NVPS Athletics (Balance) - Bid Clarification 01.pdf

PDF 269 KB Posted

Attached to
Northview High School Athletic Stadium Addition & Renovation
Solicitation number
RFP NVP 260000002718 6
Issued by
Kent County, Grand Rapids City, Michigan

About this file

This is a Bid Clarification document issued by Rockford Construction for the NVPS Athletics Addition and Renovation project located in Grand Rapids, Michigan. The clarification addresses multiple scope modifications across various bid packages (BP) related to athletic facility construction and renovation work. Key clarifications include the exclusion of soccer and lacrosse goals from BP 6 (to be furnished by owner), confirmation that BP 13 (Bleacher Contractor) is responsible for concrete slabs under proposed bleachers, assignment of turf drain tile responsibility to BP 32D, and several revised and new alternate pricing options for concrete work, netting replacement, turf specifications, and demolition services across multiple bid packages. The document specifies that all Bid RFIs must be submitted by October 15, 2026, to allow time for design team responses and incorporation into a future addendum. Additionally, BP 31 is tasked with sawcutting track edges in both North and South D Zones to prevent damage while facilitating demolition and preparation for new systems.

The clarification document does not contain pricing information, funding sources, set-asides, contract terms, or renewal options. Several line items require bidders to submit alternate pricing (indicated by blank lines for dollar amounts), including revised Alternate 5 for demo and removal of existing turf and shock pad under BP 31, Alternate 6 for complete removal of existing turf base and drainage systems at band field with two pricing options, and alternates under BP 32C and BP 32D for netting replacement and turf weight specifications. The document serves as an interim communication mechanism pending receipt of responses from the design team regarding outstanding bid RFIs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

601 First Street NW Grand Rapids, Michigan 49504

(616) 285-6933 www.rockford.com

BID CLARIFICATION NO. 1

TO: All Subcontractors / Suppliers

FROM: Dan Korcek, Senior Project Manager; Morgan Gross, Assistant Project Manager

DATE: October 14, 2026

RE: NVPS Athletics Addition and Renovation

This Bid Clarification No.1 is being sent to all bidders to address questions raised at bid time.

1. Bid RFIs have been generated; no responses have been received from design team as of this clarification. Responses will be provided in future bid clarifications. AS A REMINDER ALL BID

RFIS ARE DUE BY 10/15/2026 TO ALLOW TIME FOR RESPONSE AND INCORPORATION INTO

ADDENDUM.

2. Scope Clarifications

a. BP 6; Soccer and Lacrosse goals previously listed to be included shall not be included in this bid package. Soccer and Lacrosse Goals will be furnished and installed by owner.

b. BP 13 Bleacher Contractor is responsible for providing concrete slabs under proposed bleachers. Reference sheets LD1.09, L5.01, L5.02, LD5.01, LD5.02, LD5.03, LD5.04, LD 5.05.

c. BP 32D shall be responsible for Specification section 33 4615 Turf Drain Tile under their turf system.

d. Revised Alternate 3 for BP 3 Concrete to provide alternate to furnish and install curb turf anchors at 2 Bullpens. Reference LD1.07

e. BP 32C Alternate 1 provide Alternate for Netting replacement at Quad which is not currently specified to be replaced. $__________

f. BP 32D Alternate 4 Provide Alternate to provide 52 oz turf in lieu of 46 oz turf. This will also be issued in the addendum.

g. BP 31 Provide revised Alternate 5 Demo, Removal and Off Site Disposal of Existing Turf and Shock pad. $___________

h. BP 31 ALTERNATE 6 Include Complete removal of Existing Turf base, drain tiles, flat drains at band field. Dispose of offsite A $_____________ B. This material can be used as access roads $________

i. South D Zone Demo. BP 31 shall sawcut edge of track as required to prevent damage to track and allow for Demo all weather surface in D zone, asphalt surface, aggregate, trench train etc. to allow for new Aggregate Base and drainage system to be installed by

BP 32D.

j. North D Zone Demo. BP 31 shall sawcut edge of track as required to demo items as specified in D zone to allow for new storm drainage aggregate base by BP 31.

k. BP 3 Alternate 3 Disregard Alternate 3 as this is provided by BP 13.

End of Clarification https://protect.checkpoint.com/v2/r01/___http:/www.rockford.com___.YzJ1OnJvY2tmb3JkMTpjOm9mZmljZTM2NV9lbWFpbHNfYXR0YWNobWVudDo5M2QwMjI2MWQxMmRhNzdlYmEzMzkzODgzYTMyNTAwMDo3OmE1OGI6NWEyYTg3YTcwZmI4OWM3M2VlNmEzNjAzOGZhZGM4YzE5NDE3ODNlY2Q3Y2YwOWZiNGUzYWY2Y2NiZmQ2YjRmOTpwOlQ6Rg