OTAG Generator Fuel Transfer Pump Replacement SOW~1.pdf
PDF 141 KB Posted
- Attached to
- OTAG Generator Fuel Transfer Pump Replacement
- Solicitation number
- 43ADG-S3492
- Issued by
- Churchill County, Nevada
About this file
This is a Scope of Work Summary from the Nevada Army National Guard Construction and Facilities Management Office for a Generator Fuel Transfer Pump Replacement project located at the OTAG facility in Carson City, Nevada, dated September 29, 2025. The project seeks qualified contractors to safely remove the existing fuel transfer pump and install a new fuel transfer pump for a Baldor 60 Series generator with a 400KVA diesel engine, manufactured by Detroit.
The scope of work requires the contractor to provide all materials, tools, hardware, and labor to complete the project, including pre-installation fuel transfer, electrical disconnection, pump removal, new pump installation, plumbing, electrical connections, testing, and proper disposal of removed materials. The detailed scope includes specific tasks such as transferring fuel, de-energizing electrical systems, removing existing pump and electrical components, installing new pump and fuel lines, running electrical circuits, pressure testing connections, priming the fuel system, and performing functionality and simulated power outage tests to ensure proper generator and pump operation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Quote Instructions.pdf | ||
| OTAG Generator Fuel Transfer Pump Replacement Invitation to Bid~1.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment AA
Nevada Army National Guard Construction and Facilities Management Office
Scope of Work Summary
Date: September 29, 2025 Project: OTAG – Generator Fuel Transfer Pump Replacement
General Intention: This scope of work is intended to include all the work required to complete the project described below. Contractors who submit bids are required to include and disclose in their bid all work deemed necessary to complete the project.
Task(s):
The State of Nevada, The Office of the Military, is seeking bids/proposals from qualified contractors to safely remove the existing fuel transfer pump and install new fuel transfer pump for the generator.
Scope of Work:
The contractor shall provide new fuel transfer pumps for the generators. Contractor is responsible for all materials, tools, hardware, and labor to complete this project. Contractor is also responsible for properly disposing of all materials that have been removed from this project.
1. Pre-installation:
a. If necessary, the contractor transfer fuel from the day tank to the main storage tank or other approved containment system. De-energize and lock out all electrical power to the fuel transfer system. Shut off and secure the fuel supply lines.
2. Demolition and Removal:
a. Disconnect and remove all electrical wiring to the existing pump.
b. Disconnect fuel lines from the existing pump, managing the residual fuel.
c. Remove the existing fuel transfer pump from its mounting.
d. If necessary, remove the existing fuel filter assembly and replace it with new.
3. Installation:
a. Install the new fuel transfer pump onto the existing or a new properly prepared mounting base.
b. Plumb the new fuel lines, utilizing the pipe and fittings from the fuel tank to the day tank and new pump. All flexible hoses should also be replaced.
c. Install the new, primary fuel filter assembly.
d. Run and land all new electrical circuits and wire for the pump, ensuring proper grounding and connection to the generator control panel.
e. After re-fueling, pressure tests the new piping and pump connections for a leak-tight seal.
4. Post-Installation and testing:
a. Prime the new fuel system to remove any air from the lines.
b. Functionality test generator and test the fuel transfer pump operation, monitoring fuel pressure and flow.
c. Perform a simulated power outage to confirm the generator starts automatically, the transfer switch works, and the new pump operates correctly under the load.
d. The contractor must thoroughly clean the work area and properly dispose of all materials used and remove from project.
Attachment AA
Nevada Army National Guard Construction and Facilities Management Office
OTAG
GENERATOR DETAIL
Make: Baldor, 60 Series
Model: 572RSL4027
Serial: MX-126529-1208
Fuel: Diesel
Engine Make: Detroit
KW: 400KVA
Location:
OTAG
2460 Fairview Dr.
Carson City, NV 89701
Scope of Work Summary
File details come from the government source that posted it. Updated .