Office_Automation_Form B2727652.pdf
PDF 164 KB Posted
- Attached to
- APC NetShelter Rack PDU
- Solicitation number
- B2728011
- Issued by
- Pennsylvania
About this file
This is an Office Automation Form for a City of Philadelphia contract opportunity related to IT equipment procurement and configuration services. The form outlines installation, configuration, warranty, maintenance, and training requirements for office automation equipment. The City requires vendors to provide inside delivery to loading docks with included installation and configuration services unless otherwise directed. Equipment must be delivered pre-configured or configured at the City's location, with vendors required to specify the platform if configuration is performed on-site. The procurement includes options for on-site maintenance with next-day response service (within 24 hours) including all parts and labor, available under either a 3-year or 5-year service level agreement.
Warranty coverage requirements are specified by equipment category: servers and IT appliances require a minimum five-year warranty, PCs and laptops require four years, tablets require three years, and peripherals including printers, copiers, and multifunction devices require the original equipment manufacturer's warranty period. All warranty coverage begins after a 30 to 120-day acceptance period. The form indicates that instruction and training by the vendor is requested, and the City will consider refurbished equipment. Maintenance payment shall be made following equipment delivery and City acceptance. Vendors must submit product literature at the City's request and review all requirements before submitting quotes through PHLContracts. The contract is governed by the terms and conditions of the DPA (Data Processing Agreement).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Seller_Office_Automation_Checklist B2727652.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Office Automation Form
A. Installation and Configuration Requirements
Equipment to be installed by the vendor at the desktop and debris removed by the vendor?
No (Ex. Boxes)
Product delivered configured?
Yes
No
Product configured at City’s location?
Yes
No
If vendor is configuring product, then specify platform.
Extended warranty coverage beyond the basic coverage?
The basic coverage shall carry a five year (minimum) warranty period for servers and IT appliances, four years for PCs and laptops, three years for tablets, and the original equipment manufacturer’s warranty period on all peripherals to include, but not limited to, printers copiers, and multifunction devices as per all terms and conditions of the DPA. All after the 30 - 120 day acceptance period.
B. Maintenance Requirements (if requested) On-site maintenance: Next day response (within 24 hours) to include all parts and labor.
**Payment for chosen maintenance option shall be made after equipment is delivered and accepted by the City.
3Year-LO 5Year-LO
City departments must complete for Office Automation requests through PHLContracts. Vendor must review requirements before submitting quote.
Yes
Instruction/Training by the vendor requested.
Yes
No
Yes
No
Will you accept refurbished equipment?
Yes
No
| specify platform: |
| Vendor2: Off |
| Vendor1: Off |
| Product2: Off |
| Location1: Off |
| Location2: Off |
| Training1: Off |
| Training2: Off |
| Equipment1: Off |
| Equipment2: Off |
| Warranty1: Off |
| Warranty2: Off |
| Product1: Off |
| 5Year: Off |
| 3Year: Off |
File details come from the government source that posted it. Updated .