NWRRF_Well_Site_and_Drawings.pdf

PDF 927 KB Posted

Attached to
Deep Injection Well Acidization Services - Northwest Water Reclamation Facility (NWWRF)
Solicitation number
IFB- 26 - 349
Issued by
Pinellas County, Florida

About this file

This file contains well completion drawings and site maps for the Northwest Water Reclamation Facility (NWWRF) operated by the City of St. Petersburg, Florida. The document illustrates the construction specifications and technical details for three deep injection wells (IW-1, IW-2, and IW-3) located at the facility. The drawings depict well construction parameters including casing diameters and depths, with IW-1 featuring 50-inch, 40-inch, and 30-inch diameter casings; IW-2 also featuring 50-inch, 40-inch, and 30-inch diameter casings; and IW-3 featuring 44-inch, 36-inch, and 24-inch diameter casings. Historical data on the wells includes total depths (TD) ranging from approximately 991 feet to 1,115 feet, with various measurements recorded between 1989 and 2017. The site map identifies the wells' locations relative to surrounding streets (72nd Street North, 75th Street North, 79th Street North, and 80th Street North) in St. Petersburg.

The document serves as technical reference material for the City's contract to perform deep injection well acidization services on the three identified injection wells. These wells are Florida Department of Environmental Protection (FDEP) Underground Injection Control (UIC) permitted Class I deep injection wells. The acidization services are intended to maintain well performance and reliability, reduce operational risk, and ensure regulatory compliance at the facility. The technical specifications and well construction details provided in this document establish the baseline information necessary for qualified contractors to understand the well systems they will be servicing during the acidization project.

View the file

Other files

File Type Posted
Deep_Injection_Well_Acidization_Services_-_Northwest_Water_Reclamation_Facility_(NWWRF).pdf PDF
Agreement_.pdf PDF
Performance_&_Payment_Bond_.DOCX DOCX document
FILLABLE_BEP_NON-USE_BEP_FORM_B.pdf PDF
Subcontractor_Summary_Spreadsheet.xlsx XLSX spreadsheet
FILLABLE_LETTER_OF_INTENT_BEP-FORM_A.pdf PDF
Public_Construction_Bond.docx DOCX document
Shelterd_BID_-_Subcontractor_Summary_Spreadsheet_.xlsx XLSX spreadsheet
Bid_Bond_.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N or th

A p p ro x.

F e et

79th Street N

72nd Street N

80th Street N

75th Street N

79th Street N

72nd Street N

80th Street N

75th Street N

1,000

1,100

1,200

TD = 1,103’

(Sept. ‘99) (July ’04) (July ‘09)

TD = 1,100’

(Aug. ‘89) (Aug. ’94) (Sept. ‘98)

TD = 1,022’

(Sept. ‘98)

TD = 1,055’

(July ‘09)

TD = 1,028’

(Aug. ‘99) (July ‘04)

TD = 1,098’

(Aug. ‘89) (Aug. ‘94)

TD = 991’

(June ‘14)

TD = 1,101’

(June ‘14)

760’

50’

330’

30” Dia.

Steel Casing to 760’ (0.5” Wall thickness)

24” Dia.

Steel Casing to 738’ (0.5” Wall thickness)

30” Dia.

Steel Casing to 760’ (0.5” Wall thickness)

FIGURE

Well Completion Drawings

760’

50’

330’

738’

100’

430’

TD = 1,115’ TD = 1, 10’

TD = 1,200’

50” 40” 30”

NW IW-1

50” 40” 30”

NW IW-2

44” 36” 24”

NW IW-3

19841984

Northwest WRF (Plant No. 3)

TD = 99 ’

(June ‘1 )

(June ‘1 ) ( ‘

NW Site Map
Well_Construction
spec

File details come from the government source that posted it. Updated .