This Statement of Objectives (SOO) details a network upgrade for the Buckley Space Force Base (SFB) Land Mobile Radio (LMR) Trunking System, issued by the US Space Force. The upgrade requires procuring and installing Juniper networking equipment, specifically 2 SRX1500 routers, 2 EX4000 L3 switches with 24 ports, and 2 EX2300 L3 switches with 24 ports, along with necessary connectors and system programming. Key specifications include TAA-compliance, seamless integration with the existing Motorola Public Safety radio network, compatibility with the USLAUSCO DAF LMR system, and installation by a contractor team capable of passing base access background checks. The equipment must be delivered by August 18th, 2025, and go live prior to August 25th, 2025, with a full warranty and continuous fault and alarm monitoring. The primary objective is to upgrade the radio system backhaul and edge equipment from TDM circuits to Ethernet, ensuring 24/7 operations and increased mission readiness for first responders.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

US Space Force

Network Upgrade For The

Buckley SFB LMR Trunking System

Current as of 10 April 2025

1. SCOPE:

The government requires an upgrade of the Buckley SFB Motorola trunking radio system backhaul and edge equipment from TDM circuits to Ethernet for 24/7, 365-day operations. The equipment being upgraded will be in use consistently, all hours of the day, for years. The upgrade will increase mission readiness and prevent service disruptions for first responders.

2. REQUIREMENT:

Product

Quantity

Juniper SRX1500 router, standard configuration 2

Juniper EX4000 L3 switch, 24 ports 2

Juniper EX2300 L3 switch, 24 ports 2

Any connectors necessary to integrate equipment into the system

Programming of devices 1

Installation of devices 1

Warranty

3. SPECIFICATIONS:

• The equipment shall be procured, programmed, delivered and installed by the contractor.

• The equipment shall be TAA-compliant.

• The equipment shall be seamlessly integrated into the existing Motorola Public

Safety radio network on Buckley SFB and will be compatible with the USLA- USCO DAF LMR system.

• The team sent by the contractor to Buckley SFB for equipment installation shall be able to pass a background check for base access.

• The upgraded equipment shall go live prior to August 25th, 2025.

• After the integration, the equipment shall be covered under warranty.

• The routers and switches shall be monitored for faults and alarms.

4. DELIVERY:

After receipt of the order, the contractor shall deliver the equipment no later than August 18th, 2025. The delivery address will be provided upon award.

Items, when delivered, will be accepted and inspected by the government officials responsible for receiving the products and performing any required inspections.