Attachment (1) Environmental Services PWS (Draft).docx
DOCX document 48 KB Posted
- Attached to
- NAVFAC NW LAB SAMPLING SERVICES
- Solicitation number
- NW6039171
About this file
This sources sought notice seeks information from potential contractors to provide environmental services to various Navy installations in the greater Puget Sound area of Washington state. Services include laboratory testing for drinking water, wastewater, stormwater and other matrices; field sampling and testing; developing sampling and analysis plans; procuring sampling equipment and supplies; and project-specific documentation. Responses must be submitted by April 12, 2024 to be considered.
The anticipated contract is an indefinite delivery indefinite quantity contract with a one year base period and four option years, not to exceed $10 million. Work will be ordered through fixed price task orders between $1,000 and $500,000. The solicitation will seek to maximize opportunities for small businesses. Laboratory testing is to include parameters listed in an attachment priced by exhibit line item numbers. The primary office must be within three hours of Naval Base Kitsap Bangor, Washington. This sources sought notice invites capability statements from interested vendors to help determine the acquisition strategy for these environmental services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment (3) Sources Sought Info Rev1 4.3.2024.pdf | ||
| Attachment (3) Sources Sought Info.pdf | ||
| Attachment (2) Lab Sampling ELINs.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
A. Summary of Services
The contract is an Indefinite Delivery, Indefinite Quantity (IDIQ), Performance Based Service Contract (PBSC) with primarily fixed price exhibit line item numbers (ELINs) services. The objectives of this contract are to provide Navy installations and Navy sites primarily within the greater Puget Sound area services to include, but not limited to, the following:
· Laboratory Testing
· Field Sampling, Testing, Surveys, and Investigations
· Shipping (Containers and Coolers)
· Development/Modification of Sampling and Analysis Plans (SAPs),Standard Operating Procedures (SOPs), Quality Assurance Plans (QAPs), and Project Specific Documentation
· Procure and manage Testing/Sampling Equipment and Supplies
· Drinking Water Testing
· Wastewater Testing
· Stormwater Testing
· Asbestos and Lead Facility Inspections
· Air Emission Testing
· Insulating Oil Testing
· Soil Testing
The work, services, and procurements under this contract shall be executed via the ELINs listed in Attachment J B-1 or via Task Orders (TOs) that will be negotiated on an as needed basis.
B. Geographic Scope
The contract is to serve Navy installations or Navy sites primarily within the greater Puget Sound Area. The main Northwest facilities are:
· Naval Base Kitsap, Bremerton, WA
· Naval Base Kitsap, Keyport, WA
· Naval Base Kitsap, Bangor, WA
· Naval Station Everett, WA
· Naval Air Station Whidbey Island, WA
· Naval Magazine Indian Island, WA
· Naval Radio Station Jim Creek, WA
· Naval Base Kitsap Manchester
· Naval Base Kitsap Jackson Park
The geographic location of your company’s primary office must be within a three-hour (one-way) ground travel distance from Naval Base Kitsap Bangor. This criterion is to facilitate efficient on-site presence to naval facilities in the greater Puget Sound Area to conduct activities such as sample collection, sample pick-up, equipment delivery/pick-up, and attend on-site meetings. The laboratory, if a separate entity from the primary contractor, does not need to be in the three-hour travel distance.
Navy Region Northwest (NRNW) also provides facilities management throughout Washington, Oregon, Alaska, Idaho, Montana, Wyoming, North Dakota, South Dakota, Nebraska, Minnesota, and Iowa. However, samples originating outside of the Puget Sound area should not be included in the pricing of Attachment J.B-1. Samples and/or labor originating outside of the Puget Sound area will be ordered via individual task orders. On these types of TOs all items will be negotiated.
C. Non-Personal Services Statement
Contractor employees performing services under this order will be controlled, directed and supervised at all times by management personnel of the Contractor. Contractor management will ensure that employees properly comply with the performance work standards outlined in the task order PWS’s. The Contractor may be working closely with and alongside military and civilian government workers on a daily basis. Contractor personnel must be able to meet and maintain military installation access procedures for duration of contract requirement.
Contractor employees will perform duties independent of, and without the supervision of, any Government official or other Defense Contractor. The tasks, duties, and responsibilities set forth in task orders may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying federal policy, obligating the appropriated funds of the United States Government, overseeing the work of federal employees, providing direct personal services to any federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The government will control access to facilities and will perform the inspection and acceptance of completed work.
Employee Appearance/Identification. The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The Contracting Officer reserves the right to determine the acceptability of any clothing worn. All Contractor employees working under this contract in close proximity to military personnel or government employees for an extended period of time shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges. Contractor employees shall expressly identify themselves as Contractor employees in their communications, including e-mails, memos, correspondence, meeting participation, and other oral or written communications.
D. Navy Installations Access
Contractor shall comply with local Department of Defense base security and access requirements. The Contractor and their subcontractors, vendors, and suppliers shall have Defense Biometric Identification System (DBIDS) credentials for Navy Installation access. For information on how to obtain DBIDS credentials visit https://www.cnic.navy.mil/om/dbids.html.
The Contractor shall obtain and maintain Base Authorization and Visit Request (BAVR) credentials to perform work under this contract. For more information about how to obtain BAVR credentials visit https://www.bavr.cnic.navy.mil.
No employee or representative of the Contractor will be admitted on base unless the employee or representative furnishes satisfactory proof of United States citizenship, or is specifically authorized admittance by the government.
At least one member of the Contractor’s staff shall maintain the appropriate level of access, badging, and passes to facilitate rapid response field work. This includes, but is not limited to, access through the main gates of the main Northwest facilities listed in Section B.
E. Enterprise-Wide Contractor Manpower Reporting Application (ECMRA)
The Contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the NAVFAC Northwest via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) S, Utilities ONLY;
(5) V, Freight and Shipping ONLY.
The Contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
C.2 PERSONNEL REQUIREMENTS
The Contractor shall organize, furnish, maintain, supervise, and direct a work force which, within the limitation of the provisions of the contract, is thoroughly capable and qualified to effectively perform the work set forth in the contract. All personnel shall have the qualifications to perform assigned duties as required by the contract and Task Orders. Qualifications include undergraduate degrees or higher and work experience in fields related to the responsibilities assigned.
C2.1 KEY PERSONNEL RESPONSIBILITIES
The below Contractor personnel responsibilities shall be met by one or more of the Prime Contractor staff.
C2.1.1 PROGRAM MANAGEMENT
Responsibilities include oversight of all aspects of awarded Task Orders. Duties include monitoring and controlling project quality, assuring compliance with applicable Federal, State, Department of Defense, Navy and local regulations and policy, ensuring compliance with health and safety requirements, and performing as the contractor’s chief representative.
C2.1.2 CONTRACTOR PROJECT QUALITY ASSURANCE
Provides surveillance for Task Orders in which the prime contractor uses laboratory services as found in C.5. Task Order project teams should establish the level of qualifications and experience necessary for the procurement of specific sampling or testing services.
C2.1.3 CONTRACTOR PROJECT CHEMIST
Provides coordination and QA surveillance of laboratory services as found in C.5.
C.3 QUALITY CONTROL
This part establishes minimum requirements for quality control which shall apply to all actions on this contract. More stringent requirements may be included in specific contract Task Orders if the statement of work dictates.
The Contractor shall submit a contract Quality Control Management Plan (QCMP) within sixty (60) days from contract award to the Contracting Officer via the designated representative. The objective of the plan is to ensure that appropriate technical and procedural standards are followed for all reports, field sampling and measures, and documentation. It shall address the QC organization and management responsibility, quality improvement, personnel training, procedural methods, 3 phases of control where appropriate, testing, equipment calibration, inspections and the level of QC to be applied to Task Orders to ensure accurate and reliable results.
C.4 HEALTH AND SAFETY
This subsection describes the minimum Contractor health and safety requirements associated with this contract and shall apply to all contract actions.
The Contractor shall have an ongoing health and safety program per USACE EM-385-1-1, 29 CFR 1910 Occupational Safety and Health Administration (OSHA) regulations, and any other relevant Federal, State, and local regulations.
The Contractor shall also have a qualified person prepare, implement, and enforce for each site described in a contract Task Order, a written site-specific Accident Prevention Plan (APP). The Contractor shall ensure that their subcontractors, suppliers, and support personnel follow the health and safety provisions of the APP.
Within sixty (60) days of contract award, the Contractor shall submit a current Corporate Health and Safety Program Plan to the Contracting Officer or COR for review and acceptance, with input from the NAVFAC Safety Officer meeting the requirements of EM 385-1-1.
Where appropriate, required and/or requested by the Government, an Activity Hazard Analysis (AHA) shall be developed by the Contractor, supplier, or subcontractor and provided to the prime contractor for submittal to the COR for review and acceptance, with input from the NAVFAC Safety Officer. The AHA format shall be per USACE EM 385-1-1.
C.5 LABORATORY TESTING
Contractor to provide testing supplies (containers, coolers, blue ice, packing materials, preservative, etc.) and services to analyze environmental samples, including but not limited to, the following regulatory programs:
· Drinking Water
· Wastewater
· Stormwater
· Groundwater
· National Pollutant Discharge Elimination System
· Industrial Wastewater
· Hazardous/Solid Waste
· Air Testing
· Insulating Oil Testing
· Asbestos
· CERCLA (remedial investigation, feasibility studies and risk assessment - soil, sediment, groundwater, tissue)
· Sediment
· Spill Response (shoreline, water)
· Underground Storage Tank investigations
Most samples will originate in the Greater Puget Sound Area. The laboratory(s) must be accredited by the Washington State Department of Ecology in accordance with Chapter 173-50 Washington Administrative Code and Department of Defense Environmental Laboratory Accreditation Program (DoD ELAP). For those analytical procedures that do not fall under Chapter 173-50, the Contractor shall work with the NAVFAC Northwest Technical contact to determine best analytical procedure for the specific testing need.
When the Navy collects the samples: For those parameters with short hold-times, the Contractor is to arrange for analysis with a laboratory within 20 miles of the sampling site. The Navy will deliver the samples to the lab specified by the Contractor. For bioassay testing, the Contractor is to arrange for analysis with a laboratory within 60 miles of the sampling site if the Navy will courier the samples to the lab.
See Attachment J.B-1 for laboratory testing parameters as below:
| Test Parameter Category |
| Note |
| Standard Turn Around Time (Business Days) |
| Standard Data Package Level |
Volatile Organics
| 15 |
| II |
Semivolatile Organics
| 15 |
| II |
Metals
| 15 |
| II |
| General Chemistry |
| Includes a variety of mainly standard tests that do not fall within other categories. |
| 15 |
| II |
| Bacteriological |
| Due to potential public health ramifications, verbal communication of drinking water total coliform and E. Coli samples are requested from the laboratory within 24 hours. |
| 15 |
| II |
| Asbestos and XRF Testing |
| Includes on-site use of XRF equipment with operator. |
| 10 |
| NA |
Radiological
| 20 |
| II |
Bioassay
| 20 (longer if laboratory SOP dictates) |
| NA |
| Miscellaneous |
| Includes field testing, special laboratory techniques, emerging compounds, and other miscellaneous testing. |
| 15 |
| II |
C.5.1 CONTRACTOR LABORATORY SERVICES QUALITY ASSURANCE
For Task Orders in which the prime contractor subcontracts laboratory services, a contractor QA Manager and Project Chemist must be designated by the prime contractor. The Contracting Officer or designated representative will monitor the prime contractor to ensure appropriate oversight of environmental sampling and testing activities.
C.5.2 TESTING LABORATORIES
a. Minimum Performance Standards for Environmental Laboratories:
1. Laboratories performing analyses in support of this procurement must have an established and documented laboratory quality system that conforms to WAC Chapter 173-50 and reference h) ISO/IEC 17025:2005 as implemented by reference i) the DoD Quality Systems Manual (QSM) for Environmental Laboratories
2. Laboratories must possess any required state certification and/or be accredited for each applicable test method, by a nationally recognized laboratory accreditation body, e.g., National Environmental Laboratory Accreditation Program (NELAP), compliant with reference j) ISO/IEC 17011:2017.
4. Where applicable, all laboratories must demonstrate the ability to generate acceptable results from the analysis of Proficiency-testing (PT) sample(s), subject to availability, using each applicable method in the specified matrix.
5. Where applicable, laboratories must make available to the DoD, the results of all PT samples analyzed by the laboratory during the period of performance per reference k) DoD Policy and Guidelines for Acquisitions involving Environmental Sampling.
6. Where applicable, the Contractor shall ensure the laboratory makes appropriate documentation available to the government Chemist/QA Manager and COR.
7. The Contractor shall ensure the Contracting Officer or COR is notified in writing of any change in laboratory certification or accreditation status within 30 calendar days of the change. This written notification requirement applies, but is not limited to suspension or revocation of certification or accreditation (even for specific methods within the awarded SLINs and/or current performance execution requirements). In addition, the prime contractor shall be responsible to correct impacted Sample and Analysis Plans.
8. Data anomalies and/or poor quality results will be reported to the Prime Contractor, COR, and NAVFAC PM immediately, regardless of internal steps to provide remedy. This notification does not relieve the laboratory and Prime Contractor of responsibility to make internal/method execution errors right.
C.5.3 QUALITY CONTROL/QUALITY ASSURANCE
Following award of the contract, the Contractor shall implement and comply with all applicable quality control and quality assurance documentation. All applicable quality assurance and quality shall be submitted to the COR for review.
C.5.5 PROHIBITED PRACTICES
The following prohibited practices will be considered material non-compliance, which may result in contract termination or other remedies as appropriate.
· Fabrication, falsification, or misrepresentation of data.
· Improper clock setting (time traveling) or improper date/time recording
· Unwarranted manipulation of samples, software, or analytical conditions
· Misrepresenting or misreporting QC samples
· Improper calibrations
· Concealing a known analytical or sample problem
· Concealing a known improper or unethical behavior or action
· Failing to report the occurrence of a prohibited practice or known improper or unethical act to the appropriate laboratory or contract representative, or to an appropriate government official.
C.6 FIELD SAMPLING AND FIELD TESTING
The Contractor shall furnish all labor, supervision, materials, supplies, travel, consumables, and equipment to conduct field sampling and testing service calls as described in this section and Attachment J.B-1. Labor rates in Attachment J.B-1 apply for contractor effort needed to support Field Sampling and Field Testing, if applicable. This section only applies to sites in the Greater Puget Sound area.
The Contractor is to perform sampling in accordance with relevant federal, state and local regulations, Sampling and Analysis Plan(s), Accident Prevention Plan(s), Quality Assurance Plan(s), and customer guidance. Routine sampling may be performed for: (a) drinking water to include, but not limited to, distribution points, hose bibs, reservoirs, tanks, wells, faucets, drinking fountains, chlorination stations, corrosion control plants, and pipeline breaks; (b) wastewater and stormwater to include, but not limited to grab and/or composite samples at manholes, outfalls*, plant pipelines, ponds, tanks, spills to ground/soils/sediment, autosamplers and sludge; (c) surface soils (0-6 inches) and sediments; (d) paint, insulation, and siding; and (e) miscellaneous matrices for hazardous waste characterization to include, but not limited to, soil, sediment, aqueous, sludge, oils, (including sampling oils from equipment), solid debris and discarded product/chemicals, collected from various locations to include, but not limited to, waste piles, drums, tanks, manholes, equipment, machines, landfill and buildings.
*Some Navy wastewater and stormwater outfalls are located a short distance off shore and may require navigation over open water to access the sampling location. Field sampling and testing from these locations will be negotiated via task order.
C.7 SHIPPING
When the Government is responsible for sample collection, the Contractor may be requested to ship the sampling supplies to the Government. As ordered and specified in Attachment J.B-1, the Contractor will be responsible to ship sample containers, equipment, cooler(s), and supplies to the location specified by the Government to support the services ordered. Shipping method specified in the task order based on Attachment J.B-1. Ship containers, equipment, cooler(s), and supplies via contract carrier such as FedEx or UPS.
As ordered and specified in Attachment J.B-1, the Government will ship samples to the laboratory (return shipping) via a contract carrier such as FedEx or UPS. The Contractor shall provide shipping information (contract shipper, account number, shipping labels, lab address, etc.) to the Government. If a laboratory is local, the Navy may choose to hand-deliver samples directly to the lab.
Courier service will be provided to pick up samples at locations specified by the Government and deliver them to the contracted laboratory.
C.8 DEVELOPMENT/MODIFICATION OF SAMPLING AND ANALYSIS PLANS
Upon Government request, the Contractor shall furnish all labor, supervision, materials, supplies, consumables, documentation, equipment, and transportation necessary to generate Sampling and Analysis Plans (SAPs) (and/or a Standard Operating Procedure (SOP)) that covers all aspects of the field sampling activities) in the format specified by the Government. The SAP is comprised of the UFP-QAPP and FSP (or SOP); however, only one of these documents may be required to be generated. The Contractor may be asked to modify an existing SAP or prepare a new one. Documents shall be delivered electronically in Microsoft Word format.
Effort may include having the laboratory that will analyze samples for a specific project review an existing/or under-development project-specific SAP to:
· Get input to help tailor the SAP to coincide with laboratory SOPs.
· Get input on analytical methods most appropriate for the project specific data quality objectives.
Labor rates in Attachment J.B-1 are applicable to development/modification of SAPs.
C.9 PROCURE EQUIPMENT AND SUPPLIES
Procure equipment and supplies associated with testing and sampling as specified by the Government. Typically, the equipment and supplies will be for Government use. Specialized or non-routine sampling equipment may be ordered to support the Contractor’s sampling effort as tasked per this contract. For example, the Government may order automatic stormwater samplers. The Government may also request that sampling equipment be installed and maintained so that it is ready to collect samples when needed.
Additional costs for "Sampling Events" may be incurred for specialized sampling equipment required to collect samples under the following conditions. The Contractor shall furnish (i.e., rent, lease, purchase, etc.), at the request of the government and at government expense, the specialized sampling equipment required to perform sampling for: (a) groundwater wells of depths up to 100 feet; (b) soil/waste piles for composite samples at specific intervals up to 12 feet deep; (c) subsurface soils of varying consistency at specified depth intervals up to 12 feet deep with the occasional need for locating sample coordinates by Global Positioning System to less than 3 feet; and (d) air samples collected outdoor and indoor. Specialized sampling equipment includes, but is not limited to, drilling and direct push equipment for soils, groundwater pumps for groundwater monitoring and personal air-monitoring pumps and summa canisters for air samples. In addition, specialized equipment includes the replacement of government furnished wastewater/stormwater auto samplers (e.g., ISCO) that have reached the end of serviceable operation or the purchase of auto samplers for new regulatory requirements. All equipment purchased under this contract shall be “government property” as defined by FAR Clause 52.245-1, Government Property.
Attachment J.B-1, contains the ELIN for equipment and supplies. Labor rates in Attachment J.B-1 apply to administrative effort to procure equipment and supplies.
C.10 DRINKING WATER
For drinking water samples, the Contractor must follow the most current version of Washington Department of Health Laboratory Reporting Guidance (331-530). This document specifies the information required by the Department of Health for reporting results. It also lists all of the compounds which are required to be analyzed as part of each sample.
Due to potential public health ramifications, early communication of drinking water contaminants may be requested.
Labs that perform tests on DoD drinking water must be accredited by the Department of Defense Environmental Laboratory Accreditation Program (DoD ELAP).
C.11 ASBESTOS AND LEAD FACILITY INSPECTIONS
Provide surveys, in accordance with 40 CFR 763 and local air regulations. All inspections must be done by an accredited inspector per the Asbestos Hazard Emergency Response Act (AHERA).
The comprehensive survey report shall include the name and certification of the inspector, a summary of findings, laboratory report(s) of sampling results, chain-of-custody records, QA/QC report and laboratory certifications. Drawings shall be provided indicating the location and estimated quantities of asbestos, the associated sample numbers and any homogenous building materials determined during the survey. The survey shall denote if the material is TSI, Surfacing or Miscellaneous, and if any said material is friable or can be rendered friable from renovation/demolition activities. Surveys for renovation projects shall be limited to the area of impact/disturbance.
For painted building materials which will be disturbed by “Trigger Tasks”, perform bulk testing and laboratory analysis for Lead (Pb), Cadmium (Cd) and Chromium (Cr) per 29 CFR 1926 for occupational exposure risk assessment.
C.12 AIR EMISSION SOURCE TESTING
Air emission monitoring and testing performed in accordance with requirements set forth by federal, state, and local rules and permits. Testing and monitoring may be performed for the following sources, but not limited to: boilers, generators, storage tanks, fugitive emissions from building enclosures, electroplating/anodizing tanks, blast booths, paint booths, and powder coating booths. Testing and monitoring methods may include but not limited to: methods proposed and promulgated in 40 CFR Part 60 Appendix A, Emission Measurement Center's (EMC) Conditional Methods, RICE NESHAP, and California Air Resources Board (CARB) Methods.
Labor rates in Attachment J.B-1 are applicable to air emission source testing.
C.13 INSULATING OIL TESTING
The work includes performing oil sample tests on various samples taken from electrical equipment, and providing written reports on the tests. The Contractor shall furnish all materials, supplies, and equipment necessary to perform the sampling efforts.
Oil samples will originate from transformers with silicone, transformers without silicone oil, load tap changers, and oil breakers. Test methods for Insulating Oil shall include ASTM D-117-89 and ASTM D-2225-92. PCB Content, EPS-600/4-81-045 of September 1982, will be tested only upon special request.
The Government will forward samples to the Contractor for testing along with the following information: Substation number, Equipment description, Equipment number, Equipment manufacturer, Electrical rating, Liquid Type, Oil temperature at sample time, Date sample taken, Location on tank where sample taken.
If the Government requires emergency sample analysis, the Contractor shall provide written results to the Government within 24 hours of receipt of the samples. For samples requiring routine analysis, the Contractor shall forward written results to the Government within one week of receipt of the sample. In the event that test results indicate a hazardous or potentially hazardous situation exists, the Contractor shall notify the Government immediately.
Labor rates in Attachment J.B-1 are applicable to Insulating Oil Testing.
C.14 PROJECT SPECIFIC DOCUMENTATION
Upon Government request, the Contractor shall develop and provide documentation related to a sampling and/or laboratory service such as:
· Documentation required by the Navy for Contractor access areas that may have enhanced security access requirements.
· For complex and/or longer-term projects, project management type documentation such as schedules, project plans, quality control plans, operation/maintenance manuals, analytical database, and final or interim project reports.
· Health and Safety Plans.
· Underground Storage Tank closure documentation
· Well closure documentation
· Third Party Data Package Validation
· Waste Characterization per 40 CFR 262.11 and applicable state regulation.
Labor rates in Attachment J.B-1 are applicable to project-specific documentation.
C.15 CONTRACTOR LABOR
Contractor labor to support tasks requested by the Government based on the level of effort negotiated and labor rates established in Attachment J.B-1.
C.16 REFERENCES
a) Data Quality Assessment: A Reviewer’s Guide (QA/G-9R), EPA/240/B-06/002 February 2006. https://www.epa.gov/quality/guidance-data-quality-assessment
b) Data Quality Assessment: Statistical Tools for Practitioners (QA/G-9S), EPA/240/B-06/003 February 2006. https://www.epa.gov/quality/guidance-data-quality-assessment
c) Navy Environmental Compliance Sampling and Field Testing Procedures Manual (NAVSEAT0300 AZPRO- 010)
d) NAVFAC Supplemental SAP Guidance to the UFP-QAPP Manual (Tier 1 & 2) https://www.navfac.navy.mil/content/dam/navfac/Specialty%20Centers/Engineering%20and%20Expeditionary%20Warfare%20Center/Environmental/Restoration/er_pdfs/u/navfac-ev-tmpl-ufpsap-tier1-201102.pdf https://www.navfac.navy.mil/content/dam/navfac/Specialty%20Centers/Engineering%20and%20Expeditionary%20Warfare%20Center/Environmental/Restoration/er_pdfs/u/navfac-ev-tmpl-ufpsap-tier2-201102.pdf
e) EPA Requirements for QA Project Plans (QA/R-5), EPA/240/B-01/003 March 2001; Reissue Notice May 2006. https://www.epa.gov/sites/production/files/2016-06/documents/r5-final_0.pdf
f) Guidance on Environmental Data Verification and Data Validation (QA/G-8), EPA/240/R-02/004 November 2002; Reissue Notice January 2008. https://www.epa.gov/sites/production/files/2015-06/documents/g8-final.pdf
g) EM 385-1-1 Army Corps of Engineers Safety and Health Requirements Manual (latest version) http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
h) ISO/IEC 17025:2017, General requirements for the competence of testing and calibration laboratories. https://www.denix.osd.mil/edqw/documents/manuals/qsm-version-5-2-final/
i) DoD Environmental Laboratory Quality Systems Manual, Version 5.2, (DoD QSM) October 2018 (or latest version). http://denix.osd.mil/edqw/upload/QSM-V4-2-Final-102510.pdf
j) ISO/IEC 17011:2017, Conformity assessment – Requirements for accreditation bodies accrediting conformity assessment bodies. https://www.iso.org/standard/67198.html
k) Department of Defense Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing November 2007 Para 5.2. https://www.acq.osd.mil/dpap/dars/dfars/changenotice/2008/20080303/223.7.pdf
l) Uniform Federal Policy for Implementing Environmental Quality Systems (UFP-QS), March 2005. Available at: https://www.denix.osd.mil/edqw/documents/policy/uniform-federal-policy-for-implementing-environmental-quality-systems-ufp/
m) Uniform Federal Policy for Quality Assurance Project Plans (UFP-QAPP), March 2005 (or latest version) Available at: https://www.epa.gov/sites/production/files/documents/ufp_qapp_v1_0305.pdf
n) ANSI/ASQ E4-2004, Quality systems for environmental data and technology programs – requirements with guidance for use
o) Joint Travel Regulations, Volume 2, DoD Civilian Personnel https://www.defensetravel.dod.mil/Docs/perdiem/JTR.pdf
File details come from the government source that posted it. Updated .