NY050-ORANGEBUR-WORK IDENTIFICATION MAP.pdf
PDF 12 MB Posted
- Solicitation number
- W15QKN-25-Q-A122
About this file
This document is a detailed site plan for the "Additional Drainage and New Entryway" project at the SGT JAROR C. PUELLO USARC located at 123 Route 303, Orangeburg, NY 10962. The project involves installing multiple new catch basins (CB-1, CB-4, CB-5, CB-6) and connecting them to the existing drainage system, with specific focus on storm sewer trenching and drainage improvements. The site plan includes technical drawings showing precise locations for new drainage infrastructure, maintenance hole details, and a new entryway installation that involves creating an additional wall and repurposing interior doors to create a more weather-protected entrance. The project is part of a federal contract opportunity (Solicitation Number W15QKN-25-Q-A122) issued by the Department of the Army Contracting Command, set aside for 100% small business participation with a planned 210-day performance period and a North American Industry Classification System (NAICS) code of 237110 for water and sewer line construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-Q-A122 - DBA WD NY20250020 (d. 03.14.2025).txt | TXT text file | |
| NY050-ORANGEBURG-SOW.docx | DOCX document | |
| Solicitation - W15QKN25QA122.pdf | ||
| Construction Cost Breakdown Form.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name: ADDITIONAL DRAINAGE AND NEW ENTRYWAY Project Number: CSS# 96657
Location: SGT JAROR C. PUELLO USARC (NY050)
Address: 123 ROUTE 303, ORANGEBURG NY 10962
Prepared by: Therese Pointer Date: OCT 2024 Page 1 of 7
OMS BUILDING
U N
DERG
RO
U N
D STO
RAG
E
U N
DERG
RO
U N
D
STO
RAG
E
USARC
CB-6
CB-5
CB-4
CB-1 CB-3
Install new catch basin and drain pipe. Connect to ex-is ng drainage system.
Install new catch basin and drain pipe. Connect to ex-is ng drainage system.
Access/MH
Access/MH
KEY
Inac ve Storm Drain
Exis ng Storm Drain
Underground Fire
Alarm Cable
Underground Comms and Access Control
New Install
See As-Builds for further detail on exis ng condi ons.
Prepared by: Therese Pointer Date: OCT 2024 Page 2 of 7
See As-Builds for further detail on exis ng condi ons.
Install new catch basin and drain pipe. Connect to ex-is ng drainage system.
Install new catch basin and drain pipe. Connect to ex-is ng drainage system.
Future loca on of catch basin CB-5
Prepared by: Therese Pointer Date: OCT 2024 Page 3 of 7
Prepared by: Therese Pointer Date: OCT 2024 Page 4 of 7
See As-Builds for further details.
Prepared by: Therese Pointer Date: OCT 2024 Page 5 of 7
See As-Builds for further details.
Prepared by: Therese Pointer Date: OCT 2024 Page 6 of 7
Door Install Site
-Create addi onal wall (green out-line)
-Install repurposed doors from inside building.
-Create new entryway that is ap-propriately guarded against ele-ments.
Prepared by: Therese Pointer Date: OCT 2024 Page 7 of 7
File details come from the government source that posted it. Updated .