This addendum and pre-bid meeting minutes document pertains to the State of Delaware, Office of Management and Budget, Division of Facilities Management, for the Delaware Hospital for the Chronically Ill Medical Building Basement Window Removal project (Contract #MC3514000084). The project involves comprehensive basement window removal and associated concrete remediation work at the hospital's Smyrna, Delaware location. The pre-bid meeting was held on January 29, 2026, with attendance required from 22 contractor entities representing concrete, construction, and building services firms. Sealed bids are due to the State via the Bonfire Portal by 10:00 AM on February 17, 2026, with public bid opening and reading at 11:00 AM the same day. A mandatory site visit date is to be determined. The contract includes two unit price categories: vertical concrete repair billed per square foot and epoxy crack injection billed per linear foot. Written questions must be submitted to Chris Daube at cmd@dbfinc.com by February 11, 2026.
Addendum No. 1, issued February 2, 2026, clarifies that bidding drawings and project specifications are available via Dropbox link upon payment of a non-refundable $50.00 fee to Davis, Bowen & Friedel, Inc. Concrete subcontractors must be identified in the bid submission. The project includes a $20,000 allowance for unforeseen or deteriorated conditions. This is a state prevailing wage project with current wage rates included in specifications. Contractors are responsible for all building permits and associated fees, while electrical and water access are available on site. All work must be completed during normal working hours between 7:00 AM and 3:30 PM. Bid security of 10 percent is required, and the successful contractor must submit performance and payment bonds equal to 100 percent of the contract price within 20 days of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OMB-MC3514000084-rfp.pdf | ||
| OMB-MC3514000084-dwgs.pdf | ||
| OMB-MC3514000084-specs.pdf | ||
| OMB-MC3514000084-wages.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
❑ 601 E. MAIN STREET, SUITE 100, SALISBURY, MD 21804 • 410-543-9091
1 PARK AVENUE, MILFORD, DE 19963 • 302-424-1441
❑ 106 N. WASHINGTON STREET, SUITE 103, EASTON, MD 21601• 410-770-4744
www.dbfinc.com
Ring W. Lardner, P.E.
W. Zachary Crouch, P.E.
Michael E. Wheedleton, AIA, LEED GA
Jason P. Loar, P.E.
Jamie L. Sechler, P.E.
DHCI CAMPUS MEDICAL BUILDING
BASEMENT WINDOW REMOVAL
100 SUNNYSIDE ROAD
DBF #0586B064.C02 ❖ DFM # MC3514000084
FEBRUARY 2, 2026
ADDENDUM NO. 1
The following items shall become a part of the contract documents.
Item No. 1 The prebid meeting minutes are attached.
Item No. 2 Bidding Drawings and Project Specifications are available via Dropbox link, once payment of $50.00 is paid to Davis, Bowen & Friedel, Inc.
Item No. 3 Regarding subcontractors list, Concrete Subcontractors shall be indicated in bid.
See revised 00 41 13 Bid Form section attached.
Item No. 4 Unit price repairs: vertical concrete repair shall be per square feet (SF), epoxy crack injection shall be per linear feet (LF).
See revised 01 22 00 Unit Prices section attached.
Item No. 5 Access to water and electricity is available on site.
END OF ADDENDUM
❑ 601 E. MAIN STREET, SUITE 100, SALISBURY, MD 21804 • 410-543-9091
1 PARK AVENUE, MILFORD, DE 19963 • 302-424-1441
❑ 106 N. WASHINGTON STREET, SUITE 103, EASTON, MD 21601• 410-770-4744
www.dbfinc.com
Ring W. Lardner, P.E.
W. Zachary Crouch, P.E.
Michael E. Wheedleton, AIA, LEED GA
Jason P. Loar, P.E.
Jamie L. Sechler, P.E.
DHCI CAMPUS MEDICAL BUILDING
BASEMENT WINDOW REMOVAL
100 SUNNYSIDE ROAD
SMYRNA, DELAWARE 19977
CONTRACT #MC3514000084
DBF #0586B064.C02
JANUARY 29, 2026
In Attendance
DFM: Michael Bailey michael.a.bailey@delaware.gov
Davis, Bowen & Friedel, Inc. Chris Daube, P.E. cmd@dbfinc.com
BSS Contractors Brian Mattheus bsmith@bsscontractor.com
Deldeo Builders
The Borsello Companies, Inc.
Commonwealth Construction Co.
DK Construction Services LLC
LC Bathon Builders
Amakor Inc.
BRS Consulting, Inc.
Kent Construction Co.
Conventional Builders
Thomas Building Group
Ventresca Brothers
Stratified
L.J. Paolella Construction, Inc.
Tony Orga
Richie Meriggi
Bill Booth
Chidozie Dike
Larry Bathon
Kim Lombardi
Robin Schurman
Tony Reynolds
Kevin O’Neal
Phillip Simpson
Nick Koski-Vacirca
Clive Diaz
Joe Kane loudeldeo@comcast.net mark@borsellomasonryinc.com bbooth@itscommonwealth.com cdike.dkconstructionservices@gmail.com kwilhelm@bathonbuilders.com amakor@aol.com robin@brsconinc.com tony@kentconstructionco.com info@conventionalbuilders.net phil@tbgde.com tony@ventrescabros.com estimating@stratified.us larry@ljpinc.net
Items Discussed
Item 1 DBF gave a brief summary of the project.
Item 2 Bids will be due to the State by way of the Bonfire Portal on February 17, 2026, by 10:00 a.m. This will be a formal bid opening, with bids opened and read aloud at 11:00am
February 17, 2026.
Item 3 Any questions must be submitted in writing to Chris Daube at cmd@dbfinc.com. The last day for questions is February 11, 2026.
Item 4 This is a state wage rate job, and the current rates are in the specs.
Pre-Bid Meeting Minutes DHCI Medical Building Basement Window Removal January 29, 2026
Item 5 Date to visit the site to be determined.
Item 6 There will be an allowance of $20,000.00 for found deteriorated conditions.
Item 7 Unit Price repairs are indicated in the specifications, in the bid form. Vertical concrete repair in square feet (SF), epoxy crack injection in linear feet (LF).
Item 8 Contractor is responsible for any building permits and associated fees.
Item 9 Access to electrical and water on site available on site.
Item 10 Regarding subcontractors list, Concrete Subcontractors shall be indicated in bid.
Item 11 Work shall be completed during normal working hours, between 7:00am to 3:30pm.
Any changes, additions or deletions to these minutes should be submitted in writing to Davis, Bowen &
Friedel, Inc., within ten (10) days.
Respectfully Submitted, DAVIS, BOWEN & FRIEDEL, INC.
Chris Daube, P.E.
Associate / Sr. Structural Engineer
STATE OF DELAWARE
OFFICE OF MANAGEMENT AND BUDGET
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MC3514000084
DELAWARE HOSPITAL FOR THE CHRONICALLY ILL
MEDICAL BUILDING BASEMENT WINDOW REMOVAL
SMYRNA, DELAWARE
0586B064.C02 Bid Form / 00 41 13
SECTION 00 41 13
BID FORM
For Bids Due: To: State of Delaware
Division of Facilities Management
Haslet Armory
122 Martin Luther King Jr. Blvd
Dover, DE 19901
Name of Bidder:
Delaware Business License No.: Taxpayer ID No.:
(Other License Nos.):
Phone No.: ( ) - Fax No.: ( ) -
The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the work described by the aforesaid documents for the lump sum itemized below:
ALLOWANCES
Allowances conform to applicable project specification section. Refer to specifications section 01 21 00 – Allowances for a complete description of the following Allowances to be included in the Base Bid.
ALLOWANCE. No. 1: Provide an allowance of $20,000.00 for unforeseen conditions.
_____________Acknowledged.
UNIT PRICES
Unit Prices conform to applicable project specification section. Refer to specifications section 01 22 00 – Unit Prices for a complete description of the following Unit Prices.
UNIT PRICE No. 1: Cost associated with repairing concrete surfaces per square foot; including surface preparation, reinforcement and concrete repair, and finishing.
Unit Price $_______________
UNIT PRICE No. 2: Cost associated with repairing concrete cracking per linear foot; including surface preparation, injection ports, repair materials, and surface finishing.
Unit Price $_______________
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MC3514000084
DELAWARE HOSPITAL FOR THE CHRONICALLY ILL
00 41 13 \ Bid Form 0586B064.C02
I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.
This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to this Bid.
The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.
This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.
Should I/We be awarded this contract, I/We pledge to achieve substantial completion of all the work within calendar days of the Notice to Proceed.
The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken action in restraint of free competitive bidding.
Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.
I am / We are an Individual / a Partnership / a Corporation
By Trading as
(Individual’s / General Partner’s / Corporate Name)
(State of Corporation)
Business Address:
Witness: By:
( Authorized Signature )
(SEAL)
( Title )
Date:
ATTACHMENTS
Sub-Contractor List
Non-Collusion Statement
Affidavit of Employee Drug Testing Program
Affidavit of Contractor Qualifications
Bid Security
(Others as Required by Project Manuals)
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MC3514000084
DELAWARE HOSPITAL FOR THE CHRONICALLY ILL
SUBCONTRACTOR LIST
In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier contractors, and submit it with your bid.
Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID # or Delaware Business license #
1. Concrete
A.
B.
C.
2.
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MC3514000084
DELAWARE HOSPITAL FOR THE CHRONICALLY ILL
3.
4.
5.
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MC3514000084
DELAWARE HOSPITAL FOR THE CHRONICALLY ILL
NON-COLLUSION STATEMENT
This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (to the Office of Management and Budget, Division of Facilities Management).
All the terms and conditions of Contract #mc3514000084 have been thoroughly examined and are understood.
NAME OF BIDDER:
AUTHORIZED REPRESENTATIVE
(TYPED):
AUTHORIZED REPRESENTATIVE
(SIGNATURE):
TITLE:
ADDRESS OF BIDDER:
E-MAIL: ______________________________________________________________
PHONE NUMBER:
Sworn to and Subscribed before me this day of 20 .
My Commission expires . NOTARY PUBLIC .
THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MC3514000084
DELAWARE HOSPITAL FOR THE CHRONICALLY ILL
AFFIDAVIT
OF
EMPLOYEE DRUG TESTING PROGRAM
4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works
Contracts funded all or in part with public funds.
We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program for our employees on the jobsite, including subcontractors, that complies with this regulation:
Contractor/Subcontractor Name:
Contractor/Subcontractor Address:
Authorized Representative (typed or printed):
Authorized Representative (signature):
Title:
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MC3514000084
DELAWARE HOSPITAL FOR THE CHRONICALLY ILL
AFFIDAVIT
OF
CONTRACTOR QUALIFICATIONS
We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration of the contract term.
In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.
Contractor Name:
Contractor Address:
Authorized Representative (typed or printed):
Authorized Representative (signature):
Title:
DIVISION OF FACILITIES MANAGEMENT
CONTRACT #MC3514000084
DELAWARE HOSPITAL FOR THE CHRONICALLY ILL
This page intentionally left blank.
Delaware Hospital for the Chronically Ill Medical Building Basement Window Removal
Smyrna, Delaware MC3514000084
0586B064.C02 Unit Prices / 01 22 00
SECTION 01 22 00
UNIT PRICES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for unit prices.
1.3 DEFINITIONS
A. Unit price is an amount incorporated in the Agreement, applicable during the duration of the
Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.
1.4 PROCEDURES
A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.
B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.
C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.
D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.
Medical Building Basement Window Removal Delaware Hospital for the Chronically Ill
MC3514000084 Smyrna, Delaware
01 22 00 \ Unit Prices 0586B064.C02
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF UNIT PRICES
A. Unit Price No. 1: Cost associated with repairing concrete surfaces per square foot; including surface preparation, reinforcement and concrete repair, and finishing.
B. Unit Price No. 2: Cost associated with repairing concrete cracking per linear foot; including surface preparation, injection ports, repair materials, and surface finishing.
END OF SECTION
| 0586B064.C01 Addendum No. 1 |
| 0586B064.C02 Prebid Meeting Minutes |
| 00 41 13_Bid Forms (JAN2023) |
| 01 22 00 Unit Prices |
File details come from the government source that posted it. Updated .