OR DOT 18(2) 2022.pdf
PDF 159 KB Posted
- Attached to
- OR DOT 18(2) OR58: Fix it Corridor Culverts Federal contract opportunity
- Solicitation number
- 69056721B000023
About this file
This document outlines the requirements for a federal construction contract opportunity with the Oregon Department of Transportation. The project involves grading, drainage, surfacing and culvert replacement work along 82 miles of roadway southeast of Springfield, Oregon, with an estimated price range of $5-7 million. Key work items include clearing, excavation, untreated aggregate courses, asphalt paving, minor concrete structures, installation and lining of various sized culverts, guardrail installation, erosion control measures, turf establishment and permanent traffic control devices. The pre-solicitation has a planned completion date of September 2023 and is being administered under solicitation number 69056721B000023 by the Federal Highway Administration and Oregon DOT.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OR DOT 18(2).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR DOT18(2)/OR58: Fix-It Corridor Culverts
The work consists of Grading, drainage and surfacing.
Project Length: 82.24 Miles
Tentative Fixed Completion Date: September 2023
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: between $ 5,000,000 and $ 7,000,000
Location: Approximately 5 mile SE of Springfield OR.
O n e S ch ed u le
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes
153 Contractor Quality Control and Assurance (yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
157 Soil Erosion & Sediment Control Temporary Water Management Bypass Pumping Fiber Roll Check Dam Inlet Protection Stabilized Construction Exit
ALL
ALL
22,500 LNFT
300 EACH
15 EACH
10 EACH
DIVISION 200 – Earthwork
201 Clearing & Grubbing 4.0 ACRE
203 Removal of Structures & Obstructions Removal of Headwall Removal of Inlet Removal of Pipe End Section Removal of Guardrail
1 EACH
5 EACH
12 EACH
4,320 LNFT
204 Excavation & Embankment Ditch, Excavation (Regrading) 880 LNFT
205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No
207 Earthwork Geosynthetics Geotextile Filter, Class 1, Type A 870 SQYD e S ch ed
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap Placed riprap, Method A, Class 1 Placed riprap, Method A, Class 2 Placed riprap, Method A, Class 3 Placed riprap, Method A, Class 4
320 CUYD
50 CUYD
115 CUYD
12 CUYD
DIVISION 300 – Aggregate and Base Courses
301 Untreated Aggregate Courses Roadway Aggregate, Method 2 1,550 CUYD
303 Road Reconditioning Ditch Reconditioning 1,350 LNFT
DIVISION 400 – Asphalt Pavements & Surface Treatments
403 Asphalt Concrete 1,730 TON
DIVISION 500 – Rigid Pavement
DIVISION 550 – Bridge Construction
DIVISION 600 – Incidental Construction
601 Minor Concrete Structures Concrete (Paved end slope) Concrete headwall for double 18-inch pipe culvert
990 SQYD
1 EACH
602 Culverts & Drains 18-inch pipe culvert 24-inch pipe culvert 30-inch pipe culvert 36-inch pipe culvert 42-inch pipe culvert 48-inch pipe culvert 96-inch pipe culvert End section for 18-inch pipe culvert End section for 24-inch pipe culvert End section for 30-inch pipe culvert
1,755 LNFT
1,110 LNFT
800 LNFT
865 LNFT
195 LNFT
215 LNFT
210 LNFT
6 EACH
4 EACH
11 EACH
e S ch ed
604 Manholes, Inlets, & Catch Basins Inlet Cleaning culverts in place Repairing drainage structure Cleaning drainage structure Lining 18-inch pipe culvert Lining 24-inch pipe culvert Lining 30-inch pipe culvert Lining 36-inch pipe culvert Concrete pipe joint repair
10 EACH
1,350 LNFT
1 EACH
3 EACH
120 LNFT
50 LNFT
230 LNFT
90 LNFT
9 EACH
609 Curb & Gutter Curb, asphalt, 4-inch depth 130 LNFT
617 Guardrail Guardrail system MGS, Type 2 Class A wood posts Terminal section (buried) Terminal section type MGS tangent Terminal section type MGS flared Structure transition railing, MGS system
3,440 LNFT
5 EACH
1 EACH
4 EACH
42 LNFT
621 Monuments & Markers (construction survey & staking) (yes/no) No
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
625 Turf Establishment Seeding, hydraulic method Mulching, hydraulic method, bonded fiber matrix
3.5 ACRE
3.5 ACRE
626 Plants, Trees, Shrubs, Vines & Groundcovers 45 EACH
629 Rolled Erosion Control Products & Cellular Confinement Systems 3,155 SQYD
633 Permanent Traffic Control Delineator, Type 1 Delineator, Type Snow Pole, 12 feet Remove and reset sign Snow pole holder
150 EACH
150 EACH
20 EACH
150 EACH
634 Permanent Pavement Marking Type C, Solid 5,735 LNFT
635 Temporary Traffic Control – Flagger 5,560 HOUR
635 Temporary Traffic Control Traffic signal system (AFAD) Arrow Board, Type A Barricade Type 2 Barricade Type 3 Tubular Marker Drum Portable Changeable Message Sign Crash Cushion Concrete barrier Construction sign Traffic control supervisor
ALL
2 EACH
6 EACH
10 EACH
540 EACH
66 EACH
6 EACH
2 EACH
550 LNFT
1,610 SQFT
330 DAY
e S ch ed
647 Environmental Mitigation Rock weir Fish passage boulder Baffle Streambed material (soil amendments) Streambed material
40 EACH
30 EACH
30 EACH
35 CUYD
85 CUYD
File details come from the government source that posted it. Updated .