OCC_CEP-1_FIRE_PUMP_SYSTEM_REPLACEMENT_-_100%_DRAWINGS.pdf
PDF 13 MB Posted
- Attached to
- Corrections CEP 1 Fire Pump System Replacement
- Solicitation number
- Y22-7007
- Issued by
- Orange County, Orlando City, Florida
About this file
These are 100% construction documents for the Orange County Corrections CEP #1 Fire Pump System Replacement project located at 2400 33rd Street in Orlando, Florida, dated October 13, 2021. The comprehensive set of engineering and design drawings includes structural, electrical, fire protection, and site utility plans prepared by Atkins Global for Orange County Government. The project involves replacing the existing fire pump system at the Corrections Center, with detailed plans covering demolition, new work, electrical one-line diagrams, panel schedules, and site utility configurations.
The documents indicate a pre-engineered pump house structure will be installed, with specific technical requirements for concrete foundations, electrical systems, and utility connections. The project scope includes removing existing infrastructure, installing new fire pump equipment, reconfiguring electrical systems, and ensuring compliance with local building codes and engineering standards. The construction documents provide extensive technical specifications, including wind load calculations, concrete design criteria, electrical panel schedules, and utility coordination requirements, suggesting a complex infrastructure replacement project with precise engineering specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OCC_CEP-1_FIRE_PUMP_SYSTEM_REPLACEMENT_-_100%_SPECIFICATIONS.pdf | ||
| Y22-7007-CC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100% CONSTRUCTION DOCUMENTS
OCTOBER 13, 2021
OCTOBER 13, 2021
100% CDs
STATE: FLORIDA COUNTY: ORANGE
SITE
NICOLE H. WILSON
COVER SHEET AND SHEET INDEXG-000 YES
SHEET NAMESHEET
NUMBER
SHEET
ISSUED
NO SCALE
GENERAL NOTESC-100 YESNO SCALE
EROSION CONTROL AND DEMOLITION PLANC-200 YES1"=10'-0"
SITE AND UTILITY PLANC-300 YES1"=10'-0"
SITE DETAILSC-500 YESNO SCALE
FIRE PROTECTION PLAN - DEMOLITIONFD-101 YES1"=10'-0"
FIRE PROTECTION PLAN - NEW WORKF-101 YES1"=10'-0"
ELECTRICAL LEGEND, SYMBOLS AND
GENERAL NOTES
E-001 YESNO SCALE
CEP BUILDING ELECTRICAL DEMOLITION WORKED-101 YES1/16"=1'-0"
ELECTRICAL ONE-LINE DIAGRAM DEMOLITIONED-201 YESNO SCALE
CEP BUILDING POWER PLANE-101 YES1/16"=1'-0"
ELECTRICAL ONE-LINE DIAGRAM NEW WORKE-201 YESNO SCALE
SCALE
STRUCTURAL NOTES, PLAN, & DETAILSS-101 YESNO SCALE
ELECTRICALPANEL SCHEDULESE-301 YESNO SCALE
Sheet Number:Designed By:
JOB No.
100058985
Phase:
Checked By:
Date Issued: 10/11/2021
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
QC Review:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
O ra ng e
Co un ty C or re ct io ns C
EP
Fi re P um p
Sy st em R ep la ce m en t
3r d St re et
, O rla nd o
Fl
DL
CT
RR
CHRISTOPHER L. THOMPSON JR, P.E. 83165
482 SOUTH KELLER ROAD ORLANDO, FL 32810
TEL. 407.647.7275
FAX. 407.806.4500
FBPR CERTIFICATE OF AUTHORIZATION NO.24
www.atkinsglobal.com
100% CDs
10/11/20211 100% CONSTRUCTION DOCUMENTS
GENERAL NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING TO HIS SATISFACTION, PRIOR TO THE
EXECUTION OF THE CONTRACT, THE NATURE AND LOCATION OF THE WORK, THE CONFIRMATION OF THE
EXISTING GROUND, THE CHARACTER AND QUALITY OF THE SUBSTRATA, THE TYPES AND QUANTITY OF
EXISTING MATERIALS TO BE ENCOUNTERED, THE NATURE OF THE GROUNDWATER CONDITIONS, THE
CHARACTER OF EQUIPMENT AND FACILITIES NEEDED PRIOR TO AND DURING THE EXECUTION OF THE
WORK, THE GENERAL AND LOCAL CONDITIONS, AND ALL OTHER MATTERS WHICH CAN IN ANY WAY AFFECT
THE WORK UNDER THIS CONTRACT. THE CONTRACT UNIT PRICES FOR THE ENTIRE CONTRACT WILL
REFLECT ALL COSTS PERTAINING TO PROPOSED WORK.
2. THE CONTRACTOR SHALL SUPPLY HIS OWN TEMPORARY ELECTRIC, WATER AND SANITARY FACILITIES AND
ACQUIRE ALL NECESSARY CONSTRUCTION PERMITS. TEMPORARY SANITARY SEWER FACILITIES FOR
CONSTRUCTION WORKERS SHALL REMAIN LOCKED DURING NON- CONSTRUCTION HOURS. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO CONTACT EACH UTILITY COMPANY AND ORANGE COUNTY.
3. ALL COSTS ASSOCIATED WITH PREPARING THE CONTRACTOR' S STORAGE AND STAGING AREA SITE SHALL
BE BORNE BY THE CONTRACTOR. THIS INCLUDES, BUT IS NOT LIMITED TO, CLEARING AND GRADING OF THE
SITE, CONSTRUCTION OF ALL TEMPORARY UTILITIES, ACCESS ROADS, ALL SECURITY FENCING, PERMITTING
COSTS, RESTORATION OF THE SITE TO ITS ORIGINAL CONDITION AT PROJECT COMPLETION, MEETING
FEDERAL, STATE AND LOCAL REQUIREMENTS, ETC.
4. CONTRACTOR SHALL REVIEW ALL PERMITS BEFORE BIDDING ON THE PROJECT AND BECOME FAMILIAR
WITH THE CONDITIONS OF THE PERMITS. CONTRACTOR SHALL ENSURE THAT THE CONSTRUCTION
ACTIVITIES ARE IN COMPLIANCE WITH ALL REGULATORY AGENCY PERMITS.
5. THE PROJECT PAY ITEMS ARE INTENDED TO BE INCLUSIVE OF ALL WORK TO BE PERFORMED WITHIN THESE
CONTRACT DOCUMENTS AND ALL REFERENCED CONSTRUCTION AND PERMIT REQUIREMENTS. ALL
INCIDENTAL WORK REQUIRED TO COMPLETE THE PROJECT AND ADHERE TO THIS PROJECT'S
REQUIREMENTS SHALL BE INCLUDED IN THE CONTRACTOR'S BIO UNDER THE MOST APPLICABLE BID ITEM.
6. THE CONTRACTOR WILL RESTRICT PERSONNEL, THE USE OF EQUIPMENT, AND THE STORAGE OF
MATERIALS TO AREAS WITHIN THE LIMITS OF CONSTRUCTION, OR TO OTHER AREAS AS DIRECTED BY THE
OWNER'S AUTHORIZED REPRESENTATIVE.
7. ALL CONTRACTOR VEHICLES AND TRAFFIC SHALL REMAIN WITHIN THE DESIGNATED CONSTRUCTION AREAS, STAGING AREAS, OR HAUL ROUTES.
8. THE CONTRACTOR SHALL COMPLY WITH OSHA'S EXCAVATION SAFETY STANDARDS AND THE FLORIDA
TRENCH SAFETY ACT.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND RESTORATION OF EXISTING PAVEMENT, SIDEWALK, UTILITY PIPES, CONDUITS, SPRINKLER HEADS, CABLES, GRASS, LANDSCAPED AREAS, AND ALL
OTHER EXISTING IMPROVEMENTS DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS. THE
CONTRACTOR SHALL RESTORE ALL EXISTING IMPROVEMENTS TO ORIGINAL CONDITION OR BETTER AT NO
ADDITIONAL COST TO THE OWNER.
10. WHERE REQUIRED, AT NO ADDITIONAL COST TO THE OWNER, THE CONTRACTOR SHALL USE TEMPORARY
SHEETING OR TRENCH BOXES, TO MINIMIZE THE SIZE OF EXCAVATIONS IN ORDER TO PROTECT ADJACENT
EXISTING ROADWAYS, UTILITIES AND OTHER FACILITIES.
11. UNLESS OTHERWISE NOTED, EXISTING DRAINAGE STRUCTURES AND DRAINAGE PIPE AT THE PROJECT
SHALL REMAIN .
12. HORIZONTAL AND VERTICAL DATUM FOR THIS PROJECT IS RELATIVE TO THE ELEVATIONS AND HORIZONTAL
POSITIONS OF FIXED IMPROVEMENTS SHOWN ON SHEET 4 OF 7 OF SURVEY BY SOUTHEASTERN SURVEYING
AND MAPPING CORPORATION, DRAWING NO. 46280007, REV. 10/13/09 PER DIGITAL FILES FURNISHED BY THE
CLIENT. WOOD VERIFIED THE RELATIVE LOCATIONS AND ELEVATIONS OF SEVERAL FIXED IMPROVEMENTS
(SUCH AS MANHOLES AND DRAINAGE INLETS) DEPICTED ON SHEET 4 AND UTILIZED THESE LOCATIONS AND
ELEVATION VALUES TO PERFORM THE LIMITED TOPOGRAPHIC SURVEY. THE RELATIONSHIP OF THESE
PROJECT SPECIFIC DATUM'S TO A PUBLISHED DATUM SUCH AS THE NORTH AMERICAN DATUM OF 1983
(NAD83) OR THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) IS UNKNOWN.
13. CONTRACTOR SHALL SET TEMPORARY BENCHMARKS AS NEEDED.
14. ANY SURVEY MONUMENT WITHIN THE LIMITS OF CONSTRUCTION IS TO BE PROTECTED. IF A MONUMENT IS
IN DANGER OF BEING DAMAGED, THE CONTRACTOR SHALL NOTIFY THE FLORIDA DEPARTMENT OF NATURAL
RESOURCES, BUREAU OF SURVEY AND MAPPING, 3900 COMMONWEALTH BOULEVARD, SUITE 309 , TALLAHASSEE, FLORIDA 32399, TELEPHONE (904) 488-2427.
15. ALL PUBLIC LAND CORNERS OR COUNTY MONUMENTS WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE
PROTECTED. IF A CORNER OR MONUMENT IS IN DANGER OF BEING DESTROYED AND HAS NOT BEEN
PROPERLY REFERENCED, THE CONTRACTOR'S CONSTRUCTION MANAGER SHOULD NOTIFY THE CITY OF
MIAMI BEACH SURVEYOR WITHOUT DELAY.
16. ALL EXISTING ROADS AND DRIVEWAYS SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES DURING
CONSTRUCTION, UNLESS WRITTEN APPROVAL IS OBTAINED FROM THE OWNER.
17. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL AIR QUALITY AND POLLUTION
CONTROL REGULATIONS PERTAINING TO CONSTRUCTION ACTIVITIES.
18. SILT FENCES SHALL BE PLACED IN ACCORDANCE WITH THE FDOT DESIGN STANDARDS. ALL EROSION
CONTROL DEVICES SHALL BE REMOVED BY THE CONTRACTOR AFTER INSTALLATION OF PERMANENT
GRASSING IS COMPLETE. THE COST OF REMOVING EROSION CONTROL ITEMS IS TO BE INCLUDED IN THE
COST OF EROSION CONTROL. ANY AREAS DISTURBED BY THE REMOVAL OF EROSION CONTROL ITEMS
SHALL BE REGRASSED OR SODDED AT NO ADDITIONAL COST TO THE OWNER.
19. PRIOR TO AND DURING CONSTRUCTION, THE CONTRACTOR SHALL INSURE AGAINST POLLUTING, SILTING
OR DISTURBING ONSITE AND DOWNSTREAM WATER BODIES AND WETLANDS TO SUCH AN EXTENT AS TO
CAUSE AN INCREASE IN TURBIDITY ABOVE THAT ALLOWED BY CHAPTER 62-302, FLORIDA ADMINISTRATIVE
CODE (FAC) (0 NTU ABOVE BACKGROUND), TO WATERS OF THE STATE. SUCH MEASURES MAY INCLUDE, BUT
NOT BE LIMITED TO, CONSTRUCTION OF TEMPORARY EROSION CONTROL STRUCTURES SUCH AS SEDIMENT
BASINS, SEDIMENT CHECKS, OR SILT BARRIERS. THESE TURBIDITY CONTROL DEVICES SHALL BE INSPECTED
AND MAINTAINED ON A DAILY BASIS TO ENSURE THAT CONSTRUCTION GENERATED TURBIDITY IS
CONTAINED WITHIN THE WORK AREAS. AT NO TIME SHALL THE CONSTRUCTION SITE RUNOFF OR
DEWATERING ACTIVITY RESULT IN EXCEEDING THE WATER QUALITY STANDARDS AS SET FORTH IN
CHAPTER 62 - 302, FLORIDA ADMINISTRATIVE CODE (FAC) AS REQUIRED BY THE FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION (FDEP).
20. CONTRACTOR SHALL PROVIDE SITE DRAINAGE AND EROSION CONTROL DURING CLEARING AND GRUBBING
AND ALL PHASES OF CONSTRUCTION. SITE DRAINAGE AND FLOW THROUGH EXISTING AND TEMPORARY
DRAINAGE SYSTEMS SHALL BE MAINTAINED AT ALL TIMES AND SHALL EQUAL THE FLOW THROUGH THE
EXISTING SYSTEM.
21. CONTRACTOR TO SUBMIT AND RECEIVE APPROVAL OF AN EROSION CONTROL PLAN FROM THE OWNER
PRIOR TO BEGINNING ANY CONSTRUCTION. EROSION CONTROL ITEMS ARE REQUIRED FOR PREVENTION, CONTROL AND ABATEMENT OF EROSION, SEDIMENTATION, AND WATER POLLUTION. THESE ITEMS ARE TO
BE USED AT THE LOCATIONS DESCRIBED IN THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN TO
COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS. CONTRACTOR TO SUBMIT NPDES PERMIT
APPLICATION AND PROVIDE OWNER WITH A COPY.
22. THE EROSION CONTROL MEASURES AS SHOWN IN FDOT DESIGN STANDARDS ARE THE MINIMUM REQUIRED.
ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED DUE TO FIELD CONDITIONS AS DETERMINED
BY THE OWNER AND REGULATORY AGENCIES.
23. IN ADDITION TO THE TURBIDITY AND EROSION CONTROL MEASURES SPECIFIED IN THE FDOT DESIGN
STANDARDS, BEST MANAGEMENT PRACTICES FOR EROSION AND TURBIDITY CONTROL SHALL BE UTILIZED
AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH
ALL LOCAL, STATE AND FEDER AL REGULATIONS INCLUDING, BUT NOT LIMITED TO, SOUTH FLORIDA WATER
MANAGEMENT DISTRICT (SFWMD) AND FDEP ( NPDES). THESE BEST MANAGEMENT PRACTICES SHALL
INCLUDE THE USE AND MAINTENANCE OF STAKED FILTER CLOTH, AND OTHER SUITABLE MEANS
SURROUNDING ALL CONSTRUCTION AREAS TO PREVENT EROSION AS WELL AS THE USE OF FLOA TING OR
STAKED TURBIDITY SCREENS, WHERE APPROPRIATE, TO ISOLATE CONSTRUCTION AREAS FROM ADJACENT
SURFACE WATERS. THESE TURBIDITY CONTROL DEVICES SHALL BE INSPECTED AND MAINTAINED ON A
DAILY BASIS TO ENSURE THAT CONSTRUCTION GENERATED TURBIDITY IS CONTAINED WITHIN THE WORK
AREAS AND THAT THE TURBIDITY CONTROL DEVICES REMAIN IN PLACE UNTIL ALL CONSTRUCTION IS
COMPLETE.
24. THE CONTRACTOR SHALL APPLY BEST MANAGEMENT PRACTICES TO PREVENT EROSION OF SOILS, TURBIDITY AND POLLUTION IN ADJACENT WATERWAYS, DUST CLOUDS AND AIR POLLUTION.
25. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL FDEP NPDES PERMITS. THE CONTRACTOR SHALL
PREPARE AND SUBMIT ALL PERMIT APPLICATIONS, EXHIBITS, STORMWATER POLLUTION PREVENTION
PLANS (SWPPP) AND ALL OTHER REQUIRED SUBMITTALS NECESSARY TO OBTAIN THE NPDES PERMIT FOR
THE PROJECT.THE CONTRACTOR SHALL SUBMIT TWO (2) COPIES OF ALL SUBMITTAL DOCUMENTS TO THE
OWNER AND TWO (2) COPIES TO THE ENGINEER FOR REVIEW AND ACCEPTANCE PRIOR TO SUBMITTING
NPDES PERMIT APPLICATION / NOTIFICATION TO FDEP.
26. THE CONTRACTOR SHALL NOT BRING ANY HAZARDOUS MATERIALS ONTO THE PROJECT. SHOULD THE
CONTRACTOR REQUIRE SUCH FOR PERFORMING THE CONTRACTED WORK, THE CONTRACTOR SHALL
REQUEST, IN WRITING, WRITTEN PERMISSION FROM THE OWNER. THE CONTRACTOR SHALL PROVIDE THE
OWNER WITH A COPY OF THE MATERIAL SAFETY DATA SHEET (MSDS) FOR EACH HAZARDOUS MATERIAL
PROPOSED FOR USE. THE OWNER SHALL ISSUE WRITTEN APPROVAL TO THE CONTRACTOR. BECAUSE
STATE LAW DOES NOT TREAT PETROLEUM PRODUCTS THAT ARE PROPERLY CONTAINERIZED AND IN
TENDED FOR EQUIPMENT USE AS A HAZARDOUS MATERIAL, SUCH PRODUCTS DO NOT NEED A MSDS
SUBMITTAL.
27. ANY KNOWN OR SUSPECTED HAZARDOUS MATERIAL FOUND ON THE PROJECT BY THE CONTRACTOR SHALL
BE IMMEDIATELY REPORTED TO THE OWNER, WHO SHALL DIRECT THE CONTRACTOR TO PROTECT THE
AREA OF KNOWN OR SUSPECTED CONTAMINATION FROM FURTHER ACCESS. THE OWNER WILL ARRANGE
FOR INVESTIGATION, IDENTIFICATION, AND REMEDIATION OF THE HAZARDOUS MATERIAL. THE
CONTRACTOR SHALL NOT RETURN TO THE AREA OF CONTAMINATION UNTIL APPROVAL IS PROVIDED BY
THE OWNER.
28. EXISTING CONDITIONS AND LOCATIONS OF EXISTING UTILITIES AND STORM DRAINAGE PIPE AND
STRUCTURES INDICATED ON THE PLANS ARE TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS, SURVEYS AND FIELD INVESTIGATIONS. IT IS TO BE UNDERSTOOD THAT UNFORESEEN CONDITIONS MAY
EXIST AND NEW AND EXISTING WORK MAY NOT BE LOCATED EXACTLY AS SHOWN ON THE DRAWINGS. IT IS
ALSO TO BE UNDERSTOOD THAT THE PLANS ARE NOT COMPLETELY TO SCALE. THE CONTRACTOR SHALL
CONTACT THE UTILITY OWNERS TO FIELD VERIFY LOCATIONS AND DIMENSIONS OF ALL EXISTING SITE
UTILITIES AND THE CONTRACTOR SHALL FIELD VERIFY ALL OTHER EXISTING IMPROVEMENTS PRIOR TO
CONSTRUCTION. THE COSTS FOR DEVIATIONS OR UNKNOWN CONDITIONS SHALL BE INCLUDED IN THE
CONTRACT.
29. PRIOR TO COMMENCEMENT OF ANY EXCAVATION, THE CONTRACTOR SHALL COMPLY WITH FLORIDA
STATUTES FOR THE PROTECTION OF UNDERGROUND GAS PIPELINES.
30. THE LOCATION OF THE UTILITIES SHOWN IN THE PLANS IS BASED ON LIMITED INVESTIGATION TECHNIQUES
AND SHOULD BE CONSIDERED APPROXIMATE ONLY. THE VERIFIED LOCATIONS/ELEVATIONS APPLY ONLY AT
THE POINT SHOWN. INTERPOLATIONS BETWEEN THESE POINTS HAVE NOT BEEN VERIFIED. ALL UTILITIES
SHALL REMAIN UNLESS OTHERWISE NOTED.
31. THE CONTRACTOR SHALL NOTIFY UTILITY OWNERS THROUGH SUNSHINE 811 (DIAL 811) AT LEAST 48 HOURS
IN ADVANCE OF BEGINNING CONSTRUCTION ON JOB SITE.
32. PRIOR TO ANY SITE WORK, THE CONTRACTOR SHALL SUPPLY TO THE OWNER A COMPREHENSIVE
CHECKLIST OF UTILlTY FACILITY OWNERS CONTACTED FOR VERIFICATION OF ON-SITE UTILITIES AND THE
LOCATION OF FACILITIES. THE CHECK LIST SHALL INCLUDE: CONTACT NAME, TELEPHONE NUMBER, DATE
CONTACTED AND DATE UTILITY WAS FLAGGED AT SITE. NO WORK AT SITE SHALL PROCEED WITHOUT
OWNER'S WRITTEN REVIEW AND ACCEPTANCE OF THE COMPREHENSIVE UTILITY LOCATE CHECK LIST.
ADDITIONALLY, PRIOR TO ANY WORK PROCEEDING AT THE PROJECT SITE. THE CONTRACTOR SHALL FLAG
THE LOCATION OF ALL UTILITIES (WATER, SEWER, RECLAIMED WATER, POWER, TELEPHONE, FUEL, GAS, AND ALL OTHERS) IN THE FIELD. THE OWNER SHALL PROVIDE WRITTEN REVIEW AND ACCEPTANCE OF
FLAGGED LOCATIONS OF UTILITIES AND MUST PROVIDE WRITTEN NOTICE TO PROCEED TO THE
CONTRACTOR PRIOR TO ANY EXCAVATION AT THE SITE. AS PART OF THE FLAGGING OF THE UTILITIES, THE
CONTRACTOR SHALL HAND EXCAVATE, OR USE OTHER SUBSURFACE UTILITY LOCATING TECHNIQUES, AT
EACH UTILlTY CROSSING OR AT LOCATIONS ADJACENT TO PROPOSED IMPROVEMENTS, TO EXPOSE, TO A
DEPTH OF 2 FEET BELOW THE BOTTOM OF ANY PROPOSED EXCAVATIONS, THE UTILITY FOR VISUAL
VERIFICATION BY THE OWNER PRIOR TO CONSTRUCTION. THE OWNER'S REVIEW OF THE EXISTING
UTILITIES, FLAGGING, EXPOSURE AND REVIEW OF THE CHECKLIST IS FOR VERIFICATION OF THE
CONTRACTOR'S UTILITY LOCATE EFFORTS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING, PROTECTING AND SUPPORTING ALL EXISTING UTILITIES AND IS RESPONSIBLE FOR ANY DAMAGE TO
UTILITIES WHETHER ON THE PLANS, CHECKLIST, FLAGGED, EXPOSED OR NOT.
C100
GENERAL NOTES
COMPANY CONTACT UTILITY TELEPHONE
CHARTER COMMUNICATIONS
CITY OF ORLANDO RECLAMATION
MCI
ORANGE COUNTY UTILITIES
SUMMIT BROADBAND
ORLANDO UTILITIES COMMISSION
TECO PEOPLES GAS
AT&T DISTRIBUTION
MARVIN USRY JR
DANIEL BOLLONE
INVESTIGATION
VICTOR GONZALEZ
LESTER GUTHRIE
STEVEN LOCKINGTON
JOAN DOMNING
DINO FARRUGGIO
TELEPHONE
RECLAIMED WATER
COMMUNICATIONS
SANITARY
CABLE TV
WATER
GAS
FIBER OPTIC
407.532.8509
407.246.3805
469.886.4091
407.836.6869 EXT.66869
407.996.1183
407.434.2568
813.275.3783
561.997.0240
SF
LIMITS OF PROPOSED
TRENCH\DEMOLITION
SINGLE ROW SILT FENCE
INLET SEDIMENT FILTER
STORM SEWER PIPE AND
STRUCTURE
EXISTING SANITARY PIPE AND
STRUCTURE
EXISTING STRUCTURE LABEL
LEGEND
EXISTING CONCRETE PAD
TO BE REMOVED
LIMITS OF CONSTRUCTION
ASTERISK INDICATES EXISTING
DATA OBTAINED FROM
RECORD DRAWINGS
X X X X X X X X X X EXISTING ELEMENT TO BE
DEMOLISHED
SAWCUT EXISTING ASPHALT
PRIOR TO DEMOLITION (TYP)
SAWCUT CLEAN JOINTS PRIOR
TO DEMOLITION (TYP)
EXISTING ELECTRICAL
MANHOLE TO REMAIN
SF
SF
SF
SF
SF
SF
SF
SF
S F
S F
ELECTICAL FIXTURES TO BE
RELOCATED AS NEEDED
EXISTING STORM PIPE
TO REAMAIN
EXISTING WATER MAIN
TO REMAIN
EXISTING CHAINLINK
TO BE REMOVED
EXISTING 10" PVC SANITARY
PIPE TO REMAIN
EXISTING STORM
INLET TO REMAIN.
PROVIDE SEDIMENT
PROTECTED.
(TYP)
EXISTING AC UNIT
TO REMIAN
EXISTING STEEL BOX
TO REMAIN
EXISTING BOLLARD TO
BE REMOVED
EXISTING BURIED
TELEPHONE LINE
TO REMAIN
EXISTING 8" PVC
SANITARY PIPE
TO REMAIN
EXISTING 4" DIP
SANITARY PIPE
TO REMAIN
EXISTING SANITARY
MANHOLE TO REMAIN
(TYP)
EXISTING 8" PVC
SANITARY PIPE
TO REMAIN
EXISTING SANITARY
MANHOLE TO REMAIN
(TYP)
EXISTING SEWER
VALVE TO
REMAIN
EXISTING BOLLARD TO
BE REMOVED
LIMITS OF
CONSTRUCTION
LIMITS OF
CONSTRUCTION
EXISTING AWNING SUPPORT COLUMN TO
REMAIN. CONTRACTOR SHALL PROVIDE
TEMPORARY REINFORCEMENT TO
COLUMN DURING CONSTRUCTION.
CONTRACTOR MAY NEED TO PROVIDE
TEMPORARY SHORING, AT NO
ADDITIONAL COST TO THE OWNER, TO
PROTECT EXISTING STRUCTURES.
EXISTING CURB
AND GUTTER TO BE
REMOVED
EXISTING CURB TO
REMAIN
EXISTING CURB
TO REMAIN
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
SEE FIRE PROTECTION PLANS FOR
DEMOLITION OF EXISTING FIRE PUMP AND
PIPING. CONNECTION OF NEW PUMP SHALL
BE COORDINATED BY CONTRACTOR WITH
THE AHJ TO ENSURE FIRE PROTECTION IS
MAINTAINED AS REQUIRED
100058985
1. THE CONTRACTOR SHALL UTILIZE SUITABLE
EROSION CONTROL DURING DEMOLITION.
2. THE CONTRACTOR IS RESPONSIBLE FOR THE
DISPOSAL OF ALL DEMOLITION DEBRIS.
3. THE CONTRACTOR SHALL COORDINATE THE
REMOVAL/RELOCATION OF EXISTING UTILITIES WITH
THE OWNER OF SAID UTILITY. THIS SHALL INCLUDE
WATER, SEWER, STORM DRAIN, GAS, CABLE TV,
POWER AND TELEPHONE.
4. THE CONTRACTOR SHALL LOCATE ALL EXISTING
UTILITIES PRIOR TO DEMOLITION AND WILL BE
RESPONSIBLE FOR THE DAMAGE OF ANY ON-SITE
OR OFF-SITE UTILITIES THAT ARE OR ARE NOT A
PART OF THIS PROJECT OR ARE NOT IDENTIFIED TO
BE REMOVED. BELOW GROUND UTILITY LOCATIONS
ARE APPROXIMATE AND WERE BASED OFF OF
ABOVE GROUND FEATURES OBTAINED FROM THE
FIELD SURVEY.
5. CONTRACTOR IS RESPONSIBLE FOR THE PROPER
OFFSITE DISPOSAL OF ALL SPOIL MATERIALS
REMOVED FROM THE PROJECT SITE.
6. SAW CUT CLEAN EDGE WHEN REMOVING ASPHALT
AND CONCRETE PAVEMENT.
7. CONTRACTOR TO ADJUST TOPS OF ALL EXISTING
UTILITY FIXTURES TO BE FLUSH WITH THE NEWLY
PAVED AREAS.
8. AN ASTERISK NEXT TO EXISTING CALLOUTS
INDICATES THAT THE DATA WAS OBTAINED FROM
HISTORICAL DATA. THE CONTRACTOR SHALL FIELD
VERIFY.
9. PRIOR TO ORDERING MATERIALS AND BEGINNING
DEMOLITION, THE CONTRACTOR SHALL LOCATE
THE PROPOSED WATER AND SANITARY CORRIDORS
AND SHALL PROVIDE THE OWNER WITH A LEVEL A
SUBSURFACE SURVEY, PER CI/ASCE 38-20.
ADDITIONALLY, THE CONTRACTOR SHALL PROVIDE
THE OWNER WITH A UTILITY ADJUSTMENT PLAN.
THE ENGINEER WILL REVIEW THE CONTRACTOR'S
PROPOSED UTILITY ADJUSTMENT PLAN, AND
PROVIDE CONCURRENCE, IF ACCEPTABLE. THE
CONTRACTOR WILL BARE THE COST OF LEVEL A
SUBSURFACE SURVEY AND UTILITY ADJUSTMENTS.
10.PRIOR TO THE DEMOLITION OF THE SIDEWALK, THE
CONTRACTOR SHALL PROVIDE A TEMPORARY
WALKWAY/SIDEWALK, MEETING THE
REQUIREMENTS OF FDOT STANDARD PLANS INDEX
102-660. CHANNELIZING DEVICES AND ROAD SIGNS
ARE NOT NEEDED. THE OWNER WILL REVIEW AND
APPROVE THE LAYOUT OF TEMPORARY
WALKWAY/SIDEWALK.
NOTES
0 10' 20'
FULL SCALE: 1"=10'
HALF SCALE: 1"=20'
8'' FW
PROPOSED CONCRETE
STORM SEWER PIPE AND
STRUCTURE TO BE REMOVED
TO REMAIN
PROPOSED SANITARY PIPE
AND STRUCTURE
PROPOSED FIRE MAIN
EXISTING STRUCTURE LABEL
LEGEND
PROPOSED ASPHALT FULL
DEPTH
LIMITS OF CONSTRUCTION
ASTERISK INDICATES EXISTING
DATA OBTAINED FROM
RECORD DRAWINGS
EXISTING SANITARY PIPE AND
STRUCTURE TO REMAIN
MATCH EXISTING GRADE
SPOT ELEVATION-ASPHALT/BTTM
OF CURB
FORCEMAINFM
MEG
PROPOSED DIRECTION OF FLOW
8' ' F
W
'' F
W
8'' FW
8'' FW
8'' FW
8'' FW
8'' FW
8'' FW
8'' FW8'' FW
8' ' F
W
8' ' F
W
8' ' F
W
8' ' F
W
8' ' F
W
11.11'
F.F . = 9
9.
8" BEND45
8" BEND45
8" BEND45
16 LF 8" PVC FM,
C-900, DR 14
SEE MEP PLAN FOR
CONNECTION TO
FIRE MAIN
86 LF 8" PVC FM,
C-900, DR14
CONNECT TO EXISTING FIRE
LINE. CONTRACTOR SHALL
FIELD VERIFY LOCATION,
SIZE, AND MATERIAL OF
EXISTING FIRE LINE BEFORE
ORDERING PIPES AND
APPURTENANCES.
8" BEND45
SEE MEP PLAN FOR
CONTINUATION
8" TAPPING SLEEVE AND VALVE.
CONTRACTOR SHALL FIELD
VERIFY LOCATION, SIZE, AND
MATERIAL OF EXISTING LINE
BEFORE ORDERING PIPES AND
APPURTENANCES.
138 LF 8" PVC FM,
C-900, DR14
8" BEND45
30 LF 8" PVC FM,
C-900, DR14
14 LF 8" PVC FM,
C-900, DR14
16 LF 8" PVC FM,
C-900, DR14
5 LF 8" PVC FM,
C-900, DR 14
13'
6'
F.F
.5
10.66'
LIMITS OF
CONSTRUCTION
10.66' x 24' RAISED CONCRETE PAD.
SEE STRUCTURAL SHEETS FOR DETAILS.
PROPOSED
VERTICAL CURB.
MATCH EXISTING.
LIMITS OF
CONSTRUCTION
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
MEG
6'x13' RAISED CONCRETE
PAD. SEE STRUCTURAL
SHEETS FOR DETAILS.
EXISTING UTILITIES
NOTES:
1. CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS,
ELEVATIONS, AND DIMENSIONS OF ALL EXISTING
UTILITIES AND SHALL NOTIFY THE ENGINEER OF ANY
DEVIATION FROM THE PLANS PRIOR TO PROCEEDING
WITH ANY PROPOSED CONSTRUCTION OR ORDERING
OF MATERIALS.
2. CONTRACTOR TO NOTIFY ENGINEER IMMEDIATELY
UPON IDENTIFICATION OF UNKNOWN CONFLICTS.
3. AN ASTERISK NEXT TO EXISTING CALLOUTS INDICATES
THAT THE DATA WAS OBTAINED FROM HISTORICAL
DATA. THE CONTRACTOR SHALL FIELD VERIFY.
4. UTILITY LOCATIONS, DEPTHS, SIZES, AND MATERIALS
IDENTIFIED, ARE FROM RECORD DRAWINGS AND
AS-BUILT DRAWINGS. THE EXISTING UTILITIES IN THE
PATH OF NEW WATER AND SANITARY LINES HAVE NOT
BEEN IDENTIFIED. THE CONTRACTOR WILL MAKE
ADJUSTMENTS TO THE WATER LINE, SANITARY LINE,
OR EXISTING UTILITIES IN ORDER TO AVOID UTILITY
CONFLICTS AT NO ADDITIONAL COST TO THE OWNER.
5. ADJUSTMENTS MADE TO AVOID UTILITY CONFLICTS
MUST MEET THE SEPARATION REQUIREMENTS FOR
WATER, WASTEWATER, AND RECLAIMED WATER
MAINS INDICATED IN FIGURE A116, SHEET C500.
100058985
0 10' 20'
FULL SCALE: 1"=10'
HALF SCALE: 1"=20'
Sheet Number:Designed By:
JOB No.
100058985
Phase:
Checked By:
Date Issued: 10/11/2021
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
QC Review:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
O ra ng e
Co un ty C or re ct io ns C
EP
Fi re P um p
Sy st em R ep la ce m en t
3r d St re et
, O rla nd o
Fl
DL
CT
RR
CHRISTOPHER L. THOMPSON JR, P.E. 83165
482 SOUTH KELLER ROAD ORLANDO, FL 32810
TEL. 407.647.7275
FAX. 407.806.4500
FBPR CERTIFICATE OF AUTHORIZATION NO.24
www.atkinsglobal.com
100% CDs
10/11/20211 100% CONSTRUCTION DOCUMENTS
C500
SITE DETAILS
CONCRETE SIDEWALK DETAIL
NTS
W
6"
SINGLE-COMPONENT
POLYURETHANE SEALANT 3/4" THICK
CLOSED CELL SEMI-RIGID
PLASTIC JOINT FILLER
SINGLE-COMPONENT
POLYURETHANE SEALANT 3/4"
THICK
CLOSED CELL SEMI-RIGID PLASTIC
JOINT FILLER
OR
CONSTRUCTION JOINT
0.2*D
0.1*D
1/4"
STRUCTURE
D
1/4" EXPANSION JOINT
D
1/2"
1/4"
D/4
D
EXPANSION JOINT
D
CONTROL JOINT
NTS
SAWCUT JOINT
12"
NOTES:
ASPHALT PAVEMENT SPLICE DETAIL
NTS
ASPHALT PAVEMENT SECTION WITH
RECYCLED CONCRETE BASE
NTS
NORMAL DUTY PAVEMENT
FILTERED WATER
SECTION
PLAN
PAVEMENT (TYP)
GRATE
1" TYP1" TYP
ROCK / SAND BAGS OR BIOFILTER
BAGS (PLACED END TO END)
WRAP GRATE WITH FILTER
FABRIC WITH OVERLAPPING TOP
FLAPS
WRAP GRATE WITH FILTER
FABRIC WITH OVERLAPPING
TOP FLAPS
ROCK / SAND BAGS OR
BIOFILTER BAGS (PLACED
END TO END)
INLET SEDIMENT FILTER DETAIL
NTS
PIPES OF
EQUAL
SIZE
SANITARY GRAVITY SEWER
CLEANOUT DETAIL
NTS
1. (*) WHEN USED ON HIGH SIDE OF ROADWAYS, THE CROSS SLOPE OF THE
GUTTER SHALL MATCH THE CROSS SLOPE OF THE ADJACENT PAVEMENT.
THE THICKNESS OF THE LIP SHALL BE 6".
2. SEE FDOT INDEX 520-001, LATEST EDITION, FOR ADDITIONAL DETAILS
RELATED TO USES WITH PAVEMENT TYPES AS WELL AS JOINTS TYPES AND
SPACING.
GENERAL NOTES:
6" 1'-6"
R
R
R
TYPE F CURB DETAILS
NTS
4"
CAST-IN-PLACE CONCRETE
1. CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF THE
LATEST ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE."
2. CONCRETE SHALL BE NORMAL WEIGHT UNLESS OTHERWISE NOTED
AND SHALL CONFORM TO ASTM C-94 IN ADDITION TO THE FOLLOWING:
A. PORTLAND CEMENT SHALL MEET ASTM C-150 TYPEI/II.
B. AGGREGATES SHALL MEET ASTM C-33 (3/4" MAX).
C. AIR ENTRAINING AGENT SHALL MEET ASTM C-260.
D. WATER REDUCING AGENT SHALL MEET ASTM C-494.
E. CALCIUM CHLORIDE SHALL NOT BE USED IN THE MIX.
F. CURING COMPOUND SHALL MEET ASTM C309 TYPE 1 UNO.
3. CONCRETE SHALL HAVE THE MINIMUM ULTIMATE COMPRESSIVE
STRENGTH AS INDICATED BELOW. MIX DESIGNS SHALL BE APPROVED
BY THE ENGINEER BEFORE USE. FLY ASH, SUBSTITUTING FOR CEMENT,
SHALL NOT EXCEED 25% BY WEIGHT.
COMPONENT 28-DAY STRENGTH
FOOTINGS 3000 PSI
SLABS 3000 PSI
4. REINFORCING BARS USED IN CONCRETE SHALL BE GRADE 60 KSI
DEFORMED BAR CONFORMING TO ASTM SPECIFICATION A-615.
REINFORCEMENT SHALL BE RUST,OIL, AND SCALE FREE AND SHALL BE
PLACED AND BENT IN ACCORDANCE WITH THE REFERENCED
STANDARDS INDICATED IN NOTE 1 OF THIS SECTION. SHOP DRAWINGS
FOR REINFORCEMENT LAYOUT, DETAILING, AND PLACING SHALL BE
APPROVED BY THE STRUCTURAL ENGINEER PRIOR TO FABRICATION,
SITE DELIVERY, AND INSTALLATION.
5. CONCRETE SHALL BE CURED IN ACCORDANCE WITH ACI STANDARDS
AND SPECIFICATIONS. THE CONTRACTOR SHALL BEGIN CONCRETE
CURING IMMEDIATELY AFTER FINISHING OPERATIONS ARE
COMPLETED.
6. CONCRETE ADMIXTURES SHALL BE UTILIZED ONLY WITH PRIOR
APPROVAL FROM THE STRUCTURAL ENGINEER.
7. CONCRETE ADDITIVES SHALL BE COORDINATED BY THE CONTRACTOR
TO ENSURE COMPATIBILITY WITH COVERINGS, EXPOSED, POLISHED,
AND STAINED FINISHES AS SPECIFIED BY THE ARCHITECT.
8. CONCRETE TESTING SHALL BE REQUIRED FOR CAST-IN-PLACE
CONCRETE ELEMENTS AND SHALL BE PERFORMED BY A QUALIFIED,
INDEPENDENT TESTING LAB. MINIMUM TESTING SHALL BE FOR SLUMP
IN ACCORDANCE WITH ASTM C143 AND FOR COMPRESSIVE STRENGTH
IN ACCORDANCE WITH ASTM C39.
9. COMPRESSIVE STRENGTH TESTING SHALL BE CONDUCTED FOR EACH
CLASS, FOR EVERY FIFTY CUBIC YARDS OF CONCRETE PLACED PER
DAY. PLACEMENTS LESS THAN FIFTY CUBIC YARDS SHALL ALSO BE
TESTED PER DAY FOR EACH CLASS. A MINIMUM OF FOUR LAB-CURED
AND SIX FIELD-CURED CYLINDERS SHALL BE COLLECTED. TWO
CYLINDERS SHALL BE KEPT IN RESERVE AND TESTED, IF NECESSARY,
WITH PRIOR APPROVAL FROM THE STRUCTURAL ENGINEER.
10. MIX DESIGN SUBMITTALS SHALL BE SENT TO THE STRUCTURAL
ENGINEER FOR REVIEW AND APPROVAL PRIOR TO CONCRETE
PLACEMENT AND SHALL BE UNIQUELY IDENTIFIED WITH MIX NUMBER
AND EXACT LOCATION WHERE MIX WILL BE PLACED ON THE
STRUCTURE. SUBMITTALS SHALL INCLUDE DATA FROM RECENT FIELD
AND LAB CYLINDER TESTS AND STATISTICAL, TESTED BACK-UP DATA
PER ACI 318.
11. CONCRETE TICKETS FOR CONCRETE MIXES DELIVERED TO THE SITE
SHALL IDENTIFY THE EXACT TIME THAT THE MIX IS BATCHED.
CONCRETE PLACEMENT SHALL OCCUR WITHIN ONE AND A HALF
HOURS FROM THE TIME THE PROPORTIONED MIXING WATER IS ADDED
TO THE MIX FOR PLACEMENT. MIXES SHALL BE DISCARDED IF THIS
TIMEFRAME IS EXCEED. IT SHALL BE THE RESPONSIBILITY OF THE
INDEPENDENT TESTING LAB TO ASSURE COMPLIANCE WITH PLACING
TIME AND TO NOTIFY THE CONTRACTOR AND OWNER OF NON-
COMPLIANCE.
12. CONCRETE FORMS SHALL NOT BE STRIPPED UNTIL CONCRETE HAS
ATTAINED A MINIMUM 70% OF THE SPECIFIED 28-DAY COMPRESSIVE
STRENGTH AS INDICATED BY TESTING SAMPLES.
13. LAP SPLICE LENGTHS SHALL BE A MINIMUM OF 48 BAR DIAMETERS
UNLESS NOTED OTHERWISE.
14. CONCRETE CLEAR COVER OVER REINFORCING SHALL BE IN
ACCORDANCE WITH ACI 318 AS LISTED BELOW, UNLESS NOTED
OTHERWISE.
LOCATION CLEAR COVER
CAST AGAINST EARTH 3"
EXPOSED TO EARTH OR WEATHER #6 AND LARGER 2"
EXPOSED TO EARTH OR WEATHER #5 AND SMALLER 1 1/2"
SLABS AND WALLS NOT EXPOSED TO WEATHER 3/4"
BEAMS AND COLUMNS NOT EXPOSED TO WEATHER 1 1/2"
SLABS ON GRADE (COVER FROM TOP OF SLAB) 1 1/2"
15. VERTICAL AND HORIZONTAL REINFORCING INDICATED ON THE
DRAWINGS SHALL BE DOWELED OUT OF THE FOUNDATION OR THE
ELEMENT WHERE THE REINFORCING ORIGINATES, (SLAB BEAM, THE
BEAM, WALL, ETC.) UTILIZING AN ACI STANDARD HOOK EMBEDDED TO
DEVELOP THE FULL ULTIMATE TENSILE STRENGTH OF THE BAR.
16. FORMWORK REMOVAL IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. REMOVE FORMS IN SUCH A MANNER AS TO ENSURE JOB
SAFETY AND TO PREVENT DAMAGE TO, AND CREEP DEFLECTION OF THE
STRUCTURE.
17. IMMEDIATELY AFTER REMOVAL OF FORMS, REPAIR HONEYCOMBED OR
DEFECTIVE AREAS WITH HIGH STRENGTH CEMENT GROUT. GROUT
SHALL BE APPROVED BY THE STRUCTURAL ENGINEER. WHEN
REINFORCING IS VISIBLE IN DEFECTIVE AREA, CONTACT THE
STRUCTURAL ENGINEER IMMEDIATELY.
DESIGN CRITERIA
1. STRUCTURAL WORK SHALL BE IN ACCORDANCE WITH:
FLORIDA BUILDING CODE 2020 EDITION 7 AS ADOPTED AND
SUPPLEMENTED BY LOCAL REGULATIONS AND ASCE 7-16 MINIMUM
DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES.
2. REFER TO CIVIL & ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND
LAYOUT. NOTIFY ENGINEER OF DISCREPANCIES PRIOR TO
EXECUTION OF WORK.
3. REFER TO CIVIL & ARCHITECTURAL DRAWINGS FOR MATERIALS,
COMPONENTS, AND CONNECTIONS NOT SHOWN HEREIN, AND FOR
ANCHORED, SUPPORTED AND EMBEDDED ITEMS WHICH AFFECT THE
STRUCTURAL WORK. VERIFY DETAILS AND DIMENSIONS WITH
EQUIPMENT PURCHASED.
4. NO PROVISIONS HAVE BEEN MADE FOR FUTURE VERTICAL AND/OR
HORIZONTAL ADDITIONS, MODIFICATIONS, AND/OR EXPANSIONS.
5. STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR THE DESIGN OF
OTHER SYSTEMS DELEGATED OR NOT SHOWN IN THE STRUCTURAL
DRAWINGS. SUCH SYSTEMS SHALL BE DESIGNED, FURNISHED, AND
INSTALLED BY OTHER PORTIONS OF THE CONTRACT DOCUMENTS.
6. VERIFY ELEVATIONS WITH CIVIL DRAWINGS.
7. ALL DESIGN CRITERIA TO BE VERIFIED BY DELEGATED
PRE-ENGINEERED PUMP HOUSE STRUCTURAL ENGINEER OF
RECORD.
GENERAL STRUCTURAL CRITERIA
1. STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE
ONCE IN SERVICE. NO CONSIDERATION FOR STABILITY AND SHORING
IS ASSUMED BY THE ENGINEER DURING THE BUILDING PROCESS. IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THE
STABILITY AND SAFETY OF THE STRUCTURE AND ITS COMPONENTS BY
DETERMINING AND IMPLEMENTING ERECTION PROCEDURES AND
SEQUENCE OF CONSTRUCTION. THIS INCLUDES TEMPORARY
BRACING AND SHORING AS WELL AS SOIL STABILIZATION AND
PROTECTIVE MEASURES FOR ADJACENT EXISTING CONSTRUCTION.
2. STRUCTURAL DRAWINGS AND SPECIFICATIONS SHALL BE UTILIZED
CONCURRENTLY WITH SITE AND ENGINEERING DRAWINGS OF OTHER
DISCIPLINES TO CONSULT INFORMATION NOT EXPLICITLY INDICATED
ON STRUCTURAL DRAWINGS.
3. CONTRACTOR SHALL VERIFY DIMENSIONS AND SITE CONDITIONS
PRIOR TO PROCEEDING WITH PROCUREMENT OF MATERIALS AND
LABOR, FABRICATION, AND CONSTRUCTION WORK. WHERE
DISCREPANCIES EXIST, NOTIFY ENGINEER OF SUCH DISCREPANCIES
IN WRITING VIA A REQUEST FOR INFORMATION / INTERPRETATION
(RFI) BEFORE PROCEEDING WITH THE WORK IN THE AFFECTED AREA
IN QUESTION.
4. NO STRUCTURAL MEMBER OR COMPONENT SHALL BE CUT, NOTCHED,
OR OTHERWISE ALTERED UNLESS APPROVED IN WRITING BY
STRUCTURAL ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ANY AND ALL COSTS INCURRED BY STRUCTURAL ENGINEER FOR
REVIEW OF SUCH DEVIATIONS AND IMPLEMENTATION OF
APPROPRIATE SOLUTIONS.
5. PRIOR TO COMMENCING WORK, THE GENERAL CONTRACTOR SHALL
BE RESPONSIBLE FOR REVIEWING AND COORDINATING WITH THE
SUB-CONTRACTORS WORK INDICATED ON STRUCTURAL DRAWINGS
WITH ARCHITECTURE, SITE WORK, DELEGATED COMPONENTS, AND
THE WORK OF OTHER ENGINEERING DISCIPLINES.
6. THE STRUCTURAL DRAWINGS AND SPECIFICATIONS ARE
REPRESENTATIVE OF THE FINISHED STRUCTURE. THE STRUCTURAL
ENGINEER SHALL NOT BE IN RESPONSIBLE CHARGE AND CONTROL OF
CONSTRUCTION MEANS, METHODS, PROCEDURES AND
CONSTRUCTION TECHNIQUES, AND JOBSITE SAFETY. THIS SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR.
7. THE STRUCTURAL ENGINEER SHALL NOT BE CONSTRUED AS HAVING
CONTROL, CHARGE, AND RESPONSIBILITY FOR THE ACTS AND
OMISSIONS AND FOR FAILURE OF THE CONTRACTOR, SUB-
CONTRACTOR, AND OTHER PERSONS PERFORMING THE WORK TO
CARRY OUT SUCH WORK IN ACCORDANCE WITH THE STRUCTURAL
DRAWINGS AND COLLECTIVE CONTRACT DOCUMENTS.
8. PERIODIC SITE OBSERVATION BY THE STRUCTURAL ENGINEER AND
HIS / HER REPRESENTATIVES IS SOLELY FOR THE PURPOSE OF
DETERMINING IF THE WORK OF THE CONTRACTOR IS PROCEEDING IN
GENERAL ACCORDANCE WITH THE STRUCTURAL DRAWINGS AND
SPECIFICATIONS. THIS LIMITED SITE OBSERVATION SHALL NOT BE
CONSTRUED AS AN INSPECTION, EXHAUSTIVE, OR CONTINUOUS
OBSERVATION TO VERIFY THE QUALITY AND QUANTITY OF THE WORK.
9. THE USE OF REPRODUCTIONS OF THESE STRUCTURAL DRAWINGS
AND SPECIFICATIONS AND USE OF ELECTRONIC FILES AND MODELS
BY ANY CONTRACTOR, SUBCONTRACTOR, ERECTOR, FABRICATOR OR
MATERIAL SUPPLIER IN LIEU OF PREPARATION OF SHOP DRAWINGS IS
PROHIBITED UNLESS PRIOR WRITTEN APPROVAL IS OBTAINED FROM
THE STRUCTURAL ENGINEER.
GRAVITY LOADS
LOCATION
UNIFORM
LIVE LOAD
(PSF)
CONC.
LIVE LOAD
(LBS)
UNIFORM
DEAD LOAD
(PSF)
SLAB 100 - -
ROOF 20 300 20
SHOP DRAWING SUBMITTALS
1. SHOP DRAWING SUBMITTALS ARE REQUIRED FOR ALL STRUCTURAL
FRAMING, ELEMENTS, COMPONENTS, AND SYSTEMS INDICATED ON
THE STRUCTURAL DRAWINGS. SHOP DRAWING SUBMITTALS INCLUDE
BUT ARE NOT LIMITED TO THE FOLLOWING:
A. CONCRETE MIX DESIGNS
B. CONCRETE REINFORCING SUBMITTALS
C. PRE-ENGINEERED PUMP HOUSE (*)
SHOP DRAWING SUBMITTALS FOR ITEMS NOT LISTED ABOVE SHALL
BE SUBMITTED FOR REVIEW UPON REQUEST BY THE STRUCTURAL
ENGINEER.
ITEMS MARKED (*) SHALL HAVE SHOP DRAWINGS SEALED BY A
PROFESSIONAL ENGINEER.
ITEMS MARKED (#) SHALL BE SUBMITTED FOR ENGINEERS RECORD
ONLY.
2. SHOP DRAWINGS SHALL BE REVIEWED BY THE STRUCTURAL
ENGINEER FOR COMPLIANCE WITH DESIGN INTENT AND FOR
GENERAL CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS.
CORRECTIONS OR COMMENTS MADE ON THE SHOP DRAWINGS SHALL
NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH THE
STRUCTURAL DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR CONFORMING AND CORRELATING
QUANTITIES, DIMENSIONS, ELEVATIONS, AND LENGTHS, FOR
SELECTING FABRICATION PROCESSES, FOR SELECTING METHODS OF
CONSTRUCTION, FOR COORDINATING SUB TRADES AND FOR
PERFORMING WORK IN A SAFE MANNER.
3. SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTOR AND
MARKED "APPROVED" PRIOR TO SUBMITTING THE DRAWINGS TO THE
ARCHITECT ENGINEER FOR REVIEW. SHOP DRAWINGS SHALL BE
MARKED WITH A REVIEW STAMP FROM THE CONTRACTOR INDICATING
REVIEW DISPOSITION AND SHALL BE DATED AND INITIALED. SHOP
DRAWINGS THAT HAVE NOT BEEN REVIEWED, STAMPED, DATED AND
INITIALED WILL BE CONSIDERED NOT REVIEWED BY THE
CONTRACTOR AND SHALL BE RETURNED NOT REVIEWED AND
UNCHECKED BY THE STRUCTURAL ENGINEER.
4. STRUCTURAL ENGINEER SHALL NOT BE RESPONSIBLE FOR DELAYS
CAUSED DUE TO THE REJECTION OF INCOMPLETE SUBMITTALS,
SUBMITTALS RETURNED DUE TO THE CONTRACTOR'S FAILURE TO
REVIEW DOCUMENTS PRIOR TO RECEIPT BY THE STRUCTURAL
ENGINEER, AND FOR THE ADDITIONAL TIME REQUIRED BY THE
CONTRACTOR'S SUB TRADES TO REVISE AND RE-SUBMIT THE
DRAWINGS AND FOR THE STRUCTURAL ENGINEER TO PERFORM
ADDITIONAL REVIEWS OF NON-CONFORMING SUBMITTALS.
5. UPON RECEIPT OF SHOP DRAWING SUBMITTALS FROM THE
CONTRACTOR THAT HAVE BEEN REVIEWED, STAMPED, DATED, AND
INITIALED BY THE CONTRACTOR, THE ENGINEER SHALL BEGIN
REVIEW OF THE RECEIVED SUBMITTALS. THE CONTRACTOR SHALL
ALLOW FOURTEEN (14) WORKING DAYS FOR SUBMITTAL REVIEW BY
THE STRUCTURAL ENGINEER FROM RECEIPT OF SHOP DRAWINGS.
THE CONTRACTOR SHALL FURTHER ALLOW TEN (10) WORKING DAYS
FROM RECEIPT OF SHOP DRAWING RE-SUBMITTALS FOR REVIEW BY
THE STRUCTURAL ENGINEER.
6. THE STRUCTURAL ENGINEER'S OBLIGATIONS TO REVIEW SHOP
DRAWINGS AND OTHER SUBMITTALS AND TO RETURN THEM IN A
TIMELY MANNER ARE CONDITIONED UPON THE PRIOR REVIEW AND
APPROVAL OF THE SHOP DRAWINGS OR SUBMITTALS BY THE
CONTRACTOR AS REQUIRED IN THE CONSTRUCTION CONTRACT AND
THE CONTRACTOR'S SUBMITTAL OF THE SHOP DRAWINGS AND OTHER
SUBMITTALS IN ACCORDANCE WITH A WRITTEN SCHEDULE
DISTRIBUTED IN ADVANCE TO THE ENGINEER IDENTIFYING THE DATES
FOR THE SUBMITTAL OF THE VARIOUS SHOP DRAWINGS AND
SUBMITTALS.
7. THE STRUCTURAL ENGINEER SHALL NOT BE RESPONSIBLE FOR
MATERIALS THAT ARE FABRICATED, DELIVERED, AND INSTALLED AT
THE SITE WITHOUT A SET OF SHOP SUBMITTALS THAT HAVE BEEN
REVIEWED AND APPROVED BY THE STRUCTURAL ENGINEER. COSTS
ASSOCIATED WITH THE REMOVAL OF UNAPPROVED MATERIALS AND
THE DELAYS ASSOCIATED WITH THE REPAIR, RECONFIGURATION,
AND/OR REMOVAL OF SUCH MATERIALS SHALL NOT BE THE
RESPONSIBILITY OF THE STRUCTURAL ENGINEER.
8. SHOP DRAWINGS REVIEWED BY THE STRUCTURAL ENGINEER AND
RETURNED WITH A MARK OF 'REJECTED' OR 'REVISE AND RESUBMIT'
SHALL BE RE-SUBMITTED FOR REVIEW BY THE STRUCTURAL
ENGINEER. REVISIONS MADE TO SHOP DRAWINGS SHALL BE CLEARLY
MARKED AND THE PURPOSE FOR THE RE-SUBMISSION SHALL BE
CLEARLY NOTED ON THE SHOP DRAWING TRANSMITTAL. REVISIONS
SHALL BE ASSIGNED A SEQUENTIAL REVISION NUMBER.
9. THE CONTRACT DOCUMENTS SHALL GOVERN OVER THE SHOP
DRAWINGS UNLESS OTHERWISE SPECIFIED IN WRITING BY THE
ENGINEER.
SPECIALITY ENGINEER REQUIREMENTS AND SUBMITTALS
1. THE TERM "DELEGATE ENGINEER" SHALL REFER TO A REGISTERED
PROFESSIONAL ENGINEER RETAINED BY THE CONTRACTOR TO
PROVIDE DESIGN AND FABRICATION SUBMITTALS AND CALCULATIONS
FOR THE COMPONENTS DELEGATED BY THE STRUCTURAL ENGINEER
OF RECORD HEREIN.
2. WHERE NOTED ON THIS SET OF CONSTRUCTION DOCUMENTS AND AS
INDICATED BELOW, THE CONTRACTOR SHALL ENGAGE THE SERVICES
OF A DELEGATED ENGINEER TO PROVIDE SPECIALTY ENGINEERING
SERVICES FOR STRUCTURAL BUILDING COMPONENTS THESE
COMPONENTS SHALL INCLUDE BUT NOT BE LIMITED TO THE
FOLLOWING:
A. PREFABRICATED FENCE AND GATE ASSEMBLIES
B. BOLLARDS AND MISC SITE STRUCTURES NOT SHOWN IN
DRAWINGS
C. SHORING
D. HANDRAIL AND GUARDRAIL SYSTEMS
E. LIGHTPOLE AND LIGHTPOLE FOUNDATION
F. PRE-ENGINEERED PUMP HOUSE
3. THE DELEGATE ENGINEER FOR EACH COMPONENT SHALL BE A
REGISTERED PROFESSIONAL ENGINEER CURRENT AND IN GOOD
STANDING WITH A MINIMUM OF FIVE (5) YEARS OF EXPERIENCE IN
DESIGN FOR EACH SPECIFIC COMPONENT.
4. THE DELEGATE ENGINEER SHALL BE THE ENGINEER OF RECORD FOR
THE AFOREMENTIONED COMPONENTS AND SHALL SUBMIT SIGNED
AND SEALED CALCULATIONS AND DRAWINGS FOR REVIEW BY THE
STRUCTURAL ENGINEER.
5. CALCULATIONS AND DRAWINGS SUBMITTED BY THE DELEGATE
ENGINEER FOR REVIEW BY THE ENGINEER SHALL INCLUDE CLEARLY
DEFINED DESIGN CRITERIA, DESIGN PROCEDURES, STRUCTURAL
LOADS, CODE COMPLIANCE, REQUIRED DETAILS, AND LAYOUTS.
6. THE DELEGATE ENGINEER SHALL ALSO BE RESPONSIBLE FOR
GENERATING ERECTION DRAWINGS AND FABRICATION PROCEDURES
FOR THE SPECIALTY ENGINEERED COMPONENTS.
7. REVIEW OF CALCULATIONS AND DRAWINGS SUBMITTED BY THE
DELEGATE ENGINEER TO THE STRUCTURAL ENGINEER SHALL BE
LIMITED TO THE VERIFICATION THAT THE DELEGATE ENGINEER HAS
UTILIZED THE DESIGN CRITERIA SPECIFIED AND HAS UNDERSTOOD
THE INTENT OF THE DESIGN. THE STRUCTURAL ENGINEER WILL NOT
MAKE A DETAILED CHECK OF THE CALCULATIONS AND DESIGN
PROCESSES UTILIZED BY THE DELEGATE ENGINEER. THE DELEGATE
ENGINEER SHALL BE RESPONSIBLE FOR THE STRUCTURAL INTEGRITY
OF THE SPECIALTY COMPONENTS.
8. DELEGATE ENGINEER MUST HAVE A CURRENT FLORIDA
PROFESSIONAL ENGINEER LICENSE TO PERFORM STRUCTURAL
ANALYSIS AND DESIGN WORK SHOWN ON THE STRUCTURAL DRAWINGS
AND DETAILS.
ULTIMATE DESIGN WIND SPEED: Vult
RISK CATEGORY
WIND EXPOSURE
WIND LOADS
149 MPH
III
C
EQUIVALENT ALLOWABLE WIND SPEED: Vasd 116 MPH
INTERNAL PRESSURE COEFFICIENT (ENCLOSED) ±0.18
SOIL PREPARATION AND FOUNDATIONS
1. NO GEOTECHNICAL REPORT WAS PROVIDED TO THE STRUCTURAL
ENGINEER INDICATING FOUNDATION RECOMMENDATIONS BASED
ON ACTUAL SOIL CONDITIONS. A PRESUMPTIVE BEARING
PRESSURE OF 1,500 PSF BASED ON IBC TABLE 1806.2 WAS UTILIZED
FOR FOUNDATION DESIGN.
2. WHERE SATISFACTORY SUBSURFACE DATA IS NOT AVAILABLE OR
WHERE THE BUILDING OFFICIAL DETERMINES NECESSARY, THE
ALLOWABLE BEARING PRESSURE SHALL BE VERIFIED BY AN
INSPECTION AND TESTING FIRM BEFORE FOOTINGS ARE PLACED
AND THE FINDINGS SHALL BE PRESENTED IN THE FORM OF A
SIGNED AND SEALED GEOTECHNICAL REPORT TO THE STRUCTURAL
ENGINEER FOR REVIEW.
3. THE CONTRACTOR SHALL PERFORM SITE PREPARATION AND
DEWATERING REQUIREMENTS BASED ON THE IBC AND ACCEPTED
INDUSTRY STANDARDS.
4. REINFORCING SHALL BE SUPPORTED FROM ABOVE OR WITH 3" SBP
(WITH BOTTOM PLATE) AT 4'-0" O.C. MAXIMUM FOR ALL FOUNDATION
REINFORCING.
5. REMOVE FREE WATER FROM EXCAVATIONS BEFORE PLACING
CONCRETE.
6. BACKFILL BELOW STRUCTURAL ELEMENTS TO BE A GRANULAR
MATERIAL HAVING MAXIMUM SIZE OF 3" AND LESS THAN 12%
PASSING THE #200 SIEVE SIZE. FILL TO BE PLACED IN LIFTS OF ONE-
FOOT OR LESS COMPACTED TO A MINIMUM OF 95% OF THE
MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED
PROCTOR (ASTM:D1557).
7. THE CONTRACTOR SHALL COORDINATE THE ROUTING OF BELOW
GRADE PIPING TO INSURE THAT PIPING DOES NOT PENETRATE THE
MONOLITHIC FOUNDATION. NOTIFY THE STRUCTURAL ENGINEER
OF DISCREPANCIES PRIOR TO INSTALLING BELOW GRADE PIPING
THROUGH THE FOUNDATIONS. PIPING SHALL HAVE A MINIMUM
CLEARANCE BELOW FOUNDATIONS AS DETERMINED BY THE CIVIL
ENGINEER.
B A
R S
IZ
E
4d OR 2 1/2" MIN
B A
R S
IZ
E d bBAR
SIZE
f'c = 3,000 PSI
9#3
#4
#5
#6
#7
#8
#9
#10
NOTES:
1. TABULATED VALUES BASED ON GRADE 60 REINF BARS
AND NORMAL WEIGHT CONCRETE.
2. TENSION DEVELOPMENT LENGTHS OF STANDARD HOOKS ARE
BASED ON ACI 318. LENGTHS ARE IN INCHES.
3. FOR BAR SIZES #3 THROUGH #10 ONLY:
A. IF CONCRETE COVER CONFORMS TO ACI 318, THEN A
MODIFICATION FACTOR OF 0.7 MAY BE APPLIED BUT THE
RESULTING LENGTH MUST NOT BE LESS THAN 8db OR 6 IN.
B. IF HOOK IS ENCLOSED IN TIES OR STIRRUPS CONFORMING
TO ACI 318, THEN A MODIFICATION FACTOR OF 0.8 MAY BE
APPLIED BUT THE RESULTING LENGTH MUST NOT BE LESS
THAN 8db OR 6 IN.
f'c = 4,000 PSI f'c = 5,000 PSI
ACI HOOK DEVELOPMENT LENGTHS FOR f'c =3,000 TO 5,000 PSI
4d
5d
6d
#3 THROUGH #8
#9, #10 AND #11
#14 AND #18
Ldh
CRITICAL
SECTION
Lhb = 1200db
√f'c
BAR
SIZE
f'c = 3,000 PSI
17#3
#4
#5
#6
#7
#8
#9
#10
NOTES:
1. TABULATED VALUES BASED ON GRADE 60 REINF BARS AND NORMAL WEIGHT CONCRETE.
2. TENSION DEVELOPMENT LENGTHS AND TENSION LAP SPLICE LENGTHS ARE BASED ON ACI 318, RESPECTIVELY. TABULATED VALUES FOR BEAMS OR COLUMNS ARE BASED ON TRANSVERSE
REINFORCEMENT AND CONCRETE COVER MEETING MINIMUM CODE REQUIREMENTS. LENGTHS
ARE IN INCHES.
3. TOP BARS ARE HORIZ BARS WITH MORE THAN 12" OF CONCRETE CAST BELOW THE BARS.
TOP BARS OTHER BARS
f'c = 4,000 PSI
TOP BARS OTHER BARS
STD. HOOK
NOTE:
PROVIDE MATCHING CORNER BARS FOR ALL HORIZONTAL REINFORCING
AT INTERSECTIONS & CORNERS OF ALL FOOTINGS, THICKENED SLABS
ON GRADE, WALLS, BEAMS, AND CONTINUOUS KNOCK-OUT BLOCKS,
UNLESS NOTED OTHERWISE.
CORNER INTERSECTION
STD. HOOK
L A
P S
P L
IC
E
T Y
P
(P E
R A
C I-
L A
P S
P L
IC
E
T Y
P
(P E
R A
C I-
0" TYP.
T Y
P
T Y
P
ANCHOR BOLT AND ANCHOR PLATE
(BY OTHERS)
PRE-ENGINEERED PUMP HOUSE STRUCTURE BY DELEGATE
ENGINEER. GENERAL CONTRACTOR TO SUBMIT SIGNED
AND SEALED SHOP DRAWINGS AND CALCULATIONS FOR
REVIEW BY STRUCTURAL ENGINEER OF RECORD.
T/ FLOOR
SEE CIVIL
METAL DECK PLATE (OPTIONAL, BY OTHERS)
COMPACTED SUBGRADE, PRESUMPTIVE
ALLOWABLE BEARING PRESSURE OF
1,500 PSF, SEE GENERAL NOTES
#3 STIRRUPS @ 12" OC
(3) #6 CONT T&B
WELD AFTER INSTALLATION IS
COMPLETE (BY OTHERS)
2' - 0"
T/ GRADE
SEE CIVIL
FOAM POLYSTYRENE INSULATION (BY OTHERS).
1/4" STIFFENER PLATE AT ANCHOR LOCATIONS,
BOTH SIDES OF WEB.
CONCRETE FLOOR (OPTIONAL, BY OTHERS)
T Y
P
PER MANUF
S-101
1 2
A
B
P E
R M
A N
U F
TYP
PER MANUF PER MANUF PER MANUF
P E
R M
A N
U F
P E
R M
A N
U F
PRE-ENGINEERED PUMP HOUSE. BASIS
OF DESIGN: PATTERSON PUMP COMPANY
PPC ORDER #C0167402 . REFER TO
DRAWINGS/SPECIFICATIONS OF OTHER
DISCIPLINES AND MANUFACTURER FOR
FURTHER INFORMATION
ANCHOR BOLT AND ANCHOR PLATE SIZE AND LOCATION SHOWN FOR SCHEMATIC
PURPOSES ONLY. ANCHOR BOLT AND ANCHOR PLATE TO BE DESIGNED BY DELEGATE
ENGINEER. GENERAL CONTRACTOR TO SUBMIT SIGNED AND SEALED SHOP DRAWINGS
AND CALCULATIONS FOR REVIEW BY STRUCTURAL ENGINEER OF RECORD. COORDINATE
WITH GEOTECHNICAL ENGINEER AND PRE-ENGINEERED PUMP HOUSE MANUFACTURER.
CONCRETE GRADE BEAM
SKID WIDE FLANGE BEAM, 8" TYP
a a aa a a
BUILDING
a
(FT)
ULTIMATE C&C WIND PRESSURE (ASCE 7-16)
Vult
(MPH)
Vasd
(MPH)
GCpi Area
(SF)
ZONE
(PSF)
ZONE
(PSF)
ZONE
(PSF)
ZONE
(PSF)
ZONE
(PSF)
<10
+19.7 -48.4
PRE-
ENGINEERED
PUMP HOUSE
3 149 116 +/- 0.18
ULTIMATE C&C WIND PRESSURE PLAN NOTES:
1. PRESSURES INDICATED ARE ULTIMATE COMPONENTS AND CLADDING GROSS
PRESSURES. NOMINAL PRESSURES CAN BE DETERMINED USING A 0.6 MULTIPLIER.
NO FURTHER REDUCTION IS ALLOWED.
2. a - INDICATES END ZONE WIDTH IN FT.
3. Vult AND Vasd INDICATE ULTIMATE AND NOMINAL DESIGN WIND SPEED IN MPH.
4. GROSS PRESSURES SHALL BE LINEARLY INTERPOLATED FOR (A) NOT SHOWN IN TABLE.
5. GROSS PRESSURES ARE FOR JOISTS, WINDOWS, DOORS, VENEER, LIGHT GAGE METAL
FRAMING, METAL DECK ATTACHMENTS, ROOFING, ROOFING ACCESSORIES AND OTHER
BUILDING COMPONENTS AND CLADDING.
6. POSITIVE PRESSURES INDICATE PRESSURES ACTING TOWARD A PROJECTED SURFACE.
NEGATIVE PRESSURES INDICATE PRESSURES ACTING AWAY FROM A PROJECTED
SURFACE.
7. ROOF ZONES INCLUDING END CONDITIONS ARE DENOTED AS 1 THROUGH 3.
8. WALL ZONES INCLUDING END CONDITIONS ARE DENOTED AS 4 THROUGH 5.
+19.7 -81.2
+19.7 -122.2
+44.3 -48.0
+44.3 -59.1
+18.4 -47.2
+16.8 -45.5
+16.0 -44.3
+18.4 -72.6
+16.0 -52.5
+16.8 -61.1
+18.4 -101.2
+16.0 -52.5
+16.8 -73.5
+42.3 -46.0
+37.8 -41.5
+39.7 -43.4
+42.3 -55.1
+37.8 -46.0
+39.7 -49.9
1/2" ISOLATION JOINT
MATERIAL, SEAL PER
CIVIL DWG, TYP
EQUIPMENT ANCHORS PER
EQUIPMENT MANUFACTURERS
REQUIREMENTS
REFER TO EQUIPMENT PAD
REINFORCING SCHEDULE
10'-0" MAX SPACING BETWEEN CONCRETE CONTROL JOINTS.
SEE MECH OR ELEC PLANS & SPECIFICATIONS FOR EQUIPMENT REQUIREMENTS, PAD
SIZE, ACCESSORIES, AND LOCATIONS. CONTRACTOR TO COORDINATE WITH
MANUFACTURER FOR REQUIRED PAD THICKNESS AND ALL OTHER PAD REQUIREMENTS.
ISOLATED EQUIPMENT PAD
EQUIPMENT PAD
REINFORCING SCHEDULE
T ≤ 4" 6"x6", W2.9 x W2.9
4"x4", W4.0 x W4.0
#4@12"EW
#5@12"EW
NONE
NONE
NONE
#4@12"EW
#5@12"EW
BOTTOM
REINF.TOP REINF.
PAD
THICKNESS
#4@12"EW
S U
P P
L
IE
R
T S
E E
E Q
U
IP
M E
N T
M
IN
MIN 8"
T/ PAD
SEE CIVIL
M
IN
4" ≤ T ≤ 6"
6" ≤ T ≤ 8"
8" ≤ T ≤ 12"
12" ≤ T ≤ 16"
3/4" CHAMFERED EDGE
EQUIP SIZE +6" ALL AROUND
COMPACTED SUBGRADE
Sheet Number:Designed By:
JOB No.
Phase:
Checked By:
Date Issued:
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
QC Review:
SHEET INFORMATION:
PROJECT NAME:
No. Date Description
O ra ng e
C ou nt y
C or re ct io ns
C E
P
Fi re P um p
S ys te m
R ep la ce m en t
3r d
S tre et , O rla nd o, F
L
PRD
JI
JT
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
Paul Richard DiCicco, PE #79314
C
R e vi t L o c a l C o p ie s\
O
C C
C C
E P
S tr
R
_D
IC
I7
.r vt
S-101
100058985
100% CDs
10/04/2021
STRUCTURAL NOTES,
PLAN, & DETAILS
S-101
6 HOOK DEVELOPMENT
S-101
4 TENSION LAP SPLICE LENGTHS
S-101
3 TYP. CORNER REINF. DETAIL
3/4" = 1'-0"S-101
2 TYPICAL SKID FOUNDATION
FOUNDATION PLAN NOTES
1. REFER TO GENERAL STRUCTURAL NOTES FOR OTHER INFORMATION AND CRITERIA NOT
SHOWN ON PLAN.
2. VERIFY DIMENSIONS, ELEVATIONS, DEPRESSIONS, DRAIN LOCATIONS, FINISHES AND LIMITS
THEREOF, AND INFORMATION NOT EXPLICITLY INDICATED ON CONTRACT DOCUMENTS WITH
THE ARCHITECTURAL, CIVIL, AND MEP/FP DRAWINGS PRIOR TO CONSTRUCTION.
3. ALL REINFORCING IN FOUNDATION CORNERS, INTERSECTIONS, TEES, AND CHANGES IN
DIRECTION SHALL BE CONTINUOUS AND CORNER REINFORCING SHALL BE PROVIDED AND
LAPPED.
4. DRAWINGS SHOW MINIMUM SIZE AND QUANTITY OF ANCHOR BOLTS NEEDED FOR MOST SKID
INSTALLATIONS. THE ACTUAL ANCHOR BOLT SIZE AND TYPE ARE TO BE DETERMINED BY THE
INSTALLING CONTRACTOR. SOME LOCAL BUILDING CODES MAY REQUIRE ADDITIONAL BOLTS.
1/2" = 1'-0"S-101
1 SKID FOUNDATION PLAN
S-101
5 WIND PRESSURES AND NOTES
S-101
7 EQUIPMENT PAD
E-001
ELECTRICAL LEGEND,
SYMBOLS AND GENERAL
NOTES
Sheet Number:Designed By:
JOB No.100058985
Phase:
Checked By:
Date Issued: OCTOBER 04, 2020
PROFESSIONAL SEALS:
CLIENT:
SHEET TITLE:
ISSUE LOG
CONSULTANT:
QC Review:
SHEET INFORMATION:
PROJECT NAME:
482 SOUTH KELLER ROAD
ORLANDO, FL 32810
PHONE: 407.647.7275 FAX: 407.740.8958
No. Date Description
O ra ng e
Co un ty C or re ct io ns C
EP
Fi re P um p
Sy st em R ep la ce m en t
3r d St re et
, O rla nd o
Fl
FL PE NO. 81965
ALEX ZOTESCU, P.E.
JP
JP
AZ
100% CD
AutoCAD SHX Text
%%UPOWER DISTRIBUTION
AutoCAD SHX Text
%%USWITCHES
AutoCAD SHX Text
%%UWIRING
AutoCAD SHX Text
%%UFIRE ALARM
AutoCAD SHX Text 20A, MANUAL MOTOR STARTER TOGGLE SWITCH WITH PILOT LIGHT AND WITHOUT OVERLOADS. 3 = NUMBER OF POLES. 20A. MOTOR RATED SWITCH. NON-FUSED SAFETY SWITCH, 3 = NO. OF POLES, 60 = SWITCH SIZE. 600 V. UNLESS OTHERWISE NOTED. FUSED SAFETY SWITCH, 3 = NO. OF POLES, 60 = SWITCH SIZE, 50 = FUSES SIZE. 600 V. UNLESS OTHERWISE NOTED. INDIVIDUALLY MOUNTED ENCLOSED CIRCUIT BREAKER, 3 = NO. OF POLES, 100 = FRAME SIZE, 70 = TRIP RATING. 600 V. UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
%%UABBREVIATIONS
AutoCAD SHX Text
%%UGENERAL NOTES
AutoCAD SHX Text
1. THE WORK PRACTICES EMPLOYED ON THIS PROJECT SHALL AT ALL TIMES THE WORK PRACTICES EMPLOYED ON THIS PROJECT SHALL AT ALL TIMES COMPLY WITH OR EXCEED THE LATEST ADOPTED EDITION OF THE NEC (NATIONAL ELECTRICAL CODE). ELECTRICAL CONTRACTOR SHALL PROVIDE OR OBTAIN ALL REQUIRED LABOR, MATERIAL , EQUIPMENT, INSURANCE, TOOLS, PERMITS, INSPECTIONS, ETC. TO PERFORM THE PROJECT ELECTRICAL WORK AS PER NEC, LOCAL AGENCIES, AND OWNER REQUIREMENTS. 2. A COPPER EQUIPMENT GROUNDING CONDUCTOR, SIZED AS PER TABLE 250-22 A COPPER EQUIPMENT GROUNDING CONDUCTOR, SIZED AS PER TABLE 250-22 OF THE 2017 OR LATEST ADOPTED NEC, SHALL BE INSTALLED IN EVERY RACEWAY AND EFFECTIVELY TERMINATED AT EACH DEVICE. UNLESS NOTED OTHERWISE, MINIMUM WIRE SIZE FOR PHASE, NEUTRAL AND GROUND SHALL BE #12AWG AND MINIMUM CONDUIT SIZE SHALL BE 3/4". 3. CONDUCTORS #8AWG AND LARGER SHALL BE STRANDED COPPER, #10AWG AND CONDUCTORS #8AWG AND LARGER SHALL BE STRANDED COPPER, #10AWG AND SMALLER SHALL BE SOLID COPPER TYPE THHN/THWN-2 UNLESS NOTED OTHERWISE. 4. PROVIDE HANGER, CONDUIT SUPPORTS, JUNCTION BOXES, ETC. PER NEC PROVIDE HANGER, CONDUIT SUPPORTS, JUNCTION BOXES, ETC. PER NEC REQUIREMENTS ACCORDING TO THEIR LOCATION. 5. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING AND ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING AND PATCHING REQUIRED TO PERFORM THE ELECTRICAL WORK. OWNER/GENERAL CONTRACTOR SHALL BE NOTIFIED BEFORE STARTING ANY CUTTING AND PATCHING, AND WORK SHALL BE DONE IN SUCH A MANNER THAT WILL NOT AFFECT THE BUILDING STRUCTURE. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE AS A RESULT OF THE CUTTING AND PATCHING AND SHALL PROVIDE A CODE COMPLIANT SOLUTION TO RESTORE THE AFFECTED SYSTEMS AT NO EXTRA CHARGE. 6. ELECTRICAL CONTRACTOR SHALL FOLLOW OWNER/GENERAL CONTRACTOR, ELECTRICAL CONTRACTOR SHALL FOLLOW OWNER/GENERAL CONTRACTOR, NATIONAL AND LOCAL AGENCIES, ETC. SAFETY REGULATIONS PROCEDURES. ELECTRICAL CONTRACTOR SHALL PROVIDE ADEQUATE EQUIPMENT AND WORKING AREA PROTECTION TO PREVENT INJURIES TO PEOPLE AND DAMAGE TO PROPERTY. 7. FULLY TEST ALL ELECTRICAL SYSTEMS UPON COMPLETION OF WORK. FULLY TEST ALL ELECTRICAL SYSTEMS UPON COMPLETION OF WORK. 8. IT IS THE BIDDER'S RESPONSIBILITY TO INSPECT THE PROJECT SITE AND IT IS THE BIDDER'S RESPONSIBILITY TO INSPECT THE PROJECT SITE AND CONSTRUCTION DOCUMENTS PRIOR TO BIDDING. FAILURE TO DO SO SHALL NOT RELIEVE THE ELECTRICAL CONTRACTOR TO COMPLY AND PERFORM HIS/HER WORK RESPONSIBILITIES UNDER THIS CONTRACT. 9. LABEL EACH SWITCH, RECEPTACLE, PANEL, AND JUNCTION BOXES WITH SOURCE LABEL EACH SWITCH, RECEPTACLE, PANEL, AND JUNCTION BOXES WITH SOURCE PANEL AND CIRCUIT NUMBER. 10. VERIFY PHASE ROTATION ON ALL THREE-PHASE EQUIPMENT (DISCONNECTS, VERIFY PHASE ROTATION ON ALL THREE-PHASE EQUIPMENT (DISCONNECTS, RECEPTACLES, ETC.) 11. ALL CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE. CIRCUIT BREAKERS ALL CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE. CIRCUIT BREAKERS PROTECTING POWER PANELS, TRANSFORMERS, AND MOTORS SHALL BE 100%. CIRCUIT BREAKERS PROTECTING HEATING, AIR CONDITIONING AND REFRIGERATION EQUIPMENT SHALL BE HACR RATED. 12. RUN POWER DISTRIBUTION CONDUITS AND HOME RUNS ABOVE THE BOTTOM OF RUN POWER DISTRIBUTION CONDUITS AND HOME RUNS ABOVE THE BOTTOM OF TRUSSES TO AVOID FIRE RATED WALL PENETRATIONS. IF A FIRE WALL PENETRATION IS REQUIRED, THE ELECTRICAL CONTRACTOR SHALL USE AND PROVIDE A WALL PENETRATION PROCEDURE AND INSTALLATION APPROVED BY THE A.H.J. FOR THE FIRE RATED WALL TO BE PENETRATED. 13. FIELD COORDINATE FINAL CONDUITS LOCATION WITH OTHER DISCIPLINES WORK FIELD COORDINATE FINAL CONDUITS LOCATION WITH OTHER DISCIPLINES WORK AND EXISTING CONDITIONS. 14. PROVIDE CUT AND PATCHING AS NECESSARY TO INSTALL REQUIRED PROVIDE CUT AND PATCHING AS NECESSARY TO INSTALL REQUIRED UNDERGROUND RACEWAYS AND ABOVE-GRADE ROUTING FOR A COMPLETE AND FULLY FUNCTIONAL ELECTRICAL SYSTEM.
AutoCAD SHX Text AMPERES ABOVE COUNTER ABOVE FINISHED FLOOR AVAILABLE FAULT CURRENT AUTHORITY HAVING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .