DA--Project 550-24-103 (CON) Replace Air Handler Units B98 Federal contract opportunity
- Solicitation number
- 36C25225B0003
About this file
This document appears to be a set of bid drawings related to a Department of Veterans Affairs solicitation for the replacement of air handler units at facility B98. The solicitation number is 36C25225B0003 and it is for Project 550-24-103 (CON) Replace Air Handler Units B98. The solicitation is issued by the Department of Veterans Affairs' Veterans Health Administration, Veterans Integrated Service Network 12. The bid drawings provide detailed technical specifications and diagrams for the required work. No additional details about the solicitation requirements, pricing, set-asides, award dates, or other key information are included in this particular document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S05 - Pre-Bid RFIs 550-24-103 CON-VA.xlsx | XLSX spreadsheet | |
| S06 550-24-103 B98 AHU Addendem 1 Specs.pdf | ||
| S06 550-24-103 B98 AHU Addendem 1 Narrative.pdf | ||
| S04 Sign Visit Pre-Bid Sign in sheet 550-24-103 CON.pdf | ||
| 36C25225B0003 0002.docx | DOCX document | |
| S06 Wage Determination SAM 11_25_2024.pdf | ||
| S06 550-24-103 B98 AHU Addendem 1 Dwgs.pdf | ||
| S06 Wage Determination SAM 11_14_2024.pdf | ||
| 36C25225B0003 0001.docx | DOCX document | |
| S02 36C25225B0003_1.docx | DOCX document | |
| P01 - 07_550-24-103_BID Specifications.pdf | ||
| Wage Determination 10_09_2024.pdf | ||
| 36C25225B0003_1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLDG 98 KEYPLAN
PROJECT
LOCATION
SHADE INDICATES
AREA OUT OF
PROJECT SCOPE
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s /1
.5
.2
R e p la c e
A ir
H a n d lin g U n it s B
-9
/1
.5
.2
M
E P
V
.r v t
/3
/2
:3
:5
P
M
GI000
COVER SHEET
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE AIR HANDLING UNITS
B-98
Danville, IL
550-24-103
07/30/2024 DLJ MCP
550-24-103
REPLACE AIR HANDLING UNITS B-98
VA DANVILLE
Danville, IL
100% CONSTRUCTION DOCUMENTS
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SHEET INDEX
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 LIFE SAFETY PLAN
CIVIL
CS101 SITE PLAN
FIRE SUPRRESION
F000 FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS
FDX101 PENTHOUSE FIRE SUPPRESSION DEMO PLAN
FX101 PENTHOUSE FIRE SUPPRESSION PLAN
MECHANICAL
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MM001 MECHANICAL SITE PLAN
MM002 MECHANICAL SITE PLAN
MD100.1 PENTHOUSE MECHANICAL HVAC DEMOLITION PLAN - PHASE 1
MD100.2 PENTHOUSE MECHANICAL HVAC DEMOLITION PLAN - PHASE 2
MD100.3 PENTHOUSE MECHANICAL HVAC DEMOLITION PLAN - PHASE 3
MD100.4 PENTHOUSE MECHANICAL HVAC DEMOLITION PLAN - PHASE 4
MM100.1 PENTHOUSE MECHANICAL HVAC PLAN - PHASE 1
MM100.2 PENTHOUSE MECHANICAL HVAC PLAN - PHASE 2
MM100.3 PENTHOUSE MECHANICAL HVAC PLAN - PHASE 3
MM100.4 PENTHOUSE MECHANICAL HVAC PLAN - PHASE 4
MM400 MECHANICAL ROOM SECTIONS- PHASE 1&2
MM401 MECHANICAL ROOM SECTIONS - PHASE 3&4
MM500 MECHANICAL DETAILS
MM501 MECHANICAL DETAILS
MM502 MECHANICAL 98-AHU02 DETAILS
MM503 MECHANICAL 98-AHU03 DETAILS
MM600 MECHANICAL SCHEDULES
MM700 MECHANICAL CONTROLS
ELECTRICAL
E000 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND NOTES
E001 ELECTRICAL SITE PLAN
ED100.1 PENTHOUSE ELECTRICAL DEMOLITION PLAN - PHASE 1
ED100.2 PENTHOUSE ELECTRICAL DEMOLITION PLAN - PHASE 2
ED100.3 PENTHOUSE ELECTRICAL DEMOLITION PLAN - PHASE 3
ED100.4 PENTHOUSE ELECTRICAL DEMOLITION PLAN - PHASE 4
E100.1 PENTHOUSE ELECTRICAL NEW WORK PLAN - PHASE 1
E100.2 PENTHOUSE ELECTRICAL NEW WORK PLAN - PHASE 2
E100.3 PENTHOUSE ELECTRICAL NEW WORK PLAN - PHASE 3
E100.4 PENTHOUSE ELECTRICAL NEW WORK PLAN - PHASE 4
E701 ELECTRICAL SINGLE LINE DIAGRAMS AND SCHEDULES
AREA MAP
VICINITY MAP
CAMPUS MAP
PROJECT SITE LOCATION
PROJECT SITE LOCATION
PROJECT SITE LOCATION
N
N
N
Revisions: Date:
Contact: Contact:
VA ILLIANA HEALTHCARE SYSTEM
Michael Wlos
COR
1900 E. Main Street Danville, IL 61832 p: (217) 554-5985 e: Michael.Wlos@va.gov
OWNER
GUIDON DESIGN INC.
DeShun Johnson
Project Manager
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: (317) 800-6388 x148 e: djohnson@guidon.com
PROJECT MANAGER
Contact:
GUIDON DESIGN INC.
Sr. Civil Engineer
CIVIL
ENGINEER
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x108 e: cbutler@guidon.com
Chad Butler
Contact:
GUIDON DESIGN INC.
Adam Ogrzewalla
Architect
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: (317) 800-6388 x103 e: aogrzewalla@guidon.com
ARCHITECT
Contact:
GUIDON DESIGN INC.
Sr. Mechanical Engineer
MECHANICAL
ENGINEER
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x145 e: jfague@guidon.com
Jake Fague
Contact:
GUIDON DESIGN INC.
Al Halabi
Sr. Electrical Engineer
ELECTRICAL
ENGINEER
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 e: ahalabi@guidon.com
Contact:
GUIDON DESIGN INC.
STRUCTURAL
ENGINEER
Structural Engineer
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 117 e: llai@guidon.com
Lauren Lai
09/06/2024
98-CH01
EX 2" LPS
EX 4" CWR
EX 4" CWS
EX 4" CWS
EX 4" CWS
FEC
FEC
E X
IT
GI101
GI101
BLDG 98 KEYPLAN
PROJECT
LOCATION
SHADE INDICATES
AREA OUT OF
PROJECT SCOPE
N
FEC
EXIT EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
EXISTING 2 HR - FIRE SEPARATION
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2024 EDITION (IBC)
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, DESIGN HANDBOOK
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2022 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2022 EDITION
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2024
EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE
PROTECTION, 2022 EDITION
NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND
THEIR APPURTENANCE, 2022 EDITION.
NFPA 54 NATIONAL FUEL GAS CODE, 2024 EDITION
NFPA 70, NATIONAL ELECTRIC CODE, 2023 EDITION
NFPA 72, NATIONAL FIRE ALARM CODE, 2022 EDITION
NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA
PROCESSING EQUIPMENT, 2024 EDITION
NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2024 EDITION
NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2022 EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING
SYSTEMS, 2024 EDITION.
NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2024 EDITION
NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2024 EDITION
NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2024 EDITION
NFPA 101, LIFE SAFETY CODE, 2024 EDITION
NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2022 EDITION
NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2024 EDITION.
NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2023
EDITION
MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF
NFPA 5000 AND NFPA 900
ASHRAE 90.1-2022 HVAC SYSTEMS
ANSI A117.1-2017 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
ENERGY POLICY ACT OF 2005 (EPACT)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, AUGUST 1, 2014
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012
ELECTRICAL, DECEMBER 2019
ENERGY SUSTAINABILITY, AUGUST 2017
EQUIPMENT, SEPTEMBER 2019
ESTIMATING, AUGUST 21, 2022
NEPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
FIRE PROTECTION, NINTH EDITION REVISED NOVEMBER 1, 2023
HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2024
INTERIOR DESIGN, NOVEMBER 2020
PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2024
PLUMBING, FEBRUARY 2024
STRUCTURAL, JULY 2023
WAYFINDING AND SIGNAGE, INTERIOR, MAY 2023
SEISMIC DESIGN REQUIREMENTS, H-18-8, JULY 2023
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR
PROJECTS SEPTEMBER 30, 2010
EPA GUIDELINES CHECKLIST
CODE ANALYSIS LEGEND
GOVERNING CODES
VA DESIGN MANUALS PG-18-10
CONTRACTOR SHALL INSTALL TEMPORARY FLEX DUCT IN
PROPOSED LOCATION.TEMPORARY FLEX DUCT SHALL NOT
BE INSTALLED IN FRONT OF WINDOWS. SEE MM001 FOR
ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s /1
.5
.2
R e p la c e
A ir
H a n d lin g U n it s B
-9
/1
.5
.2
M
E P
V
.r v t
/3
/2
:3
:0
P
M
GI101
LIFE SAFETY PLAN
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE AIR HANDLING UNITS
B-98
Danville, IL
550-24-103
07/30/2024 DLJ TDC
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 1/16" = 1'-0"GI101
1 MECHANICAL ROOF LIFE SAFETY PLAN
SCALE: 1/16" = 1'-0"GI101
2 WEST BUILDING ELEVATION
BUILDING 98ST
ST
ST
ST
ST
ST
ST
H H
STM
STM
22'
40'
10' CLEARANCE AROUND
TEMPORARY UNIT
ENTRANCE
ENTRANCE
MAIN
ENTRANCE
ENTRANCE
ENTRANCE
ENTRANCE
ENTRANCE
N
0 4020
1. TEMPORARY AIR HANDLER LOCATION - 98-TMP
2. TEMPORARY CONCRETE MECHANICAL PAD
3. CONSTRUCTION STAGING AREA
4. CRANE STAGING LOCATION
5. "NO IDLING" TEMPORARY SIGN POST
6. REMOVE AND REINSTALL LIGHT POLE
7. PICK AREA FOR STAGING TRUCKS TO MOVE MATERIALS TO/FROM ROOF
CS101
SITE PLAN
GENERAL NOTES
CONTRACTOR SHALL REPLACE PAVEMENT DAMAGED FROM CRANE WORK.
CONTRACTOR SHALL REPAIR AND REPLACE AREAS AFFECTED BY CONSTRUCTION BACK TO
EXISTING ELEVATION CONDITION. PROVIDE TOPSOIL AND MULCH GRASS SEED AS REQUIRED
TO RESTORE GRADE AND ELEVATION.
CONTRACTOR SHALL PROTECT ALL SIDEWALKS. CONTRACTOR SHALL REPAIR AND REPLACE
ALL SIDEWALKS AFFECTED BY WORK.
CONTRACTOR SHALL COORDINATE CONSTRUCTION STAGING AREA WITH VA PRIOR TO WORK.
CONTRACTOR SHALL PROTECT ALL TEMPORARY EQUIPMENT AND STAGING AREAS
THROUGHOUT CONSTRUCTION. COORDINATE TEMPORARY FENCE LOCATION WITH COR
PRIOR TO REPLACEMENT.
CONTRACTOR SHALL COORDINATE FINAL CRANE STAGING LOCATION WITH COR PRIOR TO
WORK. CONTRACTOR SHALL COORDINATE WITH COR THE TIME AT WHICH THE CRANE WILL
BE PRESENT ON SITE.
WORK SHALL BE PERFORMED AFTER HOURS OF OPERATION OF THE FACILITY.
EXISTING LIGHT POLE TO BE REMOVED PRIOR TO CRANE WORK. LIGHT POLE TO BE
REINSTALLED AFTER CRANE WORK AS BEEN COMPLETED.
EXISTING
GRADE
1'1' 98-TMP WIDTH
U CHANNEL STEEL POST
NOTES
1. DRIVEN INSTALLATION U-CHANNEL.
4'- 0"
M
IN
NOTES
1. SIZE EQUIPMENT PAD ACCORDING TO DIMENSIONS OF TEMPORARY AIR
HANDLER UNIT.
2. EXTEND EQUIPMENT PAD 1' OFFSET OF TEMPORARY AHU DIMENSIONS.
3. ENSURE 10' CLEARANCE AROUND TEMPORARY AIR HANDLER UNIT.
12"
NO
IDLING
ALLOWED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
REPLACE AIR HANDLING UNITS
B-98
Danville, IL
550-24-103
07/17/2024 CMB SJCRevisions: Date:
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388 FULLY SPRINKLERED
SITE PLAN KEYNOTES
CONCRETE MECHANICAL PAD
CS101 NTS
CS101 NTS
'NO IDLING' SIGN
1" MIN.
6"
COMPACTED SUBGRADE 4000 PSI CONCRETE
5"
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AQST AQUASTAT
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING TOWER)
CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
FIRE SUPPRESSION ABBREVIATIONS
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J INTENTIONALLY LEFT BLANK
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SW SOFTWATER
SWHX STEAM TO WATER HEAT EXCHANGER
T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
WAG WASTE ANESTHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
VALVE SYMBOLS
FIRE SPRINKLER HEAD
FIRE SPRINKLER ZONE RISER VALVE
GENERAL PIPING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45o OR 90o
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
THERMOMETER
BOTTOM CONNECTION, 45o OR 90o
PRESSURE GAGE
VENTURI FLOW METER
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE / TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
PIPE DEMOLISHED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s /1
.5
.2
R e p la c e
A ir
H a n d lin g U n it s B
-9
/1
.5
.2
M
E P
V
.r v t
/3
/2
:3
:0
P
M
F000
FIRE SUPPRESSION SYMBOLS
AND ABBREVIATIONSGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE AIR HANDLING UNITS
B-98
Danville, IL
550-24-103
07/30/2024 DLJ JAR
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date: 09/06/2024
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
A. REFER TO SHEET F000 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES:
B. CONTRACTOR TO PROVIDE CONSTRUCTION BARRIERS AND A PHASING PLAN
AS NEEDED BY THE OWNER AND LOCAL CODES. CONTRACTOR TO MAINTAIN
ACTIVE FIRE PROTECTION THROUGHOUT CONSTRUCTION AREAS AT ALL
TIMES.
FIRE SUPPRESSION DEMOLITION PLAN NOTES
1. DEMOLISH FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS AND
ACCESSORIES AS REQUIRED TO ALLOW SPACE FOR NEW MECHANICAL
SYSTEMS. CAP EXISTING PIPES FOR SYSTEM REPRESSURIZATION.
DEMOLITION AROUND AREAS FOR 98-AHU2 & 98-AHU3 TO BE COORDINATED
WITH PROJECT PHASING SUCH THAT THE SYSTEM REMAINS ONLINE UNTIL
DEMOLITION IS NECESSARY.
BLDG 98 KEYPLAN
PROJECT
LOCATION
SHADE INDICATES
AREA OUT OF
PROJECT SCOPE
N
98-CH01
98-AHU02
98-AHU03
FDX101
ELEVATOR
CONTROL ROOM
PH1
STAIRS
S1-A
MECHANICAL
ROOM
PH2
98-AHU02
98-AHU03
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s /1
.5
.2
R e p la c e
A ir
H a n d lin g U n it s B
-9
/1
.5
.2
M
E P
V
.r v t
/3
/2
:3
:0
P
M
FDX101
PENTHOUSE FIRE SUPPRESSION
DEMO PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE AIR HANDLING UNITS
B-98
Danville, IL
550-24-103
07/30/2024 DLJ DFW
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 1/16" = 1'-0"FDX101
1 FIRE SUPPRESSION ROOF DEMOLITION PLAN
SCALE: 1/8" = 1'-0"FDX101
2 ENLARGED FIRE SUPPRESSION PENTHOUSE DEMOLITION PLAN
FIRE SUPPRESSION GENERAL NOTES
A. COORDINATE INSTALLATION OF FIRE SUPPRESSION SYSTEMS WITH ALL
OTHER SYSTEMS. ANY COST DUE TO LACK OF COORDINATION OF THIS
SYSTEM WITH OTHER SYSTEMS WILL BE THE RESPONSIBILITY OF THE FIRE
SUPPRESSION CONTRACTOR.
B. DO NOT ROUTE ANY SYSTEMS OVER EXISTING AND/OR NEW ELECTRICAL
AND/OR IT AND TELECOMMUNICATIONS ROOMS.
C. PROVIDE SPRINKLERS ABOVE AND BELOW WIDE DUCTWORK (48 INCHES AND
WIDER INCLUDING INSULATION) PER NFPA 13 REQUIREMENTS.
D. PIPING ARRANGEMENT AND SPRINKLER LOCATIONS ARE DIAGRAMMATIC AND
ARE SHOWN FOR GENERAL INFORMATION ONLY. EXACT ROUTING OF PIPING
AND FINAL SIZING AND LOCATION OF SPRINKLERS SHALL BE DESIGNED AND
PROVIDED BY THE FIRE SUPPRESSION CONTRACTOR TO ACCOUNT FOR
ACTUAL FIELD CONDITIONS. ALL AREAS SHALL BE PROTECTED UNLESS
SPECIFICALLY NOTED OTHERWISE. COORDINATE INSTALLATION WITH CEILING
HEIGHTS AND SOFFITS. REFER TO ARCHITECTURAL CONTRACT DOCUMENTS
FOR ADDITIONAL INFORMATION.
E. THIS BUILDING SHALL BE CONSIDERED LIGHT/ORDINARY HAZARD
OCCUPANCY WITH EXCEPTIONS PER NFPA 13, STATE, AND LOCAL CODES.
DESIGN DENSITIES SHALL BE IN ACCORDANCE WITH OWNER REQUIREMENTS.
F. NEW SPRINKLER PIPING AND SPRINKLER HEAD TYPE SHALL MATCH THE
PREVIOUS CONDITIONS. LOCATE NEW PIPING AND HEADS AS CLOSE TO THE
PREVIOUS LOCATIONS AS POSSIBLE WHILE MEETING COVERAGE
REQUIREMENTS.
G. PROVIDE PIPE LABELS FOR ALL SPRINKLER PIPING & DEVICES. LABELS SHALL
READ "FIRE PROTECTION PIPING".
H. ALL PENETRATIONS THROUGH FIRE-RATED WALLS OR FLOORS, NEW OR
EXISTING, SHALL BE FIRE STOPPED.
FIRE SUPPRESSION PLAN NOTES
1. CONNECT NEW FIRE PROTECTION PIPING TO THE EXISTING LOCATIONS
INDICATED. FINAL PIPE SIZING AND HEAD LOCATIONS TO BE DETERMINED BY
A CERTIFIED FIRE SPRINKLER DESIGNER. ROUTE PIPING AND LOCATE
SPRINKLER HEADS TO ENSURE ADEQUATE COVERAGE AROUND NEW
MECHANICAL CONSTRUCTION. COORDINATE WITH PROJECT PHASING TO
BRING SPRINKLER SYSTEM ONLINE WHEN THE PHASED AREA OF
CONSTRUCTION IS COMPLETED.
BLDG 98 KEYPLAN
PROJECT
LOCATION
SHADE INDICATES
AREA OUT OF
PROJECT SCOPE
N
98-CH01
FX101
ELEVATOR
CONTROL ROOM
PH1
STAIRS
S1-A
MECHANICAL
ROOM
PH2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s /1
.5
.2
R e p la c e
A ir
H a n d lin g U n it s B
-9
/1
.5
.2
M
E P
V
.r v t
/3
/2
:3
:1
P
M
FX101
PENTHOUSE FIRE SUPPRESSION
PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE AIR HANDLING UNITS
B-98
Danville, IL
550-24-103
07/30/2024 DLJ DFW
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 1/16" = 1'-0"FX101
1 FIRE SUPPRESSION ROOF PLAN
SCALE: 1/8" = 1'-0"FX101
2 ENLARGED FIRE SUPPRESSION PENTHOUSE PLAN
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AQST AQUASTAT
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING
TOWER)
CWS CONDENSER WATER SUPPLY (FROM COOLING
TOWER)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
MECHANICAL ABBREVIATIONS
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J INTENTIONALLY LEFT BLANK
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SW SOFTWATER
SWHX STEAM TO WATER HEAT EXCHANGER
T&PCV TEMPERATURE AND PRESSURE CONTROL
VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
WAG WASTE ANESTHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
GENERAL PIPING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45o OR 90o
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
THERMOMETER
BOTTOM CONNECTION, 45o OR 90o
PRESSURE GAGE
VENTURI FLOW METER
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE / TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
DN
DN
UP
UP
DNUP
DUCTWORK SYMBOLS
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP GRILLE (WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
LIMIT OF DEMOLITION
FLEXIBLE CONNECTION, EQUIPMENT, VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF SYMBOL IS MISSING)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE REMOVED
LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL SECTIONS.)
FLEXIBLE DUCTWORK (INSULATED)
DUCT WITH SOUND LINING
MANUAL VOLUME DAMPER
FIRE DAMPER
BACK DRAFT DAMPER
POINT OF CHANGE IN DUCT CONSTRUCTION BY STATIC
PRESSURE CLASS. THE NUMBER ASSIGNS PRESSURE
CLASS (IN. OF WATER) WHICH WILL ACCOMMODATE
MAXIMUM OPERATING PRESSURE IN THE DUCT
SUBSECTION. THE SYMBOL CONTINUES THE ASSIGNMENT
UNTIL THE DUCT TERMINATES OR ANOTHER SYMBOL
APPEARS. A "N" SUPERSCRIPT INDICATES NEGATIVE
PRESSURE.
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
MANUAL SPLITTER DAMPER
STANDARD BRANCH SUPPLY, NO SPLITTER (45O TAP)
STANDARD BRANCH RETURN, NO SPLITTER (45o TAP)
FC
BDD
FD
VD
N 2 1
1/2
SUPPLY
RETURN
45°
45°
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
VIEW TITLE
NORTH ARROW
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
DRAWING SYMBOLS
XX-X X
EQUIPMENT NUMBER
BUILDING NO. WHERE EQUIPMENT IS LOCATED
EQUIPMENT ABBREVIATION
UNIT NUMBER TAG
TERMINAL UNIT SYMBOLS
UNIT HEATER (HORIZONTAL)
UNIT HEATER (VERTICAL)
T
TT
M
MT
PT
TT
FT
IT
CT
SPS
SD
PDT
KR
TSL
HS
ZC
LC
LT
PDS
TSH
MECHANICAL CONTROL SYMBOLS
ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT
ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL
MOUNT
TEMPERATURE TRANSMITTER
TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRANSMITTER
STATIC PRESSURE SENSOR
FLOW TRANSMITTER
CURRENT TRANSMITTER
CONDUCTIVITY TRANSMITTER
SMOKE DETECTOR
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE DIFFERENTIAL SWITCH
HAND SWITCH (HAND-OFF-AUTO SWITCH)
VALVE OR DAMPER POSITION CONTROLLER
LOCAL RECORDING TIME CLOCK (RUNTIME)
TEMPERATURE SWITCH, LOW (FREEZESTAT)
TEMPERATURE SWITCH, HIGH (FREEZESTAT)
LEVEL CONTROLLER
LEVEL TRANSMITTER
PRESSURE SWITCH HIGH
PRESSURE SWITCH LOW
LOCAL TEMPERATURE CONTROL PANEL
HVAC CONTROL PANEL
VARIABLE SPEED MOTOR CONTROLLER
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TEMPERATURE CONTROLLER. SEE SEQUENCE OF
OPERATION
PRESSURE CONTROLLER. SEE SEQUENCE OF OPERATION
SPEED CONTROLLER. SEE SEQUENCE OF OPERATION
FLOW CONTROLLER. SEE SEQUENCE OF OPERATION
FLOW SWITCH HIGH
FLOW SWITCH LOW
TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE
TEMPERATURE SENSING ELEMENT FOR TRANSMITTING
TEMPERATURE TO EMCS (PROVIDE 12 INCHES MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
MOTOR STARTER
ELECTRIC OPERATED CONTROL DAMPER / OR VALVE
PSH
PSL
KC
FSL
FSH
FC
SC
PC
TC
LTCP
HVAC
ECC
VSMC
A
M
LC
M
VALVE SYMBOLS
GATE VALVE - THREADED / FLANGED
GLOBE VALVE - THREADED / FLANGED
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE HOSE
CONNECTOR
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
CIRCUIT SETTER VALVE
PRESSURE SAFETY VALVE
GATE VALVE WITH GLOVE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLED
FLOW METER
N
SCALE: ??
1. THESE PLANS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL BE PREPARED TO MAKE
SOME ALTERATIONS TO THE EXACT LOCATION OF PIPING AND EQUIPMENT FROM THE LOCATION
INDICATED ON THESE DRAWINGS TO FIT ACTUAL JOB CONDITIONS.
2. ALL ELBOWS, FITTINGS, ETC., IN PIPING REQUIRED TO CLEAR ALL JOB OBSTRUCTIONS ARE NOT NECESSARILY INDICATED. ALL NECESSARY TRANSITIONS, FITTINGS AND OFFSETS ARE REQUIRED
WHETHER SHOWN OR NOT.
3. BECAUSE OF THE LIMITED SPACE AVAILABLE TO INSTALL ALL OF THE MECHANICAL WORK,
COORDINATION BETWEEN THE VARIOUS TRADES IS OF UTMOST IMPORTANCE. SEE SPECIFICATIONS
FOR ALL COORDINATION REQUIREMENTS.
4. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING STAGING AND SCHEDULING
REQUIREMENTS WITH THE OWNER'S REPRESENTATIVE. ANY SCHEDULED DOWN TIMES SHALL BE
COORDINATED WITH THE OWNER IN WRITING, SEE SPECIFICATIONS FOR REQUIRED NOTIFICATION
WINDOWS.
5. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM PREVIOUS CONSTRUCTION DOCUMENTS AND INFORMAL FIELD OBSERVATION AND SHALL NOT BE CONSTITUTED AS "AS BUILT."
THE CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONS BEFORE THE ONSET OF
CONSTRUCTION.
6. DEMOLISH ALL PIPING, DUCTWORK, EQUIPMENT, ETC. THAT IS SHOWN TO BE REMOVED, IN ITS ENTIRETY, INCLUDING BUT NOT LIMITED TOO ALL HANGERS, SUPPORTS, AND HOUSEKEEPING PADS
UNLESS NOTED OTHERWISE.
7. WHERE CONTRACTOR IS REQUIRED TO CONCEAL NEW WORK, REMOVE OR MODIFY EXISTING
CONSTRUCTION OR EQUIPMENT, OR ATTACH TO EXISTING CONSTRUCTION THE CONTRACTOR SHALL
BE RESPONSIBLE FOR REPAIRING OR REPLACING EXISTING CONSTRUCTION AND MATERIALS TO
MATCH CONDITIONS AT THE ONSET OF CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE AND REPLACE EXISTING CEILINGS AND WALLS REQUIRED FOR INSTALLATION OF MECHANICAL
SYSTEMS, WHETHER INDICATED ON THE PLANS OR NOT.
8. THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF EQUIPMENT AND MATERIALS REMOVED. ALL EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL BE REMOVED FROM THE PREMISES
AND DISPOSED OF PER THE SPECIFIED REQUIREMENTS BY THE CONTRACTOR.
9. ALL WORK SHALL BE INSTALLED PER THE REFERENCE DETAILS, REGARDLESS OF WHETHER OR NOT
THE DETAILS ARE CALLED OUT ON THE PLANS. SEE MECHANICAL DETAILS SHEETS.
10. PROVIDE VENTS AT ALL HYDRONIC PIPING HIGH POINTS, AND DRAINS AT ALL PIPING LOW POINTS, REGARDLESS OF WHETHER SHOWN OR NOT.
11. DO NOT SCALE THE LOCATION OF HVAC ELEMENTS FROM THE M-SERIES DRAWINGS.
12. IT IS THE INTENT OF THESE DRAWINGS THAT A MANUAL BALANCING VALVE BE PROVIDED AT EACH
PIPING BRANCH TO AIR HANDLING COILS.
13. ALL EXISTING TEMPERATURE CONTROLS THAT ARE BEING DEMOLISHED OR DISABLED AS WORK OF
THIS CONTRACT SHALL BE COMPLETELY REMOVED FROM THE BUILDING.
14. CONTRACTOR SHALL HAVE THE DOCUMENTS REVIEWED COMPLETELY BY A CERTIFIED BALANCING CONTRACTOR FOR THE INCLUSION OF THE NECESSARY ADDITIONAL HYDRONIC SYSTEM BALANCING DEVICES THAT MIGHT BE NECESSARY. ALL BALANCING DEVICES REQUIRED FOR A PROPER BALANCING
OF THE SYSTEM SHALL BE PROVIDED AT NO CHANGE IN CONTRACT COST.
15. THE HYDRONICS SYSTEMS ARE REQUIRED TO BE BALANCED MULTIPLE TIMES THROUGHOUT THE
CONSTRUCTION OF PROJECT.
16. THE MECHANICAL CONTRACTOR SHALL THOROUGHLY INVESTIGATE AND BRING TO THE ATTENTION OF THE OWNER AND ARCHITECT ANY DAMAGE TO EXISTING TO REMAIN INFRASTRUCTURE PRIOR TO COMMENCING DEMOLITION. AFTER COMMENCING WORK ANY DAMAGE INSIDE THE SCOPE AREA WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND ANY DAMAGE SHALL BE BROUGHT TO
LIKE NEW CONDITION AT NO CHANGE IN CONTRACT COST.
17. WHERE SPRAY FIRE PROTECTION IS SCRAPED, COMPRESSED, DAMAGED, OR OTHERWISE
DISTURBED AS PART OF THIS PROJECT, THE FIRE PROTECTION SHALL BE REPAIRED WITH SIMILAR TO
PRODUCT TO MAINTAIN FIRE RATING PRIOR TO THIS PROJECT.
18. WHERE EXISTING HOUSEKEEPING PADS ARE NO LONGER REQUIRED BECAUSE OF NEW WORK,
THEY SHALL BE REMOVED DOWN TO JUST BELOW THE ADJACENT FLOOR SURFACE. THE OPENING
SHALL BE GROUTED AND POLISHED TO BE LEVEL WITH AND MATCH IN APPEARANCE THE EXISTING
ADJACENT FLOOR LEVEL AND SURFACE.
19. MINIMUM HVAC PIPE SIZE IS 3/4" UNLESS NOTED OTHERWISE. BRANCH PIPING WHERE SIZE IS NOT
INDICATED SHALL BE 3/4" UNLESS NOTED OTHERWISE.
20. MANUAL ISOLATION VALVES SHALL BE PROVIDED IN EACH BRANCH PIPING TAKEOFF TO EQUIPMENT
WHETHER INDICATED ON PLANS OR NOT. SEE SPECIFICATIONS FOR MORE DETAILS.
MECHANICAL GENERAL NOTES
NOTE SYMBOLS
KEYED NOTE, REFER TO DRAWINGS FOR NOTES
DETAIL NOTE, REFER TO DETAILS FOR NOTES AND ADDITIONAL
INFORMATION
DEMOLITION KEYED NOTE, REFER TO DRAWINGS FOR NOTES#
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s /1
.5
.2
R e p la c e
A ir
H a n d lin g U n it s B
-9
/1
.5
.2
M
E P
V
.r v t
/5
/2
:3
:4
A M
M000
MECHANICAL SYMBOLS AND
ABBREVIATIONSGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE AIR HANDLING UNITS
B-98
Danville, IL
550-24-103
07/30/2024 DLJ JAR
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
C O M
C O M
C O M
BLDG 98 KEYPLAN
PROJECT
LOCATION
SHADE INDICATES
AREA OUT OF
PROJECT SCOPE
N
AREA OF TEMPORARY
DUCTWORK AND EQUIPMENT
PATHS OF TEMPORARY
DUCTWORK
PATHS OF TEMPORARY
DUCTWORK
MM001
MM001
48' - 0"
2' - 0"
CONTRACTOR SHALL INSTALL TEMPORARY DUCTWORK IN
PROPOSED LOCATIONS AS SHOWN TO AVOID BLOCKING
ANY WINDOWS OR EGRESS PATHS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s /1
.5
.2
R e p la c e
A ir
H a n d lin g U n it s B
-9
/1
.5
.2
M
E P
V
.r v t
/5
/2
:3
:5
A M
MM001
MECHANICAL SITE PLAN
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE AIR HANDLING UNITS
B-98
Danville, IL
550-24-103
07/30/2024 DLJ JAR
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/32" = 1'-0"MM001
2 MECHANICAL ENLARGED SITE PLAN - OVERALL
NOT TO SCALEMM001
1 WEST BUILDING ELEVATION - MECHANICAL
DEMOLISH TEMPORARY SUPPLY AND RETURN
DUCTWORK UP TO POINT SHOPWN LEAVING THE
REMAINGIN DUCTWORK IN PLACE FOR USE IN THE NEXT
PHASES.
TEMPORARY AIR HANDLING UNIT
TO REMAIN FOR NEXT PHASES.
98-TMP
TEMPORARY DUCTWORK ON
GRADE AND UP THE EXTERIOR OF
BUILDING TO REMAIN FOR NEXT
PHASES.
TEMPORARY BOOSTER FAN TO
REMAIN FOR NEXT PHASES.
BLDG 98 KEYPLAN
PROJECT
LOCATION
SHADE INDICATES
AREA OUT OF
PROJECT SCOPE
N
PROVIDE TEMPORARY AIR HANDLER
MOUNTED ON NEW 6" CONCRETE
PAD IN LOCATIONS INDICATED.
ROUTE SA AND RA DUCTWORK UP
EXTERIOR OF BUILDING TO
MECHANICAL PENTHOUSE AND MAKE
CONNECTION WITH EXISTING SA AND
RA DUCTWORK. GRADE TO
PENTHOUSE ELEVATION IS APPROX.
40'-0" VERIFY EXACT ROUTING IN
FIELD.
SPLIT DUCTS AND CONNECT WITH
TEMPORARY AHU DUCT CONNECTIONS.
VERIFY ROUTING AND DIMENSIONS
WITH FIELD CONDITIONS AND RENTAL
AHU REQUIREMENTS. ROUTE
TEMPORARY 54X46 SA, AND 54X38 RA
UP TO CONNECTION WITH LOUVER IN
PHASE 3. SEE PHASE 3 PENTHOUSE
PLAN FOR DETAILS.
98-EH01
98-EH02
INSTALL TEMPORARY
ELECTRIC DUCT HEATERS
TYPICAL. PROVIDE TEMPORARY
GROUND MOUNTED DUCT SUPPORTS.
REFER TO SPECIFICATIONS FOR MORE
INFORMATION.
PHASE 3A
98-TMP
TEMPORARY UNIT SHALL BE USED FOR
THE REPLACEMENT OF AHU-03
THROUGHOUT THE DOCUMENTED
PHASES 3A,3B,4A AND DISCONNECTED
FROM SERVICE TO AHU-03 IN PHASE 4B.
TYPICAL. PROVIDE TEMPORARY ROOF
MOUNTED DUCT SUPPORTS WITH
WEIGHTED BALLAST. REFER TO
SPECIFICATIONS FOR MORE
INFORMATION.
PROVIDE TEMPORARY DUCT SMOKE
DETECTOR AND INTERLOCK WITH
TEMPORARY AIR HANDLING UNIT TO
SHUT DOWN UPON SMOKE DETECTION.
PROVIDE TEMPORARY AIR HANDLER MOUNTED ON NEW 6" CONCRETE
PAD IN LOCATION INDICATED. ROUTE SA AND RA DUCTWORK UP
EXTERIOR OF BUILDING TO MECHANICAL PENTHOUSE AND MAKE
CONNECTION WITH EXISTING SA AND RA DUCTWORK. GRADE TO
PENTHOUSE ELEVATION IS APPROX. 40'-0" VERIFY EXACT ROUTING IN
FIELD.
SPLIT DUCTS AND CONNECT WITH TEMPORARY AHU DUCT
CONNECTIONS. VERIFY ROUTING AND DIMENSIONS WITH FIELD
CONDITIONS AND RENTAL AHU REQUIREMENTS. ROUTE TEMPORARY
40" DIA. SA/RA, AND 34" DIA SA/RA UP TO CONNECTION WITH LOUVER IN
PHASE 1. SEE PHASE 1 PENTHOUSE PLAN FOR DETAILS.
TYPICAL. PROVIDE TEMPORARY
GROUND MOUNTED DUCT SUPPORTS.
REFER TO SPECIFICATIONS FOR MORE
INFORMATION.
98-TMP
PHASE 1A
TEMPORARY UNIT SHALL BE USED FOR
THE REPLACEMENT OF AHU-02 AND
AHU-03 THROUGHOUT THE
DOCUMENTED PHASES.
TYPICAL. PROVIDE TEMPORARY ROOFTOP
DUCTWORK SUPPORT. PROVIDE WEIGHTED BALLAST.
SUPPORTS SHALL REST ON EXISTING ROOFING
MEMBRANE WITHOUT DAMAGING SURFACE. SEE
SPECIFICATIONS FOR REQUIREMENTS.
TYPICAL. PROVIDE TEMPORARY ROOF
MOUNTED DUCT SUPPORTS WITH
WEIGHTED BALLAST. REFER TO
SPECIFICATIONS FOR MORE
INFORMATION.
PROVIDE TEMPORARY DUCT SMOKE
DETECTOR AND INTERLOCK WITH
TEMPORARY AIR HANDLING UNIT TO
SHUT DOWN UPON SMOKE DETECTION.
TEMPORARY BOOSTER FAN SHALL BE USED FOR THE
REPLACEMENT OF AHU-02 AND AHU-03 THROUGHOUT THE
DOCUMENTED PHASES. SUPPORT UNIT ON GRADE WITH
SUFFICIENT RISERS TO ALIGN WITH DUCTWORK.
98-BF01
54ø
52x16
40ø
40ø
40ø
REMOVE
TEMPORARY AIR
HANDLING UNIT
REMOVE TEMPORARY ELECTRIC
DUCT HEATERS AND TURNOVER
TO OWNER FOR STORAGE.
98-TMP
DEMOLISH ALL TEMPORARY SUPPLY
AND RETURN DUCTWORK.
DEMOLISH ALL TEMPORARY SUPPLY
AND RETURN DUCTWORK.
DEMOLISH ALL TEMPORARY SUPPLY
AND RETURN DUCTWORK.
DEMOLISH ALL TEMPORARY SUPPLY
AND RETURN DUCTWORK.
REMOVE TEMPORARY BOOSTER FAN
AND TURNOVER TO OWNER FOR
STORAGE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s /1
.5
.2
R e p la c e
A ir
H a n d lin g U n it s B
-9
/1
.5
.2
M
E P
V
.r v t
/5
/2
:3
:5
A M
MM002
MECHANICAL SITE PLAN
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
REPLACE AIR HANDLING UNITS
B-98
Danville, IL
550-24-103
07/30/2024 DLJ JAR
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"MM002
2 MECHANICAL ENLARGED SITE PLAN - PHASE 2B
Revisions: Date:
SCALE: 3/32" = 1'-0"MM002
3 MECHANICAL ENLARGED SITE PLAN - PHASE 3A
SCALE: 3/32" = 1'-0"MM002
1 MECHANICAL ENLARGED SITE PLAN - PHASE 1A
SCALE: 3/32" = 1'-0"MM002
4 MECHANICAL ENLARGED SITE PLAN - PHASE 4B
S D
S D
MECHANICAL DEMOLITION GENERAL NOTES
A. REFER TO SHEET M000 FOR GENERAL NOTES.
B. NEW TEMPORARY DUCTWORK, AIR HANDLER, INFRASTRUCTURE, ETC.
INDICATED ON THE PHASE 1 NEW WORK PLANS TO BE COORDINATED TO
MINIMIZE DOWNTIME. CONTRACTOR MUST SUBMIT FOR APPROVAL A
DETAILED PHASING PLAN. THIS DETAILED PHASING PLAN SHALL AT A
MINIMUM CONTAIN PRICE QUOTES AND DELIVERY INFORMATION FOR RENTAL
EQUIPMENT, TEMPORARY NEW WORK CONSTRUCTION SCHEDULE (GANTT
CHART FORMAT), DEMOLITION PHASING CONSTRUCTION SCHEDULE (GANTT
CHART FORMAT), ANTICIPATED DOWNTIME DURATION AND TIMEFRAME. SEE
SPECIFICATIONS FOR ALL REQUIREMENTS.
C. COORDINATE CRANE DATES AND LOADING DOCK BLOCKAGES WITH COR AND
EMS CHIEF AT LEAST TWO WEEKS IN…