NY050-ORANGEBUR-WORK IDENTIFICATION MAP.pdf

PDF 12 MB Posted

Attached to
Add Drainage & New Front Entrance - Orangeburg, NY
Solicitation number
W15QKN-25-Q-A122
Issued by

About this file

This document is a detailed site plan for the "Additional Drainage and New Entryway" project at the SGT JAROR C. PUELLO USARC located at 123 Route 303, Orangeburg, NY 10962. The project involves installing multiple new catch basins (CB-1, CB-4, CB-5, CB-6) and connecting them to the existing drainage system, with specific focus on storm sewer trenching and drainage improvements. The site plan includes technical drawings showing precise locations for new drainage infrastructure, maintenance hole details, and a new entryway installation that involves creating an additional wall and repurposing interior doors to create a more weather-protected entrance. The project is part of a federal contract opportunity (Solicitation Number W15QKN-25-Q-A122) issued by the Department of the Army Contracting Command, set aside for 100% small business participation with a planned 210-day performance period and a North American Industry Classification System (NAICS) code of 237110 for water and sewer line construction.

View the file

Other files

File Type Posted
25-Q-A122 - DBA WD NY20250020 (d. 03.14.2025).txt TXT text file
NY050-ORANGEBURG-SOW.docx DOCX document
Solicitation - W15QKN25QA122.pdf PDF
Construction Cost Breakdown Form.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: ADDITIONAL DRAINAGE AND NEW ENTRYWAY Project Number: CSS# 96657

Location: SGT JAROR C. PUELLO USARC (NY050)

Address: 123 ROUTE 303, ORANGEBURG NY 10962

Prepared by: Therese Pointer Date: OCT 2024 Page 1 of 7

OMS BUILDING

U N

DERG

RO

U N

D STO

RAG

E

U N

DERG

RO

U N

D

STO

RAG

E

USARC

CB-6

CB-5

CB-4

CB-1 CB-3

Install new catch basin and drain pipe. Connect to ex-is ng drainage system.

Install new catch basin and drain pipe. Connect to ex-is ng drainage system.

Access/MH

Access/MH

KEY

Inac ve Storm Drain

Exis ng Storm Drain

Underground Fire

Alarm Cable

Underground Comms and Access Control

New Install

See As-Builds for further detail on exis ng condi ons.

Prepared by: Therese Pointer Date: OCT 2024 Page 2 of 7

See As-Builds for further detail on exis ng condi ons.

Install new catch basin and drain pipe. Connect to ex-is ng drainage system.

Install new catch basin and drain pipe. Connect to ex-is ng drainage system.

Future loca on of catch basin CB-5

Prepared by: Therese Pointer Date: OCT 2024 Page 3 of 7

Prepared by: Therese Pointer Date: OCT 2024 Page 4 of 7

See As-Builds for further details.

Prepared by: Therese Pointer Date: OCT 2024 Page 5 of 7

See As-Builds for further details.

Prepared by: Therese Pointer Date: OCT 2024 Page 6 of 7

Door Install Site

-Create addi onal wall (green out-line)

-Install repurposed doors from inside building.

-Create new entryway that is ap-propriately guarded against ele-ments.

Prepared by: Therese Pointer Date: OCT 2024 Page 7 of 7