Ottawa Area ISD CTC Graphics Arts & Fire Suppression Addendum 1.docx

DOCX document 47 KB Posted

Attached to
Fire Suppression Install & Graphic Design Classroom Remodel
Solicitation number
RFP OTTA 260000001307 2
Issued by
Saginaw County, Michigan

About this file

This is an Addendum 1 document for the Ottawa Area ISD CTC Graphics Arts and Fire Suppression construction project managed by GDK Construction. The addendum provides revisions, clarifications, and corrections to the original contract documents and includes updates across five primary items: revised work category descriptions with modifications highlighted in red, an updated construction schedule, responses to seven pre-bid RFIs addressing shingle specifications, sanitary clarifications, door hardware, specific doors (D101A, D101B, and E111B), electrical clarifications, and spare electrical conduit requirements. The document references architectural write-ups and drawing revisions provided by GMB ae and includes contact information for the Assistant Project Manager, Erin Mills, at GDK Construction (616.355.0300, Ext. 101; emills@gdkconstruction.com; 12 West 8th Street, Suite 250, Holland, MI 49423).

The addendum does not specify individual pricing terms, set-asides, or funding sources. All addendum materials are accessible through a provided Datto workplace link, and bidders are required to notify the project team of their intent to bid. The document emphasizes that changes in costs resulting from the addendum modifications must be incorporated into contractors' proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ottawa Area ISD CTC Graphics Arts & Fire Suppression Addendum 1 Addendum 1 documents for the CTC Graphic Arts and Fire Suppression project has been posted.

If you haven’t already, please let me know your intent to bid.

ADDENDUM NO. 1

The following items are changes, clarifications, corrections of errors, etc., with respect to the Contract Documents previously issued.

Items listed below may or may not affect the cost of the Contractor's Proposal. Changes in cost shall be incorporated in the Contractor's Proposal.

All Addendum #1 information can be found at the following link:

https://gdk.workplace.datto.com/filelink/776e8-32888fe8-374bef9e33-2 ITEM No. 1 – Work Category Descriptions (Revised)

· Refer to items in RED for Addendums 1 changes or modifications.

ITEM No. 2 – Construction Schedule Update

· Revised schedule included in Addendum #1 Item No. 3 – Pre-Bid RFI’s RFI responses included in the updated project drawings and specifications.

o PB1 – Shingle Specs o PB2 – Sanitary Clarifications o PB3 – Door Hardware o PB4 – Doors D101A & D101B o PB5 – Door E111B o PB6 – Electrical Clarifications o PB7 – Spare Electrical Conduits ITEM No. 4 – Drawings and Specifications

· Architectural Write-Up

· Re-Issued / Removed Specifications: Refer to the Addendum Write-Up provided by GMB ae Drawings: Refer to the Addendum Write-Up provided by GMB ae ITEM No. 5 – Post Bid Interview Schedule

Erin Mills Assistant Project Manager office: 616.355.0300 – Ext 101 email: emills@gdkconstruction.com

12 West 8th Street, Ste #250 | Holland, MI 49423 image1.png image2.png