Project: Newport, RI Runway 22 Localizer, Establish Access Road from Equipment Shelter to Localizer Antenna Array
Location: Newport State Airport, Barre/Montpelier, VT. Access to site off of Airport Access Rd.
Access Road to site is approximately 300 feet on the right from Forrest Ave (see Area of Work / Site Access map).
General: The Contractor shall provide all material, equipment (unless stated otherwise), supplies, transportation and labor to complete the specific scope of work. All work to be priced out in accordance with Davis-Bacon Wage Rates.
Scope of Work:
1.) Install an access road from the existing Localizer Equipment shelter to behind the existing Localizer Antenna Array as shown on attached drawing, outside of 50 foot wetland buffer. The access road shall be constructed with grass stabilization panels to establish a permeable surface (CORE Grass 50-35 or equal). The road will be approximately 325 feet long x 11 feet wide with a turnaround behind the array as shown on attached sketch. The road shall maintain existing topography.
2.) The FAA will stake out centerline layout of road.
3.) The Contractor shall not disturb any areas located within the indicated 50 foot wetland buffer zone.
4.) The contractor shall install road per attached cross section sketch and installation guide. If another product is utilized, the contractor shall submit specification data and installation instructions for approval. Any alternative product shall meet or exceed specified product.
5.) Location of edge of wetlands and the 50 foot wetland buffer lines indicated on attached drawing UUU-D-LOC22-C001 are approximate. The actual lines will be delineated and flagged in the field by the FAA prior to start of construction and is not the responsibility of this contract.
General Notes / Execution:
• Informational submittals required for products other than what is specified.
• Adhere to all manufacturer’s instructions / recommendations for all products.
• All work to be performed Monday through Friday between the hours of 07:00 AM to 4:00 PM or as otherwise coordinated with COR.
• FAA will provide escort at all times.
• All work subject to the following provisions for Operational Risk Avoidance and Safety:
a. Operational Risk Avoidance:
1) The Localizer facility provides services to assist in the control of aircraft movement, operates 24 hours a day, 365 days a year, and is vital to the National Airspace System. All construction equipment, vehicles, and personnel shall remain behind the Localizer antenna at all times when the facility is in operation.
2) Coordination of Work Affecting Operational Systems or Personnel. Coordinate all work that has any or may have any impact on any operational systems through the COR. Cease any work that is adversely impacting the operations of the facility and immediately repair or restore any portion of the operational system that has been damaged or suffered diminished performance as a result of the Contractor’s activities.
3) Avoid actions deemed detrimental or increasing risk to the facility’s mission or equipment.
4) Avoid activities that create objectionable noise, release detectable odors, or generate smoke.
5) Avoid activities that raise temperature or decrease air volume in electronic equipment spaces, electrical equipment spaces and other areas that would suffer potential failures or reduced performance from such changes.
6) Avoid activities that change temperature or air volume in occupied spaces to the maximum extent possible.
7) All space temperature and air volume changes must be scheduled and approved in advance by the COR.
8) Circuit Breakers. Circuit breakers and disconnect switches will be operated by FAA personnel only. Contractor personnel must not operate circuit breakers or any other electrical disconnecting device. FAA will lockout / tag out equipment to insure personnel safety while safeguarding facility operations.
b. Safety:
1) Perform all work safely and in accordance with the following requirements.
2) Comply with FAA Electrical Standards, FAA Safety Standards, National Electrical Code, National Fire Code, OSHA, manufacturer’s recommendations, local, state, and federal regulations, other authorities having jurisdiction, and local facility.
3) Workers must use Personal Protective Equipment (PPE) as required by code, regulation, standard, or manufacturer’s recommendation.
Attachments:
1. Area of Work / Site Access Map
2. FAA Drawing UUU-D-LOC22-C001, Runway 22 LOCALIZER General Site Plan
3. New Access Road Layout Sketch
4. Access Road Cross Section Sketch
5. CORE Grass 50-35 Installation Guide
INSTALLATION DETAILS FOR CORE Grass 50-35
COREgrass - Honeycomb Grass Stabilizer Panels:
Panels shall be ± 45.3" x ± 30.7" x 1.4" (1.15 m x .78 m x 35mm) (MEDIUM) (JUMBO panels also available = 3X medium panel size) heavy duty green injection-molded (virgin/recycled) polypropylene panel as manufactured by CORE Landscape Products, 2750 Cumberland Road, Courtenay, BC, Canada V9N 9P1 and shall be capable of supporting wheelchairs and occasional light truck traffic. Compressive strength is tested under ASTM D 1621-04a and shall be 1016 kg/0.0175 m2. Loading capacity shall be > 250 tons/m2, > 350 psi, when filled with Structural Soil (as per specs provided by CORE Landscape Products) over the specified base.
CORE GRASS HONEYCOMB CELL, BASE AND INFILL MATERIALS
Specifier Notes (further details in Execution section):
A. Stabilize ground with a minimum road crush base on 2” (50 mm) (site dependant). Compact this layer. If road crush is already present, remove compacted top layer (min.
1”) and regrade and redress as necessary.
B. Add 2-2.75” (50-65mm) of sand/soil blend (60/40 or 70/30) to compacted road crush layer. Compact this layer.
C. Lay the grids. For a permeable system, fill cells with Structural Soil as per recipe offered by CORE Landscape Products. Structural Soil can be created from locally sourced materials.
D. Infill sizes with Structural Soil and compact with lawn roller and apply water. Reapply Structural Soil to 10 mm over top of grid and compact. You should not be able to see the grid.
E. Apply grass seed or hydroseed to previously leveled and compacted soil in grids. If laying sod over top of grid, ensure that roots are fully established (and protected) in grids cells prior to use (see Note E).
F. Allow 4-6 weeks for grass seed and sod to fully establish prior to vehicular or pedestrian use.
G. Vehicular passes per day not limited when using grass seed. If using sod, vehicle passes limited to 5 per day.
EXECUTION
EXAMINATION
A. Evaluate site conditions. Notify the Engineer and refrain from excavation until site conditions have been corrected.
B. Evaluate that the layout of the project is as indicated on the drawings. Notify the Engineer and do not proceed until the layout of the project matches the drawings.
GREEN LANDSCAPING ALTERNATIVES FOR A SUSTAINABLE FUTURE
A. Subgrade Preparation:
1. Excavate and shape foundation soils to grades, elevations, and dimensions as indicated on the drawings. Be sure water will flow away from any structures. Install moisture barrier if projects meets a foundation with a basement.
2. Confirm foundation soil meets specified compaction through proof rolling or other conventional method and is examined by the Engineer. If unacceptable foundation soils are encountered, excavate affected areas and replace these areas with suitable quality material as directed by the Engineer. For subgrade soil compaction a vibratory plate, compactor, or roller is recommended.
B. Base Preparation:
1. For subgrade or base preparation, level and clear the area of large objects such as rocks, or pieces of wood. Excavate area allowing for unit thickness and top layer. Leave 45 mm (1.8 inches) for COREgrass® 50-35 (35 mm) and top layer (10 mm) to meet final grade.
2. Examine Horticultural subsoil at the XXXX to verify suitable compaction, elevation, drainage, and/or improper gradients before commencing work. Discrepancies from detailed or specified conditions shall be reported to the Landscape Architect and the Owner’s Representative so as to not delay work.
3. Installation constitutes acceptance by the Contractor of existing conditions and assuming responsibility for satisfactory performance of the system.
4. Place the panels. Position the panels on the prepared subgrade. Cut to shape with aviation shears or skill saw with fine-toothed blade. Use protective gloves to avoid abrasions. Top of cell panels should be 1 cm (10 mm) below adjacent hard surfaced pavements or final grade.
5. All hard surfaces abutting areas to receive Grass Surfacing shall be in place prior to commencing work. Finished soil work shall be no more or no less than 1/2" below adjacent hard surfaces. Adjust soil levels accordingly so that this will be possible.
6. Place first row of panels against a stationary edge if possible. The panels have interlocking connectors; however some installations do not require them to be used. Use connectors only in areas with greater traffic or steeper grades. No anchors are needed for grass stabilizer panels under a 20 degree slope.
7. Fill cells with chosen infill. Cell walls must be sufficiently covered with infill to prevent any equipment or load bearing vehicular traffic from damaging the grid.
8. Compact infill as per Landscape Architect or Project Engineer specifications.
9. Contour compacted surface to specified elevation and grade as indicated on the drawings.
10. Install edge restraint if desired. Standard metal, plastic, concrete edge restraints or concrete curbing may be used.
Post-Placement
A. Snow plowing – Use shovels or blades with plastic blades.
B. Use of salt for de-icing is allowed.
COREgrass™ 50-35 :Grassed Surface Paving Grid 1 1 , Scale: NT.S.
COREgrass™ 50-35 :Grassed Surface: Typical Construction Profile
Scale: N.T.S.
Optional Vertical Edging Board or Curb
10mm Structural soil overburden
Structural soil (in cells).
COREGrass 50-35 (35mm) grid
Bedding Layer: 2"-2. 75" thick consolidated 60-40 rootzone (see Note 6)
Existing Soil
Sub-base Layer. Thickness & Type determined by Table 1 & Notes 1-3 or onsite engineer or landscape architect
Subgrade Soil (subsoil) Refer to Table 1, Chart 1 & Note 3
FOR GRASS SURFACES
SPECIFICATION, DESIGN & INSTALLATION GUIDE
383mm (15.1") 383mm (15.1") 383mm (15.1")
1150mm (45.3")
780m m
(30.7")
35mm (1.38")
WEB: coregravel.ca Email: info@coregravel.ca
CORE GRASS 50-35
GREEN LANDSCAPING ALTERNATIVES FOR A SUSTAINABLE FUTURE
Table 1 : Typical Sub-base Thickness (Tx) Requirements - refer to ,� Jrypical Construction Profile
APPLICATION/LOAD CBR (%) STRENGTH OF SUBGRADE SOIL (Tx) DoT SUB-BASE THICKNESS (mm & inches)
>6
Fire trucks, Coaches and occasional HGVaccess =4<6 =2<4 =1< 2
>6
Light vehicle access and overspill car parking =4<6 = 2<4 =1< 2 rrable 2 : Paving Grid Specification
Description Data
Product Material
Color options Paver dimensions Nominal internal cell size Structure Type Cell wall thickness Weight (Per square meter) Load bearing capacity (filled) Crush Resistance (unfilled) Basal support & Anti-Shear Connection type Chemical resistance UV resistance Toxicity
Bedding Layer
Grid fill (seed bed)
Grass seed
Fertiliser
COREgrass™ 50-35 100% Recycled Polypropylene Green 45.3" x 30.7" x 1.38" (1150 x 780 mm) 2.0"" (50 mm) Rigid-walled closed cell 90 mil ( 2.3 mm)
6.4 lbs/m2 (2.9 kg/m2) > 250 tons/m 2
150 tons /m 2 Integral 5S (140 mm) long section ground spikes (on slopes> 20°) Interlocking built-in Male-Female connector Excellent High Non Toxic
60:40 rootzone (see Note 6): 2·-2.75" (50-70mm) thick
Structural Soil (see Note 7)
Seed as per local specifications.
Pre-seed fertiliser followed up with appropriate seasonal fertiliser
(see Notes 1-5)
100mm 1 20mm 190mm 380mm
100mm 100mm 135mm 260mm
Sub-base type
Sub-base reinforcement
DoT Class 5 or a modified permeable Class 7 reduced Fines sub-base (Table 1 & Notes 1-5)
Geogrid optional
DESIGN NOTES:
4" 4.75" 7.5"" 15""
4" 4"
5.4'" 10.3""
Note 1: A subbase (i.e. 'Class 5' Aggregate) may be used provided that an adequate drainage system is installed. Alternatively, a permeable / open-graded 'reduced fines' subbase layer may be specified as part of Low Impact Development (LID) or National Pollutant Discharge Elimination System (NPDES).
Note 2: Where drains are omitted and a 'reduced fines' subbase is specified for LID/NPDES this must be covered with either a geotextile fabric and/or a dean, suitably graded gravel blinding to avoid the bedding layer leaching into the subbase.
Note 3: Specific advice on CBR% strengths, ground conditions and construction over weak ground with a CBR less than 1% is available upon request. CBR% = California Bearing Ratio, a measurement of subgrade soil strength. (or equivalent measures for your state / province)
Note 4: If required, typical drainage systems (not pictured) use 4" diameter perforated pipe drains laid at minimum gradient 1 :100, bedded on gravel in trench backfilled with 'covered with a geotextile fabric, pipes leading to a suitable outfall or dry well. Drains installed down center or one edge of areas up to 16' wide. Wider areas may require additional lateral drains at 16'-32' centers. Drainage design should be determined by specific site conditions.
Note 5: Drainage for a LID/NP DES application will vary according to the site but generally omits the requirement for extensive pipe and trench drainage systems within the subbase layer and may require an additional layer of geotextile fabric at base of construction.
Note 6: Root zone bedding and paver fill must be a free-drainging, structurally sound propriety blend of sand:soil or sand:compost such as used in sports/golf construction and normally identified as a 60:40 or 70:30 ratio blend. The use of site-won materials or in-situ self blending is NOT recommended without taking further advice.
Note 7: Structural Soil mix as provided by Core Landscape Products.
Note 8: Maximum advised gradient for traffic applications: 1 2% (1 :8) 7°. Make use of specific pegging points if required for steep slope applications (i.e. >20°). Pegging is not necessary for standard access.
Please note that the information above is given as a guide only. All sizes and weights may vary to what is published.
Chart 1: Field guidance for estimating sub-grade strengths
Indicator
Consistency Tactile (feel) Visual (observation)
Very Soft Hand sample squeezes Man standing will through fingers sink> 3"
Soft Easily moulded by Man walking finger pressure sinks 2"- 3•
Medium Moulded by moderate Man walking finger pressure sinks 1"
Firm Moulded by strong Utility truck ruts finger pressure 0.5"" - 1··
Stiff Cannot be moulded but Loaded construction can be indented by thumb vehicle ruts by 1·
Strength
Mechanical (test) CBR cu
SPT % kN/sqm
<2 <1 <25
2-4 Around 1 25-40
4-8 1-2 40-75
8-15 2-4 40-75
15-30 4-6 7&-150
This field guide is provided as an aid to assessing the mechanical stabilization requirements in commonly encountered site conditions. CORE Landscape Products accepts no responsibility far any loss or damage resulting from the use of this guide.
Please note that the information above is given as a guide only. All sizes and weights are nominal figures and may vary to what is published. CORE Landscape Products cannot be liable for damage caused by incorrect installation of this product. Final determination of the suitability of any information or material for the use contemplated and the manner of its use is the sole responsibility of the user and the user must assume all risk and responsibility in connection therewith.
| OTI LOC Access Road SOW |
| Area of Work & Site Access |
| uuu-d-loc22-c001 |
| New Access Road Layout |
| Road Cross Section |
| CORE Grass 50-35 - Install Guide |