These are 100% design drawings for the Orange County Fire Station #42 Petroleum Storage and Distribution System Replacement project, prepared by Stillwater Technologies for Orange County, Florida. The comprehensive set of technical engineering documents details the complete removal and replacement of existing underground storage tanks (USTs), including a 2,500-gallon diesel UST and a 1,000-gallon gas UST at Fire Station #42, located at 5420 Silver Star Road in Orlando. The drawings provide extensive technical specifications for the new fuel system, including installation of a new 1,000-gallon double-walled underground storage tank, new dispensers, electrical systems, tank monitoring equipment, and associated site work. The project involves complete demolition of existing fuel infrastructure and installation of a modern, code-compliant petroleum storage and distribution system.
The project documents indicate a total estimated cost of $494,000.00, with sealed electronic responses to be submitted through the OpenGov e-Procurement Platform by 4:00 pm EST on August 23, 2022. The design drawings demonstrate compliance with multiple technical standards, including NFPA codes, Florida Building Code 2020, and specific requirements for underground and aboveground storage tank systems. The technical specifications cover detailed aspects such as tank anchoring, electrical conduit routing, grounding details, and site preparation, with precise engineering calculations for wind loads, tank positioning, and system components. The project appears to be funded through Orange County's capital infrastructure budget and is designed to modernize and improve fuel storage capabilities for emergency response vehicles.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C o p yr ig h t
S til lw a te r
T e ch n o lo g ie s, I n c.
r e se rv e s co p yr ig h t a n d o th e r ri g h ts r e st ri ct in g t h e se d o cu m e n ts t o t h e o ri g in a l s ite o r p u rp o se f o r w h ic h t h e y w e re p re p a re d
R e p ro d u ct io n s, c h a n g e s o r a ss ig n m e n ts a re p ro h ib ite d
R E
V
SHEET NAME:
SHEET:
SCALE: NO SCALE
APPROVED:
PROJECT #:
DRAWN:
DATE:
FAB
C O
M M
E N
T S
B Y
D A
T E
C O
V E
R S
H E
E T
P R
E P
A R
E D
F R
ORANGE COUNTY FIRE STATION #42
PETROLEUM STORAGE AND
DISTRIBUTION SYSTEM PLANS
5420 Silver Star Road
Orlando, Florida 32808
GENERAL WORK SCOPE STATEMENT:
FAB
547-023
F A
B
PARCEL ID #18-22-29-0000-00-048 FDEP Facility ID: 8520441
T E
C H
N O
L O
G
IE
S st ill w at er
M a r
,2
:1 p m
J:
\5
A
T K
IN
S
N o rt h A m e ri ca
In c\
O ra n g e C o F ir e
S ta tio n
S ilv e r S ta r\
C o n st
P la n s\
B a se
-P e rc e n t.
d w g
B
ID
C
O N
S T
R U
C T
P L
A N
S
02/10/22
/1
/2
VICINITY SKETCH
N
LOCATION SKETCH
SITE
COVER SHEET
GENERAL SITE AND WORK AREA PLAN
1G01
PE02
PE01
INDEX OF DRAWINGS INCL.
PETROLEUM
PETROLEUM SYSTEM INSTALLATION AND DIMENSION PLAN
N
SITE
Know what's below.
Call before you dig.
callsunshine.com
4PE03 UST EXCAVATION DETAILS AND SPECS; PIPING DETAILS
G01
O
RA
N G
E
CO
U N
TY
F
IR
E
ST
A
TI
O
N
S ilv er
S ta r R oa d O rla nd o, F lo rid a 3
D at e
FREDER
IC
K A
B
LE
CHA
PROFES
S
IO
N
A L
E N
G
IN
EER
L
IC
E N
S E
F L
O R
ID
A
N o
. 5
S T
A T
E O
F
5PE04 UST RISERS AND SUMP DETAILS
ABOVEGROUND TANK DETAILS8PE07
N or th O ra ng e A ve nu e Su ite
A
O rl an do
, F lo ri da
(4
6-
(4
6-f ax
FL
. C er t.
of
A ut h.
S.
K el le r D ri ve
O rl an do
, F L
(4
6-
7PE06 UST ANCHORING DETAILS AND CALCULATIONS
6PE05 DISPENSER AREA DETAILS
PETROLEUM SYSTEM ELECTRICAL INFORMATION9E01
AutoCAD SHX Text THE PROPOSED WORK WILL CONSIST OF THE REMOVAL AN EXISTING 2,500-GALLON DIESEL UNDERGROUND STORAGE TANK (UST) AND A 1,000-GALLON GASOLINE UST. A NEW 1,000-GALLON DIESEL UST AND A NEW 285-GALLON GASOLINE ABOVEGROUND STORAGE TANK WILL BE INSTALLED. THE EXISTING TWO (2) FUEL DISPENSERS AND ASSOCIATED ISLAND WILL BE REMOVED AND REPLACED WITH NEW DISPENSERS AND HARDWARE. HOSE RETRACTORS WILL BE INSTALLED. A NEW FUEL MANAGEMENT SYSTEM AND TANK MONITOR SYSTEM WILL BE INSTALLED. A NEW LIGHT POLE AND FIXTURE WILL BE INSTALLED. A NEW E-STOP SWITCH WILL BE INSTALLED.
AutoCAD SHX Text R
AutoCAD SHX Text CODE REFERENCES: THE SYSTEM SHALL BE DESIGNED IN FULL COMPLIANCE WITH THE LATEST EDITION OF THE APPLICABLE SECTIONS OF THE FOLLOWING CODES, STANDARDS, AND GUIDELINES. WHERE CONFLICT EXISTS, CONTRACTOR SHALL FOLLOW THE MOST STRINGENT REQUIREMENTS. IN CASE OF A CONFLICT BETWEEN THE UNIFORM FIRE CODE AND THE NATIONAL FIRE PREVENTION ASSOCIATION STANDARDS, THE MOST STRINGENT CONDITION SHALL APPLY: FLORIDA BUILDING CODE 2020 EDITION AS APPLICABLE NFPA 1-FIRE CODE 2018 EDITION CHAPTER 66.22 AS APPLICABLE NFPA 30-FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE 2018 EDITION NFPA 30A- CODE FOR MOTOR FUEL DISPENSING FACILITIES CODE 2018 EDITION NFPA 70-NATIONAL ELECTRIC CODE 2017 EDITION FACTORY MUTUAL (FM) UNDERWRITERS LABORATORY (UL) OTHER STATE OR COUNTY CODES AS APPLICABLE. COMPLY WITH ALL APPLICABLE SECTIONS OF NEC 514 INCLUDING SWITCH NEUTRAL BREAKERS, SEALOFFS AND AREA HAZARD CLASSIFICATIONS.
.75
MW
MW
MW
MW
MW
MW
W
WMH
MH
FFE: 86.59'
Valve_Water VLVW 88.16
.6'
.4'
.0'
.1'
O U
O O
PROJECT BENCHMARK # 2
Set Nail & Disk "AMECFW TRAV."
N: 1542909.51 E: 510255.64
Elevation: 85.05'
OVERALL SITE AND WORK AREA PLAN1
R E
V
AS NOTED
FAB
FAB
SCALE:
APPROVED:
DATE:
PROJECT #:
DRAWN:
C O
M M
E N
T S
B Y
D A
T E
P R
E P
A R
E D
F R
G E
N E
R A
L S
IT
E
A N
D W
O R
K A
R E
A P
L A
N
SHEET NAME:
SHEET:
M a r
,2
:1 p m
J:
\5
A
T K
IN
S
N o rt h A m e ri ca
In c\
O ra n g e
C o
F ir e S ta tio n
S ilv e r
S ta r\ C o n st
P la n s\
B a se
-P e rc e n t.
d w g
C o p yr ig h t
S til lw a te r
T e ch n o lo g ie s, I n c.
r e se rv e s co p yr ig h t a n d o th e r ri g h ts r e st ri ct in g t h e se d o cu m e n ts t o t h e o ri g in a l s ite o r p u rp o se f o r w h ic h t h e y w e re p re p a re d
R e p ro d u ct io n s, c h a n g e s o r a ss ig n m e n ts a re p ro h ib ite d
T E
C H
N O
L O
G
IE
S st ill w at er
PE01
D at e
FREDER
IC
K A
B
LE
CHA
PROFES
S
IO
N
A L
E N
G
IN
EER
L
IC
E N
S E
F L
O R
ID
A
N o
. 5
S T
A T
E O
F
N or th
O ra ng e
A ve nu e
Su ite
A O rl an do , F lo ri da
(4
6-
(4
6-f ax
FL
. C er t.
of A ut h.
FUEL SYSTEM WORK AREA
F A
B
S.
K el le r D ri ve
O rl an do
, F L
(4
6-
DEMOLITION PLAN2
547-023
O
RA
N G
E
CO
U N
TY
F
IR
E
ST
A
TI
O
N
S ilv er
S ta r R oa d O rla nd o, F lo rid a 3
CONTRACTOR LAYDOWN
AREA
B
ID
C
O N
S T
R U
C T
P L
A N
S
02/10/22
/1
/2
FIRE STATION ELEC. ROOM
AutoCAD SHX Text
REMOVE DISPENSER AND CONTAINMENT (TYP. OF 2)
AutoCAD SHX Text
EXISTING 1,000-GAL. GAS UST TO BE REMOVED
AutoCAD SHX Text
TWO (2) EXISTING VENT RISERS AND LIGHT POLE AND FOUNDATION TO BE REMOVED
AutoCAD SHX Text
EXISTING 2,500-GAL. DIESEL UST TO BE REMOVED
AutoCAD SHX Text
LIMITS OF EXTERIOR BUILDING WALL PER SURVEY
AutoCAD SHX Text APPROXIMATE LIMITS OF DEMOLITION FOR REPLACEMENT OF UNDERGROUND STORAGE TANKS, FUEL SYSTEM, AND ELECTRICAL TRENCH TO BLDG.
AutoCAD SHX Text
REMOVE RAISED ISLAND
AutoCAD SHX Text APPROXIMATE LOCATION OF EXISTING SENSOR LOOP AND GATE KEYPAD TO BE PROTECTED AND REPLACED FOLLOWING CONSTRUCTION IF DAMAGED
AutoCAD SHX Text APPROXIMATE LOCATION OF UNDERGROUND SEWER UTILITY TO BE PROTECTED DURING CONSTRUCTION
AutoCAD SHX Text PROJECT LIMITS ON WEST SIDE OF PROJECT REQUIRED FOR CONTINUOUS OPERATION OF ALL FIRE STATION SERVICE BAYS. PROJECT CONSTRUCTION OPERATIONS SHALL NOT INTERFERE WITH THIS BOUNDARY WITHOUT OWNER APPROVAL. PROVIDE CONCRETE JERSEY BARRIERS TO PROTECT WORK AREA
AutoCAD SHX Text
EXISTING E-STOP TO BE REMOVED; SAVE CONDUITS FOR REUSE
AutoCAD SHX Text NOTE: : TANK CLOSURE SAMPLING AND REPORTING REQUIREMENTS WILL BE BY OWNER. TANK REMOVAL IS BY CONTRACTOR. COORDINATE SCOPE WITH OWNER PRIOR TO CONSTRUCTION.
AutoCAD SHX Text 1" = 30'
AutoCAD SHX Text 1" = 5'
AutoCAD SHX Text
SCALE: 1" =
AutoCAD SHX Text 0'
AutoCAD SHX Text 10'
AutoCAD SHX Text 5'
AutoCAD SHX Text 5'
AutoCAD SHX Text magnetic
AutoCAD SHX Text SCOPE OF WORK (PETROLEUM CONTRACTOR): 1. DISCONNECT ALL ELECTRICAL AND SAVE ALL CONDUITS FOR REUSE. DISCONNECT ALL ELECTRICAL AND SAVE ALL CONDUITS FOR REUSE. 2. REMOVE PAVING AND OTHER MATERIALS AS NECESSARY TO REMOVE PAVING AND OTHER MATERIALS AS NECESSARY TO FACILITATE THE PROJECT. 3. REMOVE EXISTING TWO PUMPS/DISPENSERS AND SUMPS. REMOVE EXISTING TWO PUMPS/DISPENSERS AND SUMPS. 4. REMOVE ONE LIGHT FIXTURES, FOUNDATION, AND POLE. REMOVE ONE LIGHT FIXTURES, FOUNDATION, AND POLE. 5. REMOVE EXISTING FOUR BOLLARDS AND RAISED ISLAND FORM. REMOVE EXISTING FOUR BOLLARDS AND RAISED ISLAND FORM. 6. EXCAVATE WITH CARE SO AS TO SAVE ALL CONDUITS FOR REUSE. EXCAVATE WITH CARE SO AS TO SAVE ALL CONDUITS FOR REUSE. 7. REMOVE TWO (2) EXISTING UNDERGROUND STORAGE TANKS (2,500K REMOVE TWO (2) EXISTING UNDERGROUND STORAGE TANKS (2,500K AND 1.000K). 8. PREPARE THE WORK AREA. PREPARE THE WORK AREA. 9. FORM AND POUR CONCRETE TANK/SERVICE SLAB PER PLANS. FORM AND POUR CONCRETE TANK/SERVICE SLAB PER PLANS. 10. FURNISH AND INSTALL ONE (1) 285-GALLON UL-2085 FURNISH AND INSTALL ONE (1) 285-GALLON UL-2085 ABOVEGROUND STORAGE TANK FOR GAS. 11. FURNISH AND INSTALL ONE (1) 1,000-GALLON DOUBLE-WALLED FURNISH AND INSTALL ONE (1) 1,000-GALLON DOUBLE-WALLED STEEL UNDERGROUND STORAGE TANK FOR DIESEL. 12. INSTALL NEW LIGHT POLE, FOUNDATION AND FIXTURE. INSTALL NEW LIGHT POLE, FOUNDATION AND FIXTURE. 13. EXCAVATE AN ELECTRICAL TRENCH FROM THE NEW FUELING AREA EXCAVATE AN ELECTRICAL TRENCH FROM THE NEW FUELING AREA TO THE BUILDING AS NECESSARY. 14. REUSE AND EXTEND EXISTING CONDUITS AS NECESSARY. REUSE AND EXTEND EXISTING CONDUITS AS NECESSARY. 15. REPLACE CONDUCTORS AS NECESSARY. REPLACE CONDUCTORS AS NECESSARY. 16. PROVIDE AND INSTALL ALL REQUIRED TANK FITTINGS FOR COMPLETE PROVIDE AND INSTALL ALL REQUIRED TANK FITTINGS FOR COMPLETE OPERATION. 17. PROVIDE AND INSTALL A TANK-MOUNTED SUCTION PUMP ON THE PROVIDE AND INSTALL A TANK-MOUNTED SUCTION PUMP ON THE AST. 18. PROVIDE AND INSTALL A DISPENSER, CONTAINMENT SUMP, AND PROVIDE AND INSTALL A DISPENSER, CONTAINMENT SUMP, AND RAISED DISPENSER ISLAND FOR DIESEL DISPENSING. 19. PROVIDE AND INSTALL TWO HOSE RETRACTORS. PROVIDE AND INSTALL TWO HOSE RETRACTORS. 20. REPLACE/INSTALL CONCRETE DRIVE SLAB AT EXISTING TANK REPLACE/INSTALL CONCRETE DRIVE SLAB AT EXISTING TANK MANHOLES PER PLANS. 21. FURNISH AND INSTALL TANK MONITOR AND FUEL MANAGEMENT FURNISH AND INSTALL TANK MONITOR AND FUEL MANAGEMENT SYSTEMS PER PLANS. 22. COMPLETE AND ACTIVATE THE NEW EQUIPMENT. COMPLETE AND ACTIVATE THE NEW EQUIPMENT. 23. PROVIDE AND INSTALL ANY OTHER FITTINGS AND EQUIPMENT AS PROVIDE AND INSTALL ANY OTHER FITTINGS AND EQUIPMENT AS APPROPRIATE FOR A FULL AND COMPLETE OPERATIONAL SYSTEM. 24. CLEAN THE SITE OF DEBRIS CAUSED BY CONTRACTOR. CLEAN THE SITE OF DEBRIS CAUSED BY CONTRACTOR.
AutoCAD SHX Text
SCALE: 1" =
AutoCAD SHX Text 0'
AutoCAD SHX Text 60'
AutoCAD SHX Text 30'
AutoCAD SHX Text 30' magnetic
.75
.70
.54
.54
.68
.59
.13
.28
.15
.04
.60
.55
.51
.51
.79
.94
.87
.68
.62
.81
.09
.94
.32
.29
.35
.37
.54
.54
.97
.98
.87
.91
MW
MW
MW
MW
MW
MW
W
WMH
MH
.25
86.27' 86.28'86
.27
.26
86.20'
86.30'
86.27'
.3
6'
.2 7'
.3
1'
.3
2'
.14
FFE: 86.59'
Valve_Water VLVW 88.16
.6'
.4'
.0'
.1'
O U
O O
85'
85'
86'
PROJECT BENCHMARK # 2
Set Nail & Disk "AMECFW TRAV."
N: 1542909.51 E: 510255.64
Elevation: 85.05'
.75
MW
MW
MW
MW
MW
MW
W
WMH
MH
FFE: 86.59'
Valve_Water VLVW 88.16
.6'
.4'
.0'
.1'
O U
O O
85'
85'
86'
PROJECT BENCHMARK # 2
Set Nail & Disk "AMECFW TRAV."
N: 1542909.51 E: 510255.64
Elevation: 85.05'
R E
V
AS NOTED
FAB
FAB
SCALE:
APPROVED:
DATE:
PROJECT #:
DRAWN:
C O
M M
E N
T S
B Y
D A
T E
P R
E P
A R
E D
F R
PE
T
R O
L E
U M
I N
ST
A
L L
A T
IO
N
A N
D D
IM
E
N
SI
O N
P L
A N
SHEET NAME:
SHEET:
M a r
,2
:4 p m
J:
\5
A
T K
IN
S
N o rt h A m e ri ca
In c\
O ra n g e
C o
F ir e S ta tio n
S ilv e r
S ta r\ C o n st P la n s\
B a se
-P e rc e n t.
d w g
C o p yr ig h t
S til lw a te r
T e ch n o lo g ie s, I n c.
r e se rv e s co p yr ig h t a n d o th e r ri g h ts r e st ri ct in g t h e se d o cu m e n ts t o t h e o ri g in a l s ite o r p u rp o se f o r w h ic h t h e y w e re p re p a re d
R e p ro d u ct io n s, c h a n g e s o r a ss ig n m e n ts a re p ro h ib ite d
T E
C H
N O
L O
G
IE
S st ill w at er
PE02
D at e
FREDER
IC
K A
B
LE
CHA
PROFES
S
IO
N
A L
E N
G
IN
EER
L
IC
E N
S E
F L
O R
ID
A
N o
. 5
S T
A T
E O
F
DIMENSION PLAN2
N or th O ra ng e A ve nu e Su ite
A
O rl an do
, F lo ri da
(4
6-
(4
6-f ax
FL
. C er t.
of
A ut h.
F A
B
S.
K el le r D ri ve
O rl an do
, F L
(4
6-
INSTALLATION PLAN1
547-023
O
RA
N G
E
CO
U N
TY
F
IR
E
ST
A
TI
O
N
S ilv er
S ta r R oa d O rla nd o, F lo rid a 3
B
ID
C
O N
S T
R U
C T
P L
A N
S
02/10/22
/1
/2
AutoCAD SHX Text EJ WARD CARD READER AND OMNTEC TANK MONITORING SYSTEM ASSEMBLY; MOUNT OVERFILL ALARM (IF OWNER REQUIRED) TO EXTERIOR OF OMNTEC BOX
AutoCAD SHX Text PROJECT BOUNDARY ON WEST SIDE OF PROJECT REQUIRED FOR CONTINUOUS OPERATION OF ALL FIRE STATION SERVICE BAYS. PROJECT CONSTRUCTION OPERATIONS SHALL NOT INTERFERE WITH THIS BOUNDARY WITHOUT OWNER APPROVAL. PROVIDE CONCRETE JERSEY BARRIERS TO PROTECT WORK AREA
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text
AN
AutoCAD SHX Text
STP
AutoCAD SHX Text
TM
AutoCAD SHX Text D
AutoCAD SHX Text
NEW RAISED DISPENSER ISLAND
AutoCAD SHX Text
NEW 6" STEEL BOLLARD(TYP. OF 4)
AutoCAD SHX Text
NEW 1,000-GALLON 4' DOUBLEWALLED UNDERGROUND STORAGE TANK
AutoCAD SHX Text
NEW SINGLE PRODUCT/SINGLE SIDED DIESEL DISPENSER WITH HIGH HOSE RETRIEVER
AutoCAD SHX Text
NEW LIGHT POLE, (2) NEW LED FIXTURES, AND NEW FOUNDATION
AutoCAD SHX Text
TANK-TOP MOUNTED SUCTION PUMP
AutoCAD SHX Text
APPROXIMATE LIMITS OF NEW CONCRETE REPLACEMENT 8" THICK 4,000 PSI DRIVE SLAB
AutoCAD SHX Text
INTERSTITIAL SENSOR
AutoCAD SHX Text
42" SUMP WITH SUBMERSIBLE PUMP AND VENT
AutoCAD SHX Text
TANK MONITOR
AutoCAD SHX Text
FILL/SPILL BUCKET
AutoCAD SHX Text
TANK-TOP MOUNTED FILL CONTAINER
AutoCAD SHX Text
TANK MOUNTED STEP TO FACILITATE FILLING
AutoCAD SHX Text
NEW FUELING SYSTEM SUB-PANEL (SEE ELECTRICAL SHEET)
AutoCAD SHX Text
NEW E-STOP LOCATION BETWEEN BAY DOORS
AutoCAD SHX Text
NEW 285-GALLON UL2085 WALLED ABOVEGROUND GAS STORAGE TANK
AutoCAD SHX Text
NEW HIGH-HOSE RETRIEVER (TYP. OF 2)
AutoCAD SHX Text NOTES: : 1) CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT AND MATERIALS FOR A COMPLETE OPERATIONAL SITE 2) EJ WARD CARD READER SHALL BE MODEL #FCT-IOT-SH REV1; THIS IS THE COUNTY REQUIRED STANDARD AND CANNOT BE SUBSTITUTED 3) OMNTEC TANK MONITOR CONSOLE SHALL BE MODEL #OEL8000IIIK4; THIS IS THE COUNTY STANDARD AND CANNOT BE SUBSTITUTED
AutoCAD SHX Text
2" DOUBLE WALLED SEMI-RIGID DIESEL PRODUCT PIPE
AutoCAD SHX Text
2" SINGLE WALLED SEMI-RIGID DIESEL VENT PIPE
AutoCAD SHX Text
RUN VENT RISER UP NEW LIGHT POLE
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text
AN
AutoCAD SHX Text
STP
AutoCAD SHX Text
TM
AutoCAD SHX Text D
AutoCAD SHX Text PROJECT BOUNDARY ON WEST SIDE OF PROJECT REQUIRED FOR CONTINUOUS OPERATION OF ALL FIRE STATION SERVICE BAYS. PROJECT CONSTRUCTION OPERATIONS SHALL NOT INTERFERE WITH THIS BOUNDARY WITHOUT OWNER APPROVAL. PROVIDE CONCRETE JERSEY BARRIERS TO PROTECT WORK AREA
AutoCAD SHX Text
SCALE: 1" =
AutoCAD SHX Text 0'
AutoCAD SHX Text 10'
AutoCAD SHX Text 5'
AutoCAD SHX Text 5'
AutoCAD SHX Text 1" = 5'
AutoCAD SHX Text magnetic
AutoCAD SHX Text 1" = 5'
AutoCAD SHX Text
SCALE: 1" =
AutoCAD SHX Text 0'
AutoCAD SHX Text 10'
AutoCAD SHX Text 5'
AutoCAD SHX Text 5' magnetic
MW
MW
MW
MW
MW
W
WMH
MH
.0'
O U
O O
86'
R E
V
AS NOTED
FAB
FAB
SCALE:
APPROVED:
DATE:
PROJECT #:
DRAWN:
C O
M M
E N
T S
B Y
D A
T E
P R
E P
A R
E D
F R
U
ST
E X
C A
V A
T
IO
N D
E T
A
IL
S A
N D
P
IP
IN
G
D E
T A
IL
S
SHEET NAME:
SHEET:
M a r
,2
:1 p m
J:
\5
A
T K
IN
S
N o rt h A m e ri ca
In c\
O ra n g e
C o
F ir e S ta tio n
S ilv e r
S ta r\ C o n st P la n s\
B a se
-P e rc e n t.
d w g
C o p yr ig h t
S til lw a te r
T e ch n o lo g ie s, I n c.
r e se rv e s co p yr ig h t a n d o th e r ri g h ts r e st ri ct in g t h e se d o cu m e n ts t o t h e o ri g in a l s ite o r p u rp o se f o r w h ic h t h e y w e re p re p a re d
R e p ro d u ct io n s, c h a n g e s o r a ss ig n m e n ts a re p ro h ib ite d
T E
C H
N O
L O
G
IE
S st ill w at er
PE03
D at e
FREDER
IC
K A
B
LE
CHA
PROFES
S
IO
N
A L
E N
G
IN
EER
L
IC
E N
S E
F L
O R
ID
A
N o
. 5
S T
A T
E O
F
N or th
O ra ng e
A ve nu e
Su ite
A O rl an do , F lo ri da
(4
6-
(4
6-f ax
FL
. C er t.
of A ut h.
F A
B
S.
K el le r D ri ve
O rl an do
, F L
(4
6-
547-023
O
RA
N G
E
CO
U N
TY
F
IR
E
ST
A
TI
O
N
S ilv er
S ta r R oa d O rla nd o, F lo rid a 3
TANK SPECIFICATIONS
DET A DET B
1 4' DIA. 1.000-GALLON DOUBLE-WALLED TANK AND EXCAVATION SECTION (TYPICAL)
NOTES:
1) SEE INSTALLATION SHEET FOR
EXACT LOCATION OF RISERS AND
STP SUMPS
2) SEE SHEET 'PE07' FOR DETAIL OF
CONCRETE INSTALLATION. ALL
CONCRETE ADJACENT TO EXISTING
CONCRETE SHALL BE DOWELED IN
THE SAME MANNER.
3 VENT RISER DETAILS
VENT RISER DETAIL
2 PIPE TRENCH DETAIL
B
ID
C
O N
S T
R U
C T
P L
A N
S
02/10/22
/1
/2
4 CONCRETE JOINT PLAN
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text
AN
AutoCAD SHX Text
STP
AutoCAD SHX Text
TM
AutoCAD SHX Text D
AutoCAD SHX Text
SEE DETAIL SHEET 'PE07' FOR DOWELED JOINTS WHERE NEW MEETS EX.
AutoCAD SHX Text
CTL JT
AutoCAD SHX Text
CTL JT
AutoCAD SHX Text
CTL JT
AutoCAD SHX Text
CTL JT
AutoCAD SHX Text Tighten all tank fittings. Locate a pressure gauge in the vent/monitor fitting in the secondary
AutoCAD SHX Text pressurized tank. Never pressurize the secondary (outer) tank without pressurizing the primary
AutoCAD SHX Text F. PRE-INSTALLATION PRESSURE TEST, AIR: Extreme care is to be used around and near the
AutoCAD SHX Text %%UDouble Wall
AutoCAD SHX Text After-Installation Pressure Test, Air or Hydrostatic
AutoCAD SHX Text The Contractor is responsible for all labor, material and equipment necessary to conduct the
AutoCAD SHX Text damage and will become aware of the course of action to be followed.
AutoCAD SHX Text DO NOT install a tank which shows any evidence of a leak. The Owner is to be notified of any
AutoCAD SHX Text Never pressurize the secondary (outer) tank without pressurizing the primary (inner) tank first.
AutoCAD SHX Text moving the tank or removing any fittings.
AutoCAD SHX Text USE EXTREME CARE AROUND AND NEAR THE PRESSURIZED TANK. Relieve the pressure prior to
AutoCAD SHX Text Copies of all tank tests shall be furnished to the Owner upon request.
AutoCAD SHX Text and in accordance with PEI accepted industry practices.
AutoCAD SHX Text The pressure/vacuum application system is be in accordance with the tank manufacturer's
AutoCAD SHX Text The Owner, MUST observe all tests. Notify at least 48 hours in advance of any tests.
AutoCAD SHX Text must be performed and recorded on acceptable forms.
AutoCAD SHX Text A vacuum on the annular space is substitute for the pre-installation test. All installation tests
AutoCAD SHX Text removed from the tank and the vacuum on the annular space must be released.
AutoCAD SHX Text A. PRE-INSTALLATION TEST SET UP: Prior to the pre-installation test, all shipping pads must be
AutoCAD SHX Text H. INSTALLATION WITH ALTERNATE MATERIALS: All alternate materials must receive written approval from
AutoCAD SHX Text
3. Backfill to subgrade after piping and testing is completed.
AutoCAD SHX Text around and under the tanks. Add backfill evenly around the tanks up to the tops
AutoCAD SHX Text
2. Place second 12" lift or backfill evenly around the tanks. Again, repeat the "working" or backfill
AutoCAD SHX Text prescribed by current OSHA regulations.
AutoCAD SHX Text If a man will be in the hole to "work" the backfill, hole must be shored or side sloped as
AutoCAD SHX Text the tank. Procedure can be done from bank or adjacent tank top.
AutoCAD SHX Text
1. Place a 12" lift of backfill evenly around the tanks. Push backfill completely underneath and around
AutoCAD SHX Text
G. INSTALLATION WITH APPROVED MATERIALS:
AutoCAD SHX Text Tanks that exceed the acceptable slope or that slope downward to the remote pump end are
AutoCAD SHX Text slope is 4" maximum and 1" minimum; with the fill end lower than remote pump end of the tank.
AutoCAD SHX Text of 2" difference between the two extreme openings of the tank is desired. The acceptable range of
AutoCAD SHX Text F. SETTING: Set tanks on prepared bed with a slope downward toward the fill end of the tank. A slope
AutoCAD SHX Text become aware of the course of action.
AutoCAD SHX Text
2. If the tank is damaged at any other time, do not attempt repairs. Notify the Owner who will
AutoCAD SHX Text documents and notify the Owner. Contact the tank manufacturer for additional
AutoCAD SHX Text
1. Inspect all tanks carefully for signs of damage upon receipt. Note any damage on the shipping
AutoCAD SHX Text dust cap or steel plugs in place or a 5 psi pressure relief valve in place at all times.
AutoCAD SHX Text remain in each opening until ready for the pre-installation pressure test. All tanks must have either a
AutoCAD SHX Text D. OPENINGS: All tanks are shipped with dust covers or steel plugs in each opening. Dust covers are to
AutoCAD SHX Text nylon or hemp rope over each tank and secure to stakes of adequate size to prevent movement of
AutoCAD SHX Text ready for installation. If windy conditions exist or are expected, anchor tanks using minimum 1/2"
AutoCAD SHX Text C. CHOCKING: Tanks are to be chocked in accordance with manufacturer's recommendation until
AutoCAD SHX Text EXCEPTION - Tank can be rolled up to 90%%D on a smooth clean surface.
AutoCAD SHX Text smooth ground, free of rocks and foreign objects.
AutoCAD SHX Text of at least 45%%D at each lifting lug. Never roll or use cables or chains around a tank. Set on
AutoCAD SHX Text lift by lifting lug(s). On large tanks, greater than 8' diameter, use a spreader bar to ensure a lift angle
AutoCAD SHX Text B. LIFTING & MOVING: When lifting or moving a tank, always use properly sized equipment and
AutoCAD SHX Text A crane or backhoe of sufficient lifting capacity must be used. The weight of the double wall
AutoCAD SHX Text A. RESPONSIBILITY: The Contractor is responsible for off-loading the tanks from the delivery vehicle.
AutoCAD SHX Text valve, high hose retractor, nozzle swivels, flow limiter, anti-kink springs, swivel stops, clamps, AutoCAD SHX Text Assemblies: Adapters, dust caps and nameplate holders. Phase II Equipment: Anti-Recirculation
AutoCAD SHX Text
2. Other Contractor supplied equipment included vapor recovery (when specified) Phase I
AutoCAD SHX Text Manufacturer are to be installed by Contractor in accordance with the plans and specifications
AutoCAD SHX Text
1. Double-wall Glasteel, fiberglass reinforced plastic (FRP) coated steel storage tanks as supplied by
AutoCAD SHX Text
1.5 DOUBLE WALL GLASTEEL / FRP TANK INSTALLATION:
AutoCAD SHX Text pump motor until ballast water has been removed from tank.
AutoCAD SHX Text DURING INSTALLATION. Do not remove ballast until tank slab has been poured. Do not set remote
AutoCAD SHX Text
CAUTION - BALLAST LEVEL MUST NEVER EXCEED WATER OR BACKFILL LEVEL IN THE HOLE
AutoCAD SHX Text backfill is to top of tank. After backfill to top of tank, fill tank with water until completion of
AutoCAD SHX Text partially fill with water until it sinks firmly on the bed. Use only enough water to ballast tank until
AutoCAD SHX Text followed. Install filter fabric, tie-down "logs" and bedding as specified elsewhere. Set tank in hole, AutoCAD SHX Text a "Dry Hole Condition", Owner is to be notified and will determine the course of action to be
AutoCAD SHX Text Attempt to pump water from the tank hole to maintain a "Dry Hole Condition". If unable to obtain
AutoCAD SHX Text subsurface water will enter the tank hole to a depth of 36" or greater above the bottom of the
AutoCAD SHX Text Tanks, with backfill to top of tanks, must be ballasted if there is any chance that surface or
AutoCAD SHX Text Clean water is to be used as a ballast under all conditions where ballast is required.
AutoCAD SHX Text compaction test for certification of fill at the Owner's expense. Compaction shall be at least 90% of
AutoCAD SHX Text Spread material in lifts not to exceed 12 inches and tamp thoroughly. Contractor shall provide a
AutoCAD SHX Text All fill material shall be of select sand granular nature, free from vegetation and extraneous material.
AutoCAD SHX Text design, materials, equipment, permits, etc., for shoring or side sloping a hole.
AutoCAD SHX Text be adhered to as though specificed in Company specifications. The Contractor is responsible for any
AutoCAD SHX Text No exceptions. State or local requirements that are more restrictive than Company specifications are to
AutoCAD SHX Text or side sloped as prescribed by current OSHA regulations abd the Trench Safety Act of 1986.
AutoCAD SHX Text No person shall enter a tank hole excavation below the 5 ft. deep level unless the walls are shored
AutoCAD SHX Text
a. The minimum depth of cover is 3'-0" and the maximum is 7'-0".
AutoCAD SHX Text (Measure at the Remove Pump opening).
AutoCAD SHX Text runs, to the pump blocks and vent risers, pipe burial depth, yard slope and the following criteria:
AutoCAD SHX Text
1. Contractor is responsible for establishing the tank hole depth, considering the length of piping
AutoCAD SHX Text Refer to "Alternate Backfill Materials", below.
AutoCAD SHX Text Contractor. If permanent shoring is used, follow "Stable Soil" size criteria.
AutoCAD SHX Text
4. Permanent shoring may be used to stabilize the walls of the tank hole, at the discretion of the
AutoCAD SHX Text
3. Filter fabric will be used to line the STP sump where pea gravel is utilized.
AutoCAD SHX Text diameter between the tank sides/end caps and the wall of the tank hole.
AutoCAD SHX Text
2. Size excavation perimeter to allow 24" minimum between tanks and a minimum of quarter the tank
AutoCAD SHX Text lbs./sq.ft Loose sand, muck, bog, peat, swamp or landfill where soil is soft are generally
AutoCAD SHX Text unconfined compression test, or soils with an ultimate bearing capacity of less than 3,500
AutoCAD SHX Text
1. Unstable soil is defined as having less than 750 lbs./sq. ft. cohesion, as calculated from an
AutoCAD SHX Text and 24" minimum between tank sides and end caps and the wall of the tank hole.
AutoCAD SHX Text B. TANK HOLE SIZE IN STABLE SOIL: Size excavation perimeter to allow 24" minimum between tanks
AutoCAD SHX Text Owner for instructions before proceeding with the excavation.
AutoCAD SHX Text A. EXCAVATION: If unexpected water condition or rock is encountered, immediately contact the
AutoCAD SHX Text
D. LEAKING TANKS:
AutoCAD SHX Text (inner) tank.
AutoCAD SHX Text
1. Primary (Inner) Tank Test:
AutoCAD SHX Text following tests:
AutoCAD SHX Text
E. SCOPE OF WORK:
AutoCAD SHX Text Pre-Installation Pressure Test, Air
AutoCAD SHX Text
C. PRESSURE/VACUUM APPLICATION SYSTEM:
AutoCAD SHX Text
B. NOTIFICATION:
AutoCAD SHX Text
1.7 TANK TESTING
AutoCAD SHX Text the tank manufacturer.
AutoCAD SHX Text improperly set and will be reset.
AutoCAD SHX Text
E. DAMAGE:
AutoCAD SHX Text of the tanks.
AutoCAD SHX Text information.
AutoCAD SHX Text the tanks.
AutoCAD SHX Text tank is approximately 14,000 pounds.
AutoCAD SHX Text
1.6 HANDLING OF TANKS:
AutoCAD SHX Text extension.
AutoCAD SHX Text installation. All necessary dewatering permits (ie. NPDES shall be obtained as required by regulatory
AutoCAD SHX Text
A. MATERIALS:
AutoCAD SHX Text %%UNominal Gallons
AutoCAD SHX Text as supplied by manufacturer.
AutoCAD SHX Text
C. WET HOLE CONDITION:
AutoCAD SHX Text
B. DRY HOLE CONDITION:
AutoCAD SHX Text
A. MATERIALS
AutoCAD SHX Text
1.4 BALLAST
AutoCAD SHX Text
F. FILL AND BACKFILL:
AutoCAD SHX Text tanks.
AutoCAD SHX Text the Modified Proctor density.
AutoCAD SHX Text
E. SAFETY REQUIREMENT:
AutoCAD SHX Text
D. DEPTH OF TANK HOLE:
AutoCAD SHX Text considered unstable soils.
AutoCAD SHX Text
C. TANK HOLE SIZE IN UNSTABLE SOIL:
AutoCAD SHX Text
1.3 EXCAVATION AND BACKFILL:
AutoCAD SHX Text
1. CLEAN SAND: Select coarse granular material, clean and fee of any deleterious matter or debris.
AutoCAD SHX Text Excess fabric at top of the hole should be folded over the backfill material at subgrade level.
AutoCAD SHX Text NOTE: Bedding material, tie-down "logs" and sample wells are to be placed on the top of the filter fabric.
AutoCAD SHX Text for quality and soundness. The dry gavel density must be a minimum of 95 pounds per cubic foot.
AutoCAD SHX Text NOTE: Approved materials must be dry, free of ice and snow, and meet ASTM C-33, Paragraph 7.1
AutoCAD SHX Text
3. STONE OR GRAVEL CRUSHINGS: Washed material with a particle size between 1/8" and 1/2". Up
AutoCAD SHX Text
2. PEA GRAVEL: A clean, naturally rounded aggregate with a 1/8" minimum and a 3/4" maximum
AutoCAD SHX Text fillboxes by filling with water for a minimum of one hour. There should be no drop in the water level during
AutoCAD SHX Text N. INSTALLING THE SPILL CONTAINMENT FILLBOX: The spill containment fillbox must be liquid tight. Test all
AutoCAD SHX Text M. INSTALLING THE CONTAINMENT SUMP: The containment sump must be watertight to prevent
AutoCAD SHX Text L. INTERSTITIAL MONITOR: Install monitoring gauge in riser provided by tank manufacturer. Test per FAC 62-761.
AutoCAD SHX Text off the top of the tank. This shall be considered for the slope of the piping and thus may affect the
AutoCAD SHX Text feet and a maximum of 7 feet. The fittings, if a manway is used, will be approximately 5 to 6 inches
AutoCAD SHX Text J. BURIAL DEPTH: The burial depth from the top of the tank to ground level shall be a minimum of 3
AutoCAD SHX Text secondary (outer) tank with a fluid. If the tanks are ballasted, conduct Hydrostatic Test (instead of
AutoCAD SHX Text I. BALLASTING: Only the primary (inner) tank shall be used when ballasting the tank. Never fill the
AutoCAD SHX Text If a hydrostatic test is required by a local agency, the contractor is to isolate the tank for testing and
AutoCAD SHX Text responsibility. The Owner is to be notified of any damage and will be made aware of the
AutoCAD SHX Text is to be kept in the system. Any damage incurred to the tank during the installation will be contractor's
AutoCAD SHX Text H. POST-INSTALLATION PRESSURE TEST, HYDROSTATIC: No tank that shows any evidence of a leak
AutoCAD SHX Text monitor the pressure gauge for a minimum of 1/2 hour. There should be no pressure increase in
AutoCAD SHX Text the primary (inner) tank to a minimum of 4 psi (maximum 5 psi). Soap all tank fittings and
AutoCAD SHX Text the primary (inner) tank fittings and connect the air pressure hose to this same fitting. Pressurize
AutoCAD SHX Text secondary (outer) tank. Locate a second pressure gauge with a 5 psi pressure relief, to one of
AutoCAD SHX Text tank fittings. Locate a pressure gauge in one of the annular space monitor fittings in the
AutoCAD SHX Text
1. Primary (Inner) Tank Test: Perform this test with all tank risers and fittings attached. Tighten all
AutoCAD SHX Text liquid ingress or egress. Fiberglass inside and outside of tank collar. Test per FAC 62-761.
AutoCAD SHX Text Phillips Fibers Corp. - "Supac 4Np" fabric
AutoCAD SHX Text Reemay Inc. - Typar 3401 or Typar 3341
AutoCAD SHX Text
B. RECOMMENDED FILTER FABRIC MATERIAL:
AutoCAD SHX Text
A. APPROVED BACKFILL MATERIALS:
AutoCAD SHX Text
1.8 APPROVED MATERIALS
AutoCAD SHX Text this test. Do not drain water into the tank. Double-walled spill buckets require a vacuum test and per
AutoCAD SHX Text to 5% of the particles may pass through a #8 sieve.
AutoCAD SHX Text diameter. Up to 5% of the particles may pass through a #8 sieve.
AutoCAD SHX Text K. VENTING: Vent the primary tank only as required by tank manufacturer.
AutoCAD SHX Text tank burial depth. Contractor shall provide all sheetpiling/shoring as necessary to allow facility access
AutoCAD SHX Text the post-installation air test) on the tank and fittings.
AutoCAD SHX Text reconnect when testing is complete.
AutoCAD SHX Text course of action to be followed.
AutoCAD SHX Text
G. POST-INSTALLATION PRESSURE TEST, AIR:
AutoCAD SHX Text the secondary (outer) tank.
AutoCAD SHX Text
MAX.
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
INNER TANK
AutoCAD SHX Text 3"
AutoCAD SHX Text
INNER TANK
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
FILL TUBE
AutoCAD SHX Text 3"
AutoCAD SHX Text 6"
AutoCAD SHX Text
PUMP INTAKE
AutoCAD SHX Text 6" to 8"
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
4'-0" DIA. X 11'-0' L
AutoCAD SHX Text
SINGLE COMPARTMENT
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
SEE DET. B
AutoCAD SHX Text
MIN.
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text
MIN.
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
3'-0" MIN.
AutoCAD SHX Text
7'-0" MAX.
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 11'-0"
AutoCAD SHX Text 1,000 Gal.
AutoCAD SHX Text
FILL
AutoCAD SHX Text
ANNUALR
AutoCAD SHX Text
SPACE MONITOR
AutoCAD SHX Text
SEE DET. A
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
VENT RISER
AutoCAD SHX Text
LIFTING LUG
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text
TANK
AutoCAD SHX Text
MONITOR
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
NTS
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
CORROSION PROTECTION TAPE
AutoCAD SHX Text
2" SINGLE-WALL SEMIRIGID VENT LINE
AutoCAD SHX Text
2" GALV. VENT RISER
AutoCAD SHX Text
2-D SWING JOINT 2-90° GALV. ELBOW W/ A SHORT NIPPLE BETWEEN ELBOWS
AutoCAD SHX Text
ADAPTOR
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
COLLAR
AutoCAD SHX Text
RISER
AutoCAD SHX Text
(24" MAX)
AutoCAD SHX Text
(2) 2" GALV.
AutoCAD SHX Text
2"%%C GALVANIZED
AutoCAD SHX Text
(SWING JOINT)
AutoCAD SHX Text
90%%D ELBOW
AutoCAD SHX Text
FASTEN VENT
AutoCAD SHX Text
PRE-FORMED
AutoCAD SHX Text
TO LIGHT POLE WITH
AutoCAD SHX Text
UNISTRUT BRACKETS.
AutoCAD SHX Text
RISER SECURELY
AutoCAD SHX Text
2"%%C GALVANIZED THREADED
AutoCAD SHX Text
18" MIN
AutoCAD SHX Text
2"%%C GALVANIZED PIPE, PRIMED
AutoCAD SHX Text
& WRAPPED BELOW GRADE
AutoCAD SHX Text
& WRAPPED BELOW GRADE
AutoCAD SHX Text
FEMALE COUPLING, PRIMED
AutoCAD SHX Text
ADAPTOR
AutoCAD SHX Text
SINGLE WALL PIPE TO TANK
AutoCAD SHX Text 2" BELL x MALE
AutoCAD SHX Text
5'-0" MIN.
AutoCAD SHX Text
PRESSURE VACUUM VALVE
AutoCAD SHX Text
2" %%C SCH. 40
AutoCAD SHX Text
(PRIMED AND WRAPPED
AutoCAD SHX Text
GALVANIZED
AutoCAD SHX Text
BELOW GRADE)
AutoCAD SHX Text
FLUSH W/YARD
AutoCAD SHX Text
CONC. COLLAR
AutoCAD SHX Text
PIPE COUPLING (TYP.)
AutoCAD SHX Text
GALVANIZED PIPE
AutoCAD SHX Text
AS REQUIRED BY LOCAL CODE.
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
SEE DETAIL
AutoCAD SHX Text
DO NOT LOCATE VENT RISERS WITHIN:
AutoCAD SHX Text
- BUILDING OR BUILDING COLUMNS
AutoCAD SHX Text
- 5'-0" OF ELECTROLIERS OR ELECTRIC SIGNS
AutoCAD SHX Text
- 3'-0" OF NEON ELECTRODES OR JUNCTION BOX
AutoCAD SHX Text
- 25'-0" OF EVAPORATOR COOLERS OR HEATER FLUES
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
ALL TRENCHING SHOULD BE COMPLETED PRIOR TO THE FINAL SURFACE
AutoCAD SHX Text
COURSE BEING LAID.
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
CONCRETE SLAB
AutoCAD SHX Text
6" MIN. BED
AutoCAD SHX Text
18" MIN. COVER
AutoCAD SHX Text
PEA GRAVEL BACKFILL MATERIAL (TYPICAL)
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
2" SEMI-RIGID DOUBLE-WALLEDPRODUCT PIPE (TYP.)
AutoCAD SHX Text
WOVEN GEOTEXTILE FABRIC (TYPICAL)
AutoCAD SHX Text 12"
AutoCAD SHX Text 6 "12"
AutoCAD SHX Text 6 "12"
AutoCAD SHX Text ANGLE OF SOIL REPOSE ON ALL SIDES 1:1 W/ DEPTH NOTE: SHEETPILING : SHEETPILING WILL BE REQUIRED IN ORDER TO MAINTAIN FIRE STATION ACCESS
AutoCAD SHX Text if required to maintain access.
AutoCAD SHX Text Access tot he fire station shall be in accordance with the site plan. Contractor shall provide sheetpiling/shoring
AutoCAD SHX Text
G. SHEETPILING/SHORING:
AutoCAD SHX Text requirements.
AutoCAD SHX Text FDEP will require a 30 to 45 day notification, and 48 to 72 hour notification before all testing.
AutoCAD SHX Text as stated and depicted in the plans.
AutoCAD SHX Text manufacture's requirements.
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
NEW LIGHT POLE AND FIXTURES
AutoCAD SHX Text
PER DETAIL 'PE05'
AutoCAD SHX Text
NOTE: SEE SHEET 'PE06' FOR HOLD DOWN STRAPS AND DEADMEN HOLDDOWNS
CLEAN SAND OR GRAVEL BACKFILL APPROVED BY TANK MANUFACTURER AND TO COMPLY WITH OWNER SPECIFICATIONS
R E
V
AS NOTED
FAB
FAB
SCALE:
APPROVED:
DATE:
PROJECT #:
DRAWN:
C O
M M
E N
T S
B Y
D A
T E
P R
E P
A R
E D
F R
U
ST
S U
M P
R
IS
E
R D
E T
A
IL
S
SHEET NAME:
SHEET:
M a r
,2
:2 p m
J:
\5
A
T K
IN
S
N o rt h A m e ri ca
In c\
O ra n g e
C o
F ir e S ta tio n
S ilv e r
S ta r\ C o n st P la n s\
B a se
-P e rc e n t.
d w g
C o p yr ig h t
S til lw a te r
T e ch n o lo g ie s, I n c.
r e se rv e s co p yr ig h t a n d o th e r ri g h ts r e st ri ct in g t h e se d o cu m e n ts t o t h e o ri g in a l s ite o r p u rp o se f o r w h ic h t h e y w e re p re p a re d
R e p ro d u ct io n s, c h a n g e s o r a ss ig n m e n ts a re p ro h ib ite d
T E
C H
N O
L O
G
IE
S st ill w at er
PE04
D at e
FREDER
IC
K A
B
LE
CHA
PROFES
S
IO
N
A L
E N
G
IN
EER
L
IC
E N
S E
F L
O R
ID
A
N o
. 5
S T
A T
E O
F
N or th
O ra ng e
A ve nu e
Su ite
A O rl an do , F lo ri da
(4
6-
(4
6-f ax
FL
. C er t.
of A ut h.
F A
B
S.
K el le r D ri ve
O rl an do
, F L
(4
6-
547-023
O
RA
N G
E
CO
U N
TY
F
IR
E
ST
A
TI
O
N
S ilv er
S ta r R oa d O rla nd o, F lo rid a 3
TOP VIEW
2)
3)
6 ANNULAR SPACE MONITOR
GENERAL NOTES:
FIBERGLASS STP SUMP DIMENSIONAL PLAN
54 2"/3" VENT LINE EXTRACTOR
3 FILL DETAIL
SUBMERSIBLE TURBINE PUMP (STP) AND SUMP DETAIL
AUTOMATIC TANK LEVEL MONITOR
GENERAL NOTES:
PLAN (TYPICAL)
ELEVATION (TYPICAL)
B
ID
C
O N
S T
R U
C T
P L
A N
S
02/10/22
/1
/2
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
DEEP TANK SUMP TOP S/A
AutoCAD SHX Text
VIEW B
AutoCAD SHX Text
VIEW C
AutoCAD SHX Text
TANK SUMP BOTTOM S/A
AutoCAD SHX Text
ACCESS COVER
AutoCAD SHX Text
GLASS INSPECTION PORT
AutoCAD SHX Text A
AutoCAD SHX Text
PIPING SUMP TOP
AutoCAD SHX Text
FIBERGLASS
AutoCAD SHX Text A
AutoCAD SHX Text
COVER S/A
AutoCAD SHX Text 1)
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
MONITOR PLUG
AutoCAD SHX Text
SECURED LID
AutoCAD SHX Text
WATER TIGHT
AutoCAD SHX Text
18" MANHOLE W/
AutoCAD SHX Text
THREADED PVC ADAPTOR
AutoCAD SHX Text
HOLDER
AutoCAD SHX Text
1" MAXIMUM
AutoCAD SHX Text
MONITOR TAG &
AutoCAD SHX Text
ON GALVANIZED
AutoCAD SHX Text
THREADED RISER
AutoCAD SHX Text
INTERSTITIAL RISER
AutoCAD SHX Text
2" GALVANIZED
AutoCAD SHX Text
3/4" %%C CONDUIT
AutoCAD SHX Text
JUNCTION BOX
AutoCAD SHX Text
SEAL OFF (HOME-RUN ONLY)
AutoCAD SHX Text
4" CAP ON RISER WITH PROBE ADAPTOR
AutoCAD SHX Text
SUPPLIED W/ PROBE
AutoCAD SHX Text
2 CORD GRIP SEALS
AutoCAD SHX Text
W/ PROBE
AutoCAD SHX Text
4" SCH. 40 GALVANIZED
AutoCAD SHX Text
3/4" CONDUIT
AutoCAD SHX Text
CORD SUPPLIED
AutoCAD SHX Text
SHOULD BE 21" TO BOTTOM
AutoCAD SHX Text
OF RISER CAP
AutoCAD SHX Text
STEEL RISER. RISER DIMENSION
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
%%UNOTE:
AutoCAD SHX Text
RISER PIPE WHICH MUST BE 6" LONGER
AutoCAD SHX Text
WILL USE AN 8' PROB. THE EXTRA
AutoCAD SHX Text
PROBE HEIGHT WILL BE LODGED IN THE
AutoCAD SHX Text
(EXAMPLE: A 7'-6" DIAMETER TANK
AutoCAD SHX Text
INCREASE THIS MINIMUM DIMENSION
AutoCAD SHX Text
IF THE TANK DIAMETER DOES NOT
AutoCAD SHX Text
MATCH THE PROBE LENGTH.
AutoCAD SHX Text
MAGNETOSTRICTIVE PROBE
AutoCAD SHX Text
ROOM.
AutoCAD SHX Text
THAN THE MI. IN ORDER TO PROVIDE
AutoCAD SHX Text STP POWER CONDUIT AND DATA/LOW VOLTAGE CONDUITS SHALL BE PLACED IN SEPARATE TRENCHES PER DISPENSER MANUFACTURER RECOMMENDATION
AutoCAD SHX Text CONTRACTOR SHALL VERIFY STP SIZE PRIOR TO CONDUCTING ON-SITE WORK; UST BUNG CONFIGURATION MAY DETERMINE STP SIZE TO BE UTILIZED; STP SUMP DIAMETER SHALL BE 42" FOR 4" STP BUNGS AND 48" FOR 6" STP BUNGS
AutoCAD SHX Text CONTRACTOR SHALL CONFIRM UST BUNG CONFIGURATION WITH OWNER AND UST MANUFACTURER PRIOR TO CONDUCTING ON-SITE WORK
AutoCAD SHX Text 2'
AutoCAD SHX Text 1 1/2" - 2"
AutoCAD SHX Text
(16 CUBIC INCH MIN)
AutoCAD SHX Text
BOX WITH 1/2" NPT THREADS
AutoCAD SHX Text
WEATHERPROOF JUNCTION
AutoCAD SHX Text
3/4" CONDUIT
AutoCAD SHX Text 21"
AutoCAD SHX Text
AND SURROUNDING
AutoCAD SHX Text
RISER FOR 12"
AutoCAD SHX Text
DEEP AT RISER
AutoCAD SHX Text
PEA GRAVEL 6"
AutoCAD SHX Text
NO SCALE"
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
WITH PROBE ADAPTOR
AutoCAD SHX Text
18" MANHOLE W/
AutoCAD SHX Text 2'
AutoCAD SHX Text 1 1/2" - 2"
AutoCAD SHX Text 2'
AutoCAD SHX Text 1 1/2" - 2"
AutoCAD SHX Text
FILL MANHOLE COLORS: REGULAR UNLEADED - WHITE/BLACK + DIESEL - GREEN OR YELLOW
AutoCAD SHX Text
4"-6" FROM TOP OF SPILL BUCKET TO TOP OF FILL CAP
AutoCAD SHX Text
MANHOLE COVER PER API COLOR CODE
AutoCAD SHX Text
SWIVEL ADAPTER
AutoCAD SHX Text
4" TOP SEAL CAP
AutoCAD SHX Text
DOUBLE-WALL SPILL BUCKET
AutoCAD SHX Text
4" ALUMINUM FILL TUBE
AutoCAD SHX Text
4" SCH 40 GALVANIZED RISER
AutoCAD SHX Text
TANK FITTING
AutoCAD SHX Text
4" ALUMINUM DROPTUBE WITH POSITIVE SHUTOFF
AutoCAD SHX Text
SWIVEL VAPOR RECOVERY ADAPTOR FOR GAS AND JUST CAP FOR DIESEL (SEE NOTE 1)
AutoCAD SHX Text
SINGLE-WALL SPILL BUCKET
AutoCAD SHX Text
4" SCH 40GALVANIZED RISER
AutoCAD SHX Text
EXTRACTOR FITTING
AutoCAD SHX Text
2"/3" GALV. NIPPLE (SEE NOTE 2)
AutoCAD SHX Text
2"/3" GALV. 90° ELBOW(SEE NOTE 2)
AutoCAD SHX Text 2"/3" BELL x MALE ADAPTOR (SEE NOTE 2)
AutoCAD SHX Text
2"/3" SINGLE-WALL FIBERGLASS UST VENT LINE (SEE NOTE 2)
AutoCAD SHX Text
4"-6" FROM TOP OF SPILL BUCKET TO TOP OF FILL CAP
AutoCAD SHX Text
NEW 8" THICK CONCRETE SLAB
AutoCAD SHX Text
NEW 8" THICK CONCRETE SLAB
AutoCAD SHX Text
VISUAL INDICATOR INSIDE SPILL BUCKET
AutoCAD SHX Text NOTES: PLACE VENT RISER INSIDE STP MANHOLE PER PETROLEUM LAYOUT IF REQUIRED DUE TO TANK RISERS. SPILL BUCKET WILL NOT BE REQUIRED FOR DIESEL APPLICATIONS AT STP SUMP.
AutoCAD SHX Text NOTES: 1. STAGE I VAPOR RECOVERY ADAPTOR AT GASOLINE RISER ONLY; STAGE I VAPOR RECOVERY ADAPTOR AT GASOLINE RISER ONLY; INSTALL PIPE CAP AT DIESEL RISER. 2. REFERENCE SHEET PE01 FOR VENT PIPE SIZES.REFERENCE SHEET PE01 FOR VENT PIPE SIZES.
AutoCAD SHX Text
EXPLOSION PROOF J-BOX
AutoCAD SHX Text
NEW LIQUID LEVEL SENSOR
AutoCAD SHX Text
1. CONTRACTOR SHALL CONFIRM UST CONTRACTOR SHALL CONFIRM UST BUNG CONFIGURATION WITH OWNER AND UST MANUFACTURER PRIOR TO CONDUCTING ON-SITE WORK 2. STP POWER CONDUIT AND DATA/LOW STP POWER CONDUIT AND DATA/LOW VOLTAGE CONDUITS SHALL BE PLACED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 3. CONTRACTOR SHALL INSTALL ALL CONTRACTOR SHALL INSTALL ALL ELECTRICAL IN ACCORDANCE WITH NFPA 70 "NATIONAL ELECTRICAL CODE" AND SPECIFICALLY CHAPTER 5 ARTICLE 514 (LATEST EDITION).
AutoCAD SHX Text
NEW 2" DOUBLE-WALLEDSEMI-RIGID PRODUCT PIPE
AutoCAD SHX Text
NEW TEST BOOT
AutoCAD SHX Text
NEW PENETRATION BOOT
AutoCAD SHX Text
MECHANICAL LINE LEAK DETECTOR
AutoCAD SHX Text 2" 90°
AutoCAD SHX Text
2" THREADED ADAPTER
AutoCAD SHX Text
2" FIBERGLASS PIPE OPEN AT BOTTOM (OPTIONAL)
AutoCAD SHX Text
2" FLEX CONNECTOR
AutoCAD SHX Text
2" TEE
AutoCAD SHX Text
2" BALL VALVE (FULL PORT) (TYP.)
AutoCAD SHX Text 2" 90°
AutoCAD SHX Text
2" THREADED ADAPTER
AutoCAD SHX Text
2" UNION
AutoCAD SHX Text
CONTAINMENT SUMP
AutoCAD SHX Text
NEW CONDUIT (SEE PROFILE DETAIL)
AutoCAD SHX Text
SUBMERSIBLE TURBINE PUMP
AutoCAD SHX Text
26" MANWAY
AutoCAD SHX Text
SPARE 4" BUNG
AutoCAD SHX Text
NEW 4" SPARE BUNG (TYP.)
AutoCAD SHX Text
NEW 2" GALV. ELBOW
AutoCAD SHX Text
NEW 2" GALV. NIPPLE
AutoCAD SHX Text
NEW PEA GRAVEL BACK FILL
AutoCAD SHX Text
3/4" TO TANK PROBE
AutoCAD SHX Text
3/4" FROM ELECTRICAL ROOM TO STP
AutoCAD SHX Text
NEW FOAM SEPARATOR
AutoCAD SHX Text
NEW 2" FULL PORT BALL VALVE
AutoCAD SHX Text
NEW FLEX CONNECTOR
AutoCAD SHX Text
NEW TEST BOOT
AutoCAD SHX Text
NEW (4) #5 REBARS AROUND M.H. (TYP.)
AutoCAD SHX Text
NEW 8" CONCRETE TANK SLAB (SEE DETAIL THIS SHEET FOR DESIGN AROUND MANHOLES)
AutoCAD SHX Text
4" MIN.
AutoCAD SHX Text
12" MIN.
AutoCAD SHX Text
20" MAX.
AutoCAD SHX Text
NEW 42" STEEL H-20 MANHOLEWITH LIFT HANDLE
AutoCAD SHX Text
NEW 2" DOUBLE-WALLED SEMI-RIGIDPRODUCT PIPE
AutoCAD SHX Text
NEW PELLETHANE PENETRATION BOOT
AutoCAD SHX Text NEW 2" FIBERGLASS SLEEVE AND LIQUID LEVEL SENSOR; HANG FROM CONDUIT AND SECURE WITH STAINLESS STEEL STRAPS
AutoCAD SHX Text
NEW MECHANICAL LINE LEAK DETECTOR
AutoCAD SHX Text
NEW SUBMERSIBLE TURBINE PUMP
AutoCAD SHX Text
NEW CONDUIT (TYP.)
AutoCAD SHX Text
NEW PENETRATION BOOT (FOR CONDUIT) (TYP.)
AutoCAD SHX Text
NEW 4" STEEL TUBE RISER
AutoCAD SHX Text
NEW 4" N.P.T.
AutoCAD SHX Text
NEW 26" MANWAY (TYP.)
NEW FIBERGLASS STP CONTAINMENT SUMP; CONTRACTOR TO TEST WATER TIGHTNESS FOLLOWING INSTALLATION
V
AS NOTED
FAB
FAB
SCALE:
APPROVED:
DATE:
PROJECT #:
DRAWN:
C O
M M
E N
T S
B Y
D A
T E
P R
E P
A R
E D
F R
D
IS
PE
N
SE
R
A R
E A
D E
T A
IL
S
SHEET NAME:
SHEET:
M a r
,2
:2 p m
J:
\5
A
T K
IN
S
N o rt h A m e ri ca
In c\
O ra n g e C o F ir e
S ta tio n
S ilv e r S ta r\
C o n st
P la n s\
B a se
-P e rc e n t.
d w g
C o p yr ig h t
S til lw a te r
T e ch n o lo g ie s, I n c.
r e se rv e s co p yr ig h t a n d o th e r ri g h ts r e st ri ct in g t h e se d o cu m e n ts t o t h e o ri g in a l s ite o r p u rp o se f o r w h ic h t h e y w e re p re p a re d
R e p ro d u ct io n s, c h a n g e s o r a ss ig n m e n ts a re p ro h ib ite d
T E
C H
N O
L O
G
IE
S st ill w at er
PE05
D at e
FREDER
IC
K A
B
LE
CHA
PROFES
S
IO
N
A L
E N
G
IN
EER
L
IC
E N
S E
F L
O R
ID
A
N o
. 5
S T
A T
E O
F
N or th
O ra ng e
A ve nu e
Su ite
A O rl an do , F lo ri da
(4
6-
(4
6-f ax
FL
. C er t.
of A ut h.
F A
B
S.
K el le r D ri ve
O rl an do
, F L
(4
6-
547-023
O
RA
N G
E
CO
U N
TY
F
IR
E
ST
A
TI
O
N
S ilv er
S ta r R oa d O rla nd o, F lo rid a 3
FUEL ISLAND LAYOUT 1
GASBOY DISPENSER - ATLAS 9100, SINGLE HOSE/PRODUCT3
GALLONS
GALLONS
BOLLARD DETAIL4
DIESEL DISPENSER WITH HOSE RETRACTOR DETAIL
GALLONS
LIGHT POLE, FOUNDATION AND FIXTURE DETAIL5
GALLONS
B
ID
C
O N
S T
R U
C T
P L
A N
S
02/10/22
/1
/2
PIPE STUB-UP PROTECTION DETAIL6
AutoCAD SHX Text
NOTE: BOLLARDS TO BE FURNISHED AND INSTALLED BY CONTRACTOR.
AutoCAD SHX Text
18" CONCRETE FOOTING
AutoCAD SHX Text
SURFACE AS OCCURS
AutoCAD SHX Text
6" ROUND SCH 40 STEELFILLED WITH CONCRETE; PAINT YELLOW PER OWNER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
6" FUELING AREABOLLARDS (TYP.)
AutoCAD SHX Text
PROPOSED 4'X12'X13" RAISED ISLAND
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text 28-1/4"
AutoCAD SHX Text 28-9/16"
AutoCAD SHX Text 17-1/4"
AutoCAD SHX Text 18-1/16"
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text 29-1/16"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 52-5/8"
AutoCAD SHX Text 41-3/8"
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text
SERIAL
AutoCAD SHX Text
MODEL
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text 18-3/8"
AutoCAD SHX Text
NTS
AutoCAD SHX Text NEW EJ WARD CARD READER MODEL #FCT-IOT-SH REV1 AND OMNTEC TANK MONITOR CONSOLE MODEL #OEL8000IIIK4 (OWNER STANDARD SPEC AND NOT TO BE SUBSTITUTED
AutoCAD SHX Text NOTE: FINAL PLACEMENT OF ALL FUEL : FINAL PLACEMENT OF ALL FUEL ISLAND EQUIPMENT SHALL BE COORDINATED WITH OWNER PRIOR TO CONSTRUCTION AND LOCATIONS DEPICTED HEREIN ARE FOR INFORMATION ONLY
AutoCAD SHX Text
DIESEL
AutoCAD SHX Text
NEW LIGHT POLE AND FOUNDATION (SEE DETAIL THIS SHEET)
AutoCAD SHX Text
NTS
AutoCAD SHX Text
PUMP ISLAND TO HAVE MINIMUM 4" / MAX 6" REVEAL ABOVE ADJACENT GRADE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AUTOMATIC NOZZLE WITH SPLASH GUARD
AutoCAD SHX Text
HIGH-HOSE RETRIEVER WITH HOSE BUN SUPPORT.
AutoCAD SHX Text
12' LONG HOSE
AutoCAD SHX Text
BREAKAWAY
AutoCAD SHX Text
SWIVEL
AutoCAD SHX Text
1.5" 52 VALVE
AutoCAD SHX Text
STABILIZER BAR
AutoCAD SHX Text
GASBOY ATLAWS MODEL 9100, DOUBLE-SIDED, SINGLE-HOSE, SINGLE- PRODUCT DISPENSER
AutoCAD SHX Text
SEAL OFF
AutoCAD SHX Text
CONTAINMENT SUMP
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
3/4" RIGID CONDUIT ROUTEDUNDERGROUND PER APPLICABLE ELECTRIC CODE
AutoCAD SHX Text
LED LIGHT FIXTURE (TYPICAL OF TWO)
AutoCAD SHX Text
BRONZE FACTORY FURNISHED FINISH
AutoCAD SHX Text
#6 STRANDED COPPER GROUND WIRE ATTACHED TO LUG AND CALMP
AutoCAD SHX Text
HANDHOLE WITH COVER
AutoCAD SHX Text
ANCHOR BOLT PROTECTIVE BASE PLATES
AutoCAD SHX Text
3 1/2" PROJECTION (TYP.)
AutoCAD SHX Text
LEVELING NUTS (TYP.)
AutoCAD SHX Text
(4) 3/4"x30" LONG ANCHOR BOLTS FURNISHED BY POLE SUPPLIER
AutoCAD SHX Text
#2 REBAR TIES 12" O.C.
AutoCAD SHX Text
(6) #5 REBAR VERTICAL
AutoCAD SHX Text
SUITABLE BACKFILL COMPACTED TO 98% MAX. DENSITY PER MODIFIED PROCTOR
AutoCAD SHX Text
LIMITS OF CONCRETE FOOTER
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NEW GAS AST (SEE DETAILS SHEET 'PE07')
AutoCAD SHX Text
6" FUELING AREABOLLARDS (TYP.)
AutoCAD SHX Text
NTS
AutoCAD SHX Text
SEE DETAIL THIS SHEET FOR PRODUCT PIPE STUB-UP AND PROTECTION
AutoCAD SHX Text
2" DOUBLE-WALLED SEMI RIGID DIESEL PRODUCT PIPE FROM UST
AutoCAD SHX Text
4" PVC SLEEVE THROUGH CONCRETE PAD AND ISLAND
AutoCAD SHX Text ALUMINUM FIELD/SHOP FABRICATED BOX (±14"x14x14" WITHREMOVABLE ALUMINUM LID
AutoCAD SHX Text
1.5" PRIMARY PIPE TEST FITTING
AutoCAD SHX Text
SEMI-RIGID ENTRY BOOT
AutoCAD SHX Text
ANCHOR BOX TO CONCRETE IN 4 PLACES AROUND PERIMETER
2" SEMI-RIGID ELBOW
V
AS NOTED
FAB
FAB
SCALE:
APPROVED:
DATE:
PROJECT #:
DRAWN:
C O
M M
E N
T S
B Y
D A
T E
P R
E P
A R
E D
F R
U
ST
A N
C H
O R
IN
G
A N
D
FL
O A
T A
T
IO
N C
A L
C S
SHEET NAME:
SHEET:
M a r
,2
:2 p m
J:
\5
A
T K
IN
S
N o rt h A m e ri ca
In c\
O ra n g e
C o
F ir e S ta tio n
S ilv e r
S ta r\ C o n st P la n s\
B a se
-P e rc e n t.
d w g
C o p yr ig h t
S til lw a te r
T e ch n o lo g ie s, I n c.
r e se rv e s co p yr ig h t a n d o th e r ri g h ts r e st ri ct in g t h e se d o cu m e n ts t o t h e o ri g in a l s ite o r p u rp o se f o r w h ic h t h e y w e re p re p a re d
R e p ro d u ct io n s, c h a n g e s o r a ss ig n m e n ts a re p ro h ib ite d
T E
C H
N O
L O
G
IE
S st ill w at er
PE06
D at e
FREDER
IC
K A
B
LE
CHA
PROFES
S
IO
N
A L
E N
G
IN
EER
L
IC
E N
S E
F L
O R
ID
A
N o
. 5
S T
A T
E O
F
N or th
O ra ng e
A ve nu e
Su ite
A O rl an do , F lo ri da
(4
6-
(4
6-f ax
FL
. C er t.
of A ut h.
F A
B
S.
K el le r D ri ve
O rl an do
, F L
(4
6-
547-023
O
RA
N G
E
CO
U N
TY
F
IR
E
ST
A
TI
O
N
S ilv er
S ta r R oa d O rla nd o, F lo rid a 3
DEADMAN LOCATIONS1
STORAGE TANK DEADMAN (1,000-GALLON) 2
SPECIFICATIONS
B
ID
C
O N
S T
R U
C T
P L
A N
S
02/10/22
/1
/2
AutoCAD SHX Text
TANK #1
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
12" BED
AutoCAD SHX Text
AND MULTIPLE TANK INSTALLATIONS OR AS INDICATED.
AutoCAD SHX Text
12" X 12" DEADMAN FOR USE @ SINGLE
AutoCAD SHX Text (12" x 24" BETWEEN TANKS FOR MULTIPLE TANK INSTALLATIONS)
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text 12"
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
DEADMAN
AutoCAD SHX Text CONTRACTOR SHALL CONFIRM TANK TIE-DOWN LOCATIONS WITH MANUFACTURER PRIOR TO TANK INSTALLATION.
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
NOTE::
AutoCAD SHX Text
11'-0" LENGTH OF DEADMAN)
AutoCAD SHX Text
ANCHOR LOOP (TYP.)
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text
11'-0" OVERALL LENGTH TANK
AutoCAD SHX Text
TANK AND DEADMAN
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text MATERIAL 1/8"x6", FIELD INSTALL
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
15" MAX.
AutoCAD SHX Text
9" MIN.
AutoCAD SHX Text
STRAP
AutoCAD SHX Text
HOLD DOWN
AutoCAD SHX Text 3/8"x3" F.B. STRAP DIELECTRIC
AutoCAD SHX Text
BETWEEN STRAP AND EXTERIOR
AutoCAD SHX Text
TANK SURFACE
AutoCAD SHX Text c.f.
AutoCAD SHX Text
TOTAL VOLUME
AutoCAD SHX Text Safety Factor
AutoCAD SHX Text
A.8 ADEQUACY OF RESTRAINING FORCES
AutoCAD SHX Text
DEADMAN OVERBURDEN AND BALLASTING
AutoCAD SHX Text
TOTAL DEADMAN BALLAST (2 PER TANK)
AutoCAD SHX Text
FORCE DOWN DIVIDED BY FORCE UP
AutoCAD SHX Text
A.9 CALCULATIONS OF SAFETY FACTOR
AutoCAD SHX Text
TOTAL FORCES (DOWN)
AutoCAD SHX Text
WEIGHT OF OVERBURDEN
AutoCAD SHX Text
CONCRETE PAVING AT GRADE
AutoCAD SHX Text
WEIGHT OF TANK
AutoCAD SHX Text
WEIGHT OF DEADMAN
AutoCAD SHX Text
WEIGHT OF OTHER MATERIALS
AutoCAD SHX Text
BUOYANCY OF TANK
AutoCAD SHX Text
UP FORCES
AutoCAD SHX Text Vc X WTw c X WTw X WTw w
AutoCAD SHX Text
DOWN FORCES
AutoCAD SHX Text
SUBTOTAL
AutoCAD SHX Text X WEIGHT OF SOIL (WTs)s))
AutoCAD SHX Text DEADMAN LENGTH (Lt)t))
AutoCAD SHX Text DEADMAN WIDTH (Wd)d))
AutoCAD SHX Text
TOTAL AREA (AREA 1 + AREA 2)
AutoCAD SHX Text
DEADMAN OVERBURDEN VOLUME
AutoCAD SHX Text
DEADMAN OVERBURDEN WEIGHT
AutoCAD SHX Text
DEADMAN BALLAST (PER BALLAST)
AutoCAD SHX Text
DEADMAN CONCRETE WEIGHT
AutoCAD SHX Text
TOTAL WEIGHT OF OVERBURDEN
AutoCAD SHX Text
AREA 1
AutoCAD SHX Text
AREA 2
AutoCAD SHX Text lbs.
AutoCAD SHX Text lbs.
AutoCAD SHX Text lbs.
AutoCAD SHX Text lbs.
AutoCAD SHX Text lbs.
AutoCAD SHX Text lbs.
AutoCAD SHX Text lbs, AutoCAD SHX Text lbs.
AutoCAD SHX Text s.f.
AutoCAD SHX Text lbs.
AutoCAD SHX Text lbs.
AutoCAD SHX Text lbs.
AutoCAD SHX Text lbs.
AutoCAD SHX Text c.f.
AutoCAD SHX Text s.f.
AutoCAD SHX Text s.f.
AutoCAD SHX Text s.f.
AutoCAD SHX Text ft
AutoCAD SHX Text lbs.
AutoCAD SHX Text lbs. per c.f.
AutoCAD SHX Text lbs. per c.f.
AutoCAD SHX Text SAND & PEA GRAVEL (WTs)s))
AutoCAD SHX Text gal.
AutoCAD SHX Text HIEGHT OF OVERBURDEN (h)
AutoCAD SHX Text
LESS COMMON OVERBURDEN **
AutoCAD SHX Text
LESS OTHER VOID
AutoCAD SHX Text
LESS TANK VOLUME
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .