Questions and Answers.docx
DOCX document 12 KB Posted
- Attached to
- Painting, caulking, and general maintenace
- Solicitation number
- NWWP92482300084EM
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SHV UAB Drawings.pdf | ||
| 1SAM Combined Synopsis NWWP92482300084.docx | DOCX document | |
| Questions and Answers NWWP92482300084.docx | DOCX document | |
| Statement of Work NWWP92482300084.docx | DOCX document | |
| SAM Combined Synopsis NWWP92482300084.docx | DOCX document | |
| SOW NWWP92482300084.docx | DOCX document | |
| AA 23-03 Attachment 2 - NOAA IPP Implementation Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) The lowered ceiling square above the inflation table needs to be replaced, primed and painted with KILZ paint.
Replaced with what material?
A: Don’t replace, just clean, prime and paint.
2) All cinder block of the building needs to be sealed with clear water proofer. (Thompson’s water seal or equivalent) Interior, exterior, or both?
A: Task 2 J
3) All joints need to be re-caulked with high performance; latex based sealant formulated for concrete for exterior use.
There are no concrete joists. Please clarify.
A: Joints not joists and if it is the joints the images show connections to concrete that require the sealant. Door frames, Ventilation, etc
4) Remove all rust on remaining lean-to framing.
Please clarify. There was no rust observed from the ground. Is there rust under the soffit and trim? Is there rust under the existing metal roof?
A: Omit
5) In the high bay, replace roof framing with steel framing beams and attach to existing support poles and beams.
Please clarify. There is no roof framing to be replaced since that ceiling finished roof is concrete.
A: Cleaned and painted
6) Replace roof panels with a minimum thickness of 24-gauge roof panels. Panels will be white. Prime and paint if needed Please clarify which panel are needing to be replaced in the upper air building. See commits to previous question A: Cleaned primed and painted
7) Install and seal flashing between roof and walls to ensure water does not enter between the two.
Please clarify. What type of flashing and between the roof and which walls?
A: There is flashing on the Hydrogen Storage side. Roof Flashing. Hydrogen Storage no install/replacement needed unless damaged, just caulked and sealed