This is an addendum to a solicitation document issued by the Board of County Commissioners, Palm Beach County, Florida, Facilities Development and Operations Department, Capital Improvements Division for the PBSO Aviation—Structural & Miscellaneous Repairs (RE-BID) project (Project Number P-2024-006300.1). Addendum Three, issued on July 29, 2026, modifies the original bidding documents and establishes a revised bid due date of August 6, 2026, by 2:00 PM, extended from the original date of July 30, 2026. The scope of work includes removal, disposal, and replacement of all metal siding on the north side of the building as detailed in attached exhibits, along with disposal of any metal replaced on overhead doors. Bidders must acknowledge receipt of this addendum on the bid proposal form to avoid disqualification.
The addendum addresses a request for information from THAVI LLC regarding insulation requirements for new metal wall panels. The County specifies that replacement metal wall panels must comply with the 2023 Florida Building Code and applicable Miami-Dade Notice of Acceptance approvals. For Climate Zone 1 coverage in Florida (which includes Palm Beach County), the required above-grade wall insulation is R-13 cavity insulation plus R-6.5 continuous insulation (R-13 + R-6.5ci), as referenced in FBC Commercial Energy Efficiency Table C402.1.3. Contractors may alternatively comply using the overall assembly U-factor method outlined in FBC Table C402.1.4 if their specific metal building wall assembly achieves equivalent thermal performance. All bidders must sign and attach this addendum to their bid forms, with failure to do so potentially resulting in disqualification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO: Prospective Bidders
This addendum forms a part of the contract documents, modifies the original bidding documents and shall be as binding as if contained therein. Acknowledge receipt of this addendum in the space provided on the "Bid Proposal Form". Failure to do so may subject the
Bidder to disqualification.
This Addendum consists of two (2) pages.
CHANGE TO BID/QUOTATION FORM:
1. Change bid due date from “July 30, 2026, by 2:00 PM” to read “August 6, 2026, by 2:00
PM”
CHANGE TO IFQ/ATTACHMENT C:
2. 2. SCOPE OF WORK, delete item “b” and replace with the following:
b. Contractor to remove, dispose and replace all metal siding on north side of building as per
Exhibit “1” and “2” attached.
3. 2. SCOPE OF WORK, insert item “g”:
g. Contractor to dispose of any metal replaced on overhead doors.
RESPONSE TO REQUEST FOR INFORMATION:
4. THAVI LLC
Question #1: In review of the solicitation documents for the PBSO Aviation – Structural &
Miscellaneous Repairs (RE-BID) project, Project Number P-2024-006300.1, we are requesting formal clarification regarding the insulation requirements for the new metal wall panels.
BOARD OF COUNTY COMMISSIONERS
PALM BEACH COUNTY, FLORIDA
FACILITIES DEVELOPMENT AND OPERATIONS DEPARTMENT
CAPITAL IMPROVEMENTS DIVISION
PROJECT NAME: PBSO Aviation – Structural & Miscellaneous Repairs (RE-BID)
PROJECT NUMBER: P-2024-006300.1
ADDENDUM NUMBER: THREE
DATE OF ISSUANCE: July 29, 2026
Per Exhibit 2, Technical Specifications Section 6 (Metal Panel Replacement), the contractor is tasked with furnishing, designing, and installing replacement metal wall panels including insulation, compliant with the 2023 Florida Building Code and applicable Miami-Dade NOA approvals.
To ensure accurate pricing and compliance with the County’s energy performance goals, please provide the specific minimum thermal resistance value (R-value) or continuous insulation thickness required for the new metal wall assembly on the north side of the building.
Response: Under the Florida Building Code (FBC), Energy Conservation, the required above-grade wall insulation for a metal building in Climate Zone 1 is R-13 cavity insulation plus R-6.5 continuous insulation (R-13 + R-6.5ci).
Code Compliance Details
• Requirement Type: Component R-Value-Based Method (found in FBC
Commercial Energy Efficiency Table C402.1.3)
• Climate Zone 1 Coverage in FL: Includes southern counties like Broward, Miami-Dade, Palm Beach, Monroe, Collier, Lee, and Hendry.
• Alternative Option: You can choose to comply using the overall assembly U-factor alternative method (Table C402.1.4 in the FBC) if your specific metal building wall assembly configuration achieves the equivalent thermal performance.
PLEASE ACKNOWLEDGE RECEIPT OF THIS ADDENDUM NO. THREE (3), AND ANY
PREVIOUSLY ISSUED ADDENDA, BY SIGNING BELOW AND ATTACHING THIS
ADDENDUM TO YOUR BID FORM. THIS ADDENDUM MUST BE SIGNED BY AN
AUTHORIZED AGENT AND ATTACHED TO YOUR BID FORM, AND RECEIPT OF
THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE “BID PROPOSAL FORM”.
FAILURE TO DO THIS MAY RESULT IN BIDDER’S DISQUALIFICATION.
ACKNOWLEDGMENT OF RECEIPT: _____________________________________
END OF ADDENDUM - 3