About this file
The provided document is a comprehensive set of bid drawings for the Orange County Convention Center West Building Electrical Transformers, Panels and Switchgear Replacement project, prepared by Atkins and dated December 2, 2022. The project involves a complete electrical infrastructure replacement for the West Building of the Orange County Convention Center, specifically targeting transformers, panels, and switchgear across Hall D and Hall E. The bid documents include detailed electrical site plans, tunnel power plans, demolition plans, new installation plans, one-line electrical diagrams, panel schedules, and electrical details. The bid was scheduled to be accepted until 4:00 pm EST on Thursday, March 16, 2023, with an estimated project cost of $2,671,000.00.
The drawings provide extensive technical specifications for replacing electrical infrastructure, with a focus on maintaining continuous power distribution and upgrading existing electrical systems. The project involves replacing multiple transformers, panels, and switchgear across different areas, with careful documentation of existing conditions and new installation requirements. Electronic bid submissions were required through the ProcureNow OpenGov e-Procurement Platform, with technical support available for bidders. The project appears to be funded by Orange County and is designed to modernize and improve the electrical systems of the convention center's west building, ensuring reliable and efficient power distribution for future events and operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORANGE COUNTY CONVENTION
CENTER WEST BUILDING ELECTRICAL
TRANSFORMERS, PANELS AND
SWITCHGEAR REPLACEMENT
KEY WEST
MIAMI
WEST PALM BEACH
OKEECHOBEE
FT. PIERCE
LAKE
OKEECHOBEE
MELBOURNEHAINES CITY
KISSIMMEE
ORLANDO
LEESBURG
LAKELAND
TAMPA
BRADENTON
FT. MYERS
DAYTONA BEACHOCALA
GAINESVILLE
ST. AUGUSTINE
JACKSONVILLE
LA
K E C
IT
Y
PERRY
TALLAHASSEE
APALACHICOLA
PANAMA
CITY
MARIANNA
P E
N S
A C
O L
A
BID DOCUMENTS
DECEMBER 2, 2022
ORANGE COUNTY MAYOR
JERRY L. DEMINGS
DISTRICT 1 COMMISSIONER
NICOLE H. WILSON
DISTRICT 2 COMMISSIONER
CHRISTINE MOORE
DISTRICT 3 COMMISSIONER
MAYRA URIBE
DISTRICT 4 COMMISSIONER
MARIBEL GOMEZ CORDERO
DISTRICT 5 COMMISSIONER
EMILY BONILLA
DISTRICT 6 COMMISSIONER
VICTORIA P. SIPLIN
BOARD OF COUNTY COMMISSIONERS
N.T.S.
N
PROJECT
LOCATION
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
G-000
100078746
BID
12/02/22
COVER SHEET
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
DRAWING INDEX
Sheet Number Sheet Name
G-000 COVER SHEET
E-001 ELECTRICAL SYMBOL LEGEND AND GENERAL NOTES
ES-101 ELECTRICAL SITE PLAN
E-111 OVERALL TUNNEL PLAN
ED-401 ENLARGED TUNNEL POWER PLAN - HALL D - DEMOLITION
ED-402 ENLARGED TUNNEL POWER PLAN - HALL D - DEMOLITION
ED-403 ENLARGED TUNNEL POWER PLAN - HALL E - DEMOLITION
ED-404 ENLARGED TUNNEL POWER PLAN - HALL E - DEMOLITION
EP-401 ENLARGED TUNNEL POWER PLAN - HALL D
EP-402 ENLARGED TUNNEL POWER PLAN - HALL D
EP-403 ENLARGED TUNNEL POWER PLAN - HALL E
EP-404 ENLARGED TUNNEL POWER PLAN - HALL E
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL ONE-LINE DIAGRAM - HALL D - DEMOLITION HALL D
E-602 ELECTRICAL ONE-LINE DIAGRAM - HALL D - NEW
E-603 ELECTRICAL ONE-LINE DIAGRAM - HALL E - DEMOLITION
E-604 ELECTRICAL ONE-LINE DIAGRAM - HALL E - NEW
E-801 PANEL SCHEDULE
E-802 PANEL SCHEDULE
E-803 PANEL SCHEDULE
E-804 PANEL SCHEDULE
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT.
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
GENERAL NOTES:
1. THE WORK PRACTICES EMPLOYED ON THIS PROJECT SHALL AT ALL TIMES COMPLY
WITH OR EXCEED THE LATEST ADOPTED EDITION OF THE NEC (NATIONAL ELECTRICAL
CODE. CONTRACTOR SHALL PROVIDE ALL REQUIRED LABOR, MATERIAL, EQUIPMENT,
INSURANCE, TOOLS, PERMITS, INSPECTIONS, ETC. TO PERFORM THE PROJECT
ELECTRICAL WORK AS PER NEC, LOCAL AGENCIES, AND OWNER REQUIREMENTS.
2. A COPPER EQUIPMENT GROUNDING CONDUCTOR, SIZED AS PER TABLE 250-122 OF THE
LATEST ADOPTED NEC, SHALL BE INSTALLED IN EVERY RACEWAY AND EFFECTIVELY
TERMINATED AT EACH DEVICE. UNLESS NOTED OTHERWISE, MINIMUM WIRE SIZE FOR
PHASE, NEUTRAL AND GROUND SHALL BE #12AWG AND MINIMUM CONDUIT SIZE SHALL
BE 3/4".
3. BUILDING WIRE SHALL BE THHN/THWN-2, 600V INSULATED, STRANDED COPPER TYPE.
POWER AND LIGHTING CIRCUITS SHALL USE SOLID CONDUCTORS FOR #10 AND
SMALLER AND STRANDED FOR #8 AND LARGER.
4. CONTRACTOR SHALL FIELD VERIFY LOCATION AND POWER NEEDS OF EQUIPMENT WITH
OWNER'S REPRESENTATIVE (REVISE BRANCH CIRCUITS AS REQUIRED)
5. OUTLET AND JUNCTION BOXES SHALL BE PROVIDED AS PER NEC REQUIREMENT
ACCORDINGLY TO THEIR LOCATION.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING AND PATCHING REQUIRED
TO PERFORM THE ELECTRICAL WORK. OWNER SHALL BE NOTIFIED BEFORE STARTING
ANY CUTTING AND PATCHING, AND SHALL BE DONE IN SUCH A MANNER THAT WILL NOT
AFFECT THE BUILDING STRUCTURE.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE AS A RESULT OF THE CUTTING AND PATCHING AND SHALL PROVIDE A CODE
COMPLIANT SOLUTION TO RESTORE THE DAMAGE AT NO EXTRA CHARGE.
7. CONTRACTOR SHALL FOLLOW OWNER, NATIONAL AND LOCAL AGENCIES, ETC. SAFETY
REGULATIONS AND PROCEDURES. CONTRACTOR SHALL PROVIDE ADEQUATE
EQUIPMENT AND WORKING AREA PROTECTION TO PREVENT INJURIES TO PEOPLE AND
DAMAGE TO PROPERTY.
8. CONTRACTOR SHALL FULLY TEST ALL ELECTRICAL SYSTEMS UPON COMPLETION OF
WORK.
9. IT IS THE BIDDER'S RESPONSIBILITY TO INSPECT THE PROJECT SITE AND
CONSTRUCTION DOCUMENTS PRIOR TO BIDDING. FAILURE TO DO SO SHALL NOT
RELIEVE THE CONTRACTOR TO COMPLY AND PERFORM ITS WORK RESPONSIBILITIES
UNDER THIS CONTRACT.
10. LABEL EACH SWITCH, RECEPTACLE, PANEL, AND JUNCTION BOXES WITH
SOURCE PANEL AND CIRCUIT NUMBER.
11. PROVIDE 2#12 + 1#12G (MINIMUM) IN 3/4" RACEWAY FOR EACH CIRCUIT, EXCEPT AS
NOTED OTHERWISE. COMMON NEUTRALS ARE NOT ALLOWED.
12. VERIFY PHASE ROTATION ON ALL THREE-PHASE EQUIPMENT (DISCONNECTS, MOTORS,
RECEPTACLES, ETC.)
13. ALL CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE. CIRCUIT BREAKERS PROTECTING
POWER PANELS, TRANSFORMERS, AND MOTORS SHALL BE 100% RATED. CIRCUIT
BREAKERS PROTECTING HEATING, AIR CONDITIONING AND REFRIGERATION
EQUIPMENT SHALL BE HACR RATED.
14. IF A FIRE WALL PENETRATION IS REQUIRED, THE CONTRACTOR SHALL USE AND
PROVIDE A WALL PENETRATION PROCEDURE AND INSTALLATION APPROVED BY THE
A.H.J. FOR THE FIRE RATED WALL TO BE PENETRATED.
15. REFER TO SINGLE DIAGRAMS FOR CONDUIT, DISCONNECT SWITCH AND WIRE SIZE.
ELECTRICAL SYMBOL LEGEND
NEW
EXISTING TO REMAIN
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
NON-FUSED DISCONNECT SWITCH, SIZE AS NOTED
ABBREVIATIONS
AMPERES
ABOVE COUNTER
AMPERE FRAME
AMPERE SENSOR
AMPERE TRIP
ABOVE FINISHED FLOOR
AVAILABLE FAULT CURRENT
AUTHORITY HAVING JURISDICTION
AMPERES INTERRUPTING CAPACITY, SYMMETRICAL
AUTOMATIC TRANSFER SWITCH
BUILDING AUTOMATION SYSTEM
CIRCUIT BREAKER
CIRCUIT
CONDUIT
DISCONNECT
EMERGENCY
EMPTY CONDUIT
ELECTRIC WATER COOLER
ELECTRIC WATER HEATER
ENCLOSURE INDICATES
ENCLOSURE INDICATES EXPLOSION PROOF EQUIPMENT,
CLASS 1, GROUP D HAZARDOUS AREA
FIRE ALARM CONTROL PANEL
FLORIDA POWER CORPORATION
GROUND FAULT INTERRUPTER
GROUND
GALVANIZED RIGID STEEL CONDUIT
HEATING, AIR CONDITIONING, AND REFRIGERATION
HIGH INTENSITY DISCHARGE
HORSE POWER
INTERCOM
ILLUMINATION ENGINEERING SOCIETY
ISOLATED GROUND
KILOWATT
LONG TIME, SHORT TIME, INSTANTANEOUS,
GROUND PROTECTION
MANUAL TRANSFER SWITCH
NATIONAL ELECTRICAL CODE
SHORT CIRCUIT AMPS
PANELBOARD
POLYVINYL CHLORIDE CONDUIT
SPARE CONDUIT
SWITCH
TELEPHONE TERMINAL BOARD
TELEPHONE TERMINAL CABINET
TYPICAL
UNLESS OTHERWISE NOTED
TRANSFORMER
VOLT AMPERE
INDICATES WEATHERPROOF EQUIPMENT
A
AC
AF
AS
AT
A.F.F.
A.F.C.
A.H.J.
A.I.C.
A.T.S.
BAS
C.B.
CKT.
COND., C.
DISC.
EMERG.
E.C.
E.W.C.
E.W.H.
ENCL.
EXP.
F.A.C.P.
FPC
GFI
GND, G.
GRS
HACR
HID
HP
IC
IES
IG
KW
LSIG
MTS
NEC
SCA
PNL.
PVC
SP
SW
T.T.B.
T.T.C.
TYP
U.O.N.
XFMR
VA
WP
M KWH / DEMAND UTILITY METER
3R
FRAME SIZE
# OF POLES
ENCLOSURE NEMA 1 UNLESS NOTED
VFD
ST
SPD
VARIABLE FREQUENCY DRIVE
OTHERWISE NOTED NEMA 3R FOR EXTERIOR LOCATIONS
SHUNT TRIP BUTTON - FLUSH MOUNTED UNLESS
SURGE PROTECTIVE DEVICE (SPD)
PANEL NAME
T-X
XX KVA
480- 120/208V
STEP DOWN TRANSFORMER
SWITCHBOARD OR
DISTRIBUTION
BOARD
MAIN LUG ONLY PANEL
MAIN BREAKER PANEL
GROUND ELECTRODE & GROUNDING
ELECTRODE CONDUCTOR.
ST
(00000 AIC)
(#### SCA) AMP
VOLTAGE, PHASE
CIRCUIT BREAKER W/ SHUNT TRIP
SUB-PANEL BREAKER
ENCLOSED CIRCUIT BREAKER
ONE LINE DIAGRAM
SYMBOL LEGEND
EM ENERGY MONITOR (EM)
SSS SOLID STATE STARTER
EXISTING TO BE REMOVED
3 POLE UNLESS OTHERWISE NOTED
COMBINATION MAGNETIC MOTOR STARTER, SIZE AS NOTED30/3
3R
MCP SIZE # OF POLES
NEMA STARTER
SIZE ENCLOSURE NEMA 1
UNLESS NOTED
FUSED DISCONNECT
3 3, 3R
FUSE SIZE
FRAME SIZE
# OF POLES
ENCLOSURE NEMA 1 UNLESS NOTED
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
E-001
100078746
BID
12/02/22
ELECTRICAL SYMBOL
LEGEND AND GENERAL
NOTES
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
IDC 28/82 IDC 28/82
1413121110987
R A M
P U
P
T U
N N
E L
TUNNEL
TUNNEL
IDC 8/82
CAFETERIA
ELECTRICAL
ROOM
TC 9/82
SOUTH
LOBBY
TC 2/82
IDC 7/82
ELECTRICAL
ROOM
ELECTRICAL
ROOM
TELEPHONE
ROOM
TC 3/82
ELECTRICAL
ROOM
FOOD
COURT
TC 4/82
FOOD
COURT
IDC 26/82
ELECTRICAL
ROOM
IDC 25/82
ELECTRICAL
ROOM
ELECTRICAL
ROOM
104B104A103B103A102B102A101B101A
108B108107106105AB105A
110B110AA109B109A
PARKING
IDC 13/82
ELEC.
ROOM
IDC 27/82
ELEC.
ROOM
IDC 29/82
TL 9/82 ELECTRICAL
ROOM
TC
10/82
CEP
ENTRANCE
RAMP
TTTT T T T T T T TT T TT T T T T T T
TTTTTTTTTTTTTTTTTT TTTT TT TT TT TT T T T T T T T TT TT
PROJECT LOCATION
HALL D HALL E
E-111
E-111
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
ES-101
100078746
BID
12/02/22
ELECTRICAL SITE PLAN
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
1" = 80'-0"
ELECTRICAL SITE PLAN PLAN NORTH
120' 240'80'40'0
1" = 80'-0" GRAPHIC SCALE
T T T T TTT
TT
M A
T C
H L
IN
E
/E D
-4
PNL L4A13
XFMR L4A13
PNL H4A5 PNL L4A12
PNL L4A12A
XFMR L4A12
XFMR PPL4AA
PNL PPL4AA
PNL L4A11
PNL L4A10A
PNL L4A10
XFMR L4A10
PNL H4A4
DISC L4A10B
PNL L4A9
PNL L4A9A
XFMR L4A9A
XFMR PPL4AC
PNL PPL4AC
XFMR L4A9
PNL DP4A
DISC L4A9
M A
T C
H L
IN
E
/E D
-4
M A
T C
H L
IN
E
/E D
-4
PNL H4A3
PNL L4A7A
XFMR L4A7
PNL L4A8
PNL L4A7
XFMR L4A6A
PNL L4A6A
PNL L4A6 PNL L4A4A
PNL H4A2
XFMR L4A4
PNL L4A4
PNL L4A5
PNL PPL4AD
XFMR PPL4AD
XFMR L4A3A
PNL L4A3A
PNL L4A3
PNL L4A1A
PNL H4A1
XFMR L4A1
PNL L4A1
PNL L4A2
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
ED-401
100078746
BID
12/02/22
ENLARGED TUNNEL POWER
PLAN - HALL D -
DEMOLITION
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN - HALL D - AREA 1 - DEMOLITION
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN - HALL D - AREA 2 - DEMOLITION
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
12'8'4'2'0
1/4" = 1'-0" GRAPHIC SCALE
PLAN NORTH
TT TT T T
RAMP DOWN
T T
TTT T
M A
T C
H L
IN
E
/E D
-4
M A
T C
H L
IN
E
/E D
-4
PNL L4B1
PNL L4B1A
XFMR L4B1A
PNL PPL4BA
XFMR PPL4BA
PNL L4B2A PNL H4B1
XFMR L4B2
PNL L4B2
PNL L4B3
PNL L4B4
PNL L4B4A
XFMR L4B4
XMR PPL4BB
PNL PPL4BB
PNL L4B5
PNL L4B6
PNL L4B5A
PNL DP4B
PNL H4B2
XFMR L4B5
M A
T C
H L
IN
E
/E D
-4
M A
T C
H L
IN
E
/E D
-4
XFMR L4B7A
PNL L4B7
PNL L4B7A
XFMR L4B7
PNL H4B3
PNL L4B8
XFMR L4B8
PNL L4B9
XFMR PPL4BC
XFMR L4B10
PNL PPL4BC
PNL L4B10
PNL L4B10A
PNL H4B4
PNL L4B11-1
XFMR L4B11
PNL L4B11-2DISC L4B7
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
ED-402
100078746
BID
12/02/22
ENLARGED TUNNEL POWER
PLAN - HALL D -
DEMOLITION
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN - HALL D - AREA 3 - DEMOLITION
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN - HALL D - AREA 4 - DEMOLITION KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
12'8'4'2'0
T T T T T T T T T T T
TT T T T T T T T T
M A
T C
H L
IN
E
/E D
-4
M A
T C
H L
IN
E
/E D
-4
XFMR R6A
PNL R6A-1
XFMR R5A
PNL R5A
XFMR R5B
PNL R5B
PNL HR3
PNL HR1
PNL R1
PNL R2A
XFMR R2A
XFMR R2B
XFMR C1
XFMR R3A
PNL R3A-1
PNL R3A-2
PNL R3B-2
PNL R3B-1
XFMR R3B XFMR R4B
PNL R4B
XFMR R4A
PNL R4A
PNL HR2
XFMR R1
PNL R2B
M A
T C
H L
IN
E
/E D
-4
M A
T C
H L
IN
E
/E D
-4
PNL R6A-2
XFMR R6B
PNL R6B-2
PNL R6B-2
PNL CPS
SWBD DPS
PNL HR4
PNL R7B
XFMR R7B
PNL R7A
XFMR R7A
PNL R9A-1
XFMR R8B
PNL R8A
XFMR R8B
PNL R8B
PNL HR5
PNL R9A-2
XFMR R9A
XFMR ELT
PNL EHT
PNL ELT
XFMR R9B
PNL R9B-1
PNL R9B-2
XFMR R10B
PNL R10B
PNL R10A
XFMR R10A
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
ED-403
100078746
BID
12/02/22
ENLARGED TUNNEL POWER
PLAN - HALL E -
DEMOLITION
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN - HALL E - AREA 5 - DEMOLITION
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN - HALL E - AREA 6 - DEMOLITION
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
12'8'4'2'0
T T T T T T T T
T TT T T T T
M A
T C
H L
IN
E
/E D
-4
M A
T C
H L
IN
E
/E D
-4
PNL HR6
PNL R11A
XFMR R11A
PNL R11B
XFMR R11B
PNL HR7
PNL R12A
XFMR R12B
PNL R12B
XFMR R12A
XFMR R13A
PNL R13A
XFMR R13B
PNL R13B
SWBD DPN
XFMR R14B
PNL R14B
XFMR R14A
PNL R14A
PNL HR8
M A
T C
H L
IN
E
/E D
-4
PNL CPN
XFMR R15A
PNL R15A-1
PNL R15A-2
PNL R15B-2
PNL R15B-1
XFMR R15B
PNL HR9
PNL R16A
XFMR R16A
PNL R16B
XFMR R16B
XFMR R17A
PNL R17A
XFMR R17B
PNL R17B
PNL HR10
XFMR R18
PNL R18
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
ED-404
100078746
BID
12/02/22
ENLARGED TUNNEL POWER
PLAN - HALL E -
DEMOLITION
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN - HALL E - AREA 7 - DEMOLITION
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN - HALL E - AREA 8 - DEMOLITION
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
12'8'4'2'0
T T T T TTT
TT
HALL D SCOPE STARTS HERE
M A
T C
H L
IN
E
/E P
-4
PNL L4A13
XFMR L4A13
PNL H4A5 PNL L4A12
PNL L4A12A
XFMR L4A12
XFMR PPL4AA
PNL PPL4AA
PNL L4A11
PNL L4A10A
PNL L4A10
XFMR L4A10
PNL H4A4
DISC L4A10B
PNL L4A9
PNL L4A9A
XFMR L4A9A
XFMR PPL4AC
PNL PPL4AC
XFMR L4A9
PNL DP4A
DISC L4A9
M A
T C
H L
IN
E
/E P
-4
M A
T C
H L
IN
E
/E P
-4
PNL H4A3
PNL L4A7A
XFMR L4A7
PNL L4A8
PNL L4A7
XFMR L4A6A
PNL L4A6A
PNL L4A6 PNL L4A4A
PNL H4A2
XFMR L4A4
PNL L4A4
PNL L4A5
PNL PPL4AD
XFMR PPL4AD
XFMR L4A3A
PNL L4A3A
PNL L4A3
PNL L4A1A
PNL H4A1
XFMR L4A1
PNL L4A1
PNL L4A2
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
EP-401
100078746
BID
12/02/22
ENLARGED TUNNEL POWER
PLAN - HALL D
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN - HALL D - AREA 1
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN - HALL D - AREA 2
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
12'8'4'2'0
TT TT T T
T T
TTT T
M A
T C
H L
IN
E
/E P
-4
M A
T C
H L
IN
E
/E P
-4
PNL L4B1
PNL L4B1A
XFMR L4B1A
PNL PPL4BA
XFMR PPL4BA
PNL L4B2A PNL H4B1
XFMR L4B2
PNL L4B2
PNL L4B3
PNL L4B4
PNL L4B4A
XFMR L4B4
XMR PPL4BB
PNL PPL4BB
PNL L4B5
PNL L4B6
PNL L4B5A
PNL DP4B
PNL H4B2
XFMR L4B5
M A
T C
H L
IN
E
/E P
-4
M A
T C
H L
IN
E
/E P
-4
XFMR L4B7A
PNL L4B7
PNL L4B7A
XFMR L4B7
PNL H4B3
PNL L4B8
XFMR L4B8
PNL L4B9
XFMR PPL4BC
XFMR L4B10
PNL PPL4BC
PNL L4B10
PNL L4B10A
PNL H4B4
PNL L4B11-1
XFMR L4B11
PNL L4B11-2
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
EP-402
100078746
BID
12/02/22
ENLARGED TUNNEL POWER
PLAN - HALL D
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN HALL D - AREA 3
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN HALL D - AREA 4
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
12'8'4'2'0
T T T T T T T T T T T
TT T T T T T T T T
M A
T C
H L
IN
E
/E P
-4
M A
T C
H L
IN
E
/E P
-4
XFMR R6A
PNL R6A-1
XFMR R5A
PNL R5A
XFMR R5B
PNL R5B
PNL HR3
PNL HR1
PNL R1
PNL R2A
XFMR R2A
XFMR R2B
XFMR C1
XFMR R3A
PNL R3A-1
PNL R3A-2
PNL R3B-2
PNL R3B-1
XFMR R3B XFMR R4B
PNL R4B
XFMR R4A
PNL R4A
PNL HR2
XFMR R1
PNL R2B
M A
T C
H L
IN
E
/E P
-4
M A
T C
H L
IN
E
/E P
-4
PNL R6A-2
XFMR R6B
PNL R6B-2
PNL R6B-2
PNL CPS
SWBD DPS
PNL HR4
PNL R7B
XFMR R7B
PNL R7A
XFMR R7A
PNL R9A-1
XFMR R8B
PNL R8A
XFMR R8B
PNL R8B
PNL HR5
PNL R9A-2
XFMR R9A
XFMR ELT
PNL EHT
PNL ELT
XFMR R9B
PNL R9B-1
PNL R9B-2
XFMR R10B
PNL R10B
PNL R10A
XFMR R10A
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
EP-403
100078746
BID
12/02/22
ENLARGED TUNNEL POWER
PLAN - HALL E
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN HALL E - AREA 5
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN HALL E - AREA 6
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
12'8'4'2'0
T T T T T T T T
T TT T T T T
M A
T C
H L
IN
E
/E P
-4
M A
T C
H L
IN
E
/E P
-4
PNL HR6
PNL R11A
XFMR R11A
PNL R11B
XFMR R11B
PNL HR7
PNL R12A
XFMR R12B
PNL R12B
XFMR R12A
XFMR R13A
PNL R13A
XFMR R13B
PNL R13B
SWBD DPN
XFMR R14B
PNL R14B
XFMR R14A
PNL R14A
PNL HR8
M A
T C
H L
IN
E
/E P
-4
PNL CPN
XFMR R15A
PNL R15A-1
PNL R15A-2
PNL R15B-2
PNL R15B-1
XFMR R15B
PNL HR9
PNL R16A
XFMR R16A
PNL R16B
XFMR R16B
XFMR R17A
PNL R17A
XFMR R17B
PNL R17B
PNL HR10
XFMR R18
PNL R18
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
EP-404
100078746
BID
12/02/22
ENLARGED TUNNEL POWER
PLAN - HALL E
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN HALL E - AREA 7
1/4" = 1'-0"
ENLARGED TUNNEL POWER PLAN HALL E - AREA 8
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
12'8'4'2'0
T T T T T T T
TTTTTTTTTTTTTTTTTT
T
RAMP DOWN
TTT T T T T T T TT T T TTTT TT TT TT TT T T T T T T T TT TT
1. REFER TO DRAWING G-001 FOR SYMBOLS AND ABBREVIATIONS.
2. CONTRACTOR SHALL VERIFY BREAKER SIZES AND CABLING REQUIREMENTS WITH FINAL
APPROVED VENDOR DRAWINGS.
3. DESIGN BASIS IS SQUARE D PANELS AND BREAKERS. NO APPROVED EQUAL.
4. ALL ELECTRICAL EQUIPMENT ENCLOSURES SHALL BE CONNECTED TO GROUND.
5. ALL EQUIPMENT BEING REPLACED SHALL HAVE DEDICATED NEUTRALS.
6. BEFORE COMMENCEMENT OF WORK CONTRACTOR SHALL INVESTIGATE ALL EQUIPMENT
BEING REPLACED FOR DEDICATED NEUTRALS. WHERE EQUIPMENT DOES NOT HAVE
DEDICATED NEUTRALS, CONTRACTOR SHALL INFORM ENGINEER OF RECORD AND OWNER.
7. ALL CONDUCTOR SIZES ARE BASED ON EXISTING DRAWINGS.
8. EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS DATED JULY 1, 1980
AND FROM SITE VISITS.
9. WHERE EQUIPMENT lS SHOWN TO BE REPLACED AND WIRE IS SHOWN TO BE REUSED, RETAIN EXISTING WIRE FOR FUTURE USE.
10. THERE ARE NO NEW LOADS BEING ADDED UNDER THIS PROJECT.
11. ALL EQUIPMENT BEING REPLACED SHALL HAVE OCCC NEW ASSET-DECOMMISSION FORM
FILLED OUT AND RETURNED TO OCCC
GENERAL SHEET NOTES:
HALL D - AREA 1 HALL D - AREA 2 HALL D - AREA 3 HALL D - AREA 4
M A
T C
H L
IN
E
/E -1
HALL E - AREA 5 HALL E - AREA 6 HALL E - AREA 7 HALL E - AREA 8
M A
T C
H L
IN
E
/E -1
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
E-111
100078746
BID
12/02/22
OVERALL TUNNEL PLAN
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
1/16" = 1'-0"
TUNNEL PLAN - HALL D
1/16" = 1'-0"
TUNNEL PLAN - HALL E
PLAN NORTH
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
KEY PLAN
HALL D -
AREA 1
HALL D -
AREA 2
HALL D -
AREA 3
HALL D -
AREA 4
HALL E -
AREA 5
HALL E -
AREA 6
HALL E-
AREA 7
HALL E-
AREA 8
1/16" = 1'-0" GRAPHIC SCALE
0 8' 16' 48'32'
H1
H2
H3
EQUIPMENT GROUND CONDUCTOR
PROVIDE LUG CONNECTION ON ENCLOSURE
FOR GROUND TERMINATION (TYPICAL).
DRY-TYPE TRANSFORMER ENCLOSURE
EQUIPMENT BONDING JUMPER
GROUNDING ELECTRODE CONDUCTOR
EFFECTIVELY GROUNDED BUILDING STEEL
METAL
WATER
PIPE
SYSTEM BONDING JUMPER
GROUND BUS
NOTE:
1. SEE SHEET E-601 FOR GROUND CONDUCTOR SIZES.
N
N
G
NEUTRAL BUS
NEUTRAL BUS
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
E-501
100078746
BID
12/02/22
ELECTRICAL DETAILS
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
N.T.S.
DRY TYPE TRANSFORMER GROUNDING DETAIL
1. REFER TO DRAWING G-001 FOR SYMBOLS AND ABBREVIATIONS.
2. CONTRACTOR SHALL VERIFY BREAKER SIZES AND CABLING REQUIREMENTS WITH FINAL
APPROVED VENDOR DRAWINGS.
3. DESIGN BASIS IS SQUARE D PANELS AND BREAKERS. NO APPROVED EQUAL.
4. ALL ELECTRICAL EQUIPMENT ENCLOSURES SHALL BE CONNECTED TO GROUND.
5. ALL EQUIPMENT BEING REPLACED SHALL HAVE DEDICATED NEUTRALS.
6. BEFORE COMMENCEMENT OF WORK CONTRACTOR SHALL INVESTIGATE ALL EQUIPMENT
BEING REPLACED FOR DEDICATED NEUTRALS. WHERE EQUIPMENT DOES NOT HAVE
DEDICATED NEUTRALS, CONTRACTOR SHALL INFORM ENGINEER OF RECORD AND OWNER.
7. ALL CONDUCTOR SIZES ARE BASED ON EXISTING DRAWINGS.
8. EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS DATED JULY 1, 1980
AND FROM SITE VISITS.
9. WHERE EQUIPMENT lS SHOWN TO BE REPLACED AND WIRE IS SHOWN TO BE REUSED, RETAIN EXISTING WIRE FOR FUTURE USE.
10. THERE ARE NO NEW LOADS BEING ADDED UNDER THIS PROJECT.
11. ALL EQUIPMENT BEING REPLACED SHALL HAVE OCCC NEW ASSET-DECOMMISSION FORM
FILLED OUT AND RETURNED TO OCCC
GENERAL SHEET NOTES:
250AT
400AF
H4A5
L4A13
150A
480V- 120/208V
#1/0
T-L4A13
112.5 kVA
4000 A
277/480V, 3-PHASE, 4 WIRE(65000 AIC)
MSB4
2000AT
2000AF
500AT
600AF
H4A4
L4A12
150A
480V- 120/208V
#1/0
T-L4A12
112.5 kVA
L4A10
480V- 120/208V
#3/0
T-L4A10 150 kVA
225A
600AT
600AF
PPL4AA
H4A3
L4A9
480V- 120/208V
#1/0
T-L4A9
112.5 kVA
L4A7
480V- 120/208V
#3/0
T-L4A7 150 kVA
225A
L4A9A
150A
PPL4AC
480V- 120/208V
#1/0
T-L4A6A
112.5 kVA
L4A6A
H4A2
L4A4
225A
480V- 120/208V
#3/0
T-L4A4 150 kVA
PPL4AD
480V- 120/208V
#1/0
T-L4A3A
112.5 kVA
150A
L4A3A
L4A5
500AT
600AF
H4A1
225A
480V- 120/208V
#3/0
T-L4A1 150 kVA
400AT
400AF
L4A1
L4A2
277/480V, 3-PHASE, 4 WIRE + GROUND BUS65KAIC
DP4B
2000A
500AT
600AF
H4B1
150A
480V- 120/208V
#1/0
T-L4B1A
112.5 kVA
L4B2
480V- 120/208V
#3/0
T-L4B2 150 kVA
225A
600AT
600AF
L4B1A
H4B2
L4B4
150A
480V- 120/208V
#1/0
T-L4B4
112.5 kVA
L4B5
480V- 120/208V
#3/0
T-L4B5 150 kVA
225A
150A
L4B7A
480V- 120/208V
#1/0
T-L4B7A
112.5 kVA
L4B7
H4B3
L4B8
225A
480V- 120/208V
#3/0
T-L4B8 150 kVA
L4B10
480V- 120/208V
#1/0
T-L4B10
112.5 kVA
150A
500AT
600AF
H4B4
225A
480V- 120/208V
#3/0
T-L4B11 150 kVA
500AT
600AF
L4B11
2000AT
2000AF
1000 kVA2,500kVA EXISTING
UTILITY TRANSFORMER
M
EXISTING UTILITY
METER
ROOM HALL D
ROOM HALL D
400AT
400AF
600AT
600AF
TO EXISTING
600A 480V CAMLOCKS
400AT
400AF
400AT
400AF
400A 480V CAMLOCKS
3" C
(4) 250 KCMIL
(1) #4 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
2" C
(3) #2/0
(1) #6 G
2" C
(3) #2/0
(1) #6 G
2 1/2" C
(3) #4/0
(1) #4 G
4" C
(4) 500 KCMIL
(1) #3 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
2" C
(3) #2/0
(1) #6 G
3" C
(3) 250 KCMIL
(1) #4 G
2" C
(3) #2/0
(1) #6 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
2" C
(3) #2/0
(1) #6 G
3" C
(3) 250 KCMIL
(1) #4 G
3" C
(3) 250 KCMIL
(1) #4 G
4" C
(4) 500 KCMIL
(1) #3 G
4" C
5 SETS OF
(4) 600 KCMIL
(1) 250 KCMIL G
4" C
5 SETS OF
(4) 600 KCMIL
(1) 250 KCMIL G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
2" C
(3) #2/0
(1) #6 G
2" C
(3) #2/0
(1) #6 G
2" C
(3) #2/0
(1) #6 G 2" C
(3) #2/0
(1) #6 G
3" C
(3) 250 KCMIL
(1) #4 G 3" C
(3) 250 KCMIL
(1) #4 G 3" C
(3) 250 KCMIL
(1) #4 G 3" C
(3) 250 KCMIL
(1) #4 G
4" C
(4) 500 KCMIL
(1) #3 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G 3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G 4" C
(4) 500 KCMIL
(1) #3 G
4" C
(4) 500 KCMIL
(1) #3 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G 4" C
(4) 500 KCMIL
(1) #3 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
4" C
(4) 500 KCMIL
(1) #3 G
4" C
(4) 500 KCMIL
(1) #3 G
4" C
(4) 500 KCMIL
(1) #3 G
4" C
(4) 500 KCMIL
(1) #3 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
4" C
(4) 500 KCMIL
(1) #3 G
277/480V, 3-PHASE, 4 WIRE + GROUND BUS65KAIC
DP4A
2000A
SPD
480V- 120/208V
#3/0
T-PPL4AA
150 kVA
2 1/2" C
(3) #4/0
(1) #4 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
225A
480V- 120/208V
#1/0
T-L4A9A
112.5 kVA
2" C
(3) #2/0
(1) #6 G
4" C
(4) 500 KCMIL
(1) #3 G
150A
150A
150A
480V- 120/208V
#1/0
T-PPL4AC
112.5 kVA
2" C
(3) #2/0
(1) #6 G
4" C
(4) 500 KCMIL
(1) #3 G
480V- 120/208V
#3/0
T-PPL4AD
300 kVA
4" C
3 SETS OF
(4) 400 KCMIL
(1) #2/0 G
L4A6 L4A7A
100100
L4A8
L4A11
L4A10A L4A12A
PPL4BA
480V- 120/208V
#3/0
T-PPL4BA
150 kVA
2 1/2" C
(3) #4/0
(1) #4 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
225A
L4B2A
L4B1
PPL4BB
480V- 120/208V
#3/0
T-PPL4BB
150 kVA
2 1/2" C
(3) #4/0
(1) #4 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
L4B4A
L4B5A
225A
L4B6
L4B3
480V- 120/208V
#1/0
T-L4B7
112.5 kVA
2" C
(3) #2/0
(1) #6 G
4" C
(4) 500 KCMIL
(1) #3 G
150A
PPL4BC
480V- 120/208V
#3/0
T-PPL4BC
150 kVA
225A
3" C
(3) 250 KCMIL
(1) #4 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
L4B9
L4B10A
1200AT
1200AF
SPLIT BETWEEN (2) SETS OF 600A CAMLOCKS
SECTION 1 SECTION 2
L4A3
L4A1A
L4A4A
TO
CAMLOCKS
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
E-601
100078746
BID
12/02/22
ELECTRICAL ONE-LINE
DIAGRAM - HALL D -
DEMOLITION HALL D
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
N.T.S.
ELECTRICAL ONE LINE DIAGRAM - DEMOLITION - HALL D
250AT
400AF
H4A5
L4A13
175A
480V- 120/208V
#1/0
T-L4A13
112.5 kVA
4000 A
277/480V, 3-PHASE, 4 WIRE(65000 AIC)
MSB4
2000AT
2000AF
500AT
600AF
H4A4
L4A12
175A
480V- 120/208V
#1/0
T-L4A12
112.5 kVA
L4A10
480V- 120/208V
#3/0
T-L4A10 300 kVA
450A
600AT
600AF
PPL4AA
H4A3
L4A9
480V- 120/208V
#1/0
T-L4A9
112.5 kVA
L4A7
480V- 120/208V
#3/0
T-L4A7 150 kVA
250A
L4A9A
175A
PPL4AC
480V- 120/208V
#1/0
T-L4A6A
112.5 kVA
L4A6A
H4A2
L4A4
250A
480V- 120/208V
#3/0
T-L4A4 150 kVA
PPL4AD
480V- 120/208V
#1/0
T-L4A3A
112.5 kVA
175A
L4A3A
L4A5
500AT
600AF
H4A1
250A
480V- 120/208V
#3/0
T-L4A1 150 kVA
400AT
400AF
L4A1
L4A2
277/480V, 3-PHASE, 4 WIRE + GROUND BUS65KAIC
DP4B
2000A
500AT
600AF
H4B1
175A
480V- 120/208V
#1/0
T-L4B1A
112.5 kVA
L4B2
480V- 120/208V
#3/0
T-L4B2 150 kVA
250A
600AT
600AF
L4B1A
H4B2
L4B4
175A
480V- 120/208V
#1/0
T-L4B4
112.5 kVA
L4B5
480V- 120/208V
#3/0
T-L4B5 150 kVA
250A
175A
L4B7A
480V- 120/208V
#1/0
T-L4B7A
112.5 kVA
L4B7
H4B3
L4B8
250A
480V- 120/208V
#3/0
T-L4B8 150 kVA
L4B10
480V- 120/208V
#1/0
T-L4B10
112.5 kVA
175A
500AT
600AF
H4B4
250A
480V- 120/208V
#3/0
T-L4B11 150 kVA
500AT
600AF
L4B11
2000AT
2000AF
1000 kVA2,500kVA EXISTING
UTILITY TRANSFORMER
M
EXISTING UTILITY
METER
ROOM HALL D
ET 1ET 1ET 1ET
1ET 1ET 1ET 1ET 1ET
ROOM HALL D
400AT
400AF
400AT
400AF
SPARE
400AT
400AF
400A 480V CAMLOCKS
3" C
(4) 250 KCMIL
(1) #4 G
2" C
(3) #2/0
(1) #6 G
2" C
(3) #2/0
(1) #6 G
2 1/2" C
2 SETS OF
(3) #4/0
(1) #2 G
2 1/2" C
2 SETS OF
(3) #250 KCMIL
(1) #1 G 3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
2" C
(3) #2/0
(1) #6 G
3" C
(3) 250 KCMIL
(1) #4 G
2" C
(3) #2/0
(1) #6 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
2" C
(3) #2/0
(1) #6 G
3" C
(3) 250 KCMIL
(1) #4 G
3" C
(3) 250 KCMIL
(1) #4 G
4" C
(4) 500 KCMIL
(1) #3 G
4" C
5 SETS OF
(4) 600 KCMIL
(1) 250 KCMIL G
4" C
5 SETS OF
(4) 600 KCMIL
(1) 250 KCMIL G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
2" C
(3) #2/0
(1) #6 G
2" C
(3) #2/0
(1) #6 G
2" C
(3) #2/0
(1) #6 G
2" C
(3) #2/0
(1) #6 G
3" C
(3) 250 KCMIL
(1) #4 G
3" C
(3) 250 KCMIL
(1) #4 G
3" C
(3) 250 KCMIL
(1) #4 G
3" C
(3) 250 KCMIL
(1) #4 G
4" C
(4) 500 KCMIL
(1) #3 G
4" C
3 SETS OF
(4) 400 KCMIL
(1) #2/0 G 3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G4" C
(4) 500 KCMIL
(1) #3 G
4" C
(4) 500 KCMIL
(1) #3 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G 4" C
(4) 500 KCMIL
(1) #3 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
4" C
(4) 500 KCMIL
(1) #3 G
4" C
(4) 500 KCMIL
(1) #3 G
4" C
(4) 500 KCMIL
(1) #3 G
4" C
(4) 500 KCMIL
(1) #3 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G
4" C
(4) 500 KCMIL
(1) #3 G
1ET
277/480V, 3-PHASE, 4 WIRE + GROUND BUS65KAIC
DP4A
2000A
SPD
37547A
AFC= 32592A
14865A
6000A 9873A8423A 6327A6218A
480V- 120/208V
#3/0
T-PPL4AA
150 kVA
2 1/2" C
(3) #4/0
(1) #4 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
250A
8211A
7733A
8211A
480V- 120/208V
#1/0
T-L4A9A
112.5 kVA
2" C
(3) #2/0
(1) #6 G
4" C
(4) 500 KCMIL
(1) #3 G
175A
8382A
175A
175A
480V- 120/208V
#1/0
T-PPL4AC
112.5 kVA
2" C
(3) #2/0
(1) #6 G
4" C
(4) 500 KCMIL
(1) #3 G
6327A 8162A 7902A
25909A 31557A 25909A 20172A
480V- 120/208V
#3/0
T-PPL4AD
300 kVA
4" C
3 SETS OF
(4) 400 KCMIL
(1) #2/0 G
L4A6 L4A7A
100100
L4A8
L4A11
L4A10A L4A12A
PPL4BA
480V- 120/208V
#3/0
T-PPL4BA
150 kVA
2 1/2" C
(3) #4/0
(1) #4 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
250A
L4B2A
L4B1
PPL4BB
480V- 120/208V
#3/0
T-PPL4BB
150 kVA
2 1/2" C
(3) #4/0
(1) #4 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
L4B4A
L4B5A
250A
L4B6
L4B3
480V- 120/208V
#1/0
T-L4B7
112.5 kVA
2" C
(3) #2/0
(1) #6 G
4" C
(4) 500 KCMIL
(1) #3 G
175A
PPL4BC
480V- 120/208V
#3/0
T-PPL4BC
150 kVA
250A
3" C
(3) 250 KCMIL
(1) #4 G
3 1/2" C
2 SETS OF
(4) 350 KCMIL
(1) #1 G
L4B9
L4B10A
400AT
400AF
1ET
SECTION 1 SECTION 2
L4A3
L4A1A
L4A4A
400AT
400AF
400AT
400AF
400AT
400AF
1ET 1ET 1ET
1ET
3" C
2 SETS OF
(4) 250 KCMIL
(1) #2 G 2 1/2" C
2 SETS OF
(4) #4/0
(1) #2 G 2 1/2" C
2 SETS OF
(4) #4/0
(1) #2 G 2 1/2" C
2 SETS OF
(4) #4/0
(1) #2 G 2 1/2" C
2 SETS OF
(4) #4/0
(1) #2 G
OWNER FURNISHED AND
INSTALLED ENCLOSURE WITH
(4) 400A CAMLOCKS
2 1/2" C
2 SETS OF
(4) #4/0
(1) #2 G
TO
CAMLOCKS
4" C
(4) 500 KCMIL
(1) #3 G
1. REFER TO DRAWING G-001 FOR SYMBOLS AND ABBREVIATIONS.
2. CONTRACTOR SHALL VERIFY BREAKER SIZES AND CABLING REQUIREMENTS WITH FINAL
APPROVED VENDOR DRAWINGS.
3. DESIGN BASIS IS SQUARE D PANELS AND BREAKERS. NO APPROVED EQUAL.
4. ALL ELECTRICAL EQUIPMENT ENCLOSURES SHALL BE CONNECTED TO GROUND.
5. ALL EQUIPMENT BEING REPLACED SHALL HAVE DEDICATED NEUTRALS.
6. BEFORE COMMENCEMENT OF WORK CONTRACTOR SHALL INVESTIGATE ALL EQUIPMENT
BEING REPLACED FOR DEDICATED NEUTRALS. WHERE EQUIPMENT DOES NOT HAVE
DEDICATED NEUTRALS, CONTRACTOR SHALL INFORM ENGINEER OF RECORD AND OWNER.
7. ALL CONDUCTOR SIZES ARE BASED ON EXISTING DRAWINGS.
8. EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS DATED JULY 1, 1980
AND FROM SITE VISITS.
9. WHERE EQUIPMENT lS SHOWN TO BE REPLACED AND WIRE IS SHOWN TO BE REUSED, RETAIN EXISTING WIRE FOR FUTURE USE.
10. THERE ARE NO NEW LOADS BEING ADDED UNDER THIS PROJECT.
11. ALL EQUIPMENT BEING REPLACED SHALL HAVE OCCC NEW ASSET-DECOMMISSION FORM
FILLED OUT AND RETURNED TO OCCC
GENERAL SHEET NOTES:
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
E-602
100078746
BID
12/02/22
ELECTRICAL ONE-LINE
DIAGRAM - HALL D - NEW
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
N.T.S.
ELECTRICAL ONE LINE DIAGRAM - NEW - HALL D
1 "ET" SUBSCRIPT INDICATES ELECTRONIC TRIP CIRCUIT BREAKER. PROVIDE WITH
ADJUSTABLE LONG TIME, SHORT TIME, AND INSTANTANEOUS TRIP SETTINGS. TYPICAL
FOR ALL.
2 PROVIDE METERING AT THE MAINS. METER SHALL HAVE A GRAPHICAL USER INTERFACE,
AMP METER, VOLT METER, INSTANTANEOUS, PEAK DEMAND AMP AND POWER READINGS
RECORDED WITH TIME STAMP. METER SHALL BE CAPABLE OF MODBUS TCP AND BACNET
COMMUNICATIONS.
3 PROVIDE TRANSFORMER WITH INSULATION CLASS 155 OR HIGHER AND COMPLETELY
ENCLOSED EXCEPT FOR VENTILATING OPENINGS AS REQUIRED BY NFPA 70, ARTICLE
450.21(B), EXCEPTION #2.
KEYED NOTES: #
480V, 3 PHASE, 4 WIRE + GROUND BUS75KAIC
DPS
SHEET
1500A
400AT
400AF
HR1
(10,000 AIC)
(##,### SCA)
R1
70A
480V- 120/208V
#2
T-R1 75 kVA
4000 A
277/480V, 3-PHASE, 4 WIRE(75,000 AIC)
MSB-5
1500AT
2000AF
500AT
600AF
R2A
480V- 120/208V
#4
T-R2A 45 kVA
600AT
600AF
600AT
600AF
600AT
600AF
480V, 3 PHASE, 4 WIRE + GROUND BUS75KAIC
DPN
SHEET
1500A
600AT
600AF
600AT
600AF
500AT
600AF
600AT
600AF
1500AT
2000AF
1000 kVAEXISTING UTILITY
TRANSFORMER
M
EXISTING UTILITY
METER
R2B
480V- 120/208V
#4
T-R2B 45 kVA
R3A-1
480V- 120/208V
#1/0
T-R3A
112.5 kVA
R3A-2
R3B-1
480V- 120/208V
#1/0
T-R3B
112.5 kVA
R3B-2
R4A
480V- 120/208V
#2
T-R4A 75 kVA
R4B
480V- 120/208V
#2
T-R4B 75 kVA
R5A
480V- 120/208V
#2
T-R5A 75 kVA
R5B
480V- 120/208V
#2
T-R5B 75 kVA
R6A-1
480V- 120/208V
#1/0
T-R6A
112.5 kVA
R6A-2
R6B-1
480V- 120/208V
#1/0
T-R6B
112.5 kVA
R6B-2
R7A
480V- 120/208V
#2
T-R7A 75 kVA
R7B
480V- 120/208V
#2
T-R7B 75 kVA
R8A
480V- 120/208V
#2
T-R8A 75 kVA
R8B
480V- 120/208V
#2
T-R8B 75 kVA
R9A-1
480V- 120/208V
#1/0
T-R9A
112.5 kVA
R9A-2
R10A
480V- 120/208V
#2
T-R10A 75 kVA
R10B
480V- 120/208V
#2
T-R10B 75 kVA
R9B-1
480V- 120/208V
#1/0
T-R9B
112.5 kVA
R9B-2
HR5
(10,000 AIC)
(##,### SCA)
R12A
480V- 120/208V
#1/0
T-R12A
112.5 kVA
R12B
480V- 120/208V
#1/0
T-R12B
112.5 kVA
R13A
480V- 120/208V
#2
T-R13A 75 kVA
R13B
480V- 120/208V
#2
T-R13B 75 kVA
R14A
480V- 120/208V
#2
T-R14A 75 kVA
R14B
480V- 120/208V
#2
T-R14B 75 kVA
R15A-1
480V- 120/208V
#1/0
T-R15A
112.5 kVA
R15A-2
R15B-1
480V- 120/208V
#1/0
T-R15B
112.5 kVA
R15B-2
R16A
480V- 120/208V
#1/0
T-R16A
112.5 kVA
R16B
480V- 120/208V
#1/0
T-R16B
112.5 kVA
R17A
480V- 120/208V
#2
T-R17A 75 kVA
R17B
480V- 120/208V
#2
T-R17B 75 kVA
R18
480V- 120/208V
#2
T-R18 75 kVA
HR10
(10,000 AIC)
(##,### SCA)
125A
HR9
(10,000 AIC)
(##,### SCA)
HR8
(10,000 AIC)
(##,### SCA)
HR7
(10,000 AIC)
(##,### SCA)
HR6
(10,000 AIC)
(##,### SCA)
125A
HR4
(10,000 AIC)
(##,### SCA)
HR3
(10,000 AIC)
(##,### SCA)
175A
HR2
(10,000 AIC)
(##,### SCA)
125A
480V- 120/208V
#2
T-C1 75 kVA
125A
175A
175A
R11A
480V- 120/208V
#2
T-R11A 75 kVA
R11B
480V- 120/208V
#2
T-R11B 75 kVA
125A
125A
175A
175A
125A
125A
175A
175A
175A
175A 125A
125A
400AT
400AF
CPN
(10,000 AIC)
(##,### SCA)
800AT
800AF
125A
C1
70A125A 125A175A
175A 125A
125A 175A
CPS
(10,000 AIC)
(##,### SCA)
800AT
800AF
125A125A
125A 125A
175A
175A
1. REFER TO DRAWING G-001 FOR SYMBOLS AND ABBREVIATIONS.
2. CONTRACTOR SHALL VERIFY BREAKER SIZES AND CABLING REQUIREMENTS WITH FINAL
APPROVED VENDOR DRAWINGS.
3. DESIGN BASIS IS SQUARE D PANELS AND BREAKERS. NO APPROVED EQUAL.
4. ALL ELECTRICAL EQUIPMENT ENCLOSURES SHALL BE CONNECTED TO GROUND.
5. ALL EQUIPMENT BEING REPLACED SHALL HAVE DEDICATED NEUTRALS.
6. BEFORE COMMENCEMENT OF WORK CONTRACTOR SHALL INVESTIGATE ALL EQUIPMENT
BEING REPLACED FOR DEDICATED NEUTRALS. WHERE EQUIPMENT DOES NOT HAVE
DEDICATED NEUTRALS, CONTRACTOR SHALL INFORM ENGINEER OF RECORD AND OWNER.
7. ALL CONDUCTOR SIZES ARE BASED ON EXISTING DRAWINGS.
8. EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS DATED JULY 1, 1980
AND FROM SITE VISITS.
9. WHERE EQUIPMENT lS SHOWN TO BE REPLACED AND WIRE IS SHOWN TO BE REUSED, RETAIN EXISTING WIRE FOR FUTURE USE.
10. THERE ARE NO NEW LOADS BEING ADDED UNDER THIS PROJECT.
11. ALL EQUIPMENT BEING REPLACED SHALL HAVE OCCC NEW ASSET-DECOMMISSION FORM
FILLED OUT AND RETURNED TO OCCC
GENERAL SHEET NOTES:
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
E-603
100078746
BID
12/02/22
ELECTRICAL ONE-LINE
DIAGRAM - HALL E -
DEMOLITION
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
N.T.S.
ELECTRICAL ONE LINE DIAGRAM - DEMOLITION - HALL E
480V, 3 PHASE, 4 WIRE + GROUND BUS75KAIC
DPS
SHEET
1500A
400AT
400AF
HR1
(10,000 AIC)
(##,### SCA)
R1
70A
480V- 120/208V
#2
T-R1 75 kVA
4000 A
277/480V, 3-PHASE, 4 WIRE(75,000 AIC)
MSB-5
1500AT
2000AF
500AT
600AF
R2A
480V- 120/208V
#4
T-R2A 45 kVA
600AT
600AF
600AT
600AF
600AT
600AF
480V, 3 PHASE, 4 WIRE + GROUND BUS75KAIC
DPN
SHEET
1500A
600AT
600AF
600AT
600AF
500AT
600AF
600AT
600AF
1500AT
2000AF
1000 kVAEXISTING UTILITY
TRANSFORMER
M
EXISTING UTILITY
METER
R2B
480V- 120/208V
#4
T-R2B 45 kVA
R3A-1
480V- 120/208V
#1/0
T-R3A
112.5 kVA
R3A-2
R3B-1
480V- 120/208V
#1/0
T-R3B
112.5 kVA
R3B-2
R4A
480V- 120/208V
#2
T-R4A 75 kVA
R4B
480V- 120/208V
#2
T-R4B 75 kVA
R5A
480V- 120/208V
#2
T-R5A 75 kVA
R5B
480V- 120/208V
#2
T-R5B 75 kVA
R6A-1
480V- 120/208V
#1/0
T-R6A
112.5 kVA
R6A-2
R6B-1
480V- 120/208V
#1/0
T-R6B
112.5 kVA
R6B-2
R7A
480V- 120/208V
#2
T-R7A 75 kVA
R7B
480V- 120/208V
#2
T-R7B 75 kVA
R8A
480V- 120/208V
#2
T-R8A 75 kVA
R8B
480V- 120/208V
#2
T-R8B 75 kVA
R9A-1
480V- 120/208V
#1/0
T-R9A
112.5 kVA
R9A-2
R10A
480V- 120/208V
#2
T-R10A 75 kVA
R10B
480V- 120/208V
#2
T-R10B 75 kVA
R9B-1
480V- 120/208V
#1/0
T-R9B
112.5 kVA
R9B-2
HR5
(10,000 AIC)
(##,### SCA)
R12A
480V- 120/208V
#1/0
T-R12A
112.5 kVA
R12B
480V- 120/208V
#1/0
T-R12B
112.5 kVA
R13A
480V- 120/208V
#2
T-R13A 75 kVA
R13B
480V- 120/208V
#2
T-R13B 75 kVA
R14A
480V- 120/208V
#2
T-R14A 75 kVA
R14B
480V- 120/208V
#2
T-R14B 75 kVA
R15A-1
480V- 120/208V
#1/0
T-R15A
112.5 kVA
R15A-2
R15B-1
480V- 120/208V
#1/0
T-R15B
112.5 kVA
R15B-2
R16A
480V- 120/208V
#1/0
T-R16A
112.5 kVA
R16B
480V- 120/208V
#1/0
T-R16B
112.5 kVA
R17A
480V- 120/208V
#2
T-R17A 75 kVA
R17B
480V- 120/208V
#2
T-R17B 75 kVA
R18
480V- 120/208V
#2
T-R18 75 kVA
HR10
(10,000 AIC)
(##,### SCA)
125A
HR9
(10,000 AIC)
(##,### SCA)
HR8
(10,000 AIC)
(##,### SCA)
HR7
(10,000 AIC)
(##,### SCA)
HR6
(10,000 AIC)
(##,### SCA)
125A
HR4
(10,000 AIC)
(##,### SCA)
HR3
(10,000 AIC)
(##,### SCA)
175A
HR2
(10,000 AIC)
(##,### SCA)
125A
480V- 120/208V
#2
T-C1 75 kVA
125A
175A
175A
R11A
480V- 120/208V
#2
T-R11A 75 kVA
R11B
480V- 120/208V
#2
T-R11B 75 kVA
125A
125A
175A
175A
125A
125A
175A
175A
175A
175A 125A
125A
400AT
400AF
CPN
(10,000 AIC)
(##,### SCA)
800AT
800AF
125A
C1
70A125A 125A175A
175A 125A
125A 175A
CPS
(10,000 AIC)
(##,### SCA)
800AT
800AF
125A125A
125A 125A
175A
175A
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G
3" C
(4) 350 KCMIL
(1) #3 G
3" C
(4) 350 KCMIL
(1) #3 G
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G 1-1/4" C
(3) #2
(1) #6 G
1-1/4" C
(3) #2
(1) #6 G
3" C
(4) 350 KCMIL
(1) #3 G
3" C
(4) 350 KCMIL
(1) #3 G
3" C
(4) 350 KCMIL
(1) #3 G
3" C
(4) 350 KCMIL
(1) #3 G
2" C
(3) #2/0
(1) #6 G 2" C
(3) #2/0
(1) #6 G 1-1/4" C
(3) #2
(1) #6 G
1-1/4" C
(3) #2
(1) #6 G
1-1/4" C
(3) #2
(1) #6 G 1-1/4" C
(3) #2
(1) #6 G
2" C
(3) #2/0
(1) #6 G 2" C
(3) #2/0
(1) #6 G
1-1/4" C
(3) #2
(1) #6 G
1-1/4" C
(3) #2
(1) #6 G 1-1/4" C
(3) #2
(1) #6 G
3" C
(4) 350 KCMIL
(1) #3 G 3" C
(4) 350 KCMIL
(1) #3 G 3" C
(4) 350 KCMIL
(1) #3 G
3 1/2" C
(4) 350 KCMIL
(1) #3 G
3 1/2" C
(4) 500 KCMIL
(1) #3 G
3 1/2" C
(4) 500 KCMIL
(1) #3 G
3 1/2" C
(4) 500 KCMIL
(1) #3 G
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G G
2" C
(4) 2/0
(1) #6 G
1 1/4" C
(3) #4
(1) #8 G 2" C
(3) #2/0
(1) #6 G
3 1/2" C
(4) 500 KCMIL
(1) #3 G
2" C
(4) 2/0
(1) #6 G
1 1/4" C
(3) #4
(1) #8 G
2" C
(3) #2/0
(1) #6 G
3 1/2" C
(4) 500 KCMIL
(1) #3 G
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G
2" C
(3) #2/0
(1) #6 G
3 1/2" C
(4) 500 KCMIL
(1) #3 G
2" C
(3) #2/0
(1) #6 G
3 1/2" C
(4) 500 KCMIL
(1) #3 G
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G
3" C
(4) 350 KCMIL
(1) #3 G
1-1/4" C
(3) #2
(1) #6 G
2" C
(3) #2/0
(1) #6 G
3 1/2" C
(4) 500 KCMIL
(1) #3 G
1. REFER TO DRAWING G-001 FOR SYMBOLS AND ABBREVIATIONS.
2. CONTRACTOR SHALL VERIFY BREAKER SIZES AND CABLING REQUIREMENTS WITH FINAL
APPROVED VENDOR DRAWINGS.
3. DESIGN BASIS IS SQUARE D PANELS AND BREAKERS. NO APPROVED EQUAL.
4. ALL ELECTRICAL EQUIPMENT ENCLOSURES SHALL BE CONNECTED TO GROUND.
5. ALL EQUIPMENT BEING REPLACED SHALL HAVE DEDICATED NEUTRALS.
6. BEFORE COMMENCEMENT OF WORK CONTRACTOR SHALL INVESTIGATE ALL EQUIPMENT
BEING REPLACED FOR DEDICATED NEUTRALS. WHERE EQUIPMENT DOES NOT HAVE
DEDICATED NEUTRALS, CONTRACTOR SHALL INFORM ENGINEER OF RECORD AND OWNER.
7. ALL CONDUCTOR SIZES ARE BASED ON EXISTING DRAWINGS.
8. EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS DATED JULY 1, 1980
AND FROM SITE VISITS.
9. WHERE EQUIPMENT lS SHOWN TO BE REPLACED AND WIRE IS SHOWN TO BE REUSED, RETAIN EXISTING WIRE FOR FUTURE USE.
10. THERE ARE NO NEW LOADS BEING ADDED UNDER THIS PROJECT.
11. ALL EQUIPMENT BEING REPLACED SHALL HAVE OCCC NEW ASSET-DECOMMISSION FORM
FILLED OUT AND RETURNED TO OCCC
GENERAL SHEET NOTES:
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
E-604
100078746
BID
12/02/22
ELECTRICAL ONE-LINE
DIAGRAM - HALL E - NEW
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
N.T.S.
ELECTRICAL ONE LINE DIAGRAM - NEW - HALL E
PROFESSIONAL SEAL
SIMON ECHEVERRY, P.E.
FL PE NO. 75040
Sheet Number:Drawn By:
JOB No.
Phase:
Designed By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
Checked By:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
In te rn at io na l O rla nd o, F L
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
B
IM
/1
-O
C C
C W e st
E le c t
T x
P n l S w tG r/
O
C C
C W e st
E le c t
T x
P n l S w tG r_
E le c R
.r vt
E-801
100078746
BID
12/02/22
PANEL SCHEDULE
JP
SE
JG
O R
A N
G E
C O
U N
TY
C
O N
VE
N
TI
O
N C
EN
TE
R W
ES
T
B U
IL
D
IN
G
E
LE
C
TR
IC
A
L
TR
A N
S
FO
R M
E R
S
P A
N
EL
S A
N D
S W
IT
C
H G
E A
R R
EP
LA
C
EM
EN
T
Legend:
29 30
27 28
25 26
23 0 VA / 0 VA 24
21 0 VA / 0 VA 22
Spare 250 A 3
0 VA / 0 VA
3 150 A Spare
17 0 VA / 0 VA 18
15 0 VA / 0 VA 16
Spare 100 A 3
0 VA / 0 VA
3 150 A Spare
11 0 VA / 0 VA 12
9 0 VA / 0 VA 10
Spare 100 A 3
0 VA / 0 VA
3 60 A 60A 480V Receptacle
5 0 VA / 0 VA 6
3 0 VA / 0 VA 4
L4A1 via Transformer 250 A 3
0 VA / 0 VA
3 60 A 60A 480V Receptacle
CKT Circuit Description Trip Poles Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating: 400 A
Supply From: DP4A-2 Phases: 3 Mains Type: MLO
Location: Hall D Tunnel Volts: 480/277 Wye A.I.C. Rating: 42kA
Branch Panel: H4A1
Legend:
29 30
27 28
25 26
23 0 VA / 0 VA 24
21 0 VA / 0 VA 22
Spare 225 A 3
0 VA / 0 VA
3 150 A Spare
17 0 VA / 0 VA 18
15 0 VA / 0 VA 16
Spare 100 A 3
0 VA / 0 VA
3 100 A Spare
11 0 VA / 0 VA 12
9 0 VA / 0 VA 10
60A 480V Receptacle 60 A 3
0 VA / 0 VA
3 60 A 60A 480V Receptacle
5 0 VA / 0 VA 6
3 0 VA / 0 VA 4
L4A3A via Transformer 175 A 3
0 VA / 0 VA
3 250 A L4A4 via Transformer
CKT Circuit Description Trip Poles Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating: 400 A
Supply From: DP4A-2 Phases: 3 Mains Type: MLO
Location: Hall D Tunnel Volts: 480/277 Wye A.I.C. Rating: 42kA
Branch Panel: H4A2
Legend:
41 42
39 40
37 38
35 36
33 34
31 32
29 0 VA / 0 VA 30
27 0 VA / 0 VA 28
Spare 100 A 3
0 VA / 0 VA 26
23 0 VA / 0 VA 24
21 0 VA / 0 VA 22
L4A9 via Transformer 175 A 3
0 VA / 0 VA
3 250 A PPL4AC via Transformer
17 0 VA / 0 VA 18
15 0 VA / 0 VA 16
Spare 100 A 3
0 VA / 0 VA
3 60 A 60A 480V Receptacle
11 0 VA / 0 VA 12
9 0 VA / 0 VA 10
L4A9A via Transformer 175 A 3
0 VA / 0 VA
3 60 A 60A 480V Receptacle
5 0 VA / 0 VA 6
3 0 VA / 0 VA 4
L4A7 via Transformer 250 A 3
0 VA / 0 VA
3 175 A L4A6A via Transformer
CKT Circuit Description Trip Poles Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating: 600 A
Supply From: DP4A-2 Phases: 3 Mains Type: MLO
Location: Hall D Tunnel Volts: 480/277 Wye A.I.C. Rating: 42kA
Branch Panel: H4A3
Legend:
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 0 VA / 0 VA 24
21 0 VA / 0 VA 22
PPL4AA via Transformer 250 A 3
0 VA / 0 VA 20
17 0 VA / 0 VA 18
15 0 VA / 0 VA 16
Spare 100 A 3
0 VA / 0 VA
3 100 A Spare
11 0 VA / 0 VA 12
9 0 VA / 0 VA 10
60A 480V Receptacle 60 A 3
0 VA / 0 VA
3 60 A 60A 480V Receptacle
5 0 VA / 0 VA 6
3 0 VA / 0 VA 4
L4A10 via Transformer 450 A 3
0 VA / 0 VA
3 175 A L4A12 via Transformer
CKT Circuit Description Trip Poles Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating: 800 A
Supply From: DP4A-2 Phases: 3 Mains Type: MLO
Location: Hall D Tunnel Volts: 480/277 Wye A.I.C. Rating: 42kA
Branch Panel: H4A4
Legend:
29 0 VA / 0 VA 30
27 0 VA / 0 VA 28
Spare 100 A 3
0 VA / 0 VA
3 100 A Spare
23 0 VA / 0 VA 24
21 0 VA / 0 VA 22
Spare 225 A 3
0 VA / 0 VA
3 150 A Spare
17 0 VA / 0 VA 18
15 0 VA / 0 VA 16
Spare 225 A 3
0 VA / 0 VA
3 150 A Spare
11 Spare 20 A 1 0 VA / 0 VA 12
9 Spare 20 A 1 0 VA / 0 VA 10
7 Spare 20 A 1 0 VA / 0 VA
3 60 A 60A 480V Receptacle
5 0 VA / 0 VA 6
3 0 VA / 0 VA 4
L4A13 via Transformer 175 A 3
0 VA / 0 VA
3 60 A 60A 480V Receptacle
CKT Circuit Description Trip Poles Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating: 400 A
Supply From: DP4A-2 Phases: 3 Mains Type: MLO
Location: Hall D Tunnel Volts: 480/277 Wye A.I.C. Rating: 42kA
Branch Panel: H4A5
Legend:
41 42
39 40
37 38
35 36
33 34
31 32
29 0 VA / 0 VA 30
27 0 VA / 0 VA 28
Spare 150 A 3
0 VA / 0 VA 26
23 0 VA / 0 VA 24
21 0 VA / 0 VA 22
PPL4BA via Transformer 250 A 3
0 VA / 0 VA
3 225 A Spare
17 0 VA / 0 VA 18
15 0 VA / 0 VA 16
Spare 100 A 3
0 VA / 0 VA
3 100 A Spare
11 0 VA / 0 VA 12
9 0 VA / 0 VA 10
60A 480V Receptacle 60 A 3
0 VA / 0 VA
3 60 A 60A 480V Receptacle
5 0 VA / 0 VA 6
3 0 VA / 0 VA 4
L4B1A via Transformer 175 A 3
0 VA / 0 VA
3 250 A L4B2 via Transformer
CKT Circuit Description Trip Poles Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating: 400 A
Supply From: DP4B Phases: 3 Mains Type: MLO
Location: Hall D Tunnel Volts: 480/277 Wye A.I.C. Rating: 42kA
Branch Panel: H4B1
Legend:
29 0 VA / 0 VA 30
27 0 VA / 0 VA 28
PPL4BB via Transformer 250 A 3
0 VA / 0 VA 26
23 0 VA / 0 VA 24
21 0 VA / 0 VA 22
Spare 100 A 3
0 VA / 0 VA 20
17 0 VA / 0 VA 18
15 0 VA / 0 VA 16
60A 480V Receptacle 60 A 3
0 VA / 0 VA
3 100 A Spare
11 0 VA / 0 VA 12
9 0 VA / 0 VA 10
L4B4 via Transformer 175 A 3
0 VA / 0 VA
3 60 A 60A 480V Receptacle
5 0 VA / 0 VA 6
3 0 VA / 0 VA 4
L4B7A via Transformer 175 A 3
0 VA / 0 VA
3 250 A L4B5 via Transformer
CKT Circuit Description Trip Poles Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4 Mains Rating: 600 A
Supply From: DP4B Phases: 3 Mains Type: MLO
Location: Hall D Tunnel Volts: 480/277 Wye A.I.C. Rating: 42kA
Branch Panel: H4B2
Legend:
29 30
27 28
25 26
23 0 VA / 0 VA 24
21 0 VA / 0 VA 22
L4B7 via Transformer 175 A 3
0 VA / 0 VA
3 225 A Spare
17 0 VA / 0 VA 18
15 0 VA / 0 VA 16
Spare 100 A 3
0 VA / 0 VA
3 100 A Spare
11 0 VA / 0 VA 12
9 0 VA / 0 VA 10
60A 480V Receptacle 60 A 3
0 VA / 0 VA
3 60 A 60A 480V Receptacle
5 0 VA / 0 VA 6
3 0 VA / 0 VA 4
L4B8 via Transformer 250 A 3
0 VA / 0 VA
3 175 A L4B10 via Transformer
CKT Circuit Description Trip Poles Poles Trip Circuit Description CKT
Notes:
Enclosure: Type 1
Mounting: Surface Wires: 4…