OR DOT 18(2) OR58: Fix it Corridor Culverts Federal contract opportunity
Solicitation number
69056721B000023
Issued by
Department of Transportation Federal Highway Administration

About this file

This document outlines specifications for a federal construction project. The Oregon Department of Transportation seeks a contractor to complete culvert repairs and roadwork along 82 miles of OR-58 southeast of Springfield, Oregon. Work includes grading, drainage, surfacing, erosion control, excavation, paving, culvert installation up to 96 inches in diameter, guardrails, signs, striping, and environmental mitigation. The estimated price range is $5-7 million and work must be completed by October 2023. The solicitation number is 69056721B000023 and will be issued by the Federal Highway Administration to qualified offerors to fix drainage infrastructure along this corridor.

View the file

Other files for this federal contract opportunity

Other files attached to OR DOT 18(2) OR58: Fix it Corridor Culverts, newest first.
File Type Posted
OR DOT 18(2) 2022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR DOT18(2)/OR58: Fix-It Corridor Culverts

The work consists of Grading, drainage and surfacing.

Project Length: 82.24 Miles

Tentative Fixed Completion Date: October 2023 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: between $ 5,000,000 and $ 7,000,000

Location: Approximately 5 mile SE of Springfield OR.

On e S ch ed ul e

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control Temporary Water Management Bypass Pumping Fiber Roll Check Dam Inlet Protection Stabilized Construction Exit

ALL

ALL

22,500 LNFT

300 EACH

15 EACH

10 EACH

DIVISION 200 – Earthwork 201 Clearing & Grubbing 4.0 ACRE 203 Removal of Structures & Obstructions Removal of Headwall Removal of Inlet Removal of Pipe End Section Removal of Guardrail

1 EACH

5 EACH

12 EACH

4,320 LNFT

204 Excavation & Embankment Ditch, Excavation (Regrading) 880 LNFT 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No 207 Earthwork Geosynthetics Geotextile Filter, Class 1, Type A 870 SQYD ch ed ul e

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Placed riprap, Method A, Class 1 Placed riprap, Method A, Class 2 Placed riprap, Method A, Class 3 Placed riprap, Method A, Class 4

320 CUYD

50 CUYD

115 CUYD

12 CUYD

DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses Roadway Aggregate, Method 2 1,550 CUYD 303 Road Reconditioning Ditch Reconditioning 1,350 LNFT

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 1,730 TON

DIVISION 500 – Rigid Pavement

DIVISION 550 – Bridge Construction

DIVISION 600 – Incidental Construction 601 Minor Concrete Structures Concrete (Paved end slope) Concrete headwall for double 18-inch pipe culvert

990 SQYD

1 EACH

602 Culverts & Drains 18-inch pipe culvert 24-inch pipe culvert 30-inch pipe culvert 36-inch pipe culvert 42-inch pipe culvert 48-inch pipe culvert 96-inch pipe culvert End section for 18-inch pipe culvert End section for 24-inch pipe culvert End section for 30-inch pipe culvert

1,755 LNFT

1,110 LNFT

800 LNFT

865 LNFT

195 LNFT

215 LNFT

210 LNFT

6 EACH

4 EACH

11 EACH

ch ed ul e

604 Manholes, Inlets, & Catch Basins Inlet Cleaning culverts in place Repairing drainage structure Cleaning drainage structure Lining 18-inch pipe culvert Lining 24-inch pipe culvert Lining 30-inch pipe culvert Lining 36-inch pipe culvert Concrete pipe joint repair

10 EACH

1,350 LNFT

1 EACH

3 EACH

120 LNFT

50 LNFT

230 LNFT

90 LNFT

9 EACH

609 Curb & Gutter Curb, asphalt, 4-inch depth 130 LNFT 617 Guardrail Guardrail system MGS, Type 2 Class A wood posts Terminal section (buried) Terminal section type MGS tangent Terminal section type MGS flared Structure transition railing, MGS system

3,440 LNFT

5 EACH

1 EACH

4 EACH

42 LNFT

621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 625 Turf Establishment Seeding, hydraulic method Mulching, hydraulic method, bonded fiber matrix

3.5 ACRE

3.5 ACRE

626 Plants, Trees, Shrubs, Vines & Groundcovers 45 EACH 629 Rolled Erosion Control Products & Cellular Confinement Systems 3,155 SQYD 633 Permanent Traffic Control Delineator, Type 1 Delineator, Type Snow Pole, 12 feet Remove and reset sign Snow pole holder

150 EACH

150 EACH

20 EACH

150 EACH

634 Permanent Pavement Marking Type C, Solid 5,735 LNFT 635 Temporary Traffic Control – Flagger 5,560 HOUR 635 Temporary Traffic Control Traffic signal system (AFAD) Arrow Board, Type A Barricade Type 2 Barricade Type 3 Tubular Marker Drum Portable Changeable Message Sign Crash Cushion Concrete barrier Construction sign Traffic control supervisor

ALL

2 EACH

6 EACH

10 EACH

540 EACH

66 EACH

6 EACH

2 EACH

550 LNFT

1,610 SQFT

330 DAY

ch ed ul e

647 Environmental Mitigation Rock weir Fish passage boulder Baffle Streambed material (soil amendments) Streambed material

40 EACH

30 EACH

30 EACH

35 CUYD

85 CUYD

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments
DIVISION 500 – Rigid Pavement
DIVISION 550 – Bridge Construction