P-000-190-010 Addendum 2.pdf
PDF 181 KB Posted
- Solicitation number
- BPM020995
- Issued by
- Garrett County, Maryland
About this file
This document is an Addendum No. 2 issued by the State of Maryland Department of General Services for Project No. P-000-190-010, which involves replacing exterior logs of several cabins at Herrington Manor State Park and New Germany State Park located in Garrett County, Maryland. The addendum clarifies the allowable moisture content for the replacement logs, changes the contract duration from 270 to 210 calendar days, and revises the work schedule at Herrington Manor State Park to exclude certain dates in May 2021 due to existing reservations.
The contract requires the contractor to provide all labor, equipment, materials, supplies, and insurance necessary to complete the log replacement work. The project is funded by the State of Maryland, and the contract will be awarded for a duration of 210 calendar days. No other pricing, set-aside, or funding details are provided in this addendum.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
October 6, 2020
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES
Ellington E. Churchill, Jr, Secretary
PROJECT NO. P-000-190-010
Cabin Log Replacement @ DNR Herrington Manor and New Germany State Parks
This Addendum will clarify, add to, delete from, correct and/or change the bid documents for the project referenced above to the extent indicated. This Addendum is hereby made a part of the bid documents on which the contract will be based. By submitting a bid for this solicitation, you acknowledge receipt of this addendum. All questions must be in writing and addressed to the Procurement Officer, Jessica Matos.
This Addendum includes the following:
1. The following are questions that were asked during the meeting that required additional information.
Q: What is the required moisture content for the new replacement logs?
A: The replacement logs and log skins that will be used for this project shall have an allowable moisture content of 8-12%. Moisture content shall not exceed 12%.
2. The following are clarifications and changes to items within the specifications.
Page 3; E. Limits of Work
There will be a change to the dates shown for Herrington Manor State Park. During the pre bid meeting the park indicated that there are reservations that must be honored for all of the project cabins. No work at this facility will be allowed on the following dates: May 28th – 31st 2021.
Page 11; I. General Requirements
5. The contract shall be for a duration period of 270 calendar days.
The contract duration shall be revised from 270 calendar days to 210 calendar days.
End of Addendum No. 2
Issued by:
State of Maryland Department of General Services
Office of Procurement & Logistics 301 West Preston Street
Room M-7 Baltimore, Maryland 21201
Jessica Matos Jessica Matos
Procurement Officer
File details come from the government source that posted it. Updated .