NVPS Athletics (Balance) - Bid Clarification 06.pdf

PDF 284 KB Posted

Attached to
Northview High School Athletic Stadium Addition & Renovation
Solicitation number
RFP NVP 260000002718 9
Issued by
Michigan

About this file

This is a Bid Clarification No. 6 document issued by Rockford Construction for the Northview High School Athletic Stadium Addition & Renovation project located in Grand Rapids, Michigan. The clarification addresses questions raised during the bidding process and provides critical updates to bidders and subcontractors. The updated bid due date is November 10, 2026, at 1:00 p.m. EST, with submissions required through Procore and a virtual bidding meeting available via Zoom (Meeting ID: 927 4905 2347). Key scope updates include Addendum #02, which adds a Band Tower to the project and requires General Trades bidders (BP 06) to include this work in their proposals. Additionally, Bid RFI 09 clarifies that the Entry/Arch structure is not part of the signage package and shall be constructed per applicable trade scopes. Bidders are reminded to use the most current bid forms available on Procore and to mark their bidding status as either "Will Bid" or "Will Not Bid."

The clarification addresses critical scope issues regarding site work (BP 31), noting a discrepancy between the geotechnical report recommendation for MDOT 22A Gravel in 6- and 8-inch thicknesses and the drawings' specification of 21AA Limestone in 8- and 10-inch thicknesses; bidders are instructed to price both the base bid per drawings and an alternate per the geotechnical report. Bid RFI 27 regarding civil clarifications remains awaiting response. No pricing terms, set-asides, or funding information is specified in this clarification document.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

601 First Street NW Grand Rapids, Michigan 49504

(616) 285-6933 www.rockford.com

BID CLARIFICATION NO. 6

TO: All Subcontractors / Suppliers

FROM: Dan Korcek, Senior Project Manager; Morgan Gross, Assistant Project Manager

DATE: November 06, 2026

RE: NVPS Athletics Addition and Renovation

This Bid Clarification No. 6 is being sent to all bidders to address questions raised at bid time.

1. BID DUE DATE REMINDER

a. Bid Due Date is updated to November 10, 2026 @ 1:00pm EST.

b. ZOOM link:

i. https://rockfordconstruction.zoom.us/j/92749052347?from=addon

ii. Meeting ID - 927 4905 2347

c. Reminder that all bids must be uploaded on Procore. If you do not have access to Procore, please contact Morgan Gross at mgross@rockfordconstruction.com to add you to Procore to ensure that your bid can be uploaded.

d. Please be reminded that Procore will not accept bids at 1:00 pm EST or after on bid day. Please ensure that bids are uploaded before 1:00 pm.

2. Addendum #02

a. Addendum #02 has been released. This Specification/details the addition of a

Band Tower.

b. BP 06 General Trades Bidders shall include this in their scope of work and provide a price for this work as detailed in Addendum 02.

3. Bid RFIs have been generated; Responses are attached in files, with RFI Subjects shown below.

a. Bid RFI 27 – Civil Clarifications – AWAITING RESPONSE

b. Bid RFI 09 – Clarification: RFI 9 item 3 asked for who was responsible for clarification on scope for the wildcat stadium sign vs entry arch. Please Note that the “Entry/Arch structure is not part of the signage package. Entry is to be constructed as specified by all applicable trade scopes.

4. Scope Clarifications

a. Please note, Bid Forms have been updated on Procore to reflect scope changes. Ensure that you are working from the most up to date bid forms as you work to submit your bids.

b. BP 31 Sitework Bidders shall price, per the drawings, as base bid and Geotechnical report as alternate. The geotechnical report recommends MDOT 22A Gravel in 6 and 8 inch thicknesses for pavement areas yet the drawings call out 21AA Limestone (8 and 10 inch thickness).

https://protect.checkpoint.com/v2/r01/___http:/www.rockford.com___.YzJ1OnJvY2tmb3JkMTpjOm9mZmljZTM2NV9lbWFpbHNfYXR0YWNobWVudDo5M2QwMjI2MWQxMmRhNzdlYmEzMzkzODgzYTMyNTAwMDo3OmE1OGI6NWEyYTg3YTcwZmI4OWM3M2VlNmEzNjAzOGZhZGM4YzE5NDE3ODNlY2Q3Y2YwOWZiNGUzYWY2Y2NiZmQ2YjRmOTpwOlQ6Rg https://protect.checkpoint.com/v2/r01/___https:/rockfordconstruction.zoom.us/j/92749052347?from=addon___.YzJ1OnJvY2tmb3JkMTpjOm9mZmljZTM2NV9lbWFpbHNfYXR0YWNobWVudDplMjVhZjA3YzlhYzY1ZTI3NzNhODliZjk5MzFmYjY0Mjo3OjI2NjU6YTI4MjNkMGM4ZTllZjRmOWI4YmQ0YTEyZTE0ZGM1MDMzYzkyZDIyMTQzNTg4ZmZlNzAwNTA3ZGEyYzY4N2FhMTpwOlQ6Rg mailto:mgross@rockfordconstruction.com

2 | P a g e

5. Bidding Status

a. Please mark your bidding status on Procore this helps us understand who is bidding. It is extremely helpful to mark “Will Bid” or “Will Not Bid”.

End of Clarification

(616) 285-6933
BID CLARIFICATION NO. 6
FROM: Dan Korcek, Senior Project Manager; Morgan Gross, Assistant Project Manager

File details come from the government source that posted it. Updated .