OCS Drahner Cable RFP.pdf

PDF 2 MB Posted

Attached to
Oxford Schools Drahner Rd. building structured cabling
Solicitation number
RFP - OXFO - 240000000577
Issued by
Oakland County, Onekama Village, Michigan

About this file

This document is a Request for Proposal (RFP) from Oxford Community Schools for a new structured cabling system at the Drahner Facility located at 775 W. Drahner Rd., Oxford, MI 48371. The RFP covers the provision of equipment, materials, and labor to install a complete structured cabling system, including Category 6A UTP cabling, optical fiber backbone cabling, communications room fittings, and testing. The project is located in Oxford, MI and covers the Drahner Facility. Bids are due by 2:00 PM on December 19, 2023, and the contract is expected to be awarded on January 9, 2024. The project must be completed by the end of March.

The RFP provides detailed specifications for the structured cabling system, including product and installation requirements. Pricing is required to be submitted on a Bill of Material basis with installed unit pricing. Bidders must provide a base bid as well as the option to propose voluntary alternates. The successful contractor will be required to provide performance and payment bonds, insurance, and comply with all applicable codes and regulations. No specific funding source is identified, but the owner, Oxford Community Schools, will be responsible for the project.

View the file

Other files

File Type Posted
OCS DRAHNER SCS FLOOR PLANS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12/5/2023

Request for Proposal Structured Cabling Systems

Drahner Facility 775 W. Drahner Rd., Oxford, MI 48371

For

Oxford Community Schools

Prepared by

Convergent Technology Partners, LLC 6197 Miller Rd, Swartz Creek, MI 48473

810.720.3820 www.ctpartners.net http://www.ctpartners.net/

OXFORD COMMUNITY SCHOOLS

Drahner Facility Structured Cabling System

SECTION 00 01 00 – TABLE OF CONTENTS

SECTION TITLE

DIVISION 00 - BIDDING REQUIREMENTS, BID FORMS

SECTION 00 01 00 – TABLE OF CONTENTS

SECTION 00 30 00 – INSTRUCTIONS TO BIDDERS

SECTION 00 30 10 – SCHEDULE OF EVENTS

SECTION 00 40 10 – BID PROPOSAL FORM

SUPPLEMENTAL A – COST ANALYSIS WORKSHEET

SUPPLEMENTAL B – UNIT PRICING

SUPPLEMENTAL C – MANDATORY ALTERNATES

SUPPLEMENTAL D – VOLUNTARY ALTERNATES

SUPPLEMENTAL E – FAMILIAL DISCLOSURE AFFIDAVIT

SUPPLEMENTAL F – IRAN ECONOMIC SANCTIONS ACT AFFIDAVIT

DIVISION 27 – TECHNOLOGY SPECIFICATIONS

SECTION 27 05 00 - COMMON WORK RESULTS FOR TECHNOLOGY

SECTION 27 05 26 – GROUNDING AND BONDING FOR TECHNOLOGY

SECTION 27 10 10 – CATEGORY 6A STRUCTURED CABLING SYSTEMS

SECTION 27 11 00 – TECHNOLOGY ROOM FITTINGS

SECTION 27 15 00 – OPTICAL FIBER BACKBONE

FLOORPLANS

T-100 DRAHNER BASEMENT CABLING

T-101A UNIT A DRAHNER FIRST FLOOR CABLING

T-101B UNIT B DRAHNER FIRST FLOOR CABLING

T-102A UNIT A DRAHNER SECOND FLOOR CABLING

T-102B UNIT B DRAHNER SECOND FLOOR CABLING

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 1 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

SECTION 00 30 00 – BIDDING REQUIREMENTS – INSTRUCTION TO BIDDERS

PART 1 - GENERAL

1.1 INTRODUCTION

A. Oxford Community Schools is seeking bids and proposals for a new structured cabling system at the Drahner Facility, located at 775 W. Drahner Rd., Oxford, MI 48371.

B. Bid documents may be obtained on the State of Michigan’s web site at www.Michigan.gov/VSSlogin . Due per the Schedule of Events, the Owner will receive bid proposals for the project. The Owner will not consider or accept a bid proposal received after the due date for bid proposal submission. The Owner is not responsible for any postal or deliv-ery delays. No email, facsimile or other electronic bid proposals will be accepted. All bid pro-posals received after the due date will be returned by making them available to the respective Bidder, unopened, for said Bidder to pick-up at their sole cost and expense. Bid proposals shall be submitted to:

Saso Vasovski Director of Cyber Security and Operational Technology

Oxford Community Schools 10 N. Washington, Oxford, MI 48731

1.2 PROPOSALS/QUOTES

A. Two (2) “hard” copies and two (2) electronic copies on a USB “flash” drive of each complete proposal are to be submitted in sealed packaging, clearly marked: “DRAHNER STRUCTURED CABLING SYSEM SEALED BID” for Oxford Community Schools and shall be identified with the Bidder’s name and address and the date and time of the bid proposal opening. The Owner is not responsible for any postal or delivery delays. No email, facsimile or other electronic bid proposals will be accepted.

B. Proposals will be opened immediately following the due date and time of the proposals.

C. The hard copy with the original bid Bond shall be conspicuously labeled on the exterior of the proposal stating “ORIGINAL”. All other copies shall be labeled “COPY”.

1.3 PROPOSAL FORMAT

A. The Bid response shall be structured as follows:

1. Section 1 – Submittal Letter, Executive Summary and Bid Bond

2. Section 2 – Proposal Forms and Bill of Materials with Installed Pricing

3. Section 3 – Narratives, System Description, Information, and Brochures

4. Section 4 - Bidder Qualifications, References

5. Section 5 – Sample Bidder’s Maintenance Contract

B. The “hard copy” Bids shall be submitted on 8 1/2" by 11" paper, single sided, single spaced using 10 to 12-point print, in 3 ring binders, clearly labeled to show the Bidder's name.

http://www.michigan.gov/VSSlogin

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 2 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

C. The electronic Bid shall be in the same structure and individual sections as the “hard copy” Bids, bound in .pdf files per section above, submitted on an USB “flash”, “Thumb” or similar drive with the hard copies. The electronic copy shall provide an exact duplicate of the information provided in the hard copy vice versa.

1.4 SECURITY

A. Each bid proposal must be accompanied by bid security in the form of a certified check or bid bond in the amount not less than 5% of the bid proposal amount, made payable to Oxford Community Schools or naming Oxford Community Schools as the obligee. Bid bonds shall be issued by a company licensed to do business in the State of Michigan

1.5 INSURANCE REQUIREMENTS

A. The Owner requires that all bidders submit proof of insurance with the following requirements:

1. Oxford Community Schools must be listed as an additional insured on the Contractors General Liability Coverage. Bidders must agree to this in their Bid.

2. Provide Oxford Community Schools with a copy of the Proof of General Liability Coverage from the Contractor with a minimum of $1,000,000 for projects with a value less than $1,000,000 and a minimum limit of $2,000,000 for projects with a value between $1,000,000 and $10,000,000. Bidders must agree to this in their proposal.

3. The Contractor must agree to hold the Owner harmless and to indemnify the Owner for losses from Contractor negligence as follows:

a. The waiver of subrogation clause in the AIA contract (A-201 or A-232) “General Conditions, and/or any other contract regarding this project, must be deleted.

b. The parties agree that the Owner is not waiving any rights its insurers may have to subrogation. To the extent any term in the Agreement is contrary to this provision, such term is void and unenforceable.

1.6 FAMILIAL DISCLOSURE AFFIDAVIT

A. Each bid proposal must be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the Bidder and any member of the Board of Education or the Superintendent of Oxford Community Schools. The Board of Education will not accept a bid proposal that does not include this sworn and notarized disclosure statement.

1.7 AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS

A. Each bid proposal must be accompanied by the Iran Economic Sanctions Affidavit of Compliance in compliance with Michigan Public Act No. 517 of 2012. The Board of Education will not accept a bid proposal that does not include this sworn and notarized disclosure statement.

1.8 RESERVATION OF RIGHTS

A. The Owner reserves the right, in its sole and absolute discretion (for this provision and all other provisions contained in this RFP), to accept or reject, in whole or in part, any or all bid proposal with or without cause, to waive any irregularities or informalities in this RFP process

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 3 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023 or any bid proposal, and to award the contract to other than the low bidder, when in the opinion of the Owner, such action will best serve the Owner's interests.

1.9 WITHDRAWAL OF BID PROPOSALS/QUOTES

A. All bid proposals submitted shall not be withdrawn and shall be irrevocable for a minimum period of ninety (90) calendar days following the due date for receipt of bid proposals set forth above.

1.10 REQUESTS FOR CLARIFICATION

A. Bidders may request that the Owner clarify information contained in this RFP. All such re-quests must be made in writing via email to John Foster, Convergent Technology Partners, at jfoster@ctpartners.net. Requests for Clarifications and inquiries may only be made via email.

The deadline for all Requests for Clarification is per the date and time indicated in the schedule of events. The aggregated answers to all Requests for Clarification will be provided in an ad-dendum to the RFP which will be issued and posted on the Purchasing page of the State of Michigan’s web site at www.Michigan.gov/VSSlogin no later than three (3) business days prior to the bid opening date for all potential proposers to view.

1.11 RESTRICTION ON COMMUNICATION

A. From the issue date of this RFP until a Contractor is selected and the contract is awarded a prospective Contractor shall not communicate about the subject of this RFP or a Contractor’s bid proposal with the Owner, its Board of Education, or any individual member, administrators, faculty, staff, students, or employees, except for additional requests for clarification in accordance with the paragraph above.

1.12 RELEASE OF CLAIMS

A. Each Bidder by submitting its Proposal releases the Owner from all claims arising out of, and related to, this RFP process and selection of a Contractor.

1.13 PROPOSAL COST

A. Respondents of this RFP are responsible for all costs incurred by them or others acting on their behalf in preparing or submitting a bid proposal, or otherwise responding to this RFP, or any negotiations incidental to its bid proposal or this RFP.

1.14 COLLUSIVE BIDDING

A. All Bidders certify that its bid proposal is made without any previous understanding, agreement or connection with any person, firm or corporation making a bid proposal for the same project and is in all respects fair, without outside control, collusion, fraud, or other illegal action.

1.15 DEFINITIONS

A. Bid Documents are defined as the Instructions to Bidders, Schedule of Events, this RFP, including all Supplemental forms, Attachments, Appendices, Specifications, Drawings and Addenda and the Contract.

B. Addenda are written or graphic instruments issued prior to the due date of bid proposals which modify or interpret the Bid Documents by additions, deletions, clarifications, or corrections. All Addenda issued to Bidders prior to the due date of bid proposals shall become

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 4 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023 part of the Bid Documents and all bid proposals are to include the Project/Work therein described. Each Bid Proposal submitted shall list all Addenda that have been received prior to the due date of bid proposals.

C. As used in these Instructions to Bidders, the term "Bid Proposal" means a bid proposal prepared and submitted in response to this RFP.

D. As used in these Instructions to Bidders, the term "PSC" refers to the Professional Service Contractor and means Convergent Technology Partners and its assigned representatives.

E. Throughout this RFP and Contract, the “Owner” or “OCS” will be used to refer to Oxford Community Schools and bidders submitting bid proposals will be referred to as "Bidders" or "Vendors” and a successful Bidder or Vendor will be referred to as a “Contractor” or “Integrator”.

1.16 BIDDER'S REPRESENTATION

A. Each Bidder, by submitting a Bid Proposal, represents that the Bidder has read and understands the Bid Documents and is familiar with the local conditions under which the project is to be performed. Bidders will be held to have physically reviewed and compared the Sites with Bid Documents and have satisfied themselves to all conditions affecting the execution of the Work/Project.

1.17 EXAMINATION OF BID DOCUMENTS

A. Before submitting a Bid Proposal, each Bidder shall examine the RFP documents carefully and shall read the Specifications and the Bid Documents. Each Bidder shall gather complete information prior to bidding as to existing conditions and limitations under which the Work/Project is to be performed and shall include in its Bid Proposal a sum to cover the cost of items necessary to perform the Work/Project as set forth in the Bid Documents.

B. No allowance or additional fees will be made to a Bidder because of lack of such examination or knowledge. The submission of a Bid Proposal will be considered as conclusive evidence that the Bidder has made such examination. An on-site-inspection of the Sites during the Bidder’s Conference will be for all Bidders.

C. Bidders may make written request to the PSC for interpretation or correction of any ambiguity, inconsistency or error in the Bid Documents that are discovered. These questions shall be submitted to the PSC per the Schedule of Events. Only a written interpretation or correction by Addendum shall be binding on Bidders. No explanations or interpretations requested or made orally will be considered binding. All questions will be responded to in writing and all addenda will be posted to the State of Michigan’s web site at www.Michigan.gov/VSSlogin .

1.18 SUBSTITUTIONS

A. Each Bid Proposal shall be based upon the materials and equipment described in the Bid Documents. Please note material that are indicated no substitutions allowed.

B. Voluntary alternates as substitutions for materials and equipment will be considered and evaluated if the Base Bid includes specified materials and equipment. In addition to the Base Bid, the submission of voluntary alternates is acceptable. If a voluntary alternate is submitted for consideration, it shall be expressed on the Bid Form as an “add” or “deduct” amount from the Base Bid. If a voluntary alternate is submitted, the Bidder shall also submit sufficient

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 5 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023 information in the form of drawings, specifications, and a complete description of the proposed substitute, the cost savings, or advantages. Additionally, provide the name of the material or equipment for which it is substituted, drawings, cuts, performance and test data and any other data or information necessary for a complete evaluation, sufficient for analysis of the alternate. The Owner reserves the right to unilaterally accept or reject, in whole or in part, any voluntary alternates.

1.19 BIDDING PROCEDURES

A. All Bids Proposal must be submitted on the Bid Proposal Forms provided as part of the Bid Documents and in accordance with the Advertisement to Bid and Instructions to Bidders.

Bidders must provide a complete list of proposed subcontractors (one per discipline) as indicated on the Bid Forms. Listing two or more subcontractors per discipline will be grounds for disqualification.

B. All Bidders must provide a proposal for the Base Bid that meets or exceeds the specifications set forth in this RFP. However, all Bidders may suggest voluntary alternates if it is felt that the alternate proposal better suits the intent of this RFP. Any alternate must be listed as such with separate pricing sheets. Any variance of the feature/functionality of the Base Bid must be identified in any alternates proposed.

C. Prior to the due date for bid proposals, any Addenda will be available for inspection wherever the Bid Documents are kept available for that purpose. No Addendum will be issued later than three (3) days prior to the due date for bid proposals. It is each Bidders responsibility to ascertain prior to submitting a Bid Proposal that he/she has received all Addenda issued and shall acknowledge their receipt in their Bid Proposal Form.

D. All Bids must be signed as follows:

1. Corporations: Signature of an officer of the firm who is authorized to bind the corporation.

2. Partnerships: Signature of one partner who is authorized to bind the firm and all its Partners.

3. Bids submitted by Joint Ventures shall be signed by one of the Joint Ventures and shall be accompanied by a certified copy of the Power of Attorney authorizing the individual signing to bind all the Joint Ventures. If a certified copy of the Joint Venture's certificate submitted with the Bid Proposal indicates that all Joint Ventures have signed, no authorization is required.

4. Individuals signing on own behalf: No authorization is required.

5. Individual signing on behalf of another: Power of Attorney or comparable evidence of authority shall accompany Bid.

E. Bid proposals shall be prepared on unaltered Bid Forms, which are a part of this RFP. Bidders shall make no additional stipulations on the Bid Form nor qualify the Bid Proposal in any other manner. Unauthorized conditions, limitations, or provisions attached to the Bid Proposal will be cause for rejection of the Bid Proposal. If alterations by erasure or interlineations are made for any reason, explain over such erasure or interlineations with a signed statement from the Bidder. No additional charges, other than those listed on the Bid Proposal Form and Bid Supplemental Forms, shall be made. Prices quoted will include verification/coordination of

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 6 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023 order, all costs for shipping, delivery to all Sites, insurance, payment and performance bonds, unpacking, setup, installation, operation, testing, cleanup, training, and all other requirements contained in the bid documents.

F. Bids shall be submitted in a sealed envelope. Identified on the face of the envelope:

1. Project name

2. Name and address of Bidder

3. Notation “DRAHNER STRUCTURED CABLING SYSTEM SEALED BID”

G. No responsibility shall attach to the PSC, the Owner, or the authorized representatives of either one, for the premature opening of any Bid Proposal which is not properly addressed, delivered and/or identified. In such event, that Bid Proposal will not be considered, and the Bidder will be automatically disqualified from consideration.

H. Negligence in preparation, improper preparation, errors in and/or omissions in the Bid Proposal shall not relieve the Bidder from fulfillment of all applicable obligations and requirements of contained in the Bid Documents.

I. The Owner or PSC in making copies available of the Bid Documents to Bidders do so only for the purpose of obtaining bid proposals on the project and do not confer a license or grant of use to a Bidder for any other purpose.

J. All Bidders must complete, sign, and return the attached “FAMILIAL DISCLOSURE” and “IRAN ECONOMIC SANCTIONS AFFIDAVITS” with their Bid Proposal.

K. Bidders must include a Bill of Material (BOM) per building, along with installed line-item pricing for all components proposed, including, but not limited to, maintenance and support with the total listed where indicated in the Bid Proposal Forms. Failure to provide the complete BOM with line-item pricing will result in disqualification of the Bid proposal. This does not preclude filling out the Unit Pricing Form Attachment B.

L. The Owner considers this RFP legally binding and will require that this Request for Proposal and the Bid Proposal be incorporated by reference into any subsequent Contract between the Contractor and the Owner. It should be understood by the Bidder that this means that the Owner expects the Bidder to satisfy all requirements and specifications contained in the RFP.

Any exceptions to the RFP must be explicitly noted in the Bid Proposal and accepted by the Owner. Lack of listing all exceptions will be considered acceptance of all specifications as presented in this RFP

1.20 CONSIDERATION OF BIDS

A. The Bidder acknowledges the right of the Owner to accept or reject any or all Bid proposals, in whole or in part, with or without cause, to waive any irregularities or informalities in this RFP process or any Bid Proposal, and to award the contract to other than the low bidder. In addition, the Bidder recognizes the right of the Owner to reject a Bid Proposal:

1. If the Bidder fails to furnish any required Bid Security, or to submit the data and forms required by the Bid Documents; or

2. If the Bid Proposal is in any way incomplete or irregular; or

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 7 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

3. If the Bidder's performance was unsatisfactory under a prior contract for the construction, repair, modification, or demolition of a facility with the Owner, or a contractor in privacy of contract with the Owner, which was funded, directly or indirectly, by the Owner.

B. The Owner shall have the right to accept alternates in any order or combination and to determine the lowest qualified Bidder based on the sum of the base bid, revisions due to missing material and the alternates accepted.

C. Once the contract is awarded to the Contractor, the contract is contingent upon Oxford Community Schools Board of Education approval and the Contractor providing the Owner with all documents required by the RFP prior to commencement of the Work/Project (i.e. Insurance Certificates, Labor and Material Payment Bond and Performance Bond, etc.). Further, the Owner reserves the unrestricted right to reduce the contract amount by reducing the scope of Work/project and/or components. Any such action will be taken before specific work on a building or on a project component has commenced. Contract amount shall be reduced or increased based on the unit pricing values.

D. Bidders to whom an award of a contract is under consideration shall submit to the Owner upon his/her request a properly executed Contractor's Qualification Statement, AIA Document A305 or other information format specified by the Owner.

1.21 BID SECURITY

A. The Bid Proposal shall be accompanied by a Bid Security of a certified check or cashier's check payable to the Owner or by a satisfactory Bid Bond Entity naming the Owner as the obligee and executed by the Bidder and a surety company authorized to do business in the State of Michigan, in an amount identified in the Instructions to Bidders. The check or amount of Bid Bond shall be forfeited to the Owner upon failure of the Contractor to enter into the Contract.

The Contractor's Bid security will be retained until the Contractor has signed the contract and has furnished the required Certificates of Insurance and other required Bonds and documents required by the RFP. Bonds signed by an Attorney-In-Fact must be accompanied by a certified and effectively dated copy of their Power of Attorney.

B. The Owner reserves the right to retain the Bid security of all Bidders until the Contractor enters into the contract or until ninety (90) days after bid opening, whichever is later. If the Contractor refuses to enter into the Contract, the Owner may retain their Bid Security as liquidated damages but not as a penalty.

1.22 PERFORMANCE, LABOR, AND MATERIAL PAYMENT BONDS

A. At or prior to delivery of the signed Contract, the Owner will require the Contractor to secure and post a Labor and Material Payment Bond and a Performance Bond including bonding for all subcontractors, each in the amount of 100% of the Contract Sum including bonding for all subcontractors. Surety shall be a company incorporated in the United States and must appear on the U.S. Treasury Departments approved surety list and be adaptable to the Owner. The Contractor shall obtain such bonds in a manner consistent with Michigan law.

1.23 TAXES

A. Installation services for the tangible personal property purchased by the Owner is not subject to sales taxation. Moreover, the Owner is exempt from taxation on all tangible personal

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 8 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023 property purchased by the Owner for its use and consumption; however, this exemption would not apply to any materials required under the Bid Documents that are deemed to be a component of a construction/improvement project to the Owner's Sites/Facilities. All prices submitted on the Bid Proposal Form shall be inclusive of all applicable taxes.

1.24 PERMITS AND FEES

A. All prices submitted on the Bid Proposal Form shall be inclusive of all applicable/required permits and fees.

1.25 MICHIGAN RIGHT-TO-KNOW LAW

A. All Contractors must conform to the provisions of the Michigan Right-To-Know Law, 1986 PA 80, which requires employers to:

1. Develop a communication program designed to safeguard the handling of hazardous chemicals through labeling of chemical containers, and development and availability of Material Safety Data Sheets.

2. Provide training for employees who work with these chemicals; and

3. Develop a written hazard communications program.

B. The law also provides for specific employee rights. These include:

1. The right to be notified (by employer or Contractor posting) of the location of Safety Data Sheet (SDS)

2. The right to be notified (by employer or Contractor posting) of new or revised SDS no later than five working days after receipt

3. The right to request copies of SDS from their employers or Contractors.

C. Provisions of Michigan's Right-to-Know Law may be found in those sections of the Michigan Occupational Safety and Health Act (MIOSHA), which contain Right-to-Know provisions, and the Federal Hazard Community Standard, which is part of the MIOSHA Right-to-Know Law through adoption.

1.26 WITHDRAWAL OF BIDS

A. A Bidder may withdraw its Bid Proposal by written request from an authorized Bidder representative, at any time prior to the due date of bid proposals.

B. No Bidder may withdraw a Bid Proposal for a period of ninety (90) calendar days, following the due date for receipt of bid proposals, and all bid proposals shall be subject to acceptance by the Owner during this ninety (90) day period.

1.27 EXECUTION OF CONTRACT

A. The Contractor to whom the contract is awarded shall, within ten (10) calendar days after Notice of Award and receipt of the contract from the Owner, execute and deliver required copies to the Owner.

B. At or prior to delivery of the executed Contract, the Contractor to whom the contract is awarded shall deliver to the Owner those Certificates of Insurance required by the Bid

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 9 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

Documents and such Labor and Materials Payment Bonds and Performance Bond as are required by Owner and any other documents required by this RFP.

C. The Owner shall approve the provided Bonds and Certificates of Insurance before the Contractor may proceed with the Work/Project. Failure or refusal to provide Bonds, Certificates of Insurance or any other documents required by this RFP in a form(s) satisfactory to the Owner shall subject the Contractor to loss of time from the allowable construction period equal to the time of delay in furnishing the required material.

1.28 POST BID INFORMATION

A. All additional information required for the proper evaluation of the bidder’s proposal shall be promptly provided upon request by the PSC or Owner.

1. This is not to be construed as additional time to provide documentation or information that is required to be included to be in the bid proposal.

1.29 TIME OF COMPLETION

A. The Bidder agrees to complete the Work within the timeframes listed in the Schedule of Events or as mutually agreed during the project kick-off meeting.

1.30 EQUAL OPPORTUNITY

A. The Contractor and all its subcontractors shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin.

PART 2 - EXECUTION

2.1 SITE REQUIREMENTS

A. The Owner Site is an instructional and administrative facility that provides up to year-round services to their students, staff, and the community. As such, activities in all buildings are critical to the provisioning of services to the students, staff and the community and shall not be interrupted by the Contractor's Work activities.

B. The site is currently undergoing renovation, and as such the Contractor shall coordinate all activities with the General Contractor or Construction Manager and other trades, as well as attend construction meetings as required by the GC/CM.

C. The computer and telephone systems associated with this Work will not be taken off-line or removed from service during normal working hours without coordination of the Owner’s IT department and the staff of affected buildings. Arrangements must be made by the Contractor to coordinate any such activities.

D. The Contractor will be required to work around all the conditions listed above, as well as working with the Owner’s staff to minimize disruptions to normal Owner activities.

E. Installation Guidelines

1. All Work performed on this Project will be installed in accordance with the current edition of the Michigan Electrical Code, the current edition of the BICSI Telecommunications Distribution Methods Manual, the current edition of the BICSI Cabling Installation Manual, the latest issue of the TIA Standards as published by Global

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 10 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

Engineering Documents as TIA Commercial Building Telecommunications Standard, and all local codes and ordinances.

2.2 QUALITY ASSURANCE

A. Project Manager

1. The Contractor will provide a full-time Project Manager who will act as a single point of contact for all activities regarding this Project. The Project Manager must be a management employee and will not be involved in personally performing craft installation work

2. The Project Manager is required to attend necessary technology and construction meetings for coordination before Work is started and construction meetings once Work is in progress.

3. The Project Manager will be required to make on-site decisions regarding the scope of the Work and any changes required by the Work.

4. The Project Manager will be totally responsible for all aspects of the Work and shall have the authority to make immediate decisions regarding implementation or Owner approved changes to the Work.

B. Compliance with Laws and Regulations

1. The Contractor performance of the Work shall comply with all applicable federal, state, and local laws, rules, and regulations and Owner policies, procedure, rules and regulations. The Contractor shall give required notices, shall procure necessary governmental licenses and inspections, and shall pay without burden to the Owner, all fees and charges in connection therewith unless specifically provided otherwise. In the event of violation, the Contractor shall pay all fines and penalties; including attorney's fees and other defense costs and expenses in connection therewith.

C. Federal Communications Commission

1. Equipment requiring FCC registration or approval shall have received such approval and shall be appropriately identified.

D. Codes, Standards, and Ordinances

1. All Work shall conform to the latest edition of the Michigan Electrical Code, the Building Code, and all local codes and ordinances, as applicable. Current versions of TIA-568 and TIA-569 shall be adhered to during all installation activities. Methodologies outlined in the latest edition of the BICSI Telecommunications Distribution Methods Manual shall also be used during all installation activities. Should conflicts exist with the foregoing, the authority having jurisdiction for enforcement will have responsibility for making interpretation. The Contractor is wholly responsible to meet or exceed all codes, standards, regulation, manufacturer installation standards and industry best practices.

2.3 SAFETY

A. The Contractor shall take the necessary precautions and bear the sole responsibility for the safety of the methods employed in performing the Work. The Contractor shall at all times comply with the regulations set forth by federal, state, and local laws, rules, and regulations

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 11 of 11

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023 concerning "OSHA" and all applicable state labor laws, regulations, and standards. The Contractor shall indemnify and hold harmless the Owner from and against all liabilities, suits, damages, costs, and expenses (including attorney's fees and court costs) that may be imposed on the Owner because of the Contractor, or its subcontractor, or supplier’s failure to comply with the regulations stated herein.

2.4 INSPECTION, ACCEPTANCE, AND TITLE

A. Inspection and Acceptance will be upon successful installation unless otherwise provided. Title to/or risk of loss or damage to all items shall be the responsibility of the Contractor until acceptance by the Owner unless loss or damage results from negligence by the Owner. If the materials or services supplied to the Owner are found to be defective or do not conform to the specifications, the Owner reserves the right to cancel the Contract upon written notice to and return products at the Contractor's expense, based upon the terms of the Contract.

1. When the Owner is referred to in this section of the RFP relative to inspections, the Owner has designated the PSC as the party to perform such inspections on behalf of the Owner.

Notwithstanding the above, the Owner may also perform such inspections along with the

PSC.

B. The Owner shall at all times have access to the Work wherever it is in preparation or progress and shall provide proper facilities for such access and for inspection.

C. The Contractor shall not close-up any Work until the Owner or applicable AHJ has inspected the Work. Should the Contractor close-up the work prior to inspection, the Contractor shall uncover the Work for inspection at no cost to the Owner, and then recover the Work according to the specifications contained herein. The Contractor shall notify the Owner and applicable AHJ in writing when the Work is ready for inspection. The Owner and AHJ will inspect the Work as expeditiously as possible after receipt of notification from the Contractor.

2.5 STATUS REPORTS, MEETINGS AND CONSTRUCTION COORDINATION

A. It shall be the Contractor’s responsibility to provide the Owner / PSC with written weekly project status reports while actively engaged in craft work and a summary report at the beginning of periods of inactivity between phases or construction delays noting status at that time and expected date of return to work in addition to the requirements listed below. These reports are required and shall include, but not be limited to:

B. Project completion percentage.

C. All problems that were encountered.

D. Any foreseeable problems that may arise.

E. General status of the project

F. The Owner / PSC reserves the right to hold additional status meetings on a regular basis with the Contractor’s Project Manager.

END OF SECTION

SCHEDULE OF EVENTS 00 30 10 - 1 of 1

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2022

SECTION 00 30 10 - SCHEDULE OF EVENTS

The following is a projected schedule of events for this project. The schedule may change depending upon the results of the responses and a final schedule will be established prior to contracting with the Contractor. Additionally, the final schedule shall be subject to change based on the construction schedule and progress.

EVENT DATE

Bid Release Dec 5th, 2023

Final Date and time for Questions Dec 13th, 2023

Bid Due Date/time and Public Opening 2:00 P.M. Dec 19th, 2023

Contract Award Jan 9th, 2024

Project Start Date TBD at KO meeting

Project Completion (Tentative) End of March

End of Section

Drahner Facility Structured Cabling Systems

BID PROPOSAL FORM 00 40 10 - 1 of 3

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

SECTION 00 40 10 - BID PROPOSAL FORM

OWNER: Saso Vasovski Director of Cyber Security and Operational Technology Oxford Community Schools 10 N. Washington, Oxford, MI 48731

PROJECT: Drahner Facility Structured Cabling Systems

NAME OF BIDDER:

BASE BID:

Lump sum bid for all work specified and shown on the drawings as indicated for base bid in the amount of:

____________________________________________________ Dollars ($ )

The Bid Proposal amount shall be shown in both words and figures. In the case of discrepancy, the amount shown in words shall govern.

BASE BID: The undersigned, having examined the Bid Documents and examined the conditions affecting the Work/Project, hereby proposes and agrees to furnish all of the labor, materials, and equipment and perform all work necessary to complete the Work/Project as required by the Bid Documents for the stipulated sum identified above and detailed in Supplemental A (Cost Analysis Worksheet). The Bid Documents set forth the terms and conditions upon which the Bidder will provide a "turnkey" solution for the installation and operation of the project for use by the Owner and represents and warrants that the design, operation, and functionality of the project are in accordance with the Bid Documents. All prices provided by the Bidder on this Bid Proposal Form must include all cables, connectors, equipment etc. that are necessary to the make the project fully operational for the intent and purpose stated in the Bid Documents

BID SECURITY: Enclosed herewith find (Certified Check)/ (Bid Bond) in the amount of $ ______ being five percent (5%) of the maximum Bid Proposal herein, made payable to Oxford Community Schools or naming Oxford Community Schools as obligee. The proceeds of which are to remain the property of Oxford Community Schools, if the Bidder does not, within ten (10) days after notice of the acceptance of Bid Proposal, enter the Contract.

BID PROPOSAL FORM 00 40 10 - 2 of 3

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

EXCEPTIONS AND SUBCONTRACTORS

Any exceptions to the terms and conditions contained in the RFP or contract must be identified below:

(Identify each with specific RFP section/part/paragraph, attach a separate sheet if required) Referring to an annotated RFP is NOT acceptable. Additionally, any subcontractors must be listed below with all contact information.

ADDENDA

This RFP incorporates the following Addenda:

Addendum No. Dated ____________ Addendum No. Dated ______________

Addendum No. Dated ____________ Addendum No. Dated ______________

Addendum No. Dated ____________ Addendum No. Dated ______________

BID PROPOSAL FORM REQUIRED ATTACHMENTS:

The following Bid Form Proposal Supplements are attached hereto and are considered an integral part of this Bid Proposal Form:

SUPPLEMENTAL A – Cost Analysis Worksheet

SUPPLEMENTAL B – Unit Pricing

SUPPLEMENTAL C – Mandatory Alternates

SUPPLEMENTAL D – Voluntary Alternates

SUPPLEMENTAL E – Familial Disclosure Affidavit

SUPPLEMENTAL F – Iran Economic Sanctions Act Compliance Affidavit

The following additional information must also be included for the bid proposal to be considered compliant:

Bill of Material and installed pricing

Comprehensive Narrative of the proposed System/Solution

Diagrams or Schematics supporting the System/Solution Narrative

Other information indicated herein.

BID PROPOSAL FORM 00 40 10 - 3 of 3

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

BIDDER NAME:

ADDRESS:

DATE:

TELEPHONE:

EMAIL ADDRESS: ______________________

If the award is made to our firm based upon our Bid Proposal, we agree to enter into the form of Contract with the Owner in accordance with this Request for Proposal, the contract and our Bid Proposal.

My signature certifies that the Bid Proposal as submitted complies with all terms and conditions as set forth in this Request for Proposal, unless specifically enumerated as an exception as part of this Bid Proposal Form.

I hereby certify that I am authorized to sign as a Representative for the Firm:

(Authorized Signature) (Title)

SUPPLEMENTAL A COST ANALYSIS WORKSHEET 00 40 11 -1 of 1

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

SUPPLEMENTAL A - COST ANALYSIS WORKSHEET

OWNER: Saso Vasovski Director of Cyber Security and Operational Technology Oxford Community Schools 10 N. Washington, Oxford, MI 48731

BIDDER:

ADDRESS:

BID BREAKDOWN

BUILDING COMPONENT Pricing

Category 6A UTP Cabling System Material

Labor

Sub Total

Optical Fiber Backbone Material

Labor

Sub Total

Combined Sub Total

Performance and Materials Bond

TOTAL BASE BID

Alternates

Alternate 1 – Replace OM4 optical fiber backbone with OS2 optical fiber backbone Material

Labor

Total Alternate 1

SUPPLEMENTAL B UNIT PRICING 00 40 12 - 1 of 1

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

SUPPLEMENTAL B - UNIT PRICING

Unit Pricing: In addition to the required Bill of Material (BOM) with installed unit prices, provide the following specific complete unit pricing (Inclusive of all labor, materials, wiring and connectivity, programming, associated licenses, etc.), which shall be considered firm pricing during the contract period and not subject to change.

BOM Unit prices will be used to modify quantities prior to award, the Unit Prices below will be used to determine pricing (Inclusive of licenses, labor and material including connectivity and programming into system) for additions and deletions during the contract period (after award).

Item Part Number Unit Price

UP1 Category 6A UTP cable, terminations and testing

UP2 Category 6A 48-port patch panel

UP3 Category 6A 1M patch cord

UP4 Category 6A 3M patch cord

UP5 OM4 MM fiber patch cord 1M

UP6 OM4 MM fiber patch cord 3M

UP7 OS2 SM fiber patch cord 1M

UP8 OS2 SM fiber patch cord 1M

UP9

SUPPLEMENTAL C MANDATORY ALTERNATES 00 40 13 - 1 of 1

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

SUPPLEMENTAL C - MANDATORY ALTERNATES

Alternate 1: Replace all armored OM4 Multimode optical fiber cable between technology closets with armored OS2 Single mode optical fiber cable, including all terminations and accessories required.

Add/Deduct _________________________________________ ($)________________

Alternate 2:

Add _________________________________________ ($)________________

Alternate 3:

Add _________________________________________ ($)________________

SUPPLEMENTAL D VOLUNTARY ALTERNATES 00 40 14 - 1 of 1

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

SUPPLEMENTAL D - VOLUNTARY ALTERNATES

Bidder to list all voluntary alternates on this sheet.

VOLUNTARY ALTERNATE 1:

Add/Deduct/No Change

Dollars ($ )

VOLUNTARY ALTERNATE 2:

Add/Deduct/No Change

Dollars ($ )

VOLUNTARY ALTERNATE 3:

Add/Deduct/No Change

Dollars ($ )

SUPPLEMENTAL E FAMILIAL DISCLOSURE AFFADAVIT 00 40 15 - 1 of 1

This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2022

SUPPLEMENTAL E - FAMILIAL DISCLOSURE AFFIDAVIT

The undersigned, the owner or authorized officer of ________________________ (the “Bidder”), pursuant to the familial disclosure requirement provided in the Oxford Community Schools (the “District”) Request for Proposal(s), hereby represents and warrants that, except as provided below, no familial relationships exist between the owner or any employee of the Bidder, and any member of the Board of Education of the School District or the Superintendent of the School District.

List any Familial Relationships:

BIDDER:

By:

Title:

STATE OF MICHIGAN

COUNTY OF ____________

This instrument was acknowledged before me on the _____ day of ____________, _____, by

, Notary Public

______________ County, Michigan

My Commission Expires: ___________

Acting in the County of: ___________

SUPPLEMENTAL F – IRAN ECONOMICS SANCTION AFFIDAVIT OF COMPLIANCE 00 41 60 - 1 of 1 This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

SUPPLEMENTAL F - AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT

Michigan Public Act No. 517 of 2012

The undersigned, the owner or authorized officer of the below named applicant (the “Applicant”), pursuant to the compliance certification requirement provided in the Oxford Community Schools (the “District”) Request For Proposals for Drahner Facility Structured Cabling System (the “RFP”), hereby certifies, represents and warrants that the Applicant (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public

Act No. 517 of 2012 (the “Act”), and that in the event Applicant is awarded a contract as a result of the aforementioned RFP, the Applicant will not become an “Iran linked business” at any time during the course of performing the Work or any services under the contract.

The Applicant further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the

Owner’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date it is determined that the person has submitted the false certification.

APPLICANT:

Name of Applicant

By: ___________________________________

Title: _________________________________

Date: _________________________________

State of Michigan, County of ____________ )

This instrument was acknowledged before me on the _____ day of ____________, _____, by

____________________________________, Notary Public ______________ County, __________

My Commission Expires: ___________

Acting in the County of: ___________

COMMON WORK RESULTS FOR TECHNOLOGY 27 05 00 - 1 of 9

CONFIDENTIALITY NOTICE: This document is the intellectual property of Convergent Technology Partners. Any unauthorized review, use, disclosure, or distribution in whole or in part is prohibited. © 2023

SECTION 27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS

PART 1 - GENERAL

1.1. SUMMARY

A. The successful bidder/Integrator (hereafter referred to as the Integrator) shall supply equipment, materials, labor, and services to provide the following systems including, but not limited to:

1. System(s) as indicated in each Section

2. Structured Cabling and system wiring

3. Testing and test documentation as indicated in each Section.

4. Fire stopping.

5. Extended warranty and manufacturer’s certification of systems, products, and labor.

B. Provide all equipment, materials, labor, whether specifically mentioned or not, which are necessary to complete or perfect all parts of the installation. Ensure that they are in compliance with requirements stated or reasonably inferred by the contract documents.

1.2. RELATED SECTIONS

A. Section 00 00 00

B. Section 27 10 00 Horizontal Structured Cabling

C. Section 27 13 00 Communications Backbone Cabling

D. Section 27 15 00 Communications Room Fittings

1.3. RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions apply to this section.

B. Also as indicated in each section.

1.4. REFERENCES

A. Local Codes and Standards - all applicable

1. Anywhere Standards conflict with electrical or safety Codes, Integrator shall defer to applicable local codes or ordinances, or default to the most stringent requirements listed by either. Knowledge and execution of applicable codes is the sole responsibility of the Integrator. Any code violations committed at the time of installation shall be remedied at the Integrator’s expense. Integrator is responsible to bring any perceived conflicts between project documents and referenced Standards or Codes to the attention of the PSC for resolution.

B. Integrators shall adhere to latest ratified editions of the following: this list is not all inclusive:

1. American Society for Testing and Materials (ASTM)

2. American National Standards Institute (ANSI)

3. Insulated Cables Engineers Association (ICEA)

4. National Electrical Manufacturers Association (NEMA)

5. Institute of Electrical and Electronics Engineers (IEEE)

a. National Electric Safety Code (NESC IEEE C2)

COMMO…