Orchard Beach State Park Toilet-Shower Bldgs ARPA Project Statement 230821.pdf

PDF 109 KB Posted

Attached to
751/23308. GAG; Orchard Beach SP - Two T/S Buildings
Solicitation number
RFP - 171 - 230000003023
Issued by
Manistee County, Michigan

About this file

This document is a project statement for an ARPA-funded initiative by the Michigan Department of Natural Resources (DNR) Parks and Recreation Division to upgrade and replace the toilet-shower buildings at Orchard Beach State Park in Manistee, Michigan.

The scope of work includes evaluating options to renovate the historic 1941-1942 building and replacing the 1970s north building, which no longer meets accessibility requirements. The consultant will provide design, construction administration, and related services, with construction anticipated to take place from September 2024 through May 2025. The project schedule provided indicates the Request for Proposals was posted on August 21, 2023, with proposals due September 21, 2023, and a contract award expected in October 2023. The consultant will be required to work closely with the Construction Manager, Triangle Associates, to provide value engineering and meet construction budgets.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DNR PARKS AND RECREATION DIVISION

Orchard Beach State Park

Toilet Shower Buildings Upgrades and Replacement ARPA Project Statement, August 2023

The DNR Parks and Recreation Division is requesting assistance with the Orchard Beach State Park toilet shower buildings upgrades and replacement. It is anticipated all work associated with this project will occur in a coordinated fashion at the same time.

PROJECT BACKGROUND:

Orchard Beach State Park is located along the Lake Michigan shoreline at 2064 N.

Lakeshore Road Manistee, MI 49660. The park features 164 campsites (including 7 rustic sites), 12 full hookup sites, 2 cabins, 2 toilet shower buildings, a contact station and other support type structures (well and lift station) within the campground. Orchard Beach State Park is listed on the National Register of Historic Places (reference number 09001064).

The Civilian Conservation Corps built the historic toilet shower building in 1941-42. Due to the historic significance of this building, a preliminary study was completed by Sanders Czapski to determine the viability for continued use as a toilet shower building.

A more in-depth assessment of this structure is required to compare and contrast a renovation verses a completely new design and constructed building. The north building, constructed in the 1970s, has been renovated and modified to meet maintenance and user needs. This structure has exceeded its intended life and does not meet current ADA accessibility requirements. The building is intended to be replaced with a new structure that meets current code requirements.

PROPOSED SCOPE OF WORK:

Interested bidders shall provide a complete PSC Proposal for all required Professional Services to evaluate for removal, replacement, and possibly potential upgrades (for the historic structure only) to the two existing park toilet shower buildings. Consulting services shall follow the State of Michigan, Department of Management and Budget (DTMB) Contract for Professional Services and DTMB Facilities Administration, Design and Construction Division policies and procedures for the development of Contract Bid Documents and Construction Administration to support bid letting through a construction management process. Scope of work to include all necessary site surveying, soil borings, a Phase 100 Study, Phase 400 Preliminary Design and Phase 500 Final Design Services. Phase 600 Construction Administration and Phase 700 Construction Field Services.

The Phase 100 Study shall include evaluation of south toilet shower building upgrades as compared to complete building replacement. The preliminary assessment should address ADA accessibility opportunities and challenges. The redesign may consider family style restrooms with showers in exchange for the space currently occupied by the shower stalls, provided EGLE Campground fixture requirements are met in total when considering both buildings.

The study will include advantages and disadvantages of each option, cost estimate data sufficient to compare the cost to renovate the existing building to the cost to construct a completely new prototype replacement building, comparative life cycle considerations and conclude with a professional recommendation for DNR and DTMB consideration shall be included in the work scope.

All design alternatives shall be based on and take into consideration State and Federal Barrier Free Standards, EGLE campground rules and permit requirements, State and Federal Environmental permits and requirements and State of Michigan License and Regulatory Affairs construction codes and permitting. Any new buildings will require heat while the existing historic building that is not heated, if renovated and to remain as one of the toilet shower buildings, will likely qualify and remain unheated under the Michigan Rehabilitation Code for Existing Buildings 2015.

All work must be coordinated and integrated with the Construction Manager (CM), Triangle Associates. Cost estimates, design details, and work scope will be developed in cooperation with the CM to provide value engineering and to meet construction budgets.

Construction bidding will be managed by the CM through their bidding process and coordinated with the Professional. The professional will provide construction administration services such as shop drawing review, payment request review, bulletin creation and review, field inspections etc. The CM will provide the primary construction management and oversight including construction progress meetings.

The successful consultant shall provide brief bi-weekly design progress updates for the project team. Professional services for Orchard Beach State Park shall include but are not limited to:

Toilet/Shower Building:

• Remove and replace existing north toilet/shower building.

• Soil borings and site surveys in support of the proposed toilet/shower building.

• Evaluation and integration of standard prototype plans to incorporate site specific details.

• Site improvements shall include but not be limited to the following:

o Accessible walkways o Parking spaces

GENERAL REQUIREMENTS:

• Preparation and submission of all required permit applications and permit application fees including but not limited to EGLE, LARA, EGLE Campground Unit, SESC shall be included.

• A topographic survey, geotechnical report, EGLE campground permit, and LARA plan review fees are to be included as reimbursable expenses.

• A minimum of 3 face to face project team meetings with meetings likely to be Project kick off meeting and site analysis, Phase 400 50% and Phase 500 50%.

Additional meetings as required throughout the process may be virtual.

• 50% and 90% design submittals at both design phases, including a cost estimate at the 90% submittal of each phase.

• DTMB will retain a professional to test for hazardous materials that may need to be abated. The Construction Manager will retain a professional to perform material testing during construction to meet quality control requirements.

• The park is served by well water, sanitary lift station and drainfield, Consumers Power electric and propane gas.

• All potential bidders are required to have a Unique Entity Identifier (UEI) registered in SIGMA

PROJECT SCHEDULE:

A proposed project schedule shown in weeks shall be provided as part of the proposal submission. Biweekly PSC progress updates will be required for the project team.

Request for Proposals (RFP) Posted August 21, 2023 RFP Walk through August 30, 2023 Proposals Due September 21, 2023 Contract Award October 2023 Design October 2023 through March 2024 Bid Letting April 2024 Construction September 9, 2024, through

May 19, 2025

REFERENCE DOCUMENTS:

• OB Historic Structures Summary

• Orchard Beach SP TSB Evaluation

• Orchard Beach South Restroom 1,2,3 and 4 (four separate sheets)

• OB A106 Toilet Shower Building

• Orchard Beach Site Map

Standard Toilet Shower Plan and Specifications and all existing park utility drawings will be made available to the successful bidder including sewer distribution, water distribution and electric distribution.

DNR Parks and Recreation Regional Field Planner is Annamarie Bauer (231) 468-8616.