This document appears to be a set of bid drawings related to a Department of Veterans Affairs solicitation for the replacement of air handler units at facility B98. The solicitation number is 36C25225B0003 and it is for Project 550-24-103 (CON) Replace Air Handler Units B98. The solicitation is issued by the Department of Veterans Affairs' Veterans Health Administration, Veterans Integrated Service Network 12. The bid drawings provide detailed technical specifications and diagrams for the required work. No additional details about the solicitation requirements, pricing, set-asides, award dates, or other key information are included in this particular document.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Project 550-24-103 (CON) Replace Air Handler Units B98, newest first.
File Type Posted
S05 - Pre-Bid RFIs 550-24-103 CON-VA.xlsx XLSX spreadsheet
S06 550-24-103 B98 AHU Addendem 1 Specs.pdf PDF
S06 550-24-103 B98 AHU Addendem 1 Narrative.pdf PDF
S04 Sign Visit Pre-Bid Sign in sheet 550-24-103 CON.pdf PDF
36C25225B0003 0002.docx DOCX document
S06 Wage Determination SAM 11_25_2024.pdf PDF
S06 550-24-103 B98 AHU Addendem 1 Dwgs.pdf PDF
S06 Wage Determination SAM 11_14_2024.pdf PDF
36C25225B0003 0001.docx DOCX document
S02 36C25225B0003_1.docx DOCX document
P01 - 07_550-24-103_BID Specifications.pdf PDF
Wage Determination 10_09_2024.pdf PDF
36C25225B0003_1.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG 98 KEYPLAN

PROJECT

LOCATION

SHADE INDICATES

AREA OUT OF

PROJECT SCOPE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s /1

.5

.2

R e p la c e

A ir

H a n d lin g U n it s B

-9

/1

.5

.2

M

E P

V

.r v t

/3

/2

:3

:5

P

M

GI000

COVER SHEET

GUIDON DESIGN

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

REPLACE AIR HANDLING UNITS

B-98

Danville, IL

550-24-103

07/30/2024 DLJ MCP

550-24-103

REPLACE AIR HANDLING UNITS B-98

VA DANVILLE

Danville, IL

100% CONSTRUCTION DOCUMENTS

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SHEET INDEX

SHEET NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI101 LIFE SAFETY PLAN

CIVIL

CS101 SITE PLAN

FIRE SUPRRESION

F000 FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS

FDX101 PENTHOUSE FIRE SUPPRESSION DEMO PLAN

FX101 PENTHOUSE FIRE SUPPRESSION PLAN

MECHANICAL

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MM001 MECHANICAL SITE PLAN

MM002 MECHANICAL SITE PLAN

MD100.1 PENTHOUSE MECHANICAL HVAC DEMOLITION PLAN - PHASE 1

MD100.2 PENTHOUSE MECHANICAL HVAC DEMOLITION PLAN - PHASE 2

MD100.3 PENTHOUSE MECHANICAL HVAC DEMOLITION PLAN - PHASE 3

MD100.4 PENTHOUSE MECHANICAL HVAC DEMOLITION PLAN - PHASE 4

MM100.1 PENTHOUSE MECHANICAL HVAC PLAN - PHASE 1

MM100.2 PENTHOUSE MECHANICAL HVAC PLAN - PHASE 2

MM100.3 PENTHOUSE MECHANICAL HVAC PLAN - PHASE 3

MM100.4 PENTHOUSE MECHANICAL HVAC PLAN - PHASE 4

MM400 MECHANICAL ROOM SECTIONS- PHASE 1&2

MM401 MECHANICAL ROOM SECTIONS - PHASE 3&4

MM500 MECHANICAL DETAILS

MM501 MECHANICAL DETAILS

MM502 MECHANICAL 98-AHU02 DETAILS

MM503 MECHANICAL 98-AHU03 DETAILS

MM600 MECHANICAL SCHEDULES

MM700 MECHANICAL CONTROLS

ELECTRICAL

E000 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND NOTES

E001 ELECTRICAL SITE PLAN

ED100.1 PENTHOUSE ELECTRICAL DEMOLITION PLAN - PHASE 1

ED100.2 PENTHOUSE ELECTRICAL DEMOLITION PLAN - PHASE 2

ED100.3 PENTHOUSE ELECTRICAL DEMOLITION PLAN - PHASE 3

ED100.4 PENTHOUSE ELECTRICAL DEMOLITION PLAN - PHASE 4

E100.1 PENTHOUSE ELECTRICAL NEW WORK PLAN - PHASE 1

E100.2 PENTHOUSE ELECTRICAL NEW WORK PLAN - PHASE 2

E100.3 PENTHOUSE ELECTRICAL NEW WORK PLAN - PHASE 3

E100.4 PENTHOUSE ELECTRICAL NEW WORK PLAN - PHASE 4

E701 ELECTRICAL SINGLE LINE DIAGRAMS AND SCHEDULES

AREA MAP

VICINITY MAP

CAMPUS MAP

PROJECT SITE LOCATION

PROJECT SITE LOCATION

PROJECT SITE LOCATION

N

N

N

Revisions: Date:

Contact: Contact:

VA ILLIANA HEALTHCARE SYSTEM

Michael Wlos

COR

1900 E. Main Street Danville, IL 61832 p: (217) 554-5985 e: Michael.Wlos@va.gov

OWNER

GUIDON DESIGN INC.

DeShun Johnson

Project Manager

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: (317) 800-6388 x148 e: djohnson@guidon.com

PROJECT MANAGER

Contact:

GUIDON DESIGN INC.

Sr. Civil Engineer

CIVIL

ENGINEER

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x108 e: cbutler@guidon.com

Chad Butler

Contact:

GUIDON DESIGN INC.

Adam Ogrzewalla

Architect

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: (317) 800-6388 x103 e: aogrzewalla@guidon.com

ARCHITECT

Contact:

GUIDON DESIGN INC.

Sr. Mechanical Engineer

MECHANICAL

ENGINEER

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x145 e: jfague@guidon.com

Jake Fague

Contact:

GUIDON DESIGN INC.

Al Halabi

Sr. Electrical Engineer

ELECTRICAL

ENGINEER

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 e: ahalabi@guidon.com

Contact:

GUIDON DESIGN INC.

STRUCTURAL

ENGINEER

Structural Engineer

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 117 e: llai@guidon.com

Lauren Lai

09/06/2024

98-CH01

EX 2" LPS

EX 4" CWR

EX 4" CWS

EX 4" CWS

EX 4" CWS

FEC

FEC

E X

IT

GI101

GI101

BLDG 98 KEYPLAN

PROJECT

LOCATION

SHADE INDICATES

AREA OUT OF

PROJECT SCOPE

N

FEC

EXIT EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

EXISTING 2 HR - FIRE SEPARATION

REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND

REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.

ICC, INTERNATIONAL BUILDING CODES, 2024 EDITION (IBC)

ASCE-07-10

ACI 318-11

ACI 530-11

AISC 341-10

AISC 360-10

PCI MNL 120-10, DESIGN HANDBOOK

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2022 EDITION

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2022 EDITION

NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2024

EDITION

NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE

PROTECTION, 2022 EDITION

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND

THEIR APPURTENANCE, 2022 EDITION.

NFPA 54 NATIONAL FUEL GAS CODE, 2024 EDITION

NFPA 70, NATIONAL ELECTRIC CODE, 2023 EDITION

NFPA 72, NATIONAL FIRE ALARM CODE, 2022 EDITION

NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA

PROCESSING EQUIPMENT, 2024 EDITION

NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2024 EDITION

NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2022 EDITION

NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING

SYSTEMS, 2024 EDITION.

NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2024 EDITION

NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2024 EDITION

NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2024 EDITION

NFPA 101, LIFE SAFETY CODE, 2024 EDITION

NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2022 EDITION

NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2024 EDITION.

NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2023

EDITION

MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF

NFPA 5000 AND NFPA 900

ASHRAE 90.1-2022 HVAC SYSTEMS

ANSI A117.1-2017 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

ENERGY POLICY ACT OF 2005 (EPACT)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND

TRANSPORTATION MANAGEMENT.

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS

ARCHITECTURAL, AUGUST 1, 2014

ASBESTOS ABATEMENT, JULY 2011

CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012

ELECTRICAL, DECEMBER 2019

ENERGY SUSTAINABILITY, AUGUST 2017

EQUIPMENT, SEPTEMBER 2019

ESTIMATING, AUGUST 21, 2022

NEPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010

FIRE PROTECTION, NINTH EDITION REVISED NOVEMBER 1, 2023

HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2024

INTERIOR DESIGN, NOVEMBER 2020

PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2024

PLUMBING, FEBRUARY 2024

STRUCTURAL, JULY 2023

WAYFINDING AND SIGNAGE, INTERIOR, MAY 2023

SEISMIC DESIGN REQUIREMENTS, H-18-8, JULY 2023

ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR

PROJECTS SEPTEMBER 30, 2010

EPA GUIDELINES CHECKLIST

CODE ANALYSIS LEGEND

GOVERNING CODES

VA DESIGN MANUALS PG-18-10

CONTRACTOR SHALL INSTALL TEMPORARY FLEX DUCT IN

PROPOSED LOCATION.TEMPORARY FLEX DUCT SHALL NOT

BE INSTALLED IN FRONT OF WINDOWS. SEE MM001 FOR

ADDITIONAL INFORMATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s /1

.5

.2

R e p la c e

A ir

H a n d lin g U n it s B

-9

/1

.5

.2

M

E P

V

.r v t

/3

/2

:3

:0

P

M

GI101

LIFE SAFETY PLAN

GUIDON DESIGN

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

REPLACE AIR HANDLING UNITS

B-98

Danville, IL

550-24-103

07/30/2024 DLJ TDC

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 1/16" = 1'-0"GI101

1 MECHANICAL ROOF LIFE SAFETY PLAN

SCALE: 1/16" = 1'-0"GI101

2 WEST BUILDING ELEVATION

BUILDING 98ST

ST

ST

ST

ST

ST

ST

H H

STM

STM

22'

40'

10' CLEARANCE AROUND

TEMPORARY UNIT

ENTRANCE

ENTRANCE

MAIN

ENTRANCE

ENTRANCE

ENTRANCE

ENTRANCE

ENTRANCE

N

0 4020

1. TEMPORARY AIR HANDLER LOCATION - 98-TMP

2. TEMPORARY CONCRETE MECHANICAL PAD

3. CONSTRUCTION STAGING AREA

4. CRANE STAGING LOCATION

5. "NO IDLING" TEMPORARY SIGN POST

6. REMOVE AND REINSTALL LIGHT POLE

7. PICK AREA FOR STAGING TRUCKS TO MOVE MATERIALS TO/FROM ROOF

CS101

SITE PLAN

GENERAL NOTES

CONTRACTOR SHALL REPLACE PAVEMENT DAMAGED FROM CRANE WORK.

CONTRACTOR SHALL REPAIR AND REPLACE AREAS AFFECTED BY CONSTRUCTION BACK TO

EXISTING ELEVATION CONDITION. PROVIDE TOPSOIL AND MULCH GRASS SEED AS REQUIRED

TO RESTORE GRADE AND ELEVATION.

CONTRACTOR SHALL PROTECT ALL SIDEWALKS. CONTRACTOR SHALL REPAIR AND REPLACE

ALL SIDEWALKS AFFECTED BY WORK.

CONTRACTOR SHALL COORDINATE CONSTRUCTION STAGING AREA WITH VA PRIOR TO WORK.

CONTRACTOR SHALL PROTECT ALL TEMPORARY EQUIPMENT AND STAGING AREAS

THROUGHOUT CONSTRUCTION. COORDINATE TEMPORARY FENCE LOCATION WITH COR

PRIOR TO REPLACEMENT.

CONTRACTOR SHALL COORDINATE FINAL CRANE STAGING LOCATION WITH COR PRIOR TO

WORK. CONTRACTOR SHALL COORDINATE WITH COR THE TIME AT WHICH THE CRANE WILL

BE PRESENT ON SITE.

WORK SHALL BE PERFORMED AFTER HOURS OF OPERATION OF THE FACILITY.

EXISTING LIGHT POLE TO BE REMOVED PRIOR TO CRANE WORK. LIGHT POLE TO BE

REINSTALLED AFTER CRANE WORK AS BEEN COMPLETED.

EXISTING

GRADE

1'1' 98-TMP WIDTH

U CHANNEL STEEL POST

NOTES

1. DRIVEN INSTALLATION U-CHANNEL.

4'- 0"

M

IN

NOTES

1. SIZE EQUIPMENT PAD ACCORDING TO DIMENSIONS OF TEMPORARY AIR

HANDLER UNIT.

2. EXTEND EQUIPMENT PAD 1' OFFSET OF TEMPORARY AHU DIMENSIONS.

3. ENSURE 10' CLEARANCE AROUND TEMPORARY AIR HANDLER UNIT.

12"

NO

IDLING

ALLOWED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

REPLACE AIR HANDLING UNITS

B-98

Danville, IL

550-24-103

07/17/2024 CMB SJCRevisions: Date:

GUIDON DESIGN

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388 FULLY SPRINKLERED

SITE PLAN KEYNOTES

CONCRETE MECHANICAL PAD

CS101 NTS

CS101 NTS

'NO IDLING' SIGN

1" MIN.

6"

COMPACTED SUBGRADE 4000 PSI CONCRETE

5"

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AAV AUTOMATIC AIR VENT

AB AIR BLENDER

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER, MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

AQST AQUASTAT

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELSIUS)

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO COOLING TOWER)

CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)

D DAMPER - AUTOMATIC

Db DRY-BULB TEMPERATURE

DB DECIBELS

DCW DOMESTIC COLD WATER

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

FIRE SUPPRESSION ABBREVIATIONS

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFIER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

J INTENTIONALLY LEFT BLANK

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

L LITER

L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUEFIED PETROLEUM GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND (OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

Nm NEWTON METER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P PUMP

Pa PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD RETURN AIR DAMPER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RELAD RELIEF AIR DAMPER

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SW SOFTWATER

SWHX STEAM TO WATER HEAT EXCHANGER

T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

U UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

WAG WASTE ANESTHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

VALVE SYMBOLS

FIRE SPRINKLER HEAD

FIRE SPRINKLER ZONE RISER VALVE

GENERAL PIPING SYMBOLS

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

ANCHOR

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45o OR 90o

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

THERMOMETER

BOTTOM CONNECTION, 45o OR 90o

PRESSURE GAGE

VENTURI FLOW METER

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE / TEMPERATURE)

AUTOMATIC AIR VENT

MANUAL AIR VENT

QUICK-COUPLE HOSE CONNECTOR

PIPE DEMOLISHED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s /1

.5

.2

R e p la c e

A ir

H a n d lin g U n it s B

-9

/1

.5

.2

M

E P

V

.r v t

/3

/2

:3

:0

P

M

F000

FIRE SUPPRESSION SYMBOLS

AND ABBREVIATIONSGUIDON DESIGN

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

REPLACE AIR HANDLING UNITS

B-98

Danville, IL

550-24-103

07/30/2024 DLJ JAR

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date: 09/06/2024

FIRE SUPPRESSION DEMOLITION GENERAL NOTES

A. REFER TO SHEET F000 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES:

B. CONTRACTOR TO PROVIDE CONSTRUCTION BARRIERS AND A PHASING PLAN

AS NEEDED BY THE OWNER AND LOCAL CODES. CONTRACTOR TO MAINTAIN

ACTIVE FIRE PROTECTION THROUGHOUT CONSTRUCTION AREAS AT ALL

TIMES.

FIRE SUPPRESSION DEMOLITION PLAN NOTES

1. DEMOLISH FIRE PROTECTION PIPING, SPRINKLER HEADS, FITTINGS AND

ACCESSORIES AS REQUIRED TO ALLOW SPACE FOR NEW MECHANICAL

SYSTEMS. CAP EXISTING PIPES FOR SYSTEM REPRESSURIZATION.

DEMOLITION AROUND AREAS FOR 98-AHU2 & 98-AHU3 TO BE COORDINATED

WITH PROJECT PHASING SUCH THAT THE SYSTEM REMAINS ONLINE UNTIL

DEMOLITION IS NECESSARY.

BLDG 98 KEYPLAN

PROJECT

LOCATION

SHADE INDICATES

AREA OUT OF

PROJECT SCOPE

N

98-CH01

98-AHU02

98-AHU03

FDX101

ELEVATOR

CONTROL ROOM

PH1

STAIRS

S1-A

MECHANICAL

ROOM

PH2

98-AHU02

98-AHU03

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s /1

.5

.2

R e p la c e

A ir

H a n d lin g U n it s B

-9

/1

.5

.2

M

E P

V

.r v t

/3

/2

:3

:0

P

M

FDX101

PENTHOUSE FIRE SUPPRESSION

DEMO PLANGUIDON DESIGN

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

REPLACE AIR HANDLING UNITS

B-98

Danville, IL

550-24-103

07/30/2024 DLJ DFW

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 1/16" = 1'-0"FDX101

1 FIRE SUPPRESSION ROOF DEMOLITION PLAN

SCALE: 1/8" = 1'-0"FDX101

2 ENLARGED FIRE SUPPRESSION PENTHOUSE DEMOLITION PLAN

FIRE SUPPRESSION GENERAL NOTES

A. COORDINATE INSTALLATION OF FIRE SUPPRESSION SYSTEMS WITH ALL

OTHER SYSTEMS. ANY COST DUE TO LACK OF COORDINATION OF THIS

SYSTEM WITH OTHER SYSTEMS WILL BE THE RESPONSIBILITY OF THE FIRE

SUPPRESSION CONTRACTOR.

B. DO NOT ROUTE ANY SYSTEMS OVER EXISTING AND/OR NEW ELECTRICAL

AND/OR IT AND TELECOMMUNICATIONS ROOMS.

C. PROVIDE SPRINKLERS ABOVE AND BELOW WIDE DUCTWORK (48 INCHES AND

WIDER INCLUDING INSULATION) PER NFPA 13 REQUIREMENTS.

D. PIPING ARRANGEMENT AND SPRINKLER LOCATIONS ARE DIAGRAMMATIC AND

ARE SHOWN FOR GENERAL INFORMATION ONLY. EXACT ROUTING OF PIPING

AND FINAL SIZING AND LOCATION OF SPRINKLERS SHALL BE DESIGNED AND

PROVIDED BY THE FIRE SUPPRESSION CONTRACTOR TO ACCOUNT FOR

ACTUAL FIELD CONDITIONS. ALL AREAS SHALL BE PROTECTED UNLESS

SPECIFICALLY NOTED OTHERWISE. COORDINATE INSTALLATION WITH CEILING

HEIGHTS AND SOFFITS. REFER TO ARCHITECTURAL CONTRACT DOCUMENTS

FOR ADDITIONAL INFORMATION.

E. THIS BUILDING SHALL BE CONSIDERED LIGHT/ORDINARY HAZARD

OCCUPANCY WITH EXCEPTIONS PER NFPA 13, STATE, AND LOCAL CODES.

DESIGN DENSITIES SHALL BE IN ACCORDANCE WITH OWNER REQUIREMENTS.

F. NEW SPRINKLER PIPING AND SPRINKLER HEAD TYPE SHALL MATCH THE

PREVIOUS CONDITIONS. LOCATE NEW PIPING AND HEADS AS CLOSE TO THE

PREVIOUS LOCATIONS AS POSSIBLE WHILE MEETING COVERAGE

REQUIREMENTS.

G. PROVIDE PIPE LABELS FOR ALL SPRINKLER PIPING & DEVICES. LABELS SHALL

READ "FIRE PROTECTION PIPING".

H. ALL PENETRATIONS THROUGH FIRE-RATED WALLS OR FLOORS, NEW OR

EXISTING, SHALL BE FIRE STOPPED.

FIRE SUPPRESSION PLAN NOTES

1. CONNECT NEW FIRE PROTECTION PIPING TO THE EXISTING LOCATIONS

INDICATED. FINAL PIPE SIZING AND HEAD LOCATIONS TO BE DETERMINED BY

A CERTIFIED FIRE SPRINKLER DESIGNER. ROUTE PIPING AND LOCATE

SPRINKLER HEADS TO ENSURE ADEQUATE COVERAGE AROUND NEW

MECHANICAL CONSTRUCTION. COORDINATE WITH PROJECT PHASING TO

BRING SPRINKLER SYSTEM ONLINE WHEN THE PHASED AREA OF

CONSTRUCTION IS COMPLETED.

BLDG 98 KEYPLAN

PROJECT

LOCATION

SHADE INDICATES

AREA OUT OF

PROJECT SCOPE

N

98-CH01

FX101

ELEVATOR

CONTROL ROOM

PH1

STAIRS

S1-A

MECHANICAL

ROOM

PH2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s /1

.5

.2

R e p la c e

A ir

H a n d lin g U n it s B

-9

/1

.5

.2

M

E P

V

.r v t

/3

/2

:3

:1

P

M

FX101

PENTHOUSE FIRE SUPPRESSION

PLANGUIDON DESIGN

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

REPLACE AIR HANDLING UNITS

B-98

Danville, IL

550-24-103

07/30/2024 DLJ DFW

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 1/16" = 1'-0"FX101

1 FIRE SUPPRESSION ROOF PLAN

SCALE: 1/8" = 1'-0"FX101

2 ENLARGED FIRE SUPPRESSION PENTHOUSE PLAN

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AAV AUTOMATIC AIR VENT

AB AIR BLENDER

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER, MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

AQST AQUASTAT

ARI AIR CONDITIONING AND REFRIGERATION

INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING

REFRIGERATION AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELSIUS)

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO COOLING

TOWER)

CWS CONDENSER WATER SUPPLY (FROM COOLING

TOWER)

D DAMPER - AUTOMATIC

Db DRY-BULB TEMPERATURE

DB DECIBELS

DCW DOMESTIC COLD WATER

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

MECHANICAL ABBREVIATIONS

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFIER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

J INTENTIONALLY LEFT BLANK

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

L LITER

L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUEFIED PETROLEUM GAS

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM

CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

Nm NEWTON METER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P PUMP

Pa PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD RETURN AIR DAMPER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RELAD RELIEF AIR DAMPER

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SW SOFTWATER

SWHX STEAM TO WATER HEAT EXCHANGER

T&PCV TEMPERATURE AND PRESSURE CONTROL

VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

U UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED

BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

WAG WASTE ANESTHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

GENERAL PIPING SYMBOLS

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

ANCHOR

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45o OR 90o

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

THERMOMETER

BOTTOM CONNECTION, 45o OR 90o

PRESSURE GAGE

VENTURI FLOW METER

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE / TEMPERATURE)

AUTOMATIC AIR VENT

MANUAL AIR VENT

QUICK-COUPLE HOSE CONNECTOR

DN

DN

UP

UP

DNUP

DUCTWORK SYMBOLS

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

(WALL TYPE)

EXHAUST OR RETURN REGISTER OR TOP GRILLE (WALL TYPE)

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

LIMIT OF DEMOLITION

FLEXIBLE CONNECTION, EQUIPMENT, VIBRATION, OR SEISMIC

VANED ELBOW (PROVIDE ALL SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF SYMBOL IS MISSING)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE REMOVED

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL SECTIONS.)

FLEXIBLE DUCTWORK (INSULATED)

DUCT WITH SOUND LINING

MANUAL VOLUME DAMPER

FIRE DAMPER

BACK DRAFT DAMPER

POINT OF CHANGE IN DUCT CONSTRUCTION BY STATIC

PRESSURE CLASS. THE NUMBER ASSIGNS PRESSURE

CLASS (IN. OF WATER) WHICH WILL ACCOMMODATE

MAXIMUM OPERATING PRESSURE IN THE DUCT

SUBSECTION. THE SYMBOL CONTINUES THE ASSIGNMENT

UNTIL THE DUCT TERMINATES OR ANOTHER SYMBOL

APPEARS. A "N" SUPERSCRIPT INDICATES NEGATIVE

PRESSURE.

AUTOMATIC CONTROL DAMPER MODULATING

AUTOMATIC CONTROL DAMPER TWO POSITION

MANUAL SPLITTER DAMPER

STANDARD BRANCH SUPPLY, NO SPLITTER (45O TAP)

STANDARD BRANCH RETURN, NO SPLITTER (45o TAP)

FC

BDD

FD

VD

N 2 1

1/2

SUPPLY

RETURN

45°

45°

SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

VIEW TITLE

NORTH ARROW

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY, NIC

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

X

X

XXXX

SHEET LOCATION

VIEW NUMBER

X X

X

SHEET LOCATION

VIEW NUMBER

XXXX

BUILDING SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

BUILDING X

XXXX

X

XXXX

ELEVATION REFERENCES

DRAWING SYMBOLS

XX-X X

EQUIPMENT NUMBER

BUILDING NO. WHERE EQUIPMENT IS LOCATED

EQUIPMENT ABBREVIATION

UNIT NUMBER TAG

TERMINAL UNIT SYMBOLS

UNIT HEATER (HORIZONTAL)

UNIT HEATER (VERTICAL)

T

TT

M

MT

PT

TT

FT

IT

CT

SPS

SD

PDT

KR

TSL

HS

ZC

LC

LT

PDS

TSH

MECHANICAL CONTROL SYMBOLS

ROOM THERMOSTAT / TRANSMITTER - WALL MOUNT

ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL

MOUNT

TEMPERATURE TRANSMITTER

TEMPERATURE TRANSMITTER, AVERAGING ELEMENT

MOISTURE (HUMIDITY) TRANSMITTER

PRESSURE TRANSMITTER

STATIC PRESSURE SENSOR

FLOW TRANSMITTER

CURRENT TRANSMITTER

CONDUCTIVITY TRANSMITTER

SMOKE DETECTOR

PRESSURE DIFFERENTIAL TRANSMITTER

PRESSURE DIFFERENTIAL SWITCH

HAND SWITCH (HAND-OFF-AUTO SWITCH)

VALVE OR DAMPER POSITION CONTROLLER

LOCAL RECORDING TIME CLOCK (RUNTIME)

TEMPERATURE SWITCH, LOW (FREEZESTAT)

TEMPERATURE SWITCH, HIGH (FREEZESTAT)

LEVEL CONTROLLER

LEVEL TRANSMITTER

PRESSURE SWITCH HIGH

PRESSURE SWITCH LOW

LOCAL TEMPERATURE CONTROL PANEL

HVAC CONTROL PANEL

VARIABLE SPEED MOTOR CONTROLLER

INTEGRATE CONTROL POINT ON REMOTE GRAPHICS

WORKSTATION AT ENERGY CONTROL CENTER

TEMPERATURE CONTROLLER. SEE SEQUENCE OF

OPERATION

PRESSURE CONTROLLER. SEE SEQUENCE OF OPERATION

SPEED CONTROLLER. SEE SEQUENCE OF OPERATION

FLOW CONTROLLER. SEE SEQUENCE OF OPERATION

FLOW SWITCH HIGH

FLOW SWITCH LOW

TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE

TEMPERATURE SENSING ELEMENT FOR TRANSMITTING

TEMPERATURE TO EMCS (PROVIDE 12 INCHES MINIMUM

LENGTH IN DUCT WHEN SPACE PERMITS.)

SENSOR WITH AVERAGING ELEMENT TO TRANSMIT

TEMPERATURE TO EMCS

MOTOR STARTER

ELECTRIC OPERATED CONTROL DAMPER / OR VALVE

PSH

PSL

KC

FSL

FSH

FC

SC

PC

TC

LTCP

HVAC

ECC

VSMC

A

M

LC

M

VALVE SYMBOLS

GATE VALVE - THREADED / FLANGED

GLOBE VALVE - THREADED / FLANGED

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE HOSE

CONNECTOR

FLEXIBLE CONNECTION

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

MODULATING CONTROL VALVE

MODULATING CONTROL BUTTERFLY VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

THREE-WAY TWO POSITION CONTROL VALVE

PRESSURE REGULATING VALVE

AUTOMATIC BALANCING CONTROL VALVE

WATER BALANCE DEVICE

CIRCUIT SETTER VALVE

PRESSURE SAFETY VALVE

GATE VALVE WITH GLOVE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

WATER LEVEL CONTROLLED

FLOW METER

N

SCALE: ??

1. THESE PLANS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL BE PREPARED TO MAKE

SOME ALTERATIONS TO THE EXACT LOCATION OF PIPING AND EQUIPMENT FROM THE LOCATION

INDICATED ON THESE DRAWINGS TO FIT ACTUAL JOB CONDITIONS.

2. ALL ELBOWS, FITTINGS, ETC., IN PIPING REQUIRED TO CLEAR ALL JOB OBSTRUCTIONS ARE NOT NECESSARILY INDICATED. ALL NECESSARY TRANSITIONS, FITTINGS AND OFFSETS ARE REQUIRED

WHETHER SHOWN OR NOT.

3. BECAUSE OF THE LIMITED SPACE AVAILABLE TO INSTALL ALL OF THE MECHANICAL WORK,

COORDINATION BETWEEN THE VARIOUS TRADES IS OF UTMOST IMPORTANCE. SEE SPECIFICATIONS

FOR ALL COORDINATION REQUIREMENTS.

4. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING STAGING AND SCHEDULING

REQUIREMENTS WITH THE OWNER'S REPRESENTATIVE. ANY SCHEDULED DOWN TIMES SHALL BE

COORDINATED WITH THE OWNER IN WRITING, SEE SPECIFICATIONS FOR REQUIRED NOTIFICATION

WINDOWS.

5. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM PREVIOUS CONSTRUCTION DOCUMENTS AND INFORMAL FIELD OBSERVATION AND SHALL NOT BE CONSTITUTED AS "AS BUILT."

THE CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONS BEFORE THE ONSET OF

CONSTRUCTION.

6. DEMOLISH ALL PIPING, DUCTWORK, EQUIPMENT, ETC. THAT IS SHOWN TO BE REMOVED, IN ITS ENTIRETY, INCLUDING BUT NOT LIMITED TOO ALL HANGERS, SUPPORTS, AND HOUSEKEEPING PADS

UNLESS NOTED OTHERWISE.

7. WHERE CONTRACTOR IS REQUIRED TO CONCEAL NEW WORK, REMOVE OR MODIFY EXISTING

CONSTRUCTION OR EQUIPMENT, OR ATTACH TO EXISTING CONSTRUCTION THE CONTRACTOR SHALL

BE RESPONSIBLE FOR REPAIRING OR REPLACING EXISTING CONSTRUCTION AND MATERIALS TO

MATCH CONDITIONS AT THE ONSET OF CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE AND REPLACE EXISTING CEILINGS AND WALLS REQUIRED FOR INSTALLATION OF MECHANICAL

SYSTEMS, WHETHER INDICATED ON THE PLANS OR NOT.

8. THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF EQUIPMENT AND MATERIALS REMOVED. ALL EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL BE REMOVED FROM THE PREMISES

AND DISPOSED OF PER THE SPECIFIED REQUIREMENTS BY THE CONTRACTOR.

9. ALL WORK SHALL BE INSTALLED PER THE REFERENCE DETAILS, REGARDLESS OF WHETHER OR NOT

THE DETAILS ARE CALLED OUT ON THE PLANS. SEE MECHANICAL DETAILS SHEETS.

10. PROVIDE VENTS AT ALL HYDRONIC PIPING HIGH POINTS, AND DRAINS AT ALL PIPING LOW POINTS, REGARDLESS OF WHETHER SHOWN OR NOT.

11. DO NOT SCALE THE LOCATION OF HVAC ELEMENTS FROM THE M-SERIES DRAWINGS.

12. IT IS THE INTENT OF THESE DRAWINGS THAT A MANUAL BALANCING VALVE BE PROVIDED AT EACH

PIPING BRANCH TO AIR HANDLING COILS.

13. ALL EXISTING TEMPERATURE CONTROLS THAT ARE BEING DEMOLISHED OR DISABLED AS WORK OF

THIS CONTRACT SHALL BE COMPLETELY REMOVED FROM THE BUILDING.

14. CONTRACTOR SHALL HAVE THE DOCUMENTS REVIEWED COMPLETELY BY A CERTIFIED BALANCING CONTRACTOR FOR THE INCLUSION OF THE NECESSARY ADDITIONAL HYDRONIC SYSTEM BALANCING DEVICES THAT MIGHT BE NECESSARY. ALL BALANCING DEVICES REQUIRED FOR A PROPER BALANCING

OF THE SYSTEM SHALL BE PROVIDED AT NO CHANGE IN CONTRACT COST.

15. THE HYDRONICS SYSTEMS ARE REQUIRED TO BE BALANCED MULTIPLE TIMES THROUGHOUT THE

CONSTRUCTION OF PROJECT.

16. THE MECHANICAL CONTRACTOR SHALL THOROUGHLY INVESTIGATE AND BRING TO THE ATTENTION OF THE OWNER AND ARCHITECT ANY DAMAGE TO EXISTING TO REMAIN INFRASTRUCTURE PRIOR TO COMMENCING DEMOLITION. AFTER COMMENCING WORK ANY DAMAGE INSIDE THE SCOPE AREA WILL BE DEEMED TO HAVE BEEN CAUSED BY THE CONTRACTOR AND ANY DAMAGE SHALL BE BROUGHT TO

LIKE NEW CONDITION AT NO CHANGE IN CONTRACT COST.

17. WHERE SPRAY FIRE PROTECTION IS SCRAPED, COMPRESSED, DAMAGED, OR OTHERWISE

DISTURBED AS PART OF THIS PROJECT, THE FIRE PROTECTION SHALL BE REPAIRED WITH SIMILAR TO

PRODUCT TO MAINTAIN FIRE RATING PRIOR TO THIS PROJECT.

18. WHERE EXISTING HOUSEKEEPING PADS ARE NO LONGER REQUIRED BECAUSE OF NEW WORK,

THEY SHALL BE REMOVED DOWN TO JUST BELOW THE ADJACENT FLOOR SURFACE. THE OPENING

SHALL BE GROUTED AND POLISHED TO BE LEVEL WITH AND MATCH IN APPEARANCE THE EXISTING

ADJACENT FLOOR LEVEL AND SURFACE.

19. MINIMUM HVAC PIPE SIZE IS 3/4" UNLESS NOTED OTHERWISE. BRANCH PIPING WHERE SIZE IS NOT

INDICATED SHALL BE 3/4" UNLESS NOTED OTHERWISE.

20. MANUAL ISOLATION VALVES SHALL BE PROVIDED IN EACH BRANCH PIPING TAKEOFF TO EQUIPMENT

WHETHER INDICATED ON PLANS OR NOT. SEE SPECIFICATIONS FOR MORE DETAILS.

MECHANICAL GENERAL NOTES

NOTE SYMBOLS

KEYED NOTE, REFER TO DRAWINGS FOR NOTES

DETAIL NOTE, REFER TO DETAILS FOR NOTES AND ADDITIONAL

INFORMATION

DEMOLITION KEYED NOTE, REFER TO DRAWINGS FOR NOTES#

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s /1

.5

.2

R e p la c e

A ir

H a n d lin g U n it s B

-9

/1

.5

.2

M

E P

V

.r v t

/5

/2

:3

:4

A M

M000

MECHANICAL SYMBOLS AND

ABBREVIATIONSGUIDON DESIGN

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

REPLACE AIR HANDLING UNITS

B-98

Danville, IL

550-24-103

07/30/2024 DLJ JAR

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

C O M

C O M

C O M

BLDG 98 KEYPLAN

PROJECT

LOCATION

SHADE INDICATES

AREA OUT OF

PROJECT SCOPE

N

AREA OF TEMPORARY

DUCTWORK AND EQUIPMENT

PATHS OF TEMPORARY

DUCTWORK

PATHS OF TEMPORARY

DUCTWORK

MM001

MM001

48' - 0"

2' - 0"

CONTRACTOR SHALL INSTALL TEMPORARY DUCTWORK IN

PROPOSED LOCATIONS AS SHOWN TO AVOID BLOCKING

ANY WINDOWS OR EGRESS PATHS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s /1

.5

.2

R e p la c e

A ir

H a n d lin g U n it s B

-9

/1

.5

.2

M

E P

V

.r v t

/5

/2

:3

:5

A M

MM001

MECHANICAL SITE PLAN

GUIDON DESIGN

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

REPLACE AIR HANDLING UNITS

B-98

Danville, IL

550-24-103

07/30/2024 DLJ JAR

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/32" = 1'-0"MM001

2 MECHANICAL ENLARGED SITE PLAN - OVERALL

NOT TO SCALEMM001

1 WEST BUILDING ELEVATION - MECHANICAL

DEMOLISH TEMPORARY SUPPLY AND RETURN

DUCTWORK UP TO POINT SHOPWN LEAVING THE

REMAINGIN DUCTWORK IN PLACE FOR USE IN THE NEXT

PHASES.

TEMPORARY AIR HANDLING UNIT

TO REMAIN FOR NEXT PHASES.

98-TMP

TEMPORARY DUCTWORK ON

GRADE AND UP THE EXTERIOR OF

BUILDING TO REMAIN FOR NEXT

PHASES.

TEMPORARY BOOSTER FAN TO

REMAIN FOR NEXT PHASES.

BLDG 98 KEYPLAN

PROJECT

LOCATION

SHADE INDICATES

AREA OUT OF

PROJECT SCOPE

N

PROVIDE TEMPORARY AIR HANDLER

MOUNTED ON NEW 6" CONCRETE

PAD IN LOCATIONS INDICATED.

ROUTE SA AND RA DUCTWORK UP

EXTERIOR OF BUILDING TO

MECHANICAL PENTHOUSE AND MAKE

CONNECTION WITH EXISTING SA AND

RA DUCTWORK. GRADE TO

PENTHOUSE ELEVATION IS APPROX.

40'-0" VERIFY EXACT ROUTING IN

FIELD.

SPLIT DUCTS AND CONNECT WITH

TEMPORARY AHU DUCT CONNECTIONS.

VERIFY ROUTING AND DIMENSIONS

WITH FIELD CONDITIONS AND RENTAL

AHU REQUIREMENTS. ROUTE

TEMPORARY 54X46 SA, AND 54X38 RA

UP TO CONNECTION WITH LOUVER IN

PHASE 3. SEE PHASE 3 PENTHOUSE

PLAN FOR DETAILS.

98-EH01

98-EH02

INSTALL TEMPORARY

ELECTRIC DUCT HEATERS

TYPICAL. PROVIDE TEMPORARY

GROUND MOUNTED DUCT SUPPORTS.

REFER TO SPECIFICATIONS FOR MORE

INFORMATION.

PHASE 3A

98-TMP

TEMPORARY UNIT SHALL BE USED FOR

THE REPLACEMENT OF AHU-03

THROUGHOUT THE DOCUMENTED

PHASES 3A,3B,4A AND DISCONNECTED

FROM SERVICE TO AHU-03 IN PHASE 4B.

TYPICAL. PROVIDE TEMPORARY ROOF

MOUNTED DUCT SUPPORTS WITH

WEIGHTED BALLAST. REFER TO

SPECIFICATIONS FOR MORE

INFORMATION.

PROVIDE TEMPORARY DUCT SMOKE

DETECTOR AND INTERLOCK WITH

TEMPORARY AIR HANDLING UNIT TO

SHUT DOWN UPON SMOKE DETECTION.

PROVIDE TEMPORARY AIR HANDLER MOUNTED ON NEW 6" CONCRETE

PAD IN LOCATION INDICATED. ROUTE SA AND RA DUCTWORK UP

EXTERIOR OF BUILDING TO MECHANICAL PENTHOUSE AND MAKE

CONNECTION WITH EXISTING SA AND RA DUCTWORK. GRADE TO

PENTHOUSE ELEVATION IS APPROX. 40'-0" VERIFY EXACT ROUTING IN

FIELD.

SPLIT DUCTS AND CONNECT WITH TEMPORARY AHU DUCT

CONNECTIONS. VERIFY ROUTING AND DIMENSIONS WITH FIELD

CONDITIONS AND RENTAL AHU REQUIREMENTS. ROUTE TEMPORARY

40" DIA. SA/RA, AND 34" DIA SA/RA UP TO CONNECTION WITH LOUVER IN

PHASE 1. SEE PHASE 1 PENTHOUSE PLAN FOR DETAILS.

TYPICAL. PROVIDE TEMPORARY

GROUND MOUNTED DUCT SUPPORTS.

REFER TO SPECIFICATIONS FOR MORE

INFORMATION.

98-TMP

PHASE 1A

TEMPORARY UNIT SHALL BE USED FOR

THE REPLACEMENT OF AHU-02 AND

AHU-03 THROUGHOUT THE

DOCUMENTED PHASES.

TYPICAL. PROVIDE TEMPORARY ROOFTOP

DUCTWORK SUPPORT. PROVIDE WEIGHTED BALLAST.

SUPPORTS SHALL REST ON EXISTING ROOFING

MEMBRANE WITHOUT DAMAGING SURFACE. SEE

SPECIFICATIONS FOR REQUIREMENTS.

TYPICAL. PROVIDE TEMPORARY ROOF

MOUNTED DUCT SUPPORTS WITH

WEIGHTED BALLAST. REFER TO

SPECIFICATIONS FOR MORE

INFORMATION.

PROVIDE TEMPORARY DUCT SMOKE

DETECTOR AND INTERLOCK WITH

TEMPORARY AIR HANDLING UNIT TO

SHUT DOWN UPON SMOKE DETECTION.

TEMPORARY BOOSTER FAN SHALL BE USED FOR THE

REPLACEMENT OF AHU-02 AND AHU-03 THROUGHOUT THE

DOCUMENTED PHASES. SUPPORT UNIT ON GRADE WITH

SUFFICIENT RISERS TO ALIGN WITH DUCTWORK.

98-BF01

54ø

52x16

40ø

40ø

40ø

REMOVE

TEMPORARY AIR

HANDLING UNIT

REMOVE TEMPORARY ELECTRIC

DUCT HEATERS AND TURNOVER

TO OWNER FOR STORAGE.

98-TMP

DEMOLISH ALL TEMPORARY SUPPLY

AND RETURN DUCTWORK.

DEMOLISH ALL TEMPORARY SUPPLY

AND RETURN DUCTWORK.

DEMOLISH ALL TEMPORARY SUPPLY

AND RETURN DUCTWORK.

DEMOLISH ALL TEMPORARY SUPPLY

AND RETURN DUCTWORK.

REMOVE TEMPORARY BOOSTER FAN

AND TURNOVER TO OWNER FOR

STORAGE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s /1

.5

.2

R e p la c e

A ir

H a n d lin g U n it s B

-9

/1

.5

.2

M

E P

V

.r v t

/5

/2

:3

:5

A M

MM002

MECHANICAL SITE PLAN

GUIDON DESIGN

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

REPLACE AIR HANDLING UNITS

B-98

Danville, IL

550-24-103

07/30/2024 DLJ JAR

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/32" = 1'-0"MM002

2 MECHANICAL ENLARGED SITE PLAN - PHASE 2B

Revisions: Date:

SCALE: 3/32" = 1'-0"MM002

3 MECHANICAL ENLARGED SITE PLAN - PHASE 3A

SCALE: 3/32" = 1'-0"MM002

1 MECHANICAL ENLARGED SITE PLAN - PHASE 1A

SCALE: 3/32" = 1'-0"MM002

4 MECHANICAL ENLARGED SITE PLAN - PHASE 4B

S D

S D

MECHANICAL DEMOLITION GENERAL NOTES

A. REFER TO SHEET M000 FOR GENERAL NOTES.

B. NEW TEMPORARY DUCTWORK, AIR HANDLER, INFRASTRUCTURE, ETC.

INDICATED ON THE PHASE 1 NEW WORK PLANS TO BE COORDINATED TO

MINIMIZE DOWNTIME. CONTRACTOR MUST SUBMIT FOR APPROVAL A

DETAILED PHASING PLAN. THIS DETAILED PHASING PLAN SHALL AT A

MINIMUM CONTAIN PRICE QUOTES AND DELIVERY INFORMATION FOR RENTAL

EQUIPMENT, TEMPORARY NEW WORK CONSTRUCTION SCHEDULE (GANTT

CHART FORMAT), DEMOLITION PHASING CONSTRUCTION SCHEDULE (GANTT

CHART FORMAT), ANTICIPATED DOWNTIME DURATION AND TIMEFRAME. SEE

SPECIFICATIONS FOR ALL REQUIREMENTS.

C. COORDINATE CRANE DATES AND LOADING DOCK BLOCKAGES WITH COR AND

EMS CHIEF AT LEAST TWO WEEKS IN…