P-61605 Emergency Purchase Final Cost and Term.pdf
PDF 1 MB Posted
- Solicitation number
- 26-422DNR-RESCO-B-50342
- Issued by
- Dekalb County, Illinois
About this file
This is an Emergency Purchase Final Cost and Term report from the State of Illinois Chief Procurement Office for General Services documenting a contract between the Department of Corrections' Shawnee Correctional Center and Aggreko. The emergency purchase contract ran from December 23, 2023, through September 1, 2025, representing a 21-month service period. The contract was finalized and reported to the Chief Procurement Office and Auditor General on January 14, 2026, by Amanda Hardwick, Executive II - Sourcing.
The final total cost of supplies and services provided under this emergency purchase contract was $1,196,422.51. Aggreko, the vendor located in Vienna, Illinois, supplied the specified goods or services to the correctional facility located in St. Louis, Missouri. The emergency purchase authorization allowed the Department of Corrections to bypass standard procurement procedures to address an urgent operational need at the facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Procurement Code Exempt Contract Form-November 2025.xlsx | XLSX spreadsheet | |
| standard terms and conditions 3~46.pdf | ||
| Standard Certifications V23.1~32.docx | DOCX document | |
| Sanganois_Fed Aid Provisions for Contracts - Program Code 7034.doc | DOC document | |
| Job Specs_Sanganois_Invasive Shrub Control and TSI.docx | DOCX document | |
| invitation-for-bid-vendor-instructions-and-requirements.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EMERGENCY PURCHASE FINAL COST AND TERM
Page 1 of 1State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1
Zip: 63123State:MOCity:St. LouisAddress: 10317 Lake Bluff Drive
Vendor: Aggreko
Zip: 62995State: ILCity:ViennaAddress: 6665 State Route 146E
Division: Shawnee Correctional CenterAgency: Department of Corrections
Final Costs and Term Reference #: P-61605
Final total cost of supplies and services: $1,196,422.51 Final total term of contract: 12/23/23 - 9/1/25
Title: Executive II - Sourcing Date: Jan 14, 2026
Printed Name: Amanda Hardwick Agency Signature:
I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.
Page of
EMERGENCY PURCHASE FINAL COST AND TERM
State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1
EMERGENCY PURCHASE FINAL COST AND TERM
Page of State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1 Final Costs and Term I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.
11.0.0.20130303.1.892433.887364
| PageCount: |
| CurrentPage: |
| VendorZip: 63123 |
| VendorState: MO |
| VendorCity: St. Louis |
| VendorAddress: 10317 Lake Bluff Drive |
| Vendor: Aggreko |
| AgencyZip: 62995 |
| AgencyState: IL |
| AgencyCity: Vienna |
| AgencyAddress: 6665 State Route 146E |
| AgencyDivision: Shawnee Correctional Center |
| AgencyUniversity: Department of Corrections |
| CurrentMasterPage: |
| MasterPageCount: |
| ReferenceNumber: P-61605 |
| FinalTotalCost: $1,196,422.51 |
| FinalTotalTerm: 12/23/23 - 9/1/25 |
| TitleField: Executive II - Sourcing |
| Date: 2026-01-14 |
| PrintedName: Amanda Hardwick |
| AuthorizedSignature: |
File details come from the government source that posted it. Updated .