This Addendum No. 1 document, issued by R G Architects, LLC on behalf of the State of Delaware Division of Facilities Management, provides clarifications and revisions to the selective demolition package for the Old Sussex County Family Court Building located at 22 The Circle, Georgetown, Delaware 19947 (OMB/DFM Contract No. MJ0208000003). The project scope includes interior demolition work with selective removal of non-bearing walls, floor finishes, ceilings, interior doors and frames, and select mechanical, electrical, and plumbing fixtures, while fixed casework elements such as judges' benches and security desks are included in the demolition scope. Sealed bids must be submitted through the Bonfire Portal by April 15, 2026, at 1:00 p.m., with public bid opening and reading occurring at 2:00 p.m. the same day at the Haslet Armory in Dover, Delaware. A mandatory pre-bid meeting was held on March 24, 2026, with substitution requests accepted until April 6, 2026, at 4:00 p.m., and written questions accepted until April 8, 2026, at 4:00 p.m. The addendum specifies that all subcontractor lists must identify mechanical, plumbing, electrical, and elevator contractors, with restrictions on listing multiple subcontractors per discipline unless representing second or third-tier contractors. The project requires compliance with Delaware prevailing wage rates and includes a General Owner's Allowance of $25,000 for owner-elected changes.

The asbestos NESHAP inspection report attached to the addendum, prepared by Harvard Environmental, Inc. in August 2025, identifies two materials as presumed asbestos-containing: fire doors and elevator brake pads, both requiring further intrusive investigation for confirmation. All other materials tested, including fireproofing, drywall, joint compound, ceiling tiles, floor tiles, and mastics, tested negative for asbestos under polarized light microscopy analysis. The contractor must comply with State of Delaware prevailing wage requirements, craft training affidavit submissions during the award phase, and waste management standards requiring a minimum 75 percent diversion of construction and demolition waste from landfills. No liquidated damages clause is included in the contract; however, all conditions specified in the written contract will be enforced. Bid security of ten percent of the bid amount is required, and the successful contractor must provide performance and payment bonds equal to 100 percent of the contract price within 20 days of award. The solicitation includes equal employment opportunity requirements and ensures full bidding opportunities for Minority Business Enterprises, Disadvantaged Business Enterprises, Women-Owned Business Enterprises, and Veteran-Owned Business Enterprises.

View the file

Other files

File Type Posted
OMB-MJ0208000003 - wages.pdf PDF
OMB-MJ0208000003 - rfp.pdf PDF
OMB-MJ0208000003-dwgs..pdf PDF
OMB-MJ0208000003 - specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R G Architects, LLC 200 West Main Street Middletown, DE 19709 302.376.8100 www.rgarchitects.net

RGA No. 25022 25 March 2026

ADDENDUM NO. 1 OLD SUSSEX COUNTY FAMILY COURT BUILDING

DEMOLITION PACKAGE

OMB/DFM Contract No. MJ0208000003 22 The Circle Georgetown, DE 19947

R G Architects

200 West Main Street Middletown, DE 19709 Phone: 302-376-8100 (office)

Email: bob@rgarchitects.net

BIDS DUE: Wednesday, April 15, 2026 at 1:00 p.m.

BIDS RECEIVED BY WAY OF THE BONFIRE PORTAL at https://DFM.bonfirehub.com

BIDS SHALL BE READ ALOUD AT 2:00p.m. on April 15th, 2026 at the following location:

Division of Facilities Management Haslet Armory 122 Martin Luther King Jr Blvd. S Dover, DE 19901

NOTICE TO ALL BIDDERS

1.0 GENERAL NOTES:

1.1 Bidders are hereby notified that this Addendum shall be and hereby becomes part of their Contract Documents, and shall be attached to the Project Manual for this project.

1.2 The following items are intended to revise and clarify the Drawings and Project Manual, and shall be included by the Bidder in their proposal.

1.3 Bidders shall verify that their Sub-bidders are in full receipt of the information contained herein.

1.4 A copy of the current bid set register is available upon request indicating individuals that have purchased project documents from R G Architects, LLC.

1.5 The pre-bid sign-in sheet, along with Addendum #1, is being sent as a courtesy to all pre-bid meeting attendees; However, all future addenda will only be issued to registered bid holders.

1.6 All addenda will be sent out to contractors via email. Contractors are encouraged to keep an eye on their email accounts during the bidding period for any and all updates.

25022 Old Sussex County Family Court Building – Selective Demolition Package

ADDENDUM # 1

- 2 -

2.0 PREBID MEETING:

2.1 Bid schedule is as follows:

A. The bids are due by 1:00 p.m. on Wednesday, April 15, 2026.

B. Substitution requests will be received until 4:00 p.m. on April 6, 2026.

C. Instructions for requesting substitutions are very specific and are contained in the project manual. If the contractor does not follow the processes, it is automatic grounds for rejection.

D. Questions regarding the bid documents will be received until 4:00 p.m. on April 8, 2026. All questions must be submitted in writing (via email, addressed to Bob Grove, bob@rgarchitects.net) to R G Architects. Neither R G Architects nor the Owner will answer questions verbally.

E. The last day for addenda to be issued, if required, shall be April 13, 2026.

2.2 The project will require the contractors to utilize the current State of Delaware Prevailing wage rates, included in the project manual.

2.3 Liquidated damages: Liquidated damages are not in this contract. However, a written contract is, and all conditions of that contract will be enforced as spelled out in the contract documents.

2.4 Substitutions Requests: All substitution requests shall be submitted per the project manual. Product comparison is required, and the contractor is responsible for submitting an equal substitution in comparison to the basis of design. All substitutions will be considered until the request deadline noted above.

2.5 The project does not have any Alternates.

2.6 The project has one Allowance and is described in the project manual.

2.7 General Owner’s Allowance $25,000

2.8 The subcontractors list to be noted on the bid form shall be as follows:

A. LIST OF TRADES:

1. Mechanical Contractor

2. Plumbing Contractor

3. Electrical Contractor

4. Elevator Contractor

B. The General Contractor may NOT list more than one subcontractor for a discipline on the subcontractor’s list unless it is a second or third-tier contractor.

C. On the Subcontractors List, the General Contractor must list the subcontractor that is providing the labor for 100% of the work in that category and as is required by the laws of Title 29.

2.9 RGA noted the Bid form, in the project manual or updated via Addenda, is not to be altered in any way by the Bidder. Bid form is to be filled completely and any Addenda is to be noted as 1,2,3 and not 1-3 as per issued addenda.

2.10 RGA noted the project Craft Training Affidavit must be submitted during the project award phase. The Craft Training Affidavit is not required at time of Bidding. The winning Bidder will submit the Craft Training Affidavit required paperwork during the contract awarding phase.

25022 Old Sussex County Family Court Building – Selective Demolition Package

ADDENDUM # 1

- 3 -

3.0 Revisions to the SPECIFICATIONS

3.1 None at this time

4.0 Revisions to the DRAWINGS

4.1 None at this time

5.0 QUESTIONS & ANWSERS:

Q1 – Will the furniture be removed from the building prior to the start of demolition, or is the furniture removal part of this project scope?

A1 – All furniture will be removed from the building prior to the commencement of demolition activities. However, the fixed elements (such as the judges’ bench in the courtrooms, and the security desks and platforms in the waiting areas) shall be considered casework, and are therefore included in the scope of this project.

Q2 – Was an environmental (asbestos) inspection performed on the building?

A2 – Yes, an inspection was performed last year. The report is attached to this addendum.

6.0 SUBSTITUTION REQUEST:

6.1 None at this time

7.0 ATTACHMENT LIST:

7.1 Pre Bid Sign-In Sheet

7.2 Asbestos NESHAP Inspection Report

- End of Addendum No.1 -

760 Pulaski Highway Bear, DE 19701 1-302-326-2333

Harvard Environmental, Inc.

State of Delaware Division of Facilities Management

Old Sussex Family Court 22 The Circle

Georgetown, Delaware 19947

Asbestos NESHAP Inspection Interior Renovation Project

FINAL REPORT

08/25/2025

Harvard Project # 26535

Prepared For: Robert Purnell State of Delaware-Division of Facilities Management 122 Martin Luther King Jr. Boulevard South

Dover, Delaware 19901

Prepared By: Harvard Environmental, Inc.

760 Pulaski Highway Bear Delaware 19701 302-326-2333

Written By: ________________________ Released By: ________________________ Jacob Horwitz Wesley JT Morrison

Building Inspector Operations Manager Harvard Environmental, Inc. Harvard Environmental, Inc.

DFM – Old Sussex Family Court 22 The Circle, Georgetown, Delaware 19947

Asbestos NESHAP Inspection for Renovation – Tracking # 26535

Harvard Environmental, Inc. 2

TABLE OF CONTENTS

Introductions & Executive Summary 3

Certifications & Accreditations Appendix A

Schematic Sample Location Diagram Appendix B

Laboratory Analysis Appendix C

State of Delaware Asbestos Inspection Form Appendix D

Harvard Environmental, Inc. 3

INTRODUCTIONS AND EXECUTIVE SUMMARY

Harvard Environmental, Inc. herein presents data associated with inspections performed at the facility located at 22 The Circle, Georgetown, Delaware 19947. This inspection was performed to provide compliance with 40 CFR Part 61, “Asbestos NESHAP. These Environmental Protection Agency, (EPA), regulations require inspections to be performed by certified asbestos building inspectors prior to renovations and/or demolition of facilities. This effort was made at the request of Robert Purnell, DFM.

This project was performed to identify asbestos containing materials that would be impacted during future renovation of the interior of the building. Harvard Environmental Inc. assessed the impacted building materials which would be considered suspect asbestos containing. A listing of locations, systems and/or materials which were not assessed may be found under “Non-Assessed Conditions” found further in this report.

Based on the information provided to Harvard Environmental, coupled with field inspections and laboratory analysis of samples collected, asbestos containing materials were presumed to be associated with the interior of the specified structure during this inspection. However, fire doors within the building are presumed to contain asbestos materials.

Sampling was limited to accessible locations associated with the structure. If other suspect asbestos containing materials not presented in this report are encountered, Harvard Environmental should be contacted to schedule further intrusive investigations.

Provided is a summary listing of materials assessed under this inspection and testing. The detailed inspection data is provided as appendices further in the report.

This report is intended to provide “basic data” only. It is assumed that individuals reading and interpreting the sample locations and results, methods of analysis, and hazards associated with the materials are knowledgeable in all areas of discussion. Should any questions arise regarding the content of the information presented, contact should be exclusively to Harvard Environmental, Inc., at 302.326.2333.

In the event of changes to the condition of the materials or surfaces tested or changes to the scope of materials proposed to be impacted, Harvard Environmental should be contacted for additional testing and evaluation.

SUMMARY OF FIELD METHODS

Harvard developed field schematics to assist in documenting field assessments and to provide insight as to the location of suspect materials which may be associated with the structure.

To best document the assessment, Harvard Environmental, Inc. assessed the layout and design of locations requiring assessment and assigned each geographic area a unique alpha/numeric “grid” identifier. These identifiers are specific locations of the assessment and are the basis for orientation of the data.

The inspection was performed on 08/14/2025. The conditions described within this document are accurate as of the date of last visit. Mr. Leonard Woerner was the employee responsible for Harvard Environmental, Inc. employee who led the field efforts associated with the work.

OVERVIEW OF ASBESTOS INSPECTION

Representative sampling of suspect asbestos containing materials was performed on impacted materials. The sampling effort was conducted in accordance with EPA regulations and industry accepted standards.

Asbestos analysis was completed utilizing Polarized Light Microscopy, (PLM). PLM utilizes an optical microscope equipped with a polarizing lens through which trained microscopist can identify asbestos fibers according to their crystalline structure. This method of analysis is recognized throughout the industry as standard practice. Prior to

Harvard Environmental, Inc. 4 determining the type of fiber, the sample was placed under a “Stereo Microscope” at approximately 150X magnification for purposes of visual estimation. Various fiber types were pulled from the sample and oils applied to determine refractive indices under the polarized light microscope.

This recognized method of analysis has a detection limit of 1% by volume. Percentages of asbestos < 1% are reported as “trace” and are not considered asbestos containing materials under EPA regulations.

Non-organic binder type materials were typically manufactured with asbestos fibers milled to specifications which are smaller in size. These types of materials generally include roofing products, adhesive type materials and sealants. Often PLM analysis will not detect these fibers and as such produces “false-negative” asbestos results. Some degree of uncertainty still exists regarding the definition of non-asbestos materials. Per State of Delaware regulations, transmission electron microscopy (TEM) analysis is not required for non-organic binder floor tile and floor tile mastic type building materials which test negative for asbestos utilizing standard methods of analysis. TEM analysis provides higher magnification levels which will detect smaller fibers that would normally be undetected utilizing PLM analysis.

Based on the information provided to Harvard Environmental, Inc., coupled with field inspections and laboratory analysis of samples collected, asbestos containing materials were not identified to be associated with the interior of the building. However, fire doors within the building are presumed to contain asbestos materials. This inspection was performed non-intrusive in order to confirm quantities and asbestos content additional destructive inspections will need to be performed.

Provided is a summary listing of materials assessed under this inspection. The detailed inspection data is provided as appendices further in the report.

SUMMARY OF MATERIALS ASSESSED

Materials determined to be PRESUMED ASBESTOS CONTAINING

HA # Material Description Result of Assessment

004 Fire Door PACM

019 Elevator Brakes Pad PACM

Materials determined to be NONE DETECTED via PLM Analysis HA # Material Description Result of Assessment

001 Fireproofing No Asbestos Detected

002 Drywall No Asbestos Detected

003 Joint Compound No Asbestos Detected

005 2x2 Ceiling Tile No Asbestos Detected

006 Cove Base No Asbestos Detected

007 Cove Base Mastic No Asbestos Detected

008 Rubber Floor Mastic No Asbestos Detected

009 Ceramic Tile Adhesive No Asbestos Detected

010 Ceramic Tile Grout No Asbestos Detected

011 Interior Door Caulk No Asbestos Detected

012 Mastic associated with Stairs No Asbestos Detected

013 Carpet Mastic No Asbestos Detected

014 12x12 Floor Tile – Pink No Asbestos Detected

015 Floor Tile Mastic associated with 014 No Asbestos Detected

016 Sink Undercoat – White No Asbestos Detected

017 12x12 Floor Tile – White with Blue Specks No Asbestos Detected

018 Floor Tile Mastic associated with 017 No Asbestos Detected

Harvard Environmental, Inc. 6

Appendix A

Harvard Environmental, Inc. 7

Harvard Environmental, Inc. 8

SCHEMATIC DIAGRAMS/SAMPLE LOCATIONS

Appendix B

Harvard Environmental, Inc. 9

LABORATORY ANALYSIS

Appendix C

EMSL Analytical, Inc.

200 Route 130 North Cinnaminson, NJ 08077

Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

HARV51

042517135EMSL Order ID:

Customer ID:

Customer PO:

Project ID:

Attn:

Proj: DFM - Old Family Court Building / 26535

Phone: (302) 326-2333

Fax:

Collected: 8/25/2025

Received: 8/26/2025

Analyzed: 8/27/2025

Ashley Mote

Harvard Environmental, Inc.

760 Pulaski Highway

Bear, DE 19701

Summary Test Report for Asbestos Analysis of Bulk Material

Client Sample ID:

Sample Description:

Lab Sample ID: 042517135-0001014C

3.29/12x12 Floor Tile - Pink

DateTEST Non-Fibrous Asbestos CommentColor Fibrous

Non-AsbestosAnalyzed

8/27/2025 0.0% 100.0%TEM Grav. Reduction None DetectedPink

Client Sample ID:

Sample Description:

Lab Sample ID: 042517135-0002015C

3.29/12x12 Floor Tile Mastic

DateTEST Non-Fibrous Asbestos CommentColor Fibrous

Non-AsbestosAnalyzed

8/27/2025 0.0% 100.0%TEM Grav. Reduction None DetectedBlack

Client Sample ID:

Sample Description:

Lab Sample ID: 042517135-0003017A

2.24/12x12 Floor Tile - White w/ Blue Specs

DateTEST Non-Fibrous Asbestos CommentColor Fibrous

Non-AsbestosAnalyzed

8/27/2025 0.0% 100.0% TremoliteTEM Grav. Reduction White/Blue <0.1%

Client Sample ID:

Sample Description:

Lab Sample ID: 042517135-0004018A

2.24/12x12 Floor Tile Mastic

DateTEST Non-Fibrous Asbestos CommentColor Fibrous

Non-AsbestosAnalyzed

8/27/2025 0.0% 100.0%TEM Grav. Reduction None DetectedBrown

Test Report:EPAMultiTests-7.32.2.D Printed: 8/27/2025 05:32PM Page 1 of 2

EMSL Analytical, Inc.

200 Route 130 North Cinnaminson, NJ 08077

Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

HARV51

042517135EMSL Order ID:

Customer ID:

Customer PO:

Project ID:

Summary Test Report for Asbestos Analysis of Bulk Material

Analyst(s):

TEM Grav. Reduction (4)Trinh Tran

Samantha Sweeney, Laboratory Manager or Other Approved Signatory

Reviewed and approved by:

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This is a summary report; official reports are available on LabConnect or upon request and relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received. Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA

600/M4-82-020 "Interim Method") but augmented with procedures outlined in the 1993 ("final") version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government.

Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis.

Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ PA ID# 68-00367 Initial report from: 08/27/202517:32:34

Test Report:EPAMultiTests-7.32.2.D Printed: 8/27/2025 05:32PM Page 2 of 2

Harvard Environmental, Inc. 10

STATE OF DELAWARE ASBESTOS INSPECTION FORM