OPS-2622 Temporary Beach Berms – Hampton Beach State Park
This specification document is issued by the State of New Hampshire Department of Natural and Cultural Resources, Division of Parks and Recreation, for a capital project involving construction of temporary beach berms at Hampton Beach State Park in Hampton, New Hampshire. The project requires contractors to construct 18 temporary beach berms using existing beach sand, with each berm measuring approximately 100 feet in length, 16 feet wide, and 6 feet in height, spaced approximately 125 feet apart and positioned 40 feet from the seawall above the high tide line between Haverhill Avenue and just north of the Hampton Beach Meter Patrol Office. The contractor must maintain sight lines and pathways from stairwell access points and ramps to the ocean. Work is scheduled to commence no earlier than October 2, 2026, with mandatory completion no later than 2:00 p.m. on October 15, 2026. Bid proposals must be submitted by 2:00 p.m. on August 13, 2026, to Edward Mussey, Public Works Project Manager II, either by mail to the Department of Natural and Cultural Resources at 172 Pembroke Road, Concord, New Hampshire 03301, or electronically to Edward.V.Mussey@dncr.nh.gov (by 1:45 p.m.). Specifications became available to interested contractors on August 6, 2026. No site visit or bidders' conference is formally documented as required.
The project is awarded as a lump sum contract to the lowest qualified bidder. Contractors must be registered with the New Hampshire Secretary of State Corporate Division and the Department of Administrative Services Bureau of Purchase and Property to conduct business with the state. Performance and payment bonds equal to 100 percent of the contract award are required for contract amounts of $75,000 or more. The contractor must provide minimum equipment including one Caterpillar D6 or equivalent, one 10-wheel dump truck, and one equipment trailer, with a minimum of 8 hours of daily operations Monday through Friday between 7:00 a.m. and 7:00 p.m., and Saturday through Sunday between 9:00 a.m. and 5:00 p.m. per Hampton Town Ordinance. The contractor is responsible for locating and protecting existing electrical infrastructure and wooden landing platforms. Liquidated damages for late completion are assessed daily based on contract value: $200 per day for contracts from $0–$25,000; $300 per day for $25,001–$50,000; $400 per day for $50,001–$100,000; and $500 per day for $100,001–$500,000. Comprehensive insurance coverage is mandatory, including workers' compensation, commercial general liability with $1,000,000 per occurrence limits, commercial automobile liability, and owner's protective liability. The successful bidder must execute the contract and provide bonding within 15 days of contract delivery and commence work within 15 calendar days of receiving the notice to proceed. No contract extension requests will be permitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ops-2622-temp-beach-berms-2026-sheet-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF NEW HAMPSHIRE
DEPARTMENT OF NATURAL AND CULTURAL RESOURCES
DIVISION OF PARKS AND RECREATION
CAPITAL PROJECTS & MAINTENANCE
TEMPORARY BEACH BERMS
HAMPTON BEACH STATE PARK HAMPTON, NH
SPECIFICATIONS
PROJECT # OPS-2622
AUGUST 6, 2026
DIVISION OF PARKS AND RECREATION
CAPITAL PROJECTS & MAITNEANCE
172 Pembroke Road Concord, NH 03301
Tel. (603) 271-2606 Fax (603) 271-2629
SPECIFICATIONS
TEMPOARY BEACH BERMS
HAMPTON BEACH STATE PARK HAMPTON, NH
PROJECT # OPS-2622
CONTENTS
Notice to Bidders N.B. 1
Bid Proposal Form B.P. 1-5
Sample Contract Form S.C.1-4
General Conditions of the Contract G.C.1-9
Construction Specifications Specs 1-4
DIVISION OF PARKS AND RECREATION
CAPITAL PROJECTS & MAINTENANCE
172 Pembroke Road Concord, N.H. 03301
TEL. 603-271-2606 FAX 603-271-2629
NOTICE TO BIDDERS
Project: OPS-2622 TEMPOARY BEACH BERMS
HAMPTON BEACH STATE PARK, HAMPTON, NH
Description: This project involves creating temporary beach berms adjacent to the seawall above the hid tide line in the area between Haverhill Ave. and just north of the Hampton Beach Meter Patrol Office. Contractors will use the existing beach sand. The start date for the Project will be October 2, 2026 and the completion date will be no later than 2:00 pm on October 15, 2026.
Proposals for the above project will be accepted until 2:00 P.M., prevailing time, on August 13, 2026. Proposals should be mailed to: Attn: Edward Mussey Public Works Project Manager II. Department of Natural and Cultural Resources 172 Pembroke Road, Concord, NH. 03301. Bid proposals may be submitted electronically by e-mail to:
Edward.V.Mussey@dncr.nh.gov E-mail must arrive no later than 1:45 P.M on August 13, 2026.
Specifications will be available to interested contractors at the Capital Projects & Maintenance Office on August 6, 2026. They may also be viewed at the following locations:
• Construction Summary of New Hampshire Inc.: Located at 734 Chestnut Street, Manchester, New Hampshire, 03104. Telephone number (603) 627-8856, and at the Construction Summary Website.
• Dodge Construction Network: Located at the Dodge Construction Network Website.
• Signature Digital Imaging: Located at 472 Amherst Street, Nashua, New Hampshire, 03063. Telephone number (603) 624-4025, and at the Signature Digital Imaging Website.
• ConstructConnect: Located at the ConstructConnect Website.
• New Hampshire Department of Administrative Services Bureau of Purchase and Property Website: Located at the Statewide Bids and Proposal Website.
New Hampshire State Parks Website: Located at the New Hampshire State
Parks RFP’s and Proposals Website All companies, corporations, and tradenames bidding must be registered and have a certificate of existence from the Secretary of State, Corporate Division (telephone 603- 271-3244) in order to do business with the State of New Hampshire.
Notice to Bidders Page 1 http://www.constructionsummary.com/ http://www.construction.com/ http://www.construction.com/ http://www.signaturenh.com/ http://www.signaturenh.com/ https://www.constructconnect.com/wiplogin https://apps.das.nh.gov/bidscontracts/bids.aspx https://www.nhstateparks.org/about-nh-parks/park-proposals-rfps https://www.nhstateparks.org/about-nh-parks/park-proposals-rfps
DIVISION OF PARKS AND RECREATION
CAPITAL PROJECTS & MAINTENANCE
172 Pembroke Road Concord, N.H. 03301
TEL. 603-271-2606 FAX 603-271-2629
BID PROPOSAL FORM
PROJECT: OPS-2622 TEMPORARY BEACH BERMS
HAMPTON BEACH STATE PARK HAMPTON,
NH
PROPOSAL DEADLINE: August 13, 2026 at 2:00 p.m.
START DATE: October 2, 2026
COMPLETION DATE: No later than October 15, 2026
Proposals for the will be accepted until 2:00 p.m., prevailing time, on August 13, 2026.
Bids should be mailed to: Attn: Edward Mussey Public Works Project Manager II Department of Natural and Cultural Resources, 172 Pembroke Road, Concord, N.H 03301. Bid proposals may be submitted electronically by e-mail to:
Edward.V.Mussey@dncr.nh.gov, they must arrive by 1:45 p.m. on August 13, 2026.
DATE:
PROPOSAL OF:
(Company name and address)
GRAND TOTAL / LUMP SUM BASE BID:
Bid Proposal Page 1
DIVISION OF PARKS AND RECREATION
CAITAL PROJECTS & MAINTENANCE
PROPOSAL
Proposal of...
(contractors name)
(contractors address)
To furnish and deliver all materials except as noted and to perform all work in accordance with the Contract of the State of New Hampshire, Department of Natural and Cultural Resources for the construction of...
Project #OPS-2622 Temporary Beach Berms at Hampton Beach State Park, Hampton, NH.
Commissioner Department of Natural and Cultural Resources 172 Pembroke Road Concord, N.H. 03301
Commissioner:
In accordance with the advertisement of the Department of Natural and Cultural Resources inviting proposals for the project herein before named and in conformity with the Plans and Specifications on file in the office of the Department of Natural and Cultural Resources, (firm name) hereby certifies that is/are the only person, or persons, interested in this proposal as principals; that this proposal is made without collusion with any person, firm, or corporation; that an examination has been made of the Plans, of the Standard Specifications, and Special Attentions, Supplemental Specifications, and Special Provisions, all of which are attached hereto, and also of the site of the work; and I, or we, propose to furnish all necessary machinery, equipment, tools, labor, and other means of construction, and to furnish all materials specified in the manner and at the time prescribed; and understand that the quantities of work as shown herein are approximate only and are subject to increase or decrease, and further understand that all quantities of work are to be performed at the quoted prices.
To execute the form of contract and begin work within 15 (fifteen) days after the notice to proceed has been received or otherwise delivered to the contractor and to prosecute said work until its completion.
Bid Proposal Page 2
It is further proposed:
To furnish a contract bond in the amount of one hundred percent (100%) of the contract award, if the contract award is seventy-five thousand dollars ($75,000) or more, as security for the completion of the contract in accordance with the plans and specifications and contract documents. The form of bond shall be that provided for by the surety shall be acceptable to the Commissioner. No contract bond shall be required on contract awards of less than seventy-five thousand dollars ($75,000).
To guarantee all of the work performed under this contract to be done in accordance with the plans and specifications and contract documents.
The undersigned acknowledges receipt of the following addenda, if any, issued during the bidding time, and states that these have been incorporated in the proposal:
Addendum #1 dated
Addendum #2 dated
Addendum #3 dated
Dated
Bid Proposal Page 3
SCHEDULE OF VALUES PROJECT # OPS-2622 TEMPORARY BEACH BERMS
HAMPTON BEACH
INDICATE WHOLD DOLLAR AMOUNT OF CONTRACT SUM ALLOCATED TO EACH
CATEGORY OF WORK AS DESIGNATED BELOW:
Category Quantity Hourly Price
# of Hours
Sub Total (Quantity X Hourly Rate X Hours)
Hampton Beach Temporary Beach Berms Equipment (list the make, model, year and capacity of the equipment below)
General Conditions 1 N/A N/A
Total Lump Sum
Total Lump Sum of Contract
NOTE: The Schedule of values must be completely filled out in order for the bid proposal to be considered as responsive.
Bid Proposal Page 4
SIGNATURE PAGE
Company Name____________________________________________________
Address
Phone______________________________________________________
Fax
E-mail Address
Signature of Authorized Bidder
Title
Address of Bidder___________________________________________________
(if different than company)
Names and Addresses of Members of the Firm/Corporation
Name address
Bid Proposal Page 5
INTENTIONALLY LEFT BLANK
GENERAL CONDITIONS
GENERAL
This contract is to be governed by all the applicable provisions of these specifications.
This project consists of creating Temporary Beach Berms at Hampton Beach State Park in Hampton, NH as indicated in these specifications and Plans.
BIDDING REQUIREMENTS
Bids shall only be accepted on the official Bid Proposal Forms, attached to these specifications. Any bids submitted that are not on the official bid proposal forms will not be accepted.
CONDITIONS AT SITE OR BUILDING
Bidders shall visit the site and be responsible for having ascertained pertinent local conditions such as: location, accessibility, general character of the site or building, the character and extent of existing work within or adjacent to the site, and any other work being performed thereon at the time of the submission of this bid.
PERFORMANCE AND PAYMENT BOND
In the event the bid is $75,000 or more, the contractor shall furnish security by bond or otherwise in an amount equal to 100% of the contract guaranteeing performance and payment. The payment security shall meet the requirements of RSA 447:16.
The performance and payment bond must be returned with the signed contract within 15 days after the contract has been mailed or otherwise delivered to the bidder.
PROPOSAL GUARANTEE
None Required
RIGHT TO WORK IN N.H.
All bidders must be registered and have a certificate of existence from the New Hampshire Secretary of State, Corporate Division (telephone 603-271-3246) in order to do business with the State of New Hampshire.
Contractors may register Online at: https://quickstart.sos.nh.gov/online/Account
VENDOR REGISTRATION
All Bidders must be registered with the Department of Administrative Services Bureau of Purchase and Property. Bidders may complete the online registration at:
https://www.das.nh.gov/purchasing/vendorresources.aspx
G.C. 1 https://quickstart.sos.nh.gov/online/Account https://www.das.nh.gov/purchasing/vendorresources.aspx
PROPOSAL SELECTION
In most cases the proposal submitted by the qualified bidder with the lowest base bid price shall be selected. However, the Department of Natural and Cultural Resources reserves the right to reject any or all proposals, or advertise for new proposals as it judges to be in the best interest of the state.
CONTRACTORS QUALIFICATIONS
The successful bidder shall provide evidence upon request that they have been in the Site work and Excavation business successfully performing this type, scale, and quality of work for a minimum of five years. A comprehensive list of all projects worked on involving Site work in the past two years by the contractor shall be submitted with references upon request.
EXECUTION OF CONTRACT
The Contractor's attention is called to the following:
EXECUTION AND APPROVAL OF CONTRACT. The contract shall be signed by the successful Bidder and returned, together with the contract bond, if applicable, within 15 days after the contract has been mailed or otherwise delivered to the Bidder. No contract shall be considered as in effect until it has been fully executed by all the parties thereto and, when the contract amount is more than $25,000, the award has been concurred in by the Governor and Council.
FAILURE TO EXECUTE CONTRACT. Failure to execute the contract within 15 days after the contract has been mailed or otherwise delivered to the successful Bidder shall be just cause for the cancellation of the award and the forfeiture of the proposal guaranty which shall become the property of the Department, not as a penalty, but in liquidation of damages sustained. Award may then be made to the next lowest Bidder, or the work may be re-advertised as the Commissioner may decide.
STARTING DATE
The Contractor shall start work after notice to proceed is received. The notice to proceed shall be issued immediately upon contract approval by the Governor and Council, and shall establish the actual construction start date. Failure to start work within 15 calendar days after the start date shall be considered a default of the contract. If the actual start date is later than the advertised start date, the completion date shall be extended by an equivalent number of working days.
G.C. 2
WORKSITE ACCOUNTABILITY
Per RSA 21-I:81-b At the onset of work on any state construction project, the general contractor or designated project construction manager, if any, shall provide to the Department Project Manager a current list of all subcontractors and independent contractors that the general contractor has agreed to use on the job site, with a record of the entity to whom that subcontractor is insured for worker’s compensation purposes. This list shall be posted on the jobsite and updated as needed to reflect any new subcontractors or independent contractors.
If it is determined that a subcontractor or independent contractor is present on a state construction site without the contractor’s name and direct contracting relationship being posted in a visible location at the worksite, the general contractor or designated project manager shall require the subcontractor or independent contractor to provide the information within 36 hours and to post the information in a visible location at the worksite.
If the information is not provided within 36 hours of its request, the general contractor shall suspend the contractor until the information is provided and posted.
PROTECTION OF EXISTING PROPERTY
It shall be the responsibility of the contractor to protect existing property from damage.
Any damage caused by the contractor in the performance of the work shall be repaired or replaced at his expense to the satisfaction of the Department Project Manager.
CODES
All work performed shall meet the provisions, if applicable, of the 2000 IBC, and any local codes that may apply.
WORKMANSHIP
All work shall be performed in a neat workmanlike manner by skilled workmen who have been actively engaged in performing the type of work specified under this contract for the last two years.
CLEAN-UP
All debris from the project shall be cleaned up daily and removed from the site at least on a daily basis.
G.C. 3
DEFAULT AND TERMINATION OF CONTRACT
If the Contractor…
(a) Fails to begin the work under the contract within the time specified in the contract, or
(b) Fails to perform the work with sufficient workmen and equipment or with sufficient materials to assure the prompt completion of said work, or
(c) Performs the work unsuitably or neglects or refuses to remove materials or to perform anew such work as may be rejected as unacceptable and unsuitable, or
(d) Discontinues the prosecution of work, or
(e) Fails to resume work which has been discontinued, within reasonable time after notice to do so, or
(f) Becomes insolvent or is declared bankrupt, or commits any act of bankruptcy or insolvency, or
(g) Makes an assignment for the benefit of creditors, or
(h) For any other cause whatsoever, fails to carry on the work in an acceptable manner…
The Commissioner will give notice in writing to the Contractor of such delay, neglect, or default.
If the Contractor or Surety does not proceed in accordance with the Notice, then the Commissioner will, upon written notification from the Project Manager of the fact of such delay, neglect or default, and the Contractor’s failure to comply with such notice, have full power and authority without violating the contract, to take the prosecution of the work out of the hands of the Contractor. The Commissioner may enter into an agreement for the completion of said contract according to the terms and conditions thereof, or use such other methods as in his opinion will be required for the completion of said contract in an acceptable manner.
All extra costs and charges incurred by the Department as a result of such delay, neglect or default, together with the cost of completion of the work under the contract will be deducted from any monies due or which may become due said Contractor. If such expenses exceed the sum which would have been payable under the contract, then the Contractor and the Surety shall be liable and shall pay to the Department, the amount of such excess.
G.C. 4
FAILURE TO COMPLETE THE WORK ON TIME
If the Contractor fails to complete all of the work or sections of the Project, within the time specified in the Contract, the sum given in the schedule that follows will be deducted from any money due the Contractor. This deduction will be made, not as a penalty, but as fixed, agreed liquidation damages for inconvenience to the State and for reimbursing the Department the cost of the Administration of the Contract, including engineering and inspection. Should the amount of money otherwise due the Contractor be less than the amount of such liquidated damages, the Contractor and his Surety shall be liable to the State for such deficiency.
Permitting the Contractor to continue and finish the work after the time fixed for its completion, shall in no way obligate the State to waive any of its rights under the Contract.
When the final acceptance has been duly made by the Project Manager, any liquidated damage charges shall end.
The fixed, agreed, liquidated damages shall be assessed in accordance with the following schedule.
ORIGINAL CONTRACT AMOUNT AMOUNT OF LIQUIDATED DAMAGES
PER WORKING DAY
From more than: to and including:
0. 25,000. $ 200.00 25,000. 50,000. $ 300.00 50,000. 100,000. $ 400.00 100,000. 500,000. $ 500.00
G.C. 5
SUBSTANTIAL COMPLETION & FINAL INSPECTION
When the work is substantially complete, the Contractor shall submit to the Project Manager, a list of items of work; to be completed or corrected. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all work in accordance with the Contract Documents. On the basis of an inspection by the Project Manager which determines that the work is substantially complete, a Certificate of Substantial Completion shall establish the date of substantial completion and state the responsibilities for any damage to the work and insurance, and fix the time limit within which the Contractor shall complete the items listed herein. Warranties required by the Contract documents shall commence on the date of Substantial Completion unless otherwise provided in the Certificate of Substantial Completion.
If the Contractor fails to proceed to complete the items on the “punch list”, then in addition to the corrective measures listed in the Certificate of Substantial Completion, the Commissioner may use the monies still due the Contractor to have such items completed and the Contractor shall lose any claim to the monies used.
Upon written notice that the Work is ready for final inspection and acceptance, the Project manager shall promptly make such inspection, and when he finds the Work acceptable under the Contract documents and the Contract fully performed, a Certificate of Final Payment will be issued.
Final inspection will be made by the DNCR Project Manager on or before October 15 2026, at 2:00 pm. Incomplete items necessary to complete the project shall be done prior to final payment. The completion time and data for this project is no later than 2:00
pm. October 15, 2026.
G.C. 6
PROSECUTION OF WORK
Upon starting the work within the start date set forth by this contract, the Contractor shall prosecute the work a minimum of 8 hours daily per working day until completion, excluding breakdowns or inclement weather. No request for an extension of time will be allowed on this project.
CHANGES IN THE WORK
The Project Manager may at any time, by a written order, and without notice to the Sureties, make changes in the Drawings and Specifications and completion date of this contract and within the general scope thereof.
In making any change, the additional cost or credit for the change shall be determined as follows:
• The order shall stipulate the mutually agreed upon lump sum price which shall be added to or deducted from the contract price. The contractor shall furnish an itemized breakdown of the prices used in computing the value of any change that might be ordered.
• If the price change is an addition to the contract price and the work is performed by the general contractor and not a subcontractor, it shall include the contractor’s indirect costs as follows: Workmen’s Compensation and Employee Liability, Unemployment and Social Security Taxes.
• In addition to the above indirect costs, the general contractor shall be allowed a markup not to exceed ten percent (10%). Said ten percent (10%) shall be all inclusive for overhead, supervision, and profit. In addition to this, an allowance shall be made for performance and payment bond additional premium.
• If the price change is an addition to the contract price and involves the work of the general contractor and subcontractor, the general contractor would be allowed ten percent (10%) on that part of the work performed by him and five percent (5%) on that part of the work performed by the subcontractor. The same percentages shall apply to subcontractors.
• On any change which involves a net credit to the Owner, no allowance for overhead and profit shall be figured.
G.C. 7
INSURANCE REQUIREMENTS
No operations under this contract shall commence unless and until certification of insurance attesting to the below listed requirements have been filed with the Commissioner, approved by the Attorney General, and the Contract approved by the Governor and Council and a Notice to Proceed is issued.
Insurance requirements by paragraphs 1-4 below shall be the responsibility of the Prime Contractor. The Prime Contractor, at his discretion, may make similar requests of any subcontractor.
Following is the summary of minimum insurance requirements:
1. Workmen's Compensation Insurance (In accordance with RSA 281-A.)
a. Employers' Liability 1.) $100,000 each accident 2.) $500,000 Disease-policy limit 3.) $100,000 Disease-each employee
2. Commercial General Liability Insurance: Occurrence Form Policy: Include full
Contractual Liability (see Indemnification Clause 9)., Explosion, Collapse, and Underground coverage’s:
a. Limits of Liability:
1.) $1,000,000 Each Occurrence Bodily injury & Property Damage.
2.) $2,000,000 General Aggregate-Include per Project Aggregate
Endorsement.
3) $2,000,000 Products/Completed Operations Aggregate.
4) State shall be named as an additional named insured.
3. If blasting and/or demolition is required by the Contract, the Contractor or subcontractor shall obtain the respective coverage for those activities, and shall furnish to the Commissioner a certificate of Insurance evidencing the required coverage’s prior to commencement of any operations involving blasting and/or demolition.
4. Owner’s Protective Liability coverage for the benefit of the State of New Hampshire Department of Natural and Cultural Resources.
a. Limits of Liability:
1.) $2,000,000 Each Occurrence 2.) $3,000,000 Aggregate
5. Commercial Automobile Liability covering all motor vehicles including owned, hired, borrowed, and non-owned vehicles.
a. Limits of Liability:
1.) $1,000,000 Combined Single Limit for Bodily injury & Property
Damage
G.C. 8
6. Commercial Umbrella Liability
a. Limits of Liability:
1.) $1,000,000 Each Occurrence 2.) 1,000,000 Aggregate
7. Builder's Risk Insurance (Fire and Extended Coverage): NOT APPLICABLE
The Contractor shall insure the work included in the Contract, including extras and change orders, on an "All Risk" basis, on a one hundred percent (100%) completed value basis of the Contract, as modified. Builder’s Risk coverage shall include materials located at the Contractor’s premises, on-site, in-transit, and at any temporary site. The policy by its own terms or by endorsement shall specifically permit partial or beneficiary occupancy prior to completion or acceptance of the entire work. The policies shall be in the names of the State of New Hampshire Department of Natural and Cultural Resources and the Contractor. The policies shall provide for the inclusion of the names of all other Contractors, Subcontractors, and others employed on the premises as insureds. The policies shall stipulate that the insurance companies shall have no right of subrogation against any Contractors, Subcontractors or other parties employed on the premises.
8. General Insurance Conditions
a. Each policy shall contain a clause prohibiting cancellation or modifications of the policy earlier than thirty (30) days or ten (10) in cases of non-payment of premium after written notice thereof has been received by the State.
9. Indemnification:
a. The Contractor shall indemnify, defend, and hold harmless the State of New
Hampshire, its Agencies, and its agents and employees from and against any and all claims, liabilities, suits or penalties arising out of (or which may be claimed to arise out of) acts of omissions of the Contractor or subcontractors in the performance of work covered by the Contract. This covenant shall survive the termination of the Contract. Notwithstanding the foregoing, nothing herein contained shall be deemed to constitute a waiver of the sovereign immunity of the State, which immunity is hereby reserved by the State.
NOTE:
In articles 1 - 14 of the General Conditions references to "the Project Manager" shall be understood to mean the Department Project Manager designated by the Operations, Planning and Project Management office of the New Hampshire Department of Natural and Cultural Resources.
G.C. 9
HAMPTON BEACH TEMPOARY BERMS SOPE OF WORK:
1. Mobilization: Contractor shall be fully mobilized to the site on October 2, 2026.
The work shall commence no earlier than October 2, 2026 and be completed no later than 2:00 pm on October 15, 2026.
2. Hours of Operation: The contractor shall perform the work Per Hampton Town
Ordinance Equipment may not be operated prior to 7:00 am and no later than 7:00 pm. Monday thru Friday and 9:00 am to 5:00 pm Saturday to Sunday.
3. Buried items: Carefully locate and mark out the locations of the existing electrical pad mounted transformer grounding system north of the meter patrol office. The grounding system is on the beach adjacent to the wall. Mark out the locations of existing wood landing platforms at the end of the concrete ramps.
Avoid damaging these items during operations. The cost of repair or replacement of these items will be the contractor’s sole responsibility if damaged during this project..
4. Construct 18 Temporary Beach Berms from the existing sand on the beach as shown in the plan set, and as specified in these specifications. Beach berms shall be constructed along the beach above the high tide line between Haverhill Ave and Church Street, with the existing beach sand. The berms shall be spaced 40 feet away from the wall and parallel to each other, and approximately 40° angle from the wall. Each berm shall be approximately; 100 feet in length, 16 feet wide and 6 feet in height The berms shall be spaced Approximately 125 feet apart. Berms shall be laid out so that a clear line of sight and pathway from the stairwell access points and ramps to the ocean are maintained.
5. Debris Removal: If debris is encountered during the course of the work the contractor is to move the debris adjacent to the Marine Memorial beach access ramp for collection and disposal by State Park Staff.
SPECIAL SITE CONDITIONS:
1. Construction equipment access to Hampton Beach is made only by way of the beach access ramp adjacent to the Marine Memorial which is north of the Hampton Beach Seashell. Equipment may stage out of the Hampton State Beach RV Park only with the approval of the New Hampshire State Parks Seacoast Manager, Meredith Collins Cell phone No. 603-573-6657. Construction equipment may be parked overnight on the beach adjacent to the seawall.
2. Bidders shall visit the site and be responsible for having ascertained pertinent local conditions such as: location, accessibility, general character of the site, the character and extent of existing work within or adjacent to the site, and any other work being performed thereon at the time of the submission of this bid.
Specifications Page 1
3. Public Access to the Beach. The Beach will be open to the public during the course of the project operations. The Contractor shall post warning signs or beach closed signs in the area in which work will occur each day to encourage the public to stay out of those areas while performing work.
HEAVY CONSTRUCTION EQUIPMENT REQUIRED: The Contractor is expected to be engaged in active work for a minimum of 8 hours a day until the work is completed. The Contractor shall provide at a minimum the following equipment and equipment operators for each piece of equipment. Substitutions to this equipment must be submitted in writing 1 days before the bid opening.
1. One (1) Caterpillar D6 or Equivalent.
2. One (1) Dump Truck 10 Wheel Minimum. for Transporting Construction
Equipment to and from the Site.
3. One (1) Equipment Trailer (s) for Transporting Construction Equipment to and from the Site.
4. Any other Construction equipment that the contractor deems necessary to successfully complete the scope of work.
EQUIPMENT BREAKDOWNS: In the event of an equipment breakdown, that is anticipated to render the equipment as out of service for 8 hours or more, the contractor shall notify the Project Manager immediately. In the event the equipment will be out of service for more than 1 day. The contractor shall obtain replacement equipment to complete the work on schedule without any additional cost to the State.
HYDRAULIC FLUID LEAKS OR SPILLS: In the event that hydraulic fluid leaks from any piece of the contractor’s equipment (owned or rented) onto the beach, the contractor shall immediately cease operation of that equipment and contain the spill.
The Contractor shall be responsible for cleanup of any contaminated beach Sand and all expenses associated with such cleanup effort.
EQUIPMENT RATES: The bid will be awarded on the basis of the lowest lump sum bid price.
SUCCESSFUL BIDDER:
The Successful bidder will receive a P-37 “Standard Contract Form”. The Contract forms must be filled out, signed and returned to the Operations, Planning and Project Management office within 10 Business days along with the Performance and Payment Bond, if required and the Contractors Certificate of Insurance.
NOTIFICATION TO DES and FISH & GAME: The Department will notify the Department of Environmental Services and the Department of NH Fish and Game the intended schedule of this project.
Specifications Page 2
WETLANDS PERMIT NOT REQUIRED:
NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES
CHAPTER Enc-Wt 600 COASTAL LANDS AND TIDAL WATERS/WETLANDS PART Env-Wt 608 TIDAL BEACH MAINTENANCE AND STABILIZATION
Env-Wt 608.01 Maintenance and Stabilization Activities on Public Tidal Beaches.
(a) Removal of seaweed, algae, or other debris (beach debris) from public tidal beaches shall not require a permit under RSA 482-A:3, provided:
(1) All work is done:
a. By the state or local agency responsible for maintaining the public beach, or its authorized agent, not by private land owners;
b. Between April 15 and October 15; and
c. Using the technique most appropriate for the work that will have the least environmental impact;
(2) No work is done in standing or flowing water;
(3) No work is done within 10 feet of sand dunes or salt marshes, unless work is in a legally existing developed area;
(4) Disturbance and removal of sand or other beach substrate is minimized to the maximum extent practicable;
(5) Front-end bucket loaders are only used:
a. To collect beach debris if no other practicable means exist; and
b. To transport beach debris collected by other means;
(6) The state or local agency responsible for maintaining the beach consults with NHF&G to avoid and minimize potential impacts to piping plovers and their habitat; and
(7) If the agency responsible for maintaining the beach intends to use equipment to remove sand or other beach substrate, the agency provides written notification to the department, which may be via email, in advance of the work by providing the following information:
a. The date(s) and location of the work;
b. The estimated volume of material to be removed;
c. The method by which the material will be removed; and
Specifications Page 3
d. The location where the material will be disposed.
(b) The use of motorized equipment and machinery to regrade and recontour public tidal beaches as necessary to maintain the integrity of seawalls by the NH DNCR, NHDOT, or the authorized agent(s) of either agency, shall not require a permit under RSA 482-A:3 provided:
(1) No work is done in standing or flowing water:
(2) Wash-outs of materials to adjacent tidal wetlands, waters, or to adjacent properties is prevented;
(3) No work is done within 10 feet of dunes or salt marshes, unless work is in a legally-existing developed area;
(4) The removal of sand or other beach substrate from the beach is minimized to the maximum extent practicable; and
(5) Prior to commencing the work, the agency responsible for the work provides written notice to the department, which may be via email, by providing the following information:
a. The date(s) and location of the work; and
b. The methods and equipment to be used to perform the work.
Specifications Page 4