ODLF 2026 GCCS EXPANSION ITB DRAWING SET_sign.pdf
PDF 7 MB Posted
- Attached to
- LANDFILL GAS COLLECTION AND CONTROL SYSTEM
- Solicitation number
- PE-75552-NONST-2026-000000061
- Issued by
- Wilcox County, Georgia
About this file
This is a drawing set for a gas collection and control system expansion at the Old Dixie Highway Municipal Solid Waste Landfill operated by the Dalton-Whitfield Solid Waste Authority in Dalton, Georgia. The project involves the 2026 expansion of the landfill gas collection and control system (GCCS) and was issued for bid on April 6, 2026. The drawing set, prepared by SCS Engineers (Stearns, Conrad and Schmidt Consulting Engineers, Inc.), includes nine sheets detailing existing conditions, proposed site plans, base grades, and comprehensive construction details. The project encompasses the installation of multiple landfill gas extraction wells, header and lateral piping systems of varying diameters (4 inches to 12 inches), condensate sumps with pumps, remote wellheads, air supply lines, liquid conveyance lines, and horizontal collectors. The design includes specifications for well bore reinforcement grates, perforated HDPE pipe configurations, isolation valves, air release valves, and tie-ins to existing leachate collection systems. The proposed system incorporates extraction wells (EW-60 through EW-72), multiple horizontal collectors (HC-1 through HC-19), and support infrastructure including valve isolation stations and monitoring ports.
The drawings establish detailed construction standards and specifications including minimum slope requirements (5 percent for headers and laterals, 3 percent for horizontal collectors), pressure testing protocols (4 PSIG for LFG lines, 100 PSIG for air and liquid conveyance pipes), and material requirements such as HDPE SDR 17 and SDR 11 piping, Schedule 40 PVC casing, and stainless steel components. Construction quality assurance requirements are emphasized, including surveying of well locations and alignments prior to construction, liquid level measurements within 24 hours of well completion, and field verification of existing conditions. The document specifies that locations and installations may vary to accommodate field conditions with engineer and responsible official approval, and contractor shall immediately notify the engineer of any obstructions or impacts to implementation. No specific contract pricing, award date, or completion timeline is provided in this drawing set; it serves as the technical specification basis for the competitive bidding process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ODLF 2026 GCCS Construction ITB Documents (Ap.pdf | ||
| ODLF 2026 GCCS Construction _ Technical Spec.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
LOCATION MAP
PREPARED FOR:
DALTON-WHITFIELD SOLID WASTE AUTHORITY
4189 OLD DIXIE HWY SE
DALTON, GEORGIA 30721
PROJECT LOCATION
OLD DIXIE HWY
LANDFILL
N
SCS ENGINEERS
SCS PROJECT NO. 09218052.12
OLD DIXIE HWY - MUNICIPAL SOLID WASTE LANDFILL
2026 GAS COLLECTION AND CONTROL SYSTEM
3175 SATELLITE BOULEVARD, BLDG 600 SUITE 100
DULUTH, GA 30096
PH. (678) 319-9849
WWW.SCSENGINEERS.COM
STEARNS, CONRAD AND SCHMIDT
CONSULTING ENGINEERS, INC.
DALTON-WHITFIELD SOLID WASTE AUTHORITY
APRIL 2026
DALTON, GEORGIA
L:
\P ro je ct s\
.1 2\
Dr aw in gs
\E ng in ee rin g
Dr aw in gs
\0
- C O
VE
R_
O
DL
F
GC
CS
_v
1.
0.
dw g
A pr
6,
- 3
:5 4p m L ay ou t N am e:
C
O
VE
R
SH
EE
T
By : d ki m
SCALE FEET
05,000 5,000 10,000
INDEX OF DRAWINGS
Sheet Number Sheet Title
1 COVER SHEET
2 EXISTING CONDITIONS
DETAILS - 1
3 4
DETAIL PAGE NUMBER
DETAIL NUMBER ON DETAIL PAGE
DETAIL ORIGINATION PAGE
BASE GRADES
PROPOSED SITE PLAN
DETAILS - 26
DETAILS - 37
DETAILS - 48
DETAILS - 59
ISSUED FOR BID
DATE: 4/6/2026
NOT FOR CONSTRUCTION
VINUTA SHESHAPPANAVAR, P.E.
LICENSE NO. 051568
0780790800
710720730740750760770780
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC HC HC HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
EW-60
HC-4
EW-53
HV
HV
CS-06FLARE
GAS TREATMENT/
UTILIZATION
FACILITY
HV
HV
HV
RW-60
10"
12"
12"
12"
12"
12"
12"
12"
12"
10"
10"
10"
10"
10"
8"
10"
10"
8"
8"
8"
10"
10"
4"
4"
4"
4"
4"
4"
4"
4" 4"
4" 4"
4"
4" 4" 4"
4"
4"
CS-05
HC-5
HC-3
HC-2
HC-1
EW-59
EW-58
EW-57
EW-52
EW-49
EW-50
EW-46
EW-43
EW-41
EW-39
EW-40
EW-42
EW-44
EW-45
EW-48
EW-47
EW-51
EW-55
EW-54
EW-56
RW-58
RW-57
RW-52
RW-46
4"
4"
LCO-4
LCO-3
LCO-5A
LCO-5B
LCO-6B
LCO-6A
HC HC
HC
HC
HC HC
HC
HC
HC HC
HC
CS-04
LCO-2A
HC HC HC HC HC
HC
HC
HC
HC
HCHCHCHCHCHC
HC
HCHCHCHCHC
HC
HCHCHCHCHC
AR-1
HCHCHCHCHCHCHC
HC-7
HC-11
HC-10
HC-9
HC-8
HC-6
V-1
LCR-6A
LCR-6B
6"
6"
6"
6"
6"6"
6"
6"
6"
6"
10"
6"
6"
10"
6"
6"
E X
IS
TI
N G
C O
N D
IT
IO
N S
01 -SITE PLAN_ODLF GCCS
N 0 15075
1" = 150'
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
AS SHOWN
LIC
EN
SE
N
O.
S A
TE
LL
IT
E
B
LV
D , B
LD
G
S U
IT
E
D U
LU
TH
, G A
P
H . 6
-9
FA
X
9-
APRIL 2026
DK
DKZT
DK
VS
S
.1
O
LD
D
IX
IE
H
W Y
M
U N
IC
IP
A L
S O
LI
D
W A
S
TE
L A
N D
FI
LL
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M
D A
LT
O
N
W H
IT
FI
E
LD
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y O
LD
D
IX
IE
H W
Y L
A N
D
FI
LL
O
LD
D
IX
IE
H W
Y S
E D
A
LT
O N
G
E O
R G
IA
VI
N
U
TA
S
HE
SH
AP
PA
N
AV
AR
ISSUED FOR BID
DATE:
NOT FOR CONSTRUCTION
4/6/2026
NOTES:
1. THE TOPOGRAPHY SHOWN IS A COMBINATION OF THE FOLLOWING:
1.1. TOPOGRAPHY DATED 11/16/2018 AND IS A COMPILATION OF PREVIOUSLY
PERFORMED SURVEYS BY EITHER GUNNIN LAND SURVEYING, MARTIN
SURVEY ASSOCIATES, OR AERIAL SOURCES.
1.2. TOPOGRAPHY DATED 2/14/2020 BY GUNNIN LAND SURVEYING.
1.3. TOPOGRAPHY DATED 1/13/2026 BY GUNNIN LAND SURVEYING.
LEGEND
LFG EXTRACTION WELL - EXISTING
REMOTE WELLHEAD LOCATION - EXISTING
LEACHATE COLLECTION CLEANOUT OR RISER - EXISTING
CONDENSATE SUMP WITH PUMP - EXISTING
ACCESS RISER - EXISTING
HEADER ISOLATION VALVE - EXISTING
LIQUID CONVEYANCE ISOLATION VALVE - EXISTING
AIR BLOWOFF AND ISOLATION VALVE - EXISTING
SOLID TO PERFORATED PIPE TRANSITION - EXISTING
ROAD CROSSING - EXISTING
ROCK PACK - EXISTING
HEADER/LATERAL PIPE DIAMETER - EXISTING
HEADER/LATERAL PIPE - EXISTING
2-INCH AIR SUPPLY LINE - EXISTING
2-INCH LIQUID CONVEYANCE LINE - EXISTING
HORIZONTAL COLLECTOR - EXISTING
MAJOR AND MINOR CONTOURS
APPROXIMATE CELL BOUNDARY
PROPERTY BOUNDARY
PROPERTY BUFFER BOUNDARY
LIMITS OF 2020 TOPOGRAPHICAL SURVEY
LIMITS OF 2026 TOPOGRAPHICAL SURVEY
EW-24
LCR-3A
LC-3A
CS-2
6"
AR-1
LV-01
AV-1
0780790800
710720730740750760770780
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC HC HC HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
HC
EW-60
HC-4
EW-53
HV
HV
CS-06FLARE
GAS TREATMENT/
UTILIZATION
FACILITY
HV
HV
HV
RW-60
10"
12"
12"
12"
12"
12"
12"
12"
12"
10"
10"
10"
10"
10"
8"
10"
10"
8"
8"
8"
10"
10"
4"
4"
4"
4"
4"
4"
4"
4" 4"
4" 4"
4"
4" 4" 4"
4"
4"
CS-05
HC-5
HC-3
HC-2
HC-1
EW-59
EW-58
EW-57
EW-52
EW-49
EW-50
EW-46
EW-43
EW-41
EW-39
EW-40
EW-42
EW-44
EW-45
EW-48
EW-47
EW-51
EW-55
EW-54
EW-56
RW-58
RW-57
RW-52
RW-46
4"
4"
LCO-4
LCO-3
LCO-5A
LCO-5B
LCO-6B
LCO-6A
HC HC
HC
HC
HC HC
HC
HC
HC HC
HC
CS-04
LCO-2A
HC HC HC HC HC
HC
HC
HC
HC
HCHCHCHCHCHC
HC
HCHCHCHCHC
HC
HCHCHCHCHC
AR-1
HCHCHCHCHCHCHC
HC-7
HC-11
HC-10
HC-9
HC-8
HC-6
V-1
LCR-6A
LCR-6B
6"
6"
6"
6"
6"6"
6"
6"
6"
6"
10"
6"
6"
10"
6"
6"
EW-69EW-70
EW-71
EW-72 8"
6"6"8"
HC-15
CS-07
V-2
H P
10" 10"
10"
10"
10"
10"
10"
10"
10"
6"6" 6"6"
10"
8" 8"
8"
8"
8"
6"
6"
6" 6"
6"
6"
6"
8"
EW-69
EW-61
EW-63
EW-64
EW-65
EW-66
EW-60 EW-62
EW-67
EW-68
CS-08V-3
V-4
AV-1
EW-70
HC-12
LCR-5B
LCR-5A
LV-04
8"
LCR-3
LCR-2A
LV-01
AV-2
LV-03
LCR-4
8"
8"
6"
6"
8"
6"
6"8"
6"
HC-13
HC-14
HC-16
LV-02
HC-17
HC-18
6"
6"
6" 6"
6"
6"
6"
6"
6"
6"
6"
ARV-2ARV-2
ARV-2ARV-1
10"
P R
O P
O S
E D
S
IT
E P
LA
N
01 -SITE PLAN_ODLF GCCS
N
LEGEND
PROPOSED LFG EXTRACTION WELL
PROPOSED REMOTE WELLHEAD LOCATION
PROPOSED SOLID TO PERF TRANSITION
PROPOSED HEADER/LATERAL PIPE DIAMETER
PROPOSED HEADER ISOLATION VALVE
PROPOSED HIGH POINT
PROPOSED HORIZONTAL COLLECTOR PIPE
PROPOSED HEADER/LATERAL PIPE
PROPOSED 4-INCH LIQUID CONVEYANCE PIPE
PROPOSED 2-INCH AIR LINE PIPE
PROPOSED BLIND FLANGE
PROPOSED AIR BLOWOFF & ISOLATION VALVE
PROPOSED LIQUID CONVEYANCE ISOLATION VALVE
PROPOSED CONDENSATE SUMP WITH PUMP
PROPOSED AIR RELEASE VALVE
PROPOSED ROCK PACK
LFG EXTRACTION WELL - EXISTING
REMOTE WELLHEAD LOCATION - EXISTING
LEACHATE COLLECTION CLEANOUT OR RISER - EXISTING
CONDENSATE SUMP WITH PUMP - EXISTING
ACCESS RISER - EXISTING
HEADER ISOLATION VALVE - EXISTING
LIQUID CONVEYANCE ISOLATION VALVE - EXISTING
AIR BLOWOFF AND ISOLATION VALVE - EXISTING
SOLID TO PERFORATED PIPE TRANSITION- EXISTING
ROAD CROSSING- EXISTING
ROCK PACK - EXISTING
HEADER/LATERAL PIPE DIAMETER - EXISTING
HEADER/LATERAL PIPE - EXISTING
2-INCH AIR SUPPLY LINE - EXISTING
2-INCH LIQUID CONVEYANCE LINE - EXISTING
HORIZONTAL COLLECTOR - EXISTING
MAJOR AND MINOR CONTOURS
APPROXIMATE CELL BOUNDARY
PROPERTY BOUNDARY
PROPERTY BUFFER BOUNDARY
LIMITS OF 2020 TOPOGRAPHICAL SURVEY
LIMITS OF 2026 TOPOGRAPHICAL SURVEY
EW-24
LCR-3A
LC-3A
CS-2
6"
6"
0 15075
1" = 150'
NOTES:
1. THE TOPOGRAPHY SHOWN IS A COMBINATION OF THE FOLLOWING:
1.1. TOPOGRAPHY DATED 11/16/2018 AND IS A COMPILATION OF PREVIOUSLY
PERFORMED SURVEYS BY EITHER GUNNIN LAND SURVEYING, MARTIN SURVEY
ASSOCIATES, OR AERIAL SOURCES.
1.2. TOPOGRAPHY DATED 2/14/2020 BY GUNNIN LAND SURVEYING.
1.3. TOPOGRAPHY DATED 1/13/2026 BY GUNNIN LAND SURVEYING.
2. ALL HEADER/LATERAL PIPING INSIDE THE LIMITS OF WASTE SHALL BE A MINIMUM
OF 5% SLOPE, UNLESS APPROVED BY THE ENGINEER OR RESPONSIBLE OFFICIAL.
3. ALL HORIZONTAL COLLECTOR PIPING INSIDE THE LIMITS OF WASTE SHALL BE A
MINIMUM OF 3% SLOPE, UNLESS APPROVED BY THE ENGINEER OR RESPONSIBLE
OFFICIAL.
4. ABOVE AND BELOW GROUND UTILITIES AND OTHER EXISTING FEATURES IN THE
PROJECT AREA, SHALL BE FIELD-LOCATED BY THE CONTRACTOR PRIOR TO
CONSTRUCTION. IF THE CONTRACTOR ANTICIPATES THAT ANY OF THESE FEATURES
WILL IMPACT ABILITY TO IMPLEMENT THE DESIGN SHOWN ON THESE DRAWINGS
OR WILL REQUIRE ADDITIONAL DESIGN CONSIDERATIONS, THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE ENGINEER / CONSTRUCTION QUALITY
ASSURANCE (CQA) REPRESENTATIVE.
5. LOCATIONS AND INSTALLATION OF THE PROPOSED LANDFILL GAS EXTRACTION
WELLS, REMOTE WELLHEADS, AND HEADER/LATERAL PIPE ALIGNMENTS MAY
VARY TO ACCOMMODATE FIELD CONDITIONS. ANY MODIFICATIONS TO THE
PROPOSED SITE PLAN SHALL BE APPROVED BY THE ENGINEER AND RESPONSIBLE
OFFICIAL BEFORE IT IS CONSTRUCTED.
6. WELL LOCATIONS MAY HAVE TO BE CHANGED IF AN ENCOUNTERED OBSTRUCTION
CANNOT BE PASSED DURING DRILLING. THE CONTRACTOR/DRILLER SHALL INFORM
THE ENGINEER OF SUCH OBSTRUCTIONS, BASED ON WHICH, THE WELL LOCATION
MAY BE ABANDONED FOR FURTHER DRILLING. THE ENGINEER SHALL COORDINATE
WITH THE CONTRACTOR TO RE-SURVEY A NEW LOCATION FOR THE WELL AND
ADJUST THE WELL SCHEDULE AS NECESSARY BASED ON THE NEWLY COLLECTED
SURVEY DATA. DRILLING SHALL COMMENCE ONLY AFTER ALL NECESSARY
SIGNATURES ARE OBTAINED ON THE UPDATED WELL SCHEDULE.
7. CARE SHALL BE TAKEN TO AVOID DAMAGING EXISTING FEATURES AND
STRUCTURES DURING CONSTRUCTION ACTIVITIES, INCLUDING BUT NOT LIMITED
TO EXISTING GCCS COMPONENTS, TRAFFIC SIGNS, LITTER FENCE, ETC. IF ANY
DAMAGE IS MADE DUE TO CONTRACTOR ACTIVITIES, CONTRACTOR SHALL
RESTORE THE DAMAGED STRUCTURE TO PRE-CONSTRUCTION CONDITIONS AT THE
CONTRACTOR'S EXPENSE.
8. EXCLUDING STUB-UPS, CONTRACTOR SHALL NOT USE 90° MOLDED ELBOWS OR
TEES ON LIQUID CONVEYANCE LINES. CONTRACTOR SHALL ONLY USE 90° SWEEP
BENDS OR 45° WYES, WHERE APPLICABLE.
9. CONTRACTOR SHALL SURVEY AND STAKE THE HEADER/LATERAL PIPE ALIGNMENTS
PRIOR TO CONSTRUCTION FOR APPROVAL BY THE ENGINEER AND OWNER.
10. CONTRACTOR IS TO LET CQA INSPECTOR TAKE SYSTEM PRESSURE READINGS ON
VACUUM STUB-UPS BEFORE THE LATERAL IS RAN TO THE NEWLY DRILLED WELL.
11. ALL WELDS SHALL BE BUTT WELDS, AND NO ELECTROFUSION COUPLERS SHALL BE
USED WITHOUT APPROVAL OF THE ENGINEER.
12. THE 10" VACUUM LATERAL WILL REQUIRE DEEP TRENCHING BY AN ADDITIONAL 2
FEET.
13. HDPE LATERALS AND CONNECTIONS TO LFG HEADER, AIR SUPPLY LINES, AND
LIQUID CONVEYANCE PIPELINES SHALL BE SUBJECTED TO PRESSURE TESTS AS
DESCRIBED HEREIN TO DETECT ANY LEAKS IN THE PIPING. TESTING SHALL BE
PERFORMED BELOW GRADE (INSIDE THE TRENCH). THE TEST PRESSURE FOR LFG
LATERALS, AND HEADERS SHALL BE 4 PSIG. THE TEST PRESSURE FOR AIR SUPPLY
LINE AND LIQUID CONVEYANCE PIPES SHALL BE 100 PSIG. PRESSURE DROP DURING
THE TEST SHALL NOT EXCEED ONE PERCENT OF THE TESTING GAUGE PRESSURE
OVER A PERIOD OF ONE HOUR. THIS PRESSURE DROP SHALL BE CORRECTED FOR
TEMPERATURE CHANGES BEFORE DETERMINING PASS OR FAILURE. THE CQA
PERSONNEL SHALL SIGN OFF ON THE TEST FORM TO INDICATE TEST COMPLIANCE.
IN CASE OF FAILURE OF TEST, THE LEAK SHALL BE LOCATED BY THE CONTRACTOR
AND REPAIRED. SUBSEQUENTLY, THE LINE SHALL BE RETESTED.
14. EXISTING AIRLINE AND LIQUID CONVEYANCE PIPING ARE 2" SDR 9 HDPE PIPE.
CONTRACTOR SHALL CONFIRM WITH CQA INSPECTOR THAT EACH PIPE IS
PROPERLY IDENTIFIED BEFORE CONNECTING TO THE PROPOSED GCCS.
LCR-5B
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
AS SHOWN
LIC
EN
SE
N
O.
S A
TE
LL
IT
E
B
LV
D , B
LD
G
S U
IT
E
D U
LU
TH
, G A
P
H . 6
-9
FA
X
9-
APRIL 2026
DK
DKZT
DK
VS
S
.1
O
LD
D
IX
IE
H
W Y
M
U N
IC
IP
A L
S O
LI
D
W A
S
TE
L A
N D
FI
LL
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M
D A
LT
O
N
W H
IT
FI
E
LD
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y O
LD
D
IX
IE
H W
Y L
A N
D
FI
LL
O
LD
D
IX
IE
H W
Y S
E D
A
LT
O N
G
E O
R G
IA
VI
N
U
TA
S
HE
SH
AP
PA
N
AV
AR
ISSUED FOR BID
DATE:
NOT FOR CONSTRUCTION
4/6/2026
AR-1
LV-01
AV-1
CS-07
LV-01
AV-1
V-3 H P
SEE NOTE 12
1LFG EXTRACTION WELL
SEE DETAIL
4WELLHEAD
SEE DETAIL
3IN-WASTE CONDENSATE SUMP
SEE DETAIL
3 6
1 REMOTE WELLHEAD
SEE DETAIL
3 6
3 TIE-IN TO LEACHATE CLEANOUT
SEE DETAIL
6HEADER/LATERAL TRENCH
SEE DETAIL
4LIQUID CONVEYANCE ISOLATION VALVE
SEE DETAIL
3AIR LINE ISOLATION AND BLOWOFF VALVES
SEE DETAIL
2LIQUID CONVEYANCE AIR RELEASE VALVE
SEE DETAIL
2HEADER ISOLATION VALVE
SEE DETAIL
ARV-1
5BURIED BLIND FLANGE FOR FUTURE EXPANSION
SEE DETAIL
SEE NOTE 14
TIE-IN LOCATION
N:1,693,769.69' E:2,064,105.36'
EW-60
TIE-IN LOCATION
N: 1,693,426.41' E: 2,064,431.92'
3 7
1 HORIZONTAL COLLECTOR
SEE DETAIL
1HORIZONTAL COLLECTOR ACROSS TOP DECK
SEE DETAIL
2HORIZONTAL COLLECTOR TO WELL CASING TIE-IN
SEE DETAIL
EW-71
EW-72
CS-07
EW-69
EW-61
EW-63
EW-64
EW-65
EW-66
EW-60 EW-62
EW-67
EW-68
CS-08
EW-70
B A
S E
G R
A D
E S
01 -SITE PLAN_ODLF GCCS
N 0 15075
1" = 150'
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
AS SHOWN
LIC
EN
SE
N
O.
S A
TE
LL
IT
E
B
LV
D , B
LD
G
S U
IT
E
D U
LU
TH
, G A
P
H . 6
-9
FA
X
9-
APRIL 2026
DK
DKZT
DK
VS
S
.1
O
LD
D
IX
IE
H
W Y
M
U N
IC
IP
A L
S O
LI
D
W A
S
TE
L A
N D
FI
LL
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M
D A
LT
O
N
W H
IT
FI
E
LD
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y O
LD
D
IX
IE
H W
Y L
A N
D
FI
LL
O
LD
D
IX
IE
H W
Y S
E D
A
LT
O N
G
E O
R G
IA
VI
N
U
TA
S
HE
SH
AP
PA
N
AV
AR
ISSUED FOR BID
DATE:
NOT FOR CONSTRUCTION
4/6/2026
LEGEND
PROPOSED LFG EXTRACTION WELL
PROPOSED CONDENSATE SUMP WITH PUMP
MAJOR AND MINOR CONTOURS
APPROXIMATE CELL BOUNDARY
PROPERTY BOUNDARY
PROPERTY BUFFER BOUNDARY
EW-60
NOTES:
1. THE BASE GRADE CONTOURS WERE PREPARED USING A COMBINATION OF
DRAWINGS BY OTHERS WHICH INCLUDE:
1.1. A TOP OF LINER PERMIT DRAWING PREPARED BY ATLANTIC COAST
CONSULTING, INC. DATED 05/06/2020.
CS-07
1'-0"
1' -0
5'-0"
5' -0
'-6
2'-6"
6"
NOT TO SCALE
NOTES:
1. WELL BORE REINFORCEMENT GRATES SHALL BE INSTALLED 6" TO 24" BELOW GRADE,
ABOVE THE TOP 2 FOOT BENTONITE PLUG.
WELL BORE REINFORCEMENT GRATE DETAIL
5 5
3/8" REBAR
SPACED 6"X6"
90°
1/2"
NOTES:
1. PERFORATIONS SPACED 90° APART HORIZONTALLY.
2. PERFORATIONS SPACED 4" APART VERTICALLY.
3. 90° AND 270° ROWS STAGGERED 2" BELOW 0° AND 180° ROWS.
PERFORATED HDPE PIPE DETAIL
NOT TO SCALE
5,7,8,9
4" 2"
4"
6"/8" HDPE SDR 11 PIPE
1/2" HOLES,
2 PER ROW,
ALTERNATE ROWS BY 45°
1' -0
SO
LI
D
PI
PE
L
EN
GT
H
VA
RI
ES
(S
EE
W
EL
L
SC
HE
DU
LE
PE
RF
O
RA
TE
D
PI
PE
L
EN
GT
H
VA
RI
ES
(S
EE
W
EL
L
SC
HE
DU
LE
NOTES:
1. CONTRACTOR SHALL SURVEY THE PROPOSED WELL LOCATIONS AND PROVIDE THE EXISTING GROUND SURFACE ELEVATION
AT EACH LOCATION TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF WELL DRILLING.
2. ENGINEER SHALL ADJUST WELL SCHEDULE AS NECESSARY BASED ON THE PRE-CONSTRUCTION SURVEY.
3. ALL SIGNATURES ARE REQUIRED ON THE FINAL WELL SCHEDULE PRIOR TO COMMENCEMENT OF DRILLING.
4. WELL BORE REINFORCEMENT GRATE SHALL BE 100% WELDED AND CONFIGURED WITH 3/8" REBAR WITH 6"X6" SPACING.
GRATE SHALL HAVE A 12"X12" SQUARE CENTER SPACED CUTOUT FOR WELL CASING. WELL BORE GRATE PURCHASED FROM
REPUBLIC'S NATIONAL MATERIAL SUPPLIER ONLY.
5. WELL BORE REINFORCEMENT GRATE SHALL BE INSTALLED ON GRADE AROUND WELL IMMEDIATELY AFTER COMPLETING
WELL. DURING INSTALLATION OF LATERAL RISER, GRATE SHALL BE BURIED.
6. CONTRACTOR SHALL PERFORM A LIQUID LEVEL MEASUREMENT (TOP OF THE CASING TO BOTTOM OF THE CASING AND LIQUID LEVEL) WITHIN THE FIRST 24 HOURS OF WELL COMPLETION AND PROVIDE THE DATA TO THE ENGINEER.
' M
IN
36" BOREHOLE MIN.
E W
-6
3' -0
1' -0
3'
-0
2' -0
2'
-0
1' -0
2'
-0
WELL BORE REINFORCEMENT
GRATE (SEE NOTE 2)
SEE DETAIL
8" PERFORATED HDPE PIPE
SEE DETAIL
5 5
5 5
LFG EXTRACTION WELL DETAIL
NOT TO SCALE 3 5
8" SCH 40 PVC CAP SECURED WITH 3
LAG SCREWS
REFLECTIVE TAPE
MARK EACH WELL RISER WITH
IDENTIFICATION NUMBER WITH
YELLOW PAINT AND STENCILS OR
ADHESIVE LABEL
MOUND SOIL AROUND RISER
EXISTING GRADE
24" THICK HYDRATED BENTONITE PLUG
GEOCOMPOSITE "DONUT" OVER STONE
BACKFILL
1"-3" WASHED
NON-CALCAREOUS
STONE BACKFILL,
AASHTO #4 OR
APPROVED EQUAL
8" SCH 40 PVC CAP
TOP OF BOTTOM
LINER SYSTEM
CLEAN SOIL BACKFILL (TYP.)
8" HDPE SDR 11 PIPE
DRAFT WELL SCHEDULE
D E
TA
IL
S
02-ODLF GCCS DETAILS
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
AS SHOWN
LIC
EN
SE
N
O.
S A
TE
LL
IT
E
B
LV
D , B
LD
G
S U
IT
E
D U
LU
TH
, G A
P
H . 6
-9
FA
X
9-
APRIL 2026
DK
DKZT
DK
VS
S
.1
O
LD
D
IX
IE
H
W Y
M
U N
IC
IP
A L
S O
LI
D
W A
S
TE
L A
N D
FI
LL
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M
D A
LT
O
N
W H
IT
FI
E
LD
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y O
LD
D
IX
IE
H W
Y L
A N
D
FI
LL
O
LD
D
IX
IE
H W
Y S
E D
A
LT
O N
G
E O
R G
IA
VI
N
U
TA
S
HE
SH
AP
PA
N
AV
AR
ISSUED FOR BID
DATE:
NOT FOR CONSTRUCTION
4/6/2026
6" M
IN
4"
MIN.
4"
MIN.
4"
MIN.
1' -0
2' -0
NOTES:
1. WARNING TAPE SHALL BE MIN. 3" WIDE AND IMPRINTED WITH ``GAS LINE BURIED BELOW''.
2. ALL HEADER AND LATERAL SHALL BE INSTALLED AT MIN. 5% SLOPE, UNLESS APPROVED BY THE
ENGINEER.
3. THE NUMBER AND TYPES OF PIPES INSTALLED IN THE TRENCH VARIED. SEE SITE PLAN.
4"
MIN.
5% MIN. SLOPE TO
HEADER
1' -0
EW-60
NOTES:
1. CONTRACTOR SHALL SUPPLY FULL ORIFICE PLATE PACKAGE FOR WELLHEAD AND DOCUMENT SIZE INSTALLED WITH
ENVIRONMENTAL MANAGER AND TECHNICIAN.
2. WHILE INSTALLING LATERAL RISER, CONTRACTOR SHALL EXCAVATE AROUND WELL CASING AND LOWER WELL BORE
REINFORCEMENT GRATE.
3. CQA INSPECTOR SHALL DOCUMENT FINAL DEPTH OF WELL BORE REINFORCEMENT GRATE
6" M
IN
3' -0
2' -0
2' -0
2'-0"±
4' -0
TO LEACHATE CLEANOUT OR
HORIZONTAL COLLECTOR
NOTES:
1. MOLDED TEES SHALL BE USED FOR HEADER TIE-INS 12"Ø AND SMALLER
2. HDPE BRANCH SADDLE REDUCING TEES SHALL BE USED FOR TIE-INS TO HEADER PIPING 14" AND LARGER
3. CONTRACTOR SHALL INSTALL VERTICAL STUB-UPS FOR AIR AND LIQUID CONVEYANCE AT EACH
LOCATION FOR REMOTE WELLHEAD. EACH STUB UP SHALL BE INSTALLED WITH A TEE LEADING
DOWNHILL, AS INDICATED ON THE DETAIL ABOVE.
REMOTE WELLHEAD DETAIL
NOT TO SCALE
H C
-1
WELLHEAD DETAIL
NOT TO SCALE
NOT TO SCALE
HEADER/LATERAL TRENCH DETAIL
3 6
3 6
3 6
WARNING TAPE
HDPE SDR 9 AIR
SUPPLY LINE
(2" MIN)
CLEAN SOIL BACKFILL FREE OF
EXCAVATED REFUSE
EXISTING GRADE
HDPE SDR 17
LFG HEADER/LATERAL
(DIA. VARIES)
HDPE SDR 11 LIQUID
CONVEYANCE LINE
(4" MIN)
2"Ø KANAFLEX FLEXIBLE HOSE TO BE
INSTALLED WITH SLACK FOR FUTURE
SETTLEMENT
QED QUICK CHANGE ORIFICE PLATE
WELLHEAD
POWERLOCK CLAMP
(TYP. OF 2)
8"X4" AND 4"X2"
CONCENTRIC REDUCER
REFLECTIVE TAPE
8" HDPE SDR 17 RISER PIPE
MARK EACH WELL RISER WITH
IDENTIFICATION NUMBER WITH
YELLOW PAINT AND STENCILS OR
ADHESIVE LABEL
EXISTING GRADE
WARNING
TAPE
8" HDPE SDR 17 90°
MOLDED ELBOW
6"x2" FERNCO REDUCING
COUPLING
MARK EACH WELL RISER WITH
IDENTIFICATION NUMBERS WITH
YELLOW OR WHITE PAINT AND 2"
TALL STENCILS, OR ADHESIVE
LABEL
6" HDPE SDR 17
LATERAL RISER
6" HDPE SDR 17
LATERAL
6" HDPE SDR 11 ELBOW.
ANGLE DETERMINED BY FIELD
CONDITIONS.
2" KANAFLEX OR QED
SOLARGUARD FLEXIBLE
HOSE WITH POWERLOCK
CLAMPS
6"X4" AND 4"X2"
CONCENTRIC
REDUCERS
INSTALL REFLECTIVE TAPE ON
EACH RISER (TYP)
6" HDPE SDR
17 PIPE
HDPE SDR 11 BRANCH
SADDLE REDUCING
TEE (DIA. VARIES)
HDPE SDR 17
HEADER/LATERAL
HDPE SDR 9 AIR
SUPPLY LINE
(2" MIN)
HDPE SDR 11 LIQUID CONVEYANCE LINE
(4" MIN.)
CLEAN SOIL
BACKFILL
QED QUICK CHANGE ORIFICE PLATE
WELLHEAD.
5'X5' WELL BORE
REINFORCEMENT
GRATE (SEE NOTE 2)
POWERLOCK CLAMP
(TYP. OF 2)
2' -0
4'
-0
6"
NOT TO SCALE
LIQUID CONVEYANCE AIR RELEASE VALVE DETAIL
4" HDPE SDR 11 LIQUID
CONVEYANCE LINE
4" HDPE TEE
4"x4" TREATED TIMBER SUPPORT
POST AS NEEDED
GALVANIZED WORM GEAR CLAMP
(TYP.) SECURED AROUND PIPE AND
SUPPORT POST
HDPE RISER
EXISTING GROUND
4"X2" REDUCER
2" SS TRANSITION
2" SS BALL VALVE
AIR RELEASE VALVE ARI
MODEL #D-025
3 6
3' -0
"3' -0
3' -0
EW-60
EW-61
EW-62
EW-63
EW-64
EW-65
EW-66
EW-67
EW-68
EW-69
EW-70
EW-71
EW-72
WELL ID
WELLHEAD
INSTALLATION
SCHEDULE
3 6
HDPE SDR 17
HEADER
NOTES:
1. NUTS, BOLTS, AND WASHERS SHALL BE HOT-DIP GALVANIZED. STAINLESS STEEL
BOLTS AND NUTS WILL NOT BE PERMITTED.
2. THOROUGHLY COAT ENTIRE SURFACE OF BOLTS, WASHERS, NUTS AND BACKUP
RINGS WITH POLYCOAT RUBBERIZED PRIMER, OR EQUAL, AFTER TIGHTENING
NUTS. WRAP FLANGE IN PLASTIC WRAP PRIOR TO BACKFILLING.
3. INSTALL FLANGE WITH THE PROPER SLOPE TO PROVIDE FOR FUTURE CONDENSATE
DRAINAGE.
HDPE SDR 11 FLANGE ADAPTER WITH
CARBON STEEL OR DUCTILE IRON
BACKUP RING
EXISTING GRADE
CLEAN SOIL BACKFILL
HDPE BLIND FLANGE WITH NEOPRENE
FULL FACE GASKET
FUTURE EXPANSION DETAIL
BURIED BLIND FLANGE FOR
HC-12
HC-13
HC-14
HC-15
HC-16
HC-17
HC-18
HC-19
LCR-2A
LCR-3
LCR-4
LCR-5A
LCR-5B
WELL ID
REMOTE
WELLHEAD
INSTALLATION
SCHEDULE
AIR RELEASE VALVE
INSTALLATION
ARV-1
ARV-2
NOT TO SCALE
TIE-IN TO LEACHATE CLEANOUT DETAIL
3 6
EXISTING
GROUND SURFACE
6" HDPE SDR 17 LFG
LATERAL
CLEAN SOIL BACKFILL
FREE OF EXCAVATED
REFUSE
NOTES:
1. THE CONFIGURATION OF THE LEACHATE
COLLECTION AND REMOVAL SYSTEM (LCRS)
RISERS SHOWN HERE IS FOR INFORMATIONAL
PURPOSES ONLY. CONTRACTOR SHALL
FIELD-VERIFY THE ACTUAL CONDITIONS PRIOR
TO CONSTRUCTION THE DEPICTION SHOWN ON
THIS DETAIL IS INTENDED TO SHOW THE
GENERAL INTENT OF THE TIE-IN FOR LFG
COLLECTION LINES TO THE LEACHATE
COLLECTION SYSTEM.
EXISTING
GEOMEMBRANE
LINER SYSTEM
NOT TO BE
DISTURBED
6"x6" HDPE SDR 17
FUSION WELDED TEE
MINIMUM 6" OF NATIVE
SOIL BEDDING
LEACHATE
CLEANOUT
TIE-IN
SCHEDULE
LCO-2A
LC0-3
LCO-4
LCO-5A
LCO-5B
CLEANOUT ID
4" HDPE SDR 11
FORCEMAIN
12" CMP AROUND 6" HDPE CLEANOUT
RISER, APPROX. 14' LONG
24" HDPE PIPE SDR 17
6" HDPE PIPE SDR 17
4" X 24" HDPE BRANCH
SADDLE TEE
D E
TA
IL
S
02-ODLF GCCS CONCEPTUAL
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
AS SHOWN
LIC
EN
SE
N
O.
S A
TE
LL
IT
E
B
LV
D , B
LD
G
S U
IT
E
D U
LU
TH
, G A
P
H . 6
-9
FA
X
9-
APRIL 2026
DK
DKZT
DK
VS
S
.1
O
LD
D
IX
IE
H
W Y
M
U N
IC
IP
A L
S O
LI
D
W A
S
TE
L A
N D
FI
LL
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M
D A
LT
O
N
W H
IT
FI
E
LD
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y O
LD
D
IX
IE
H W
Y L
A N
D
FI
LL
O
LD
D
IX
IE
H W
Y S
E D
A
LT
O N
G
E O
R G
IA
VI
N
U
TA
S
HE
SH
AP
PA
N
AV
AR
ISSUED FOR BID
DATE:
4' -0
2'-6" MAX.
TO WELLFIELD
FROM COMPRESSOR
NOTES:
1. ALL AIR SUPPLY PIPING SHALL BE 2" HDPE SDR 9 (MIN.).
2. 1" VALVES SHALL BE USED TO BLOW OFF LIQUIDS THAT ACCUMULATE IN THE AIR LINE AND FOR PRESSURIZING PIPE
SEGMENTS FOR TROUBLESHOOTING PURPOSES.
3. PVC FITTINGS AND VALVES SHALL NOT BE USED IN COMPRESSED AIR APPLICATIONS UNDER ANY CIRCUMSTANCES.
REFUSE
AV
2' -0
M
IN
6"
NOT TO SCALE
LIQUID CONVEYANCE ISOLATION VALVE DETAIL
AIR LINE ISOLATION AND BLOWOFF VALVES DETAIL
NOT TO SCALE
NOTES:
1. CONTRACTOR SHALL PROVIDE A KEY SO THE VALVE IS ACCESSIBLE TO OPERATE FROM THE
GROUND.
VA
RI
ES
(6
" M
IN
VA
RI
ES
(2
' M
IN
3 7
3 7
CLEAN SOIL BACKFILL
2" (MIN) HDPE SDR 9 PIPE (TYP.)
LABEL RISER WITH 2" YELLOW
STENCILED LETTERS
GALVANIZED WORM GEAR CLAMP
(TYP.) SECURED AROUND PIPE AND
SUPPORT POST
1" FEMALE x FEMALE THREADED 316
STAINLESS STEEL BALL VALVE WITH LEVER
HANDLE AND RATE FOR 200 PSI MAX.
PRESSURE (TYP.)
2"x1" HDPE X S.S. TRANSITION FITTING
4"x4" TREATED TIMBER SUPPORT
POST (TYP.)
2" STAINLESS STEEL BALL VALVE WITH
FLANGED ENDS RATED FOR 200 PSI MIN.
2" FLANGE CONNECTION TO ASSIST IN
REMOVAL OF BALL VALVE FOR
MAINTENANCE (TYP.)
2" HDPE SDR 9 90°
MOLDED ELBOW
(TYP.)LIMITS OF
EXCAVATION
EXISTING
GRADE
4" HDPE SDR 11
LIQUID
CONVEYANCE LINE 4" HDPE BALL VALVE
(SEE NOTE 3)
CLEAN SOIL
BACKFILL
24" DIA. OR SQUARE
X 30" MIN DEEP
VALVE VAULT WITH
CAP OR PLUG (SEE
NOTE 1)
GROUND SURFACE
4" HDPE SDR 11
LIQUID
CONVEYANCE LINE
AIR LINE ISOLATION
VALVE INSTALLATION
AV-1
AV-2
LIQUID CONVEYANCE
ISOLATION VALVE
INSTALLATION
LV-01
LV-02
LV-03
LV-04
SECTION A-A
10'
(MIN)
2' MIN
HC- 17
TO WELLHEAD
HORIZONTAL COLLECTOR DETAIL
NOT TO SCALE 3 7
A
A
2 NOTES:
1. SLOPE COLLECTORS SHALL BE OPERATED
WHEN THE TOP OF THE WASTE IS AT A
MINIMUM OF 15-FT ABOVE THE EDGE OF THE
SOLID TO PERFORATED PIPE TRANSITION.
2. ABOVE GROUND LATERAL FOR SLOPE
COLLECTORS SHALL BE SECURED TO THE
GROUND SURFACE WITH STAKES, MOUNDS OF
SOIL, OR ANY OTHER MEANS.
3. ROCK PACK SHALL BE MINIMUM 7' X 7' AND 5'
DEEP
5' (M
IN
6" HDPE TRANSITION
6" HDPE SDR 17 LATERAL
6" PVC/HDPE SLOPE
COLLECTOR
PERFORATED
CAP
NON-WOVEN
GEOTEXTILE
COMPOSITE LINER
SYSTEM
LEACHATE
COLLECTION LAYER
LIMIT OF EXCAVATION
MIXTURE OF SOIL AND
WASTE AS BACKFILL
FILL STAKE FOR THE NEXT
WASTE LIFT (TO BE STAKED)
STAKE FOR PERFORATED TO
SOLID PIPE TRANSITION
REFUSE
2' M
IN
. SO
IL LAYER
MIXTURE OF SOIL AND
WASTE AS BACKFILL
NOTES:
1. THE HORIZONTAL COLLECTOR ORIENTATION IS BASED ON CURRENT TOPOGRAPHY AND MAY CHANGE AT THE TIME OF CONSTRUCTION. THE COLLECTORS SHALL BE INSTALLED AT A 3% SLOPE WITH ANY NEEDED
ADJUSTMENTS WITH ENGINEER/RESPONSIBLE OFFICIAL'S APPROVAL.
2. MINIMUM DEPTH OF TRENCH SHALL BE 3'.
3'-0"
6"PERFORATED PIPE
SEE DETAIL 1'
-0
(M
IN
VA
RI
ES
GEOCOMPOSITE
EXISTING SIDE
SLOPEINTERMEDIATE
COVER SOIL
#57 NON-CALCAREOUS ROCK
3' -0
(M
IN
2' -0
(M
IN
GEOTEXTILE
BACKFILL TRENCH WITH
#57 NON-CALCAREOUS
STONE
TEMPORARY LAYER OF
SOIL TO BE STRIPPED
PRIOR TO WASTE FILL
GEOTEXTILE
GEOCOMPOSITE
6" PERFORATED PIPE
SEE DETAIL
NOTES:
1. NUTS, BOLTS, AND WASHERS SHALL BE HOT-DIP GALVANIZED. STAINLESS STEEL BOLTS AND NUTS ARE NOT PERMITTED.
2. THOROUGHLY COAT ENTIRE SURFACE OF BOLTS, WASHERS, NUTS AND BACKUP RINGS WITH POLYCOAT RUBBERIZED PRIMER, OR EQUAL, AFTER TIGHTENING BOLTS. COATING SHALL HAVE NO GAPS IN ITS APPLICATION.
3. WRAP FLANGE IN PLASTIC WRAP PRIOR TO BACKFILLING.
6" M
IN
2'
-0
M
IN
4'
-0
HEADER ISOLATION VALVE DETAIL
NOT TO SCALE
EXISTING
GRADE
SWAGELOK STAINLESS STEEL FLEXIBLE METAL HOSE,
PART NO. SS-FM4PF4PM4 (LENGTH VARIED DEPENDING
ON PIPE BURIAL DEPTH)
CARBON STEEL OUTER HOUSING WITH
EPOXY COATING
BUTTERFLY VALVE WITH 2-PIECE STEEL
EXTENSION AND OPERATING WHEEL
(WITH REMOVABLE VALVE WHEEL)
MONITORING PORT TO MATCH PORTS ON WELLHEADS.
THREAD INTO SWAGELOK FEMALE NPT CONNECTOR AT END
OF HOSE (TYP).
STAINLESS STEEL CLAMP (TYP.)
BUTTERFLY VALVE (DIA. VARIES)
TAP AND THREAD 1/4"
STAINLESS STEEL MALE NPT
END OF HOSE INTO HEADER.
WRAPPED THREADS WITH
TEFLON TAPE. (TYP)
WARNING TAPE
HDPE SDR 17 HEADER (DIA. VARIES)
HDPE SDR 11 FLANGE ADAPTER WITH
DUCTILE IRON BACK-UP RING AND RUBBER
GASKET (TYP OF 2)VALVE SPACERS INSTALLED
CLEAN SOIL
BACKFILL
MATERIAL
3 7
V-2 V-3 V-4
VALVE ID
HEADER
DIAMETER
(INCHES)
HEADER ISOLATION
VALVES
HORIZONTAL
COLLECTORS
HC-17
HC-18
HC-19
ROCK PACK
7' (MIN.)
D E
TA
IL
S
02-ODLF GCCS CONCEPTUAL
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
AS SHOWN
LIC
EN
SE
N
O.
S A
TE
LL
IT
E
B
LV
D , B
LD
G
S U
IT
E
D U
LU
TH
, G A
P
H . 6
-9
FA
X
9-
APRIL 2026
DK
DKZT
DK
VS
S
.1
O
LD
D
IX
IE
H
W Y
M
U N
IC
IP
A L
S O
LI
D
W A
S
TE
L A
N D
FI
LL
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M
D A
LT
O
N
W H
IT
FI
E
LD
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y O
LD
D
IX
IE
H W
Y L
A N
D
FI
LL
O
LD
D
IX
IE
H W
Y S
E D
A
LT
O N
G
E O
R G
IA
VI
N
U
TA
S
HE
SH
AP
PA
N
AV
AR
ISSUED FOR BID
DATE:
PUMP DISCHARGE MANIFOLD DETAIL
NOT TO SCALE
PUMPONE
ENVIRONMENTAL
PART
#2000068
(WARM CLIMATE) DETAIL
NOT TO SCALE
AIR SUPPLY LINE VALVE
MONITORING PORT DETAIL (TYP.)
NOT TO SCALE
FLANGE COMPONENTS DETAIL
NOT TO SCALE
8 8
8 8
8 8
1" CAM LOCK MALE
CONNECTORS
(TYP. OF 2)
1" IN-LINE CHECK VALVE
4" SS BALL VALVE WITH
GLYCERIN FILLED
PRESSURE GAUGE WITH
4" NPT CONNECTION
(0-120 PSI RANGE)
1" SS TEE WITH 1" SS BUSHING
(TYP. OF 3)
1" SS BALL VALVE
(TYP. 3)
1"X1
4" SS REDUCING BUSHING
4" SS NIPPLE
1" SS BALL VALVE FOR
PRESSURE RELIEF
(TYP. IN CLOSED POSITION)
2" HDPE X SS
TRANSITION
FITTING
HDPE SDR 11 REDUCER
4" HDPE SDR 11 PIPE
1" STRAP CONNECTION TO UNISTRUT
METAL UNI-STRUT
SUPPORT POST (TYP.)
1" SS BALL VALVE FOR LIQUID
CONVEYANCE LINE CONNECTION
1" SS BUSHING
1" SS TEE
1" x 2" SS REDUCING FITTING
1" SS THREADED NIPPLE LENGTH TO
PROVIDE CLEARANCE FOR VALVE
OPERATION
DISCHARGE END IN 1" FPT
8 8
NYLON DOUBLE-BARBED FITTING BY
McMASTER-CARR PRODUCT NUMBER
5228k31 OR EQUAL
SWAGELOK STAINLESS STEEL MALE
CONNECTOR BORED-THROUGH FITTING
1/2" NPT PRODUCT NUMBER SS-600-1-8
BT OR EQUAL
STRAIGHT POLYPROPYLENE TUBING (1/4"
INNER DIA., 3/8" OUTER DIA.) FIELD
MEASURED TO EXTEND INTO GAS
STREAM PATH. BOTTOM END OF TUBING
IS NOT CURLED UP. WEIGHTED END TO
STRAIGHTEN. LENGTH OF TUBING
APPROVED BY ENGINEER BASED ON THE
INSTALLED DEPTH OF HEADER
VINYL DUST CAP
PROVIDED BY
McMASTER-CARR
PRODUCT NUMBER
9531K31 OR EQUAL
HDPE FLANGED LID
DRILLED THROUGH
AND TAPPED
FLANGE FOR 1/2"
NPT FITTING
3/8" MPT x BRASS SKT QUICK
CONNECT FITTING
1/2" MPT x 3/8" FPT BRASS
BUSHING
1/2" BRASS BALL VALVE
1/2" x 2" LONG BRASS
NIPPLE
1" FPT x 1/2"
S.S. REDUCING COUPLING
1" HDPE x S.S. TRANSITION
FITTING
1" x 2" HDPE SDR 9 REDUCER
2" HDPE SDR 9 PIPE
1" S.S., 90° STREET ELBOW
WITH CAM-LOC FITTING
F-TYPE
1/2" NYLON TUBE PASS THRU
CONNECTOR AIR LINE FITTING
AIR FILTER
REGULATOR
3' x 3/8"
AIR LINE
1/2" PRESTO-LOC AIR CONNECTION
FITTING TO FLANGE
5' x 3/8" AIR
LINE
QUICK CONNECT FITTING TO AIR LINE
ASSEMBLY
1" S.S. DISCHARGE HOSE BARB (NOT
SHOWN)
5/8" NYLON TUBE PASS THRU
CONNECTOR EXHAUST FITTING
5/16" S.S. EYEBOLT
PUMPONE EASY
BOLTS
1" S.S. DISCHARGE HOSE
BARB (NOT SHOWN)
METAL UNI-STRUT SUPPORT POST
DEPTH TO BE AT LEAST 50% OF
THE HEIGHT ABOVE GROUND
IN WASTE CONDENSATE SUMP DETAIL
4'-0" MIN.
2'-0" 2'-0"
NOTES:
1. 6"Ø HDPE SDR 17 VACUUM BREAK PIPE EXTRUSION WELDED TO FLANGE LID. 1'-0" OF PIPE TO PROTRUDE THROUGH TOP OF FLANGE. EXTRUSION WELD PIPE TO BOTH SIDES OF BLIND FLANGE. CENTER OF PIPE LOCATED 2" OFF CENTER OF BLIND FLANGE.
2. THOROUGHLY COAT ENTIRE SURFACE OF BOLTS, WASHERS, NUTS AND BACKUP RINGS WITH POLYCOAT RUBBERIZED PRIMER, OR
EQUAL, AFTER TIGHTENING BOLTS. WRAP FLANGE IN PLASTIC WRAP PRIOR TO BACKFILLING.
3. CONTRACTOR SHALL VERIFY CONDENSATE SUMP CONFIGURATION IN FIELD. ADJUSTMENTS SHALL BE APPROVED BY ENGINEER
PRIOR TO INSTALLATION.
4. ENGINEER SHALL APPROVE DEPTH BASED ON GROUND SURFACE ELEVATION PRIOR TO INSTALLATION.
FLANGE COMPONENTS
SEE DETAIL
2" THICK HDPE BLIND FLANGE
HDPE FLANGE BOLTED TO
HDPE TRANSITION FLANGE
3' -0
HDPE SDR 11 LIQUID
CONVEYANCE LINE
(4" MIN)
HDPE SDR 17 PIPE (SIZE
VARIES)
HDPE SDR 9
MOLDED ELBOW
HDPE SDR 9 AIR SUPPLY
LINE (2" MIN)
6" HDPE SDR 17 VACUUM
BREAK PIPE
(4) HDPE GUSSETS FROM 1"
THICK HDPE SHEET TYP. EACH
OUTLET
1" HDPE FLAT STOCK GUSSETS
AROUND PIPE 4 PLACES
A
3' -0
2' -0
" M
IN
1' -0
HDPE SDR 11 MOLDED
ELBOW
6" HDPE SDR 17 VACUUM
BREAK PIPE WELDED TO
FLANGE LID.
TOP OF
PROTECTIVE
COVER
1" THICK HDPE FLAT STOCK WELDED TO
BOTTOM. PLATE TO EXTEND 18" MIN. FROM
EDGE OF SUMP
MARK SUMP RISER WITH IDENTIFICATION NUMBER WITH
YELLOW OR WHITE PAINT AND 2" TALL STENCILS, OR
ADHESIVE LABEL
1/4" I.D. AIR SUPPLY LINE
1" EQUALIZER LINE AND BALL VALVE
6" PERFORATED HDPE PIPE
SEE DETAIL
HDPE FLANGE
CONNECTION
(SEE NOTE 2)
PROPOSED 10" HDPE SDR 17 HEADER
3' -0
2' -0
" M
IN
2' -0
" M
IN
2' -0
" M
IN
PUMP DISCHARGE MANIFOLD
SEE DETAIL
AIR SUPPLY LINE VALVE
SEE DETAIL
3 8
C S
-0
5-
FE
ET
M
IN
MONITORING PORT
SEE DETAIL
PNEUMATIC PUMP PUMPONE
ENVIRONEMNTAL MODEL ep-4, SHORT
BODY, FIBERGLASS BOTTOM LOADING.
8 8
8 8
NOT TO SCALE
8 8
8 8
SLOPE
GAS FLOW
PROPOSED 10" HDPE SDR 17 LFG
HEADER TO BLOWER/FLARE STATION
TO FLARE
SLOPE
GAS FLOW
SUMP SCHEDULE
VARIABLE CS-7 CS-8
A (FT) 6 3
SUMP DIA. (IN) 24 36
D E
TA
IL
S
02-ODLF GCCS CONCEPTUAL
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
AS SHOWN
LIC
EN
SE
N
O.
S A
TE
LL
IT
E
B
LV
D , B
LD
G
S U
IT
E
D U
LU
TH
, G A
P
H . 6
-9
FA
X
9-
APRIL 2026
DK
DKZT
DK
VS
S
.1
O
LD
D
IX
IE
H
W Y
M
U N
IC
IP
A L
S O
LI
D
W A
S
TE
L A
N D
FI
LL
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M
D A
LT
O
N
W H
IT
FI
E
LD
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y O
LD
D
IX
IE
H W
Y L
A N
D
FI
LL
O
LD
D
IX
IE
H W
Y S
E D
A
LT
O N
G
E O
R G
IA
VI
N
U
TA
S
HE
SH
AP
PA
N
AV
AR
ISSUED FOR BID
DATE:
EXISTING WELL CASING
EXISTING HDPE LATERAL RISER PIPE
CLEAN SOIL BACKFILL
LIMITS OF
EXCAVATION2'
-0
M
IN
1' -0
EXISTING WELLHEAD
EW-67
EW-68
EW-67
EW-66
EW-65
EW-64
EW-63
WELL ID
WELL CASING
DIAMETER
(INCHES)
EXTRACTION WELLS TO
TIE-IN TO FOR PHASE 2
6-INCH HDPE SDR 17 VACUUM LINE TO
TIE INTO PROPOSED
HORIZONTAL COLLECTOR
HDPE SDR 11 TEE
HORIZONTAL COLLECTOR TO WELL CASING TIE-IN DETAIL
NOT TO SCALE 3 9
H C
-1
6" HDPE SDR 17
LATERAL RISER
6" HDPE SDR 11 ELBOW.
ANGLE DETERMINED BY FIELD
CONDITIONS.
CLEAN SOIL
BACKFILL
TRANSITION TO
PERFORATED PIPE TRANSITION
TO SOLID PIPE
MIN. 3% SLOPE
TIE-IN TO WELL CASING
AS SHOWN IN DETAIL 2
ON SHEET 9
6" HDPE SDR 17
VACUUM RISER
NOT TO SCALE
HORIZONTAL COLLECTOR ACROSS TOP DECK DETAIL
3 9
MIXTURE OF SOIL AND
WASTE AS BACKFILL
3'-0"
6"PERFORATED PIPE
SEE DETAIL 1'
-0
(M
IN
VA
RI
ES
GEOCOMPOSITE
EXISTING SIDE
SLOPEINTERMEDIATE
COVER SOIL
#57 NON-CALCAREOUS ROCK
3' -0
(M
IN
2' -0
(M
IN
GEOTEXTILE
A
A
HORIZONTAL
COLLECTORS
HC-12
HC-13
HC-14
HC-15
HC-16
10'-0"
(MIN)
HYDRATED
BENTONITE
PLUG
HYDRATED
BENTONITE
PLUG
10'-0"
(MIN)
2' -0
(M
IN
2' -0
(M
IN
NOTES:
1. THE HORIZONTAL COLLECTOR ORIENTATION IS BASED ON CURRENT TOPOGRAPHY AND MAY CHANGE AT THE TIME OF CONSTRUCTION. THE COLLECTORS SHALL BE INSTALLED AT A 3% SLOPE WITH ANY NEEDED
ADJUSTMENTS WITH ENGINEER/RESPONSIBLE OFFICIAL'S APPROVAL.
2. MINIMUM DEPTH OF TRENCH SHALL BE 3'.
SECTION A-A
2'-0"
(MIN) 2'-0"
(MIN)
D E
TA
IL
S
02-ODLF GCCS CONCEPTUAL
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
AS SHOWN
LIC
EN
SE
N
O.
S A
TE
LL
IT
E
B
LV
D , B
LD
G
S U
IT
E
D U
LU
TH
, G A
P
H . 6
-9
FA
X
9-
APRIL 2026
DK
DKZT
DK
VS
S
.1
O
LD
D
IX
IE
H
W Y
M
U N
IC
IP
A L
S O
LI
D
W A
S
TE
L A
N D
FI
LL
G A
S C
O
LL
E C
TI
O
N A
N D
C O
N
TR
O L
S Y
S
TE
M
D A
LT
O
N
W H
IT
FI
E
LD
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y O
LD
D
IX
IE
H W
Y L
A N
D
FI
LL
O
LD
D
IX
IE
H W
Y S
E D
A
LT
O N
G
E O
R G
IA
VI
N
U
TA
S
HE
SH
AP
PA
N
AV
AR
ISSUED FOR BID
DATE:
| Sheets and Views |
| COVER SHEET |
| SHEET 2 - EXISTING CONDITIONS.pdf |
| Sheets and Views |
| 2_EXISTING SITE PLAN |
| SHEET 3 - PROPOSED SITE PLAN.pdf |
| Sheets and Views |
| 3_PROPOSED SITE PLAN |
| SHEET 4 - BASE GRADES.pdf |
| Sheets and Views |
| 4_BASE GRADES |
| SHEET 5 - DETAILS 1.pdf |
| Sheets and Views |
| 5_DETAILS 1 |
| SHEET 6 - DETAILS 2.pdf |
| Sheets and Views |
| 6_DETAILS 2 |
| SHEET 7 - DETAILS 3.pdf |
| Sheets and Views |
| 7_DETAILS 3 |
| SHEET 8 - DETAILS 4.pdf |
| Sheets and Views |
| 8_DETAILS 4 |
| SHEET 9 - DETAILS 5.pdf |
| Sheets and Views |
| 9_DETAILS 5 |
| 2026-04-07T19:34:04-0400 | |
| Vinuta Sheshappanavar |
| 2026-04-07T19:34:33-0400 | |
| Vinuta Sheshappanavar |
| 2026-04-07T19:34:59-0400 | |
| Vinuta Sheshappanavar |
| 2026-04-07T19:35:42-0400 | |
| Vinuta Sheshappanavar |
| 2026-04-07T19:36:14-0400 | |
| Vinuta Sheshappanavar |
| 2026-04-07T19:36:46-0400 | |
| Vinuta Sheshappanavar |
| 2026-04-07T19:37:26-0400 | |
| Vinuta Sheshappanavar |
| 2026-04-07T19:38:11-0400 | |
| Vinuta Sheshappanavar |
| 2026-04-07T19:39:02-0400 | |
| Vinuta Sheshappanavar |
File details come from the government source that posted it. Updated .